Avoid Std. Cost Estimate every time the Routing is changed.
Hi All,
I have a situation where clinet needs to claculate the standard cost every time the routing is chnaged. We wish to chnage the setting in sucha a way that Standard cost needs not be claculated every time in material master once routing chnage is done. Just in cost collector alone the cost rerun needs to done.
Setting to be done in REM profile. Issue resolved my self.
Similar Messages
-
Is a new SI_ID created every time the InfoObject data changes in the CMS?
I'm trying to create a process that records the FRS file path and file name of every InfoObject created in the CMS and associate it with a timestamp and a friendly report name.
As this process runs the big question is does it need to crawl the entire CMS every time looking for changes in previously created InfoObjects or is a new SI_ID, and by extension new file path and name, created every time the InfoObject data changes in the CMS?
I'm hoping it is the latter. Obviously the actual SI_ID creation behavior changes the code quite a bit. Any help would be appreciated.
Thanks.Just want to make sure we're on the same page here.
If a User takes an infoObject and updates the file associated with an infoObject, then neither the SI_ID or the SI_CUID will change. Any changes to properties of the infoObject won't trigger changes to its SI_ID or SI_CUID value.
However, SI_UPDATE_TS will change with modification of the InfoObject:
http://devlibrary.businessobjects.com/businessobjectsxir2/en/en/BOE_SDK/boesdk_dotNet_doc/doc/boesdk_net_doc/html/QueryLanguageReference177.html
So that may be what you're interested in. Note that SI_UPDATE_TS is an indexed property in the CMS repository database, so a query that filters on SI_UPDATE_TS (such as SI_UPDATE_TS > '2006.02.02') wouldn't be too slow.
One danger to your scheme - it'll pick up updates to the InfoObject, but not to related InfoObjects (such as Web Intelligence - Universe relationships). Working out all the necessary relationships may be daunting.
Sincerely,
Ted Ueda -
We cannot do std cost estimate every month in ML
HI
Can we do std cost estimate whenever required with changed price,
can i change the price in material master -how
regards
sowmyaHi,
We can do std cost estimate once in a month. If we want to do multiple times in a month we should reorganise the material cost estimate using CKR1.
We can change the material master price for a material with out standard cost estimate using MR21.
If standard cost estimate exist, use CKR1, the use MR21.
Regards,
Rijo Paul -
Illustrator CS5 crashes every time the destination is changed during save & save as
I have a new Macbook Pro Retina with OS X Yosemite, version 10.10.1.
Every time I try to change the destination folder for a file during "Save" or "Save As" in Illustrator CS5 the program crashes & I get an extensive error message. I have tried uninstalling & reinstalling Illustrator 3 times but the issue persists. I have tried installing it both with the original Creative Suite disk I purchased in 2010 and with the download from Adobe's website, and neither made a difference. I have not experienced any problems with the Photoshop or InDesign programs from the same Creative Suite package.
Please advise on how to fix this issue.
