Availity Check for Customers and materials with useful life

Hello All,
Can anyone help me, about this issue . What i need to do to procedure to check availability for material and customers ?
I have a problem , all material have a expired date ( i work in a drink company) , and for this all products have a date limit for delivery (period of useful product life) , but this date it can be changed for each customer.
We have customer with one moth and another customer with differents (period of useful product life), and a priority for each customer.
Well when i check availability of material i need to have a control of this period of useful product life, in order to assign confirmed quantity for each customer.
Thanks
Sebas

Yes products use batch funcionality and i have a new table for customer / product with useful product life.
For exemple :
Product XXX with 365 days for Total Shelf Life .
Have two customers with differents % of Total Shelf Life, customer AAA 33% and customer BBB 50%.
Result:
Customer AAA for product XXX need 120 days for availity Check
Customer BBB for product XXX need 183 days for availity Check
Where i could introduce search strategy for each customer ?
Do you know user exit i need to change for availity check , in order to introduce my new table.
Thanks a lot, for your help.
Sebas

Similar Messages

  • Material Availability check for Networks and Projects

    Hi,
    How do I get the material availability for a Network or Project. I am currently using fm IBAPI_ALM_ORDER_ATP_CHECK but the result are not satisfying.
    Do let me know if there's another way for it.

    The BAPI that I am using .. internally it uses the FM that you have suggested. The issue is that I want to check ATP for a bulk of materials and using this BAPI slows down the execution.

  • Availability check for Make to stock and Make to Order

    Dear All,
    Client is selling   Make to stock and make to Order material.
    How and what settings need to do for Avaialbility check.or we can use standard one.
    I hope in case of Make to Order availability check may not happen.
    Please correct me.
    Thanks in advance.
    Regards,
    Shrikant

