Background job requirement in Systems like MDM
Hi All,
We will like to know periodic background job requirements in systems like MDM. May be rough volume of these jobs (defination) will help.
Do these systems have process chains like BI and APO systems.
Also do these systems have some interfaces with ECC / R/3 systems to transfer the data. (for e.g. in APO we have CIF interface)
Thanks a lot for all your help.
Best Regards,
Vithal
Hi Zanwar,
my apologies for wrong answer.
as per my knowledge, i only know these things.
1. Periodic background job requirements in systems like MDM may be.
Ans: - seeing for MDM server heartbeat
- Import & Syndication server start/stop process
- MDM server performance
- maintaning & cleaning log files
etc.
2. Do these systems have some interfaces with ECC / R/3 systems to transfer the data. (for e.g. in APO we have CIF interface)?
Ans: yes, MDM have Generic extractor (mdm_clnt_extr) and MDMGX to extract data from R3 systems.
- also you can use custom scenarios using XI as middleware
like: Proxies, Idocs.
- Abap apis is another method to integrate R3-MDM.
3. Do these systems have process chains like BI and APO systems?
Ans: i think mdm have but nort sure.
BR,
Alok
Edited by: Alok Sharma on Jan 30, 2008 12:35 PM
Similar Messages
-
Background job requirement in Systems like GRC
Hi All,
We will like to know periodic background job requirements in systems like GRC. May be rough volume of these jobs (defination) will help.
Do these systems have process chains like BI and APO systems.
Also do these systems have some interfaces with ECC / R/3 systems to transfer the data. (for e.g. in APO we have CIF interface)
Thanks a lot for all your help.
Best Regards,
VithalHi all,
I think I have some commun issues with Vithalprasad about scheduling GRC Control Access background jobs (especially the FireFighter jobs) with an external scheduler (we are also using SAP CPS).
I have to specify that for now we are using the internal job scheduler of GRC to schedule both ABAP and Java jobs which are dependant the one from the others.
But we would like to schedule all of them in SAP CPS: it is possible for the ABAP programs, but not (?) for the Java jobs (we have not any NetWeaver Java Scheduler, since we have the 7.0 version of NetWeaver).
Please feel free to ask me precisions.
Have anyone an idea about the way to make this work ?
Thanks for your help,
Regards,
Yi Jiang -
Monitoring of File in FTP Server generated by background job in ECC system
Hi,
There is a background job in ECC system, which generates a file in FTP server. However the issue is that even if the background job is successfully executed, there are instances where the file is not generated in FTP server. Is there any way by which we can monitor such file in FTP Server?
Regards
Nishu ShahHi,
I guess this is not a solman question. Anyway, how do you perform the FTP?? custom code?
Cheers,
Diego. -
Normal Background jobs in Sender System
Hi,
Is that the normal daily operation jobs should be stopped in Sender system during the TDMS migration process.
Will this make TDMS migration process faster?
In our sender system the problem is not the availability of batch process but I am trying to analyze that if we stop the normal daily operational jobs then can the data selection will be faster...
I think Yes !
What are your comments?
thanks !
Regards,
SantoshIt depends what those background jobs are doing. If they are heavily loading the database (reading and writing) it can be faster if you stop them.
Markus -
ORA-20000 error when executing background jobs in BI System
Hello Experts,
We newly installed NW2004s System. Few BI related background jobs are showing Error no: 4 or Error no: 3 in SM50. Also few BI related background jobs are giving error "ORA-20000 occurred when executing SQL statement (parse error offset=0)". Please let me know what does Error 4 or 3 mean in SM50 and how to resolve Ora-20000 error?
ThanksThis may be to do with insufficient authorization for the user (for creating statistics for example). Check OSS note 963760.
-
RSBDCSUB not scheduling background job in PRD system
hi all,
i have created one background program to re-run all error session from sm35 using program RSBDCSUB..
tables: APQI.
data: ls_apqi type apqi,
it_apqi type standard table of apqi .
select * from apqi into table it_apqi
where progid eq 'SAPMHPS0'
and qstate eq 'E'.
LOOP AT IT_APQI INTO LS_APQI.
SUBMIT RSBDCSUB WITH MAPPE EQ LS_APQI-GROUPID
EXPORTING LIST TO MEMORY
AND RETURN.
clear: ls_apqi.
ENDLOOP.
it work fine in development and test syetem....
problem is when i run in production system...i am getting message that "0 session(s) transferred to background processing".but in developement and test system i am getting "1 session(s) transferred to background processing.
what could be the reason?
any athorization issue...hi all,
When i run RSBDCSUB program in foreground.I got this message "submit RSBDCBTC not successfully executed".
i checked system log..
"job SM2345 is invalid"
but test system its working well....
regards,
krishna... -
Background Job - Requirement to download file to application server
Dear All,
If I want to execute one function module in background and the FM is downloading file to application server, the FM is not downloading file to application server. Can you please suggest whether it is possible to download file to application server when it is in background mode? I know it is not possible to download file to presentation server.