Beginning of Error Report (there's much more but I wasn't sure how useful it would be):
Process: Adobe Illustrator [397]
Path: /Applications/Adobe Illustrator CS5/Adobe Illustrator.app/Contents/MacOS/Adobe Illustrator
Identifier: com.adobe.illustrator
Version: 399 (15.0.2)
Code Type: X86 (Native)
Parent Process: ??? [1]
Responsible: Adobe Illustrator [397]
User ID: 502
Date/Time: 2015-01-04 02:35:58.099 -0500
OS Version: Mac OS X 10.10.1 (14B25)
Report Version: 11
Anonymous UUID: 7FA53558-D47E-CB6A-7CC3-8C017ACE9B7F
Sleep/Wake UUID: F663268C-89E9-4BF8-9FB9-105DB01F6612
Time Awake Since Boot: 850 seconds
Time Since Wake: 190 seconds
Crashed Thread: 0 Dispatch queue: com.apple.main-thread
Exception Type: EXC_BAD_ACCESS (SIGBUS)
Exception Codes: KERN_PROTECTION_FAILURE at 0x0000000016752b8c
VM Regions Near 0x16752b8c:
__IMPORT 000000001674b000-000000001674c000 [ 4K] rwx/rwx SM=COW /Applications/Adobe Illustrator CS5/Adobe Illustrator.app/Contents/Frameworks/adobe_caps.framework/Versions/A/adobe_caps
--> __LINKEDIT 000000001674c000-0000000016755000 [ 36K] r--/rwx SM=COW /Applications/Adobe Illustrator CS5/Adobe Illustrator.app/Contents/Frameworks/adobe_caps.framework/Versions/A/adobe_caps
MALLOC_LARGE 0000000016755000-00000000167bb000 [ 408K] rw-/rwx SM=PRV
Thread 0 Crashed:: Dispatch queue: com.apple.main-thread
0 com.apple.HIToolbox 0x09504025 HIStandardMenuViewsame here, new computer today and I got the exact same problem. I wonder if Adobe would do something about it, or just asking us to update and pay more to upgrade to CC
-
I have to scroll down every time the webpage reloads and it is a waste of time. Is there any add-on to solve this? I tried Screen Surfer but it sets the size of the whole window and I need to fix the position (the section of the webpage) where it appears after reloading due to a change. Thanks
Try posting at the Web Development / Standards Evangelism forum at MozillaZine. The helpers over there are more knowledgeable about web page development issues with Firefox. <br />
http://forums.mozillazine.org/viewforum.php?f=25 <br />
You'll need to register and login to be able to post in that forum. -
Dear Experts,
We have ROH, HALB & ZMAT as materials. The question is with respect std. cost estimate.
The cost estimate are run for HALB & ZMAT items created on day to day basis. However cost estimate is executed for all the HALB & ZMAT on alternate months.
I would lke to know the best practice or industry standard on this issue on the frequency of estimates. I appreciate any other points rellated to this point.
Thanks in advance.
T.S.Shankarhi read the following basics of CO-PC
1)A material cost estimate used to calculate the standard price in the
material master record.
2)The cost estimate must be executed with a costing variant that updates
the material master, and the cost estimate must be released.
3)Forms the basis for profit planning or product costing where the focus
is on determining the variances.
4)Typicall, a standard cost estimate is created for each product at the
beginning of the fiscal year or new season or BEGINING OF THE PERIOD / MONTH.
5)Standard cost estimates establish standard prices for semifinished
products and finished products. The costs calculated in standard cost
estimates are used to valuate materials with standard price control.
A costing type that calculates the cost of goods manufactured for a
product during the course of a planning period.
It differs from the standard cost estimate in that it uses the quantity
structure that has changed during the planning period as the basis for
calculating costs. ( WHEN EVR YOUR PLANNING WILL BE CHANGED )
CURRENT COST ESTIMATE
1)A cost estimate that can be created at any time to valuate the current
quantity structure with the current prices.
This cost estimate serves the following purposes:
A) You can compare its results with the results of the standard cost
estimate to support decision-making in production.
B)You can transfer the results of this cost estimate to the material
master and use them to valuate the goods receipt when working with
materials that use the moving average price.
Regards
Mala K Reddy -
How to avoid booking of stock every time, when ever I make Delivery
Hello friends,
Need your help again
1) When I am making the delivery, at the time of PGI, system asks for sale order stock.
I donu2019t want to book stock of material against sales order, whenever I make delivery.
How can I avoid booking of stock every time, when ever I make Delivery?
2) Can any one tell how we can relate Moment Type with Delivery Type., and how system recognize which Movement type is to be used for Good Issue and Good Receipt..
I will be thankful if I may get any response.
Thanks
SiddharthHi
At the time of PGI the system asks for sales order stocks?
This is picked by the system because of the special stock indicator E in the VOV7 settings of your sales order item category
If MTO by default the item category will have this special stock indicator E which is correct
I think you are doing MTS only but your item category is marked with specialstock indicator as E
Remove this from VOV7 and create a fresh order cycle and see
Now it will not ask for special stock at the time of PGI
Dont test it with existing order test it new order cycle after changes in VOV7
Movement type as all said comes from your schedule line category only in VOV6
Regards
Raja -
How to include ED in Std.cost estimate
Dear all
My client want to add ED to Std. cost estimate in receiving plant(Depot). I have acheived this by way of additive cost estimate manually. but my client wants that system could pick up the Ed from SD where ED is maintained SKU wise.