    hi,
    yes for make to order we dont have AvChk.  for make to stock items u need to follow the
    below configuration.
    Availability check
    1. Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date. For this purpose the system takes into account pre-delivery activities such as scheduling for picking or packing times and the time taken to produce or obtain the material. It also performs several background functions such as Backorder processing, rescheduling and ATP quantities.
    2. Backorder processing: processing of a sales order that has not been fully confirmed or not confirmed at a certain delivery date.
    3. Rescheduling: is a proposal of how u2013 confirmed quantities already assigned to a sales order can be reassigned to other sales orders that have a higher priority.
    4. Available to promise (ATP): is a process of checking the available quantities of a material. The ATP quantity consists of warehouse stock + planned receipts (incoming stock) u2013 planned issues (outgoing stock). to examine stock on hand (CO09) proceed to logistics u2013 sales & distribution u2013 sales u2013 environment u2013 availability overview.
    5. Replenishment lead time (RLT): is the time taken for the material to become available either internally (in house production) or externally (from a vendor). The most important things to consider during an external procurement are purchasing and MRP 2 (procurement) views of MMR where the processing time for purchasing, planned delivery time and goods receipt processing time are taken into account. On the other hand internal procurement is based on in house production time (MRP 2 view) goods receipt processing time or alternatively RLT time, which is found on MRP 3 view.
    6. RLT (Replenishment Lead Time) is the time taken for the material to become available. RLT is only used when doing an ATP check (Available To Promise). The value of RLT for a material is specified on material master record.
    7. There are three types of availability checks u2013
    Check on basis of ATP quantities.
    Check against product allocation.
    Check against planning.
    Configuring Availability check through Checking Groups u2013
    1. The checking group + checking rule determine how the availability check is to be performed.
    2. The checking group determines whether and how the system checks the stock availability and generates requirements for material planning. The checking group defines what type of requirements will be passed on i.e. summarized requirements (daily/weekly) or individual requirements for each sales order.
    3. The checking rule applies to how the availability check is to be carried out at the transaction level. Note that you must define checking rules for each individual application such as for production orders for example. In Sales and Distribution, the checking rule is specified internally within the system and cannot be changed.
    4. The checking rule, in conjunction with the checking group, determines the scope of the availability check for every business operation; that is, which stocks, receipts and issues are to be included in the availability check and whether the check is to be carried out with or without the replenishment lead time.
    5. Briefly explaining the above u2013 checking group determines which type of requirement to be passed on to MRP whether it be individual or summarized and checking rule which is at the transaction level and can be configured independently for each application module, determines which stocks, receipts and issues to be taken into account. For performing an availability check checking group has to work in conjunction with checking rule.
    6. Advantages of individual processing over summarized processing u2013
    Backorder processing is possible.
    You can access (MD04) order, line and schedule line individually which gives a greater control on available stock and requirements placed on stock.
    The system automatically uses individual requirements in case of special stock items.
    7. Required data for the Availability check to be carried out u2013
    The Availability check must be switched on at the requirement class level.
    The Availability check must be set at the schedule line level.
    A requirements type must exist by which the requirements class can be found.
    A plant must be defined in the sales order for each schedule line item (in other words plant must be defined for every material in MMR).
    A checking group must be defined in the material master record in the MRP3 screen in the availability check field.
    8. Configuring Availability check and defining Checking Groups u2013
    Checking groups are introduced into the sales order based on the setting in the material master record.
    SAP standard checking groups are 01 u2013 summarized requirements and 02 u2013 individual requirements or you can create your own by copying the standard ones.
    Total sales and total deliveries columns are there to configure a checking rule to sum up requirements to post to MRP either individually or by day or week.
    Block quantity required can be set if you want several users to be able to process the material simultaneously in different transactions without blocking each other.
    The no check indicator is CHECKED when you DO NOT want the system to carry out ATP check.
    9. Defining material block for other users u2013 the block check box is an indicator that enables you to block material master records of a particular material during the availability check and restrict other users from accessing same master record and reserve the material. If the block is not set, two users can confirm the same material at the same time for two different orders, not knowing if the stock is available or not. If you select this field, the material is blocked during the availability check and other users cannot: a) Make changes in the material master record. b) Create purchase orders for the material. C) Create orders for the material.
    10. Defining default values for checking groups - Checking groups are introduced into the sales order based on the setting in the material master record.
    However if there is no entry present in the material master record for the checking group, a default value can be set here, depending on material type and plant.
    This default value will be used by the system depending on the material type mentioned in MMR and plant in sales order.
    If an entry exists, this default value is over written by MMR.
    11. Controlling Availability Check u2013 in this section, you tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check in addition to whether or not to consider the replenishment lead time.
    12. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sales and distribution transaction.
    13. These settings carry out control both for sales order and delivery as well. This is due to the fact that you may want to include specific stock or incoming stock for the sales order, yet at the time of the delivery only include physical stock on hand waiting to be shipped.
    14. It is possible to indicate to the system that you would like the availability check NOT TO CHECK the stock at the storage location level. This indicator is used to set the scope of the availability check.
    15. It is used to switch off the check at storage location level. You create a reservation for a particular storage location. However, the scope of the availability check is set in such a way as to exclude the storage location. In this case, the system carries out the check at plant level only and does not take the storage location into account that is specified in the reservation.
    16. Should you not want the system to automatically check RLT, you may indicate so here. RLT is the time taken for a material to become available. It is only used when doing an ATP check and is taken from MMR.
    17. Defining the elements in the availability check entirely depends on the business needs, but a few tips are given under u2013
    When controlling the Availability check at the time of the sales order, a purchase requisition does not necessarily indicate by it is going to come into the plant.
    A shipping notification on the other hand - a confirmed purchase order u2013 is a good indicator of receiving stock on a specified date.
    It is always recommended not to select the shipping notifications for the delivery requirements type as you may not actually receive the stock into plant or warehouse for which you are creating a delivery.
    regards
    anand

  • Need to do availability check for multiple materials (in bulk)

    HI Friends,
    I need to do availability check for multiple materials. Currently i am using function module AVAILABILITY_CHECK within a loop.For my purpose I could find this particular FM as well as BAPI "BAPI_MATERIAL_AVAILABILITY" however both of this options can not be used for more then one materials at a time.
    I want to take out the loop from the code and get multiple materials be ckecked at once for availability. If AVAILABILTY_CHECK FM can be used for multiple materials, please post the usage.
    Any other options are there?
    Any help or clue would be appreciated.
    Thanks in advance.

    Use the BAPI.  Even if such a function existed, it would still perform the relevant internal logic required for checking by material, so you wouldn't gain anything.

  • Why yahoo/gmail retrieval and facebook app so so slow when in WIFI. But using the internet to check for emails and facebook is fast using the same WIFI connection??

    Why yahoo/gmail retrieval and facebook app so so slow when in WIFI. But using the internet to check for emails and facebook is fast using the same WIFI connection??