Thanks and regards,
AtanuHi,
Yes, it is possible to download a file to application server in background mode. check the path ur sepcifying to the Function module to download the file...in T-Code AL11 check if the path exits.
reward if helpful
Regards,
Rahul -
Background job not automatically poopulating Dependant Demand
Hi Users,
We've recently set up a POS & PA using the DP-BOM selection and characteristics, manually created PPM's and generated CVC's using the BOMS. All of this is set up fine in our SCM 7.0.
The background job has created the forecasts for the ouptput products but NOT the input product.
Now if I call up the parent material, and then choose to show the input products the dependant demand is generated. If I now return to the material with the dependant demand, it now shows the demand from the parent.
Or, if the forecast is genereated interactively, then the dependant demand is poopulated.
Is there an automated method to populate the dependant demand when using background jobs? I would like to think that we don't have to query every sales BOM parent in DP and drill into the input products to load the dependant demand?
Please let me know if there is an easier way to do this as part of the background processing.
Thanks
Edited by: Paul_111 on Mar 31, 2011 4:20 PMHi Andand,
Thanks for your reply and sorry if my post is confusing.
As far as the PPM with imputs A & B, output C - I have this relationship working and calcuclating demand in DP no problems.
If I now add a new PPM combination inpput X, Y and output Z. Create the BOM CVC and TSO so its all set to go. Add to selection profiles and background jobs.
Now, if I run the background job to create the forecast and this runs successfully. Now I check my products.
Z has the forecast generated, X & Z have no dependant demand showing.
The only way I've found that pushes the demand to X & Z is:
- open product Z in demand planning and then choose the option to show input products from the header
OR - from demand planning, select the univariate forecast to run interactively.
My issue:
The background job (if run alone) does not push the forecast on Z to X & Y.
And if I show the input products or create forecast (as bove) the dependat demand is shown on X & Y.
This is going to be a slow process if we have to do this everytime we run the backgound job.
What am I missing when running the background job? -
Background job scheduling problem in APO
Hi fellow SDNers,
i am going through this peculiar problem of background job scheduling:
scenario is like , i have an CSV (excel file) in aplication server which would load data into the infosource, which i have scheduled to run in backhround (in infopackage) ,after event is triggered (option in scheduling tab of infopackage...THE SCHEDULING OPTIONS)
now everything seems to be fine.. but the data is not getting loaded...?? could u lease help me out..how to load data from excel file (in background), after an event gets triggered.
thanks in advance,
Rohanhi Alexander,
i am triggering the event from BP_EVENT_RAISE FM in APO by passing the event id... this would automaitically raise the event...just like sm64
Thanks
Rohan -
Scheduling Background Jobs at OS level
Hi all,
How to schedule Background jobs at operating system level.
Thanks
vijayHi,
Create a event, create the job and schedule after this event has occurred and from OS call sapevt <eventname> name=sid nr=<instance name>
Regards
Umesh K -
Read Error logs after running the background jobs
Hi,
How to read the error logs after running the background jobs. In our scenarion we are running the COHV transaction to release the production orders in background. But we are not finding the error logs after background job. We would like to read the error logs and correct for further processing.
Kindly suggest.
Thanks & Regards,
N. LaxmanHi
you can check the back ground jobs defined by any user in SM37 and where you can see the spool and job logs as well.
plz check in your case and revert back
Regards
Anupam Sharma -
BWREMOTE background job canceled in sap r/3 system
Hi my friends,
Thanks for your help ahead.
Today I checked the background job in SAP R/3 created by BWREMOTE via SM37. It showed me some jobs had been canceled.
I displayed its log, the detail message is:
==========================================
Step 001 started (program SBIE0001, variant &0000000083494, user name BWREMOTE)
DATASOURCE = ZQM_NOT_SHFGRP
Call up of customer enhancement BW_BTE_CALL_BW204010_E (BTE) with 1,593 records
Result of customer enhancement: 1,593 records
Call up of customer enhancement EXIT_SAPLRSAP_001 (CMOD) with 1,593 records
ABAP/4 processor: SAPSQL_INVALID_FIELDNAME
Job cancelled
==========================================
Then I displayed the "Long Text" of the job log. It is
One of the field names in the SELECT clause was not recognized.
Error analysis
The SELECT clause was specified in an internal table at runtime.
It contains the field name "TPR00", but this does not occur in any of
the database tables listed in the FROM clause.
Information on where termination occurred
The termination occurred in the ABAP/4 program "SAPLXRSA " in
"EXIT_SAPLRSAP_001".
The main program was "SBIE0001 ".
Source code extract
008840 concatenate 'TPR'
008850 day_temp+6(2)
008860 ' = '
008870 ' ''' zshift '''' into
008880 cond .
008890 append cond to itab .
008900 select schkz into i_not_shfgrp-zzschkz from t552a
008910 where zeity = '2'
008920 and mofid = 'CN'
008930 and mosid = '28'
008940 and ( schkz = 'SFTA' or
008950 schkz = 'SFTB' or
008960 schkz = 'SFTC' or
008970 schkz = 'SFTD' )
008980 and kjahr = day_temp+0(4)
008990 and monat = day_temp+4(2)
> and (itab) .