At recieving plant(Depot) the std.cost estimate is like this
Std cost from production Plant
ED from SD
Freight ( certain % on ( St.cost+ED)
Std cost at depot
Is it possible to get above scenerio?
Pl help me out
Regards
SPSankaramHI
Standard formula for workcenter costing is SAP008 , you have to specify in the costing and capacity tab , whereas for scheduling specify SAP004
then try creating the order
regards
thyagarajan -
No standard cost estimate found for the material
Hi,
When we are trying to generate the bill systems throws the error as "no statandard cost estimate found" whereas the material is a kmat material.
Actually as per the requirement we should not Run standard cost estimate for any material,we will update the standard price in MR21
What are the settings that i need to do to avoid the above error message while doing billing?
Following error msg is appearing:-
No standard cost estimate could be found for material "300000"
Message no. K/834
Diagnosis
In Profitability Analysis, an attempt was made while valuating with material costing to read for material "123456" a standard cost estimate released on posting date "02.10.2008".
The system has discovered that there are no error-free standard cost estimates released in plant "BP01" on the specific date "02.10.2008" for material "123456".
The material cost estimate is accessed according to the CO-PA Customizing settings for costing key "YG1" under Define Access to Material Costing.
Display Cost Estimate for Material
Display Material Cost Estimate without Quantity Structure
System Response
It is not possible to process the document further.
Procedure
Check your system settings.
Thanks
KishoreRemove the Costing keys assignment in the step "assign costing keys to any
characteristics" in COPA Configuration settings. -
Since upgrading to ios6, all the family's apple devices (new ipad, 2 iphone4 & itouch) are having difficulty reconnecting to the home hub wifi network. I.e, every time the lock screen comes on, the wifi connection is lost when you reopen the device and we have to reconnect through settings. This appears to be an ios6 software issue.
Is there a solution to this wifi connection issue or do we wait for a software fix?
I'd hate to think Apple is going down the Microsoft path, of passing untested software onto the user. What ever happened to Regression Testing, to ensure the existing functionality remains intact?
I bought into the Apple dream, because it was intuitive, reliable & enjoyable to use, all the things that Microsoft windows isn't.
Other issues we are experiencing are, Games are stuttering and the kids really miss the old YouTube app.
Please Mr Browett, sort these issues out.iOS 6 Wifi Problems/Fixes
Fix For iOS 6 WiFi Problems?
http://tabletcrunch.com/2012/09/27/fix-ios-6-wifi-problems/
Did iOS 6 Screw Your Wi-Fi? Here’s How to Fix It
http://gizmodo.com/5944761/does-ios-6-have-a-wi+fi-bug
How To Fix Wi-Fi Connectivity Issue After Upgrading To iOS 6
http://www.iphonehacks.com/2012/09/fix-wi-fi-connectivity-issue-after-upgrading- to-ios-6.html
iOS 6 iPad 3 wi-fi "connection fix" for netgear router
http://www.youtube.com/watch?v=XsWS4ha-dn0
Apple's iOS 6 Wi-Fi problems
http://www.zdnet.com/apples-ios-6-wi-fi-problems-linger-on-7000004799/
~~~~~~~~~~~~~~~~~~~~~~~
Look at iOS Troubleshooting Wi-Fi networks and connections http://support.apple.com/kb/TS1398
iPad: Issues connecting to Wi-Fi networks http://support.apple.com/kb/ts3304
WiFi Connecting/Troubleshooting
http://www.apple.com/support/ipad/wifi/
How to Fix: My iPad Won't Connect to WiFi
http://ipad.about.com/od/iPad_Troubleshooting/ss/How-To-Fix-My-Ipad-Wont-Connect -To-Wi-Fi.htm
iOS: Connecting to the Internet
http://support.apple.com/kb/HT1695
iOS: Recommended settings for Wi-Fi routers and access points http://support.apple.com/kb/HT4199
Additional things to try.