    Hi SandyS_VZW,
    Yes tried resetting the wifi connection and problem still persist.
    Here it is...to make it clear. Connected thru the same wifi at home...
    -> emails (yahoo/gmail) and facebook WEBSITES are working fine and fast when using/accessing thru a browser (chrome/samsung browser) - no problem with this.
    -> emails (yahoo/gmail) and facebook APP is soooooo sloooww (thru the App). Slow I mean comparing it to using their browser/websites... news feeds/emails refreshing so quickly but not when using the APP installed in Samsung Galaxy Note 4. Slow like - It will take around 5-10minutes just to get your emails and news feed refreshed.
    THIS HAPPENS ONLY WHEN CONNECTED THRU A WIFI which has a speed of 10-20mb. It is not happening when connected to the network data/plan.
    My wife has the same Samsung Galaxy Note 4 (coming from different provider at&t) - same setup (emails, fb app), same wifi connection, but she's not experiencing anything like it.
    Not sure why, I dont want to believe that while connected to a WIFI, Verizon is restricting anything and ******* me off to make me switch to my data plan connection everytime - which is Unfair!
    Was there a known issue similar about this case?
    thanks,

  • How to check for a function module with its description and functionality

    Hi all,
    How to check for a function module,with its description and its functionality,in detail how can I know the purpose of a particular function module,how to search for a function module which suits my requirement .

    Hi,
    You can search a FM of your requirement by putting in the Key words and searching for a FM. Like * KEYWORD * and then pressing F4.
    Say for example you need to search something regarding converstion.
    Search for * CONVERT * and press F4.
    If there is something specfic like converting date to something you can give
    DATE * CONVERT *
    OR
    CONVERT * DATE *  and press F4.
    Once you narrow down your search you will have a Function module documentation inside the Function module. Please note that all the FMs willl not have documentation.
    Regards,
    Pramod

  • Duplicates.  I use iTunes match.  When I run exact duplicates, I get duplicates that say uploaded for one and uploaded with a cloud for the other.  Which one do I delete?

    Duplicates.  I use iTunes match.  Two questions:
    When I run exact duplicates on the library on my Mac Air, I get duplicates that say uploaded for one and uploaded with a cloud for the other.  Which one do I delete?
    Some of the duplicates say matched and matched with a cloud.  Same question - which one should I delete?

    I'm not sure I understand the question.
    First I would update your iTunes match.  iTunes match will tell you what is duplicates and then you can just delete them from the library. 
    Second, the course in a situation like this is to delete ONE duplicate and see what happens.  Make sure you have that song backed up somewhere just incase it deletes it completely.  But usually I'd delete one and then see if it deletes both or just the one you pressed. 
    Thirdly, update iTunes match.  It usually does a good job of locating actual duplicates.

  • I have downloaded MAMP for Mac and want to use it for working with Wordpress. I had mysql installed before this and would like to uninstall it and use MAMP. It was easy to turn off Apache and PHP but don't know how to uninstall mysql. Please help!!

    I have downloaded MAMP for Mac and want to use it for working with Wordpress. I'm on an Imac with Maverick OS 10.9. I had mysql installed before this and would like to uninstall it and use MAMP. It was easy to turn off Apache and PHP but don't know how to uninstall mysql. Please help!!

    It depends on how you installed it. You have to shutdown the MySQL service first. If you used the standard, but obsolete Startup Item, you can do that with the Startup Item. If you created a launchd script, you can do it with launchctl. Once MySQL is no longer running, you can delete the Startup Item or launchd script and the rest of MySQL.

  • Can i use The iPod shuffle cable (3rd and 4th generation) comes with a 45 mm USB cable for syncing and charging. with 2nd generation ipod?

    can i use The iPod shuffle cable (3rd and 4th generation) comes with a 45 mm USB cable for syncing and charging. with 2nd generation ipod?

    thanks

  • I have installed itunes 10.7 several times.  All goes well.  After reboot, I go into itunes and check for updates and it says I need to download the update 10.7! (And so cant sync with my Iphone)

    I have installed itunes 10.7 several times, all goes well. After reeboot, I go to check for updates and it still wants to update to version 10.7! I cant sync to my iphone4 because I get an error message saying I need version 10.6.3 or later. Help

    Thank you for getting me started on the track by mentioning "Revo" Uninstaller.  The results of "Revo" spoke volumns on why a successful install of ITunes is so difficult to achieve.  It is the evil "BONJOUR".
    I then tripped upon the following site by Apple and the detailed directions (I read, printed, re-read and followed the instructions.  It was intense) brought a successful ITunes, Quick Time and the lovely Bonjour home.  Thank you for the start JD42.
    http://support.apple.com/kb/HT1923