009010 endselect.
I guess that there is not a field named TPR00 in table t552a.
Next, I opened the 'project management of sap enhancement' via CMOD, entering the project name and chosing 'Display'.
Then Double click the Components 'EXIT_SAPLRSAP_001', we can see the function module 'EXIT_SAPLRSAP_001'. In the source codes, there is an include program, it is 'INCLUDE ZXRSAU01.'.
Then, I double clicked the Include program and find the position program terminated. The source codes are:
ZQM_NOT_SHFGRP *
when 'ZQM_NOT_SHFGRP'.
loop at c_t_data into i_not_shfgrp .
l_tabix = sy-tabix .
clear :mbatch ,zshift,cond ,zfield, zcharg, day_temp .
refresh itab.
if i_not_shfgrp-ausvn is initial.
else.
aa = '080000'.
bb = '160000'.
cc = '235959'.
day_temp = i_not_shfgrp-ausvn.
if i_not_shfgrp-auztv ge aa and
i_not_shfgrp-auztv lt bb .
zshift = 'MSHF' .
elseif i_not_shfgrp-auztv ge bb and
i_not_shfgrp-auztv le cc .
zshift = 'LSHF'.
else .
zshift = 'NSHF'.
day_temp = i_not_shfgrp-ausvn - 1.
endif.
concatenate 'TPR'
day_temp+6(2)
' = '
' ''' zshift '''' into
cond .
append cond to itab .
select schkz into i_not_shfgrp-zzschkz from t552a
where zeity = '2'
and mofid = 'CN'
and mosid = '28'
and ( schkz = 'SFTA' or
schkz = 'SFTB' or
schkz = 'SFTC' or
schkz = 'SFTD' )
and kjahr = day_temp+0(4)
and monat = day_temp+4(2)
and (itab) .
endselect.
endif.
I found that we got a TPR00 during concatenation. In other words, day_temp+6(2) = 00. But I think it is impossible. I can not explain this.
Any ideas, my friends. Many thanks.select schkz into i_not_shfgrp-zzschkz from t552a
where zeity = '2'
and mofid = 'CN'
and mosid = '28'
and ( schkz = 'SFTA' or
schkz = 'SFTB' or
schkz = 'SFTC' or
schkz = 'SFTD' )
and kjahr = day_temp+0(4)
and monat = day_temp+4(2)
<b>and (itab) .</b> => doesn't make sense?!
endselect.
endif.
it seems something got deleted between 'and' and '(itab)'... so, you'll have to recheck the requirements for your select to fill the 'and' statement further.
so, it should look like
and monat = day_temp+4(2)
and <b><some kind of condition that needs to be fulfilled></b>.
endselect.
<b><some logic to fill a line in your internal table></b>.
append cond to itab.
endif.
obviously <some kind of condition that needs to be fulfilled> needs to be replaced by a real condition
and <some logic to fill a line in your internal table> needs to be replaced by some kind of formula
I assume something like (otherwise it would be really weird to select that field):
cond = i_not_shfgrp-zzschkz.
or a formula using the i_not_shfgrp-zzschkz field.
It would also be a lot better to replace your select ... endselect by a select single as you'll be selecting 1 record only anyways.
Message was edited by:
RafB -
Help required in Background Job
Hi Experts,
My client is scheduling background job for creating Cost Document. The job creates cost document and PO simultaneously.
The requirement is, i need to change the validity start and end date of the PO with the price date of the cost doc.
I am not aware of background job. Can someone let me know how this can be done.
Thanks in advance.
Regards
BaluHi Balu,
From this Thread, my understanding is that you are not aware of the SAP Background Job scheduling Concepts and it's implementation. Have a look at the follwing links for how to schedule a Background Job in a SAP System.
http://help.sap.com/saphelp_nw04/helpdata/en/ef/2c513897110872e10000009b38f889/frameset.htm
http://help.sap.com/saphelp_wp/helpdata/en/c4/3a7f87505211d189550000e829fbbd/content.htm
http://help.sap.com/saphelp_nw04/helpdata/en/c8/6a56389f64246fe10000009b38f889/frameset.htm
Hope this will help.
Thanks,
Samantak.
Edited by: Samantak Chatterjee on Oct 23, 2009 11:15 AM -
Kicking off Background Job from Another SAP system
Hi,
Does anybody know how to kick off a background job from a separate SAP system??
i.e I have a job on our CRM system that is dependant on a Job finishing from our ECC6 system first.
Does anyone know how to do this? I know I might be able to use events, is there anything else I should be making use of??
Many ThanksHi Daniel,
Guess there is one more solution. In system A write a report (let us name it X) that would trigger a job in system B through an RFC call.
Now in System A create a job with 2 steps. First step would be normal one, the second one for report X. Only when step 1 is over would step 2 start. So indirectly end of the existing Job A would trigger the required Job B.
Regards.
Ruchit. -
Background jobs and system shutdown
Hello,
I would like to know what happens if the BI jobs were not suspended prior to system shutdown? how will that impact those