Try this first. Turn Off your iPad. Then turn Off (disconnect power cord for 30 seconds or longer) the wireless router & then back On. Now boot your iPad. Hopefully it will see the WiFi.
Go to Settings>Wi-Fi and turn Off. Then while at Settings>Wi-Fi, turn back On and chose a Network.
Change the channel on your wireless router (Auto or Channel 6 is best). Instructions at http://macintoshhowto.com/advanced/how-to-get-a-good-range-on-your-wireless-netw ork.html
Another thing to try - Go into your router security settings and change from WEP to WPA with AES.
How to Quickly Fix iPad 3 Wi-Fi Reception Problems
http://osxdaily.com/2012/03/21/fix-new-ipad-3-wi-fi-reception-problems/
If none of the above suggestions work, look at this link.
iPad Wi-Fi Problems: Comprehensive List of Fixes
http://appletoolbox.com/2010/04/ipad-wi-fi-problems-comprehensive-list-of-fixes/
Fix iPad Wifi Connection and Signal Issues http://www.youtube.com/watch?v=uwWtIG5jUxE
Fix Slow WiFi Issue https://discussions.apple.com/thread/2398063?start=60&tstart=0
Unable to Connect After iOS Update - saw this solution on another post.
https://discussions.apple.com/thread/4010130
Note - When troubleshooting wifi connection problems, don't hold your iPad by hand. There have been a few reports that holding the iPad by hand, seems to attenuate the wifi signal.
~~~~~~~~~~~~~~~
If any of the above solutions work, please post back what solved your problem. It will help others with the same problem.
~~~~~~~~~~~~~~~~
YouTube is not now part of iOS 6.
However, you can go to the App Store and do a search using YouTube. You can download several YouTube apps: YouTube (for the iPhone, a IPad app is in work), several users like Jasmine and YouPlayer.
Cheers, Tom -
FG Valuation basis - Std Cost estimate or Net sale value whichever is less
Dear SAP Experts,
Query 1 -
Valuation of Finished goods is done on basis of standard cost estimate (CK24) or Net sale value whichever is less
*Net sale value u2013 Net sales ( Sales value minus Sales deductions)
Eg : Std cost estimate gives FG price as $100, whereas Net sale value price of FG $80,
now the client wants FG values should be at $80
Is there any standard way, wherein SAP can capture whichever is less i.e standard cost estimate vs Net Sale Value
Pl let us know the options and which options would be ideal for query 1
Query 2 u2013 Can we use CRK1 and MR21 to manually change FG price whenever Net sale value is less than std cost estmate price?
u2022 In case the market value is less than the std cost estimate (CK11n) ,then Is this the approach to manually value FG price using CRK1 & MR21.
u2022 What could be the impacts if we follow this approach
For Eg: Impact on prev months WIP, Scrap, stock returns etc
u2022 We simulated CRK1 & MR21 and MR21 entries are posted successfully, however following below warning is the message is showed when CRK1 is executed
Note u2013 Material Ledger is not active
Warning Message
Deleting current standard cost estimates can cause inconsistencies. Your comments please
Message no. CK669
Diagnosis
u2022 If you delete a current standard cost estimate, the fields for the cost estimate are set to zero in the material master record. If you use the material ledger, the standard prices in the material ledger master data are also deleted when you delete the current standard cost estimate. The material master record for the material thus does no longer contains a current standard price from a standard cost estimate.
u2022 If you delete an active standard cost estimate, you can no longer determine scrap, work in process and variations for previous periods.
u2022 In certain countries, it is a legal requirement to maintain records of standard pricing. Therefore, you should check whether you are obliged by law to keep records of your standard cost estimates. Please also contact the relevant accounting and inventory management departments.Dear,
Query 1;
The FG or SFG will be valuated at Standard Cost there is no provision to enter Net sale value
Query 2:
Do not user CKR1 to delete Cost Estimate because it can bring lot of Descripenceies in CO, SAP do not recommend the same.