  • Material Availability Check for material launched in the future

    This is the requirement;
    We are launching a product in the future. Lets use August 19th as our launch date This means that on August 19th our material can be goods issued. It cannot be shipped before then. There is no loading time etc. so our GI date usually = our material availability date
    Our production & procurement activities are executed allowing us to build our stocks so we have on hand stock of the material. We are receiving customer orders. Availability check is run and it is being confirmed for dates before the GI date (As we have stock in the system). For example, a sales order is created with a requested delivery date = 19th August; Would be acceptable if there was no transit time. But what if there is a route determined with a transit time for 2 days. This brings us to a material availability date of 17th August (And therefore a GI date of 17th August) which is before our product launch date. This needs to be avoided; the earliest material availability date must be 19th August as this will then be the earliest GI date.
    Therefore, the requirement is that availability is not confirmed for a date before our launch date. But is confirmed for the launch date.
    For example, how do Apple launch their products (like iPads)in future dates but entertain customer orders well before the date & then confirm the future dates to end customers? At the time when they receive the orders from end customers, I am sure that they would be holding stock of sufficient iPads for future deliveries.

    There may be more than one way you can fulfill the requirement. First is use of user exit. In enhancement ATP00001 (User exits in the availabity check), you can try using EXIT_SAPLATPC_002 (processing results of actual check). Here you can add logic that if the system date is less than Aug 19th 2011, then propse confirm date (material available date) as 19th of August 2011.
    The second option would be use of Replishment time (RLT) in the material master MRP3 view. You can maintain certains days to match August 19th (of course you need to reduct one day when the days go-by). At the same time in t.code OVZ9, you need to uncheck the box check without RLT for the combination of availability check rule and availabity check group. After August 19th, you can check the box again after removing the RLT time in material master. My preference is to go with first option.
    Regards,

  • Availability check for configurable material.

    Hi,
    We are implementing SAP ECC-6 & facing
    issue during availability check for
    configurable materials.
    I'd like to take an example of
    computer for better understanding.
    Will consider Computer as super BOM and
    following 2 as BOM:-
    BOM-1. a)Monitor b) Cpu c)Key
    Board d)Scroll Mouse e)With
    Mouse Pad.
    BOM_2. a)Monitor b) Cpu c)Key
    Board d)Optical Mouse e)With
    out Mouse Pad.
    But Customer wants A)Monitor B)Cpu c)
    Key Board D)Optical Mouse e) With
    Mouse Pad.
    In the above case System will not show
    %age of Configurable materials
    available & Vice-versa but rather it
    creates requirement for computer and
    it gives availability as the lead time
    maintained in the Material Master of
    the Super Bom.
    Here the busines requirement is that
    it should show %age of configurable
    materials
    available.
    Plz find the attachment for your kind
    reference.
    Kindly guide me to sort out this issue.
    Thanks & Regards,
    Chandru

    Dear Sir,
    Thanks for the guidance/ reply . Still we have some doubts in this:
    As per your instructions, I have created sales order and  did the MRP run for the same.
    I got the planned order, then I have checked the ATP in Planned order change view and got the following results.
    No. of components checked:   641
    Missing parts:   640
    Overall confirmation date could not be determined 
    But  where I can see the Percentage of Avaialble and percentage of to be produced.
    Please guide me.
    Thanking you
    Regards
    Chandru

  • Availability check for STO?

    Hi,
    While doing Stock transfers order (PO) plant to plant with in the company code, there is no controlling on availability check, though stocks are not available in the supplying plant, while making delivery thro VL10B,  delivery is creating with '0' Qty. This system want to stop the delivery when quantities are not available in the supplying plant.
    The following steps are configured for availability check for STO
    Schedule line Like NN activated for availability, Assigned schedule lines to item category like NLN and determined rule for STO document type, plant, Delivery type and checking rule in MM.
    how to control the delivery,  when stock are not available in supplying plant? (Means, when stock are not available in the supplying plant, delivery creation should stop through VL10B)
    Is there any more configuration is required, pl guide.
    Rao
    Edited by: R Rao on Aug 22, 2008 1:42 PM
    Edited by: R Rao on Aug 29, 2008 6:03 PM

    Alexandro,
    During delivery creation, the system performs an availability check (ATP).  You can assign the Delivery notice type for a stock transfer order delivery notice at OMGN.  The ATP for DN will be the standard ATP rules for SD delivery notices (checking rule B).You can determine which elements are used for availability checking in OVZ9. 
    To meet your goals, I suggest you use:
    Check w/o replenishment lead time ticked
    Include deliveries ticked.
    Optionally, according to your company's policies
    Include safety stock ticked
    Include quality inspection stock ticked
    Everything else unticked.
    Regards,
    DB49

  • Sales Order - Availability check for components

    Hi All,
    I have 2 parts to my qns.
    1. When a sales order is created for a component, with a req date, the system checks & informs if the mtl can be provided on the req date & if not proposes a new date - May i know which checking rule is used & also what all does the system check for?
    2. A component say 'ABC' is used internally for production purpose & also sold as a spare part. A sales order for this component is created with a req dt. say 1.3.2008. The system commits the stock to the sales order. A production order is created later with a req. dt for 'ABC' say 1.2.2008. So when i carry out a collective availability check for the plant with ATP checking rule & with availability check reset indicator ticked, i believe the system should reset the commitments made to the sales order & assign the stock to the production order, but it is not happening so. Once the commitment is made to the sales order, it is not resetting, how can i change this behaviour?
    Await inputs.
    Anyone to help on this?
    Edited by: Vivek on Jan 15, 2008 10:56 AM

    As we know, availability check is controlled by the combination of checking rule and the checking grp.
    U can see this at OVZ9 Screen. checking grp is proposed from material master Sales org 2 view or MRP2 views.
    In the OVZ9 screen itself, we are setting what are all the stocks the system has to include when doing availability check.
    The checking rule specifies the scope of the availability check for the respective transactions in sales and distribution by specifying precisely which stocks, receipt and issue elements should be taken into account during the availability check.
    Every checking rule is allocated to a checking group: together these two elements determine the final inspection requirements. In addition, the checking rule includes a specification whether or not an availability check should take into account the replenishment lead time.
    Currently, the checking rule is predefined in SD.
    while answering to the second question, i think the system carries out the availability check again at the time of delivery, provided u need to maintain the availabililty check indicator at req. class level.
    Hope i answers.
    Reward points if it is useful.

  • I have Photoshop CS6 Extended Students and Teachers Edition.  When I go into the Filter/Oil paint and try to use Oil paint a notice comes up "This feature requires graphics processor acceleration.  Please check Performance Preferences and verify that "Use

    I have Photoshop CS6 Extended Students and Teachers Edition.  when I go into the Filter/Oil paint and try to use Oil Paint a notice comes up "This feature requires graphics processor acceleration.  Please Check Performance Preferences and verify that "Use Graphics Processor" is enabled.  When I go into Performance Preferences I get a notice "No GPU available with Photoshop Standard.  Is there any way I can add this feature to my Photoshop either by purchasing an addition or downloading something?

    Does you display adapter have a supported  GPU with at least 512MB of Vram? And do you have the latest device drivers install with Open GL support.  Use CS6 menu Help>System Info... use its copy button and paste the information in here.

Maybe you are looking for

  • A/P invoice line comments (or ref) to Journal Entry

    Scenario: a/p invoice, service type is created. Several lines, but may post to same GL account. Description field contains description that should also be visible on Journal entry, so on screen GL reports show the descriptive texts. Reference is by d

  • Video signaling problem caused by 1.9, 2.0 BIOS (pointing out a BIOS problem)

    Hi, i have a problem with the video signal. At random times when i boot up my computer, the computer would power up but there is no signal to the monitor. there is no hdd activity (via the hdd led) and nothing seems to be happening just that the fans

  • Fix for Missing Audio Device in WinXP S

    My sound card disappeared from the Sounds and Audio Devices Properties panel. I tried cleansweeping and reinstalling to no effect. I could watch my card disappear from the panel as Windows went through startup after I reinstalled it. My card , a Soun

  • DC not showing under "Network" in Windows Explorer of member server

    Hello Community     After spending an endless amount of time trying to create SharePoint Server farm and seeing an error message stating that I could not connect to the master, I found that that was not the problem at all.     The farm has Windows 20

  • Exporting and Importing

    Hi All, I want to copy group of programs, screens and tables from one system to other wchich do not have in Network ( Independent systems). Is there any way to export all these and import to other system? Thanks in advance. Regards, Venkanna