You can run the revaluation at the month end or revise your activity rates so that you standard price will be change accordingly and your inventory will be re valuated.
Hope it is clear, it not then please revert.
Br,Vivek -
Lightroom crashes every time I try to change the font color of my identity plate
I use the LRB portfolio plugin to create my website. Every time I try to change the color of my identity plate, lightroom crashes immediately. I can change the font and size without the problem, only a color change causes the crash. I tried to trash the plugin, but it still behaved the same way. Can anyone help me with this problem?
Hi Sean,
thanks for answering. No, it crashes anyway. I tried changing the identity plate color in all different modules. I was able to change it once when I had just bought a new computer and installed Lightroom, but now I can't. I wonder if there are any cache files or anything causing this. Unfortunately I don't know enough about this to fix it myself. I wondered whether LRB is causing a problem simply by having it installed, but as I said, after I removed it from the Web Galleries folder, the problem still occurred. Is there any way to recreate the identity plate in Photoshop (same font and size etc.) and reimport it into Lightroom? I need to finish my website and my name is sol light, it is barely legible. Any fix or workaround would be appreciated. -
I have forgotten my password and my iphone is disabled. I have tried resetting it but every time the time is up and I think it will work, it says "cant connect to iphone because password is on" how do i reset my iphone 5?
See Here > http://support.apple.com/kb/HT1808
You may need to try this More than Once... Be sure to Follow ALL the Steps...
After you have Recovered your Device...
Re-Sync your Content or Restore from the most recent Backup...
Restore from Backup > http://support.apple.com/kb/ht1766 -
Hi, i'd like to make quite a simple website where the main text in the centre of the page changes every time the user refreshes the page in their browser. I assume i'll have to make one master, and multiple pages that are all the same except for the changes in the text, but i'm not sure how to make it so that every refresh directs to a different page and not just the home page? Is this even possible in Muse?
This is an example of what i'm going for: :: procatinator ::
Thanks!You can't do it with Muse alone. Would probably be fairly simple to do with a bit of Javascript. Check the widget directory as it is possible someone has made a widget for random content. If not, maybe I will make one this weekend. ;-)
-
Incorrect assignment of cost estimate number to the material key
Hi,
While doing GR for a particular PO we are getting error msg that "Incorrect assignment of cost estimate number to the material key"
First we thought that this error might be missing of standard prices for materials. Even though creation of standard prices has not solved the problem.Could you please explain me clearly
1) what are the reasons for this error.
2)what is the soltuion for this?
Thanks in adavance
regds
ramachandraHi,
I assume that Material Ledger is active, isn't it?
Message C+451 is usually caused if there are some entries in ML without any entry in the MM tables (MBEW, QBEW, EBEW).
These inconsistencies can be identified with the help of program MLHELP_CHECK_MULTIPLE_CKMLHD. Correction can always and only be done by SAP Support. So if this report shows inconsistencies, you should create a message for component CO-PC-ACT.
Regards,
Antje
Maybe you are looking for
-
How do I save an emailed photo to iPhoto
When I select the option to "Add to iPhoto" in Mail, nothing happens. Am I missing something?
-
Can I make and gift a playlist without already owning the songs myself?
I am aware that I can gift individual songs but I want to make a playlist for someone and gift the whole thing to them. I believe you can make a playlist in your iTunes library and gift that but I don't already own all of the songs I want to gift. An
-
Hi all. I'm starting to investigate the Direct Store Delivery. I have 2 systems (both SAP 6.0). In one of them in the IMG I can see the menu point "Direct Store Delivery" under "Logistics Execution", but in the other one this point doesn't appear. Pl
-
How do I transfer movie rentals from iPad to iTunes library to update to 5? I get a warning message to move them but not sure how?
-
How to create a table which will appear on each sheet
I would like to have one table with some information in the corner of each sheet, but I would like the tables update automatically. Soo.. if I update one of them, rest of them update accordingly. I thought I would be able to put a table in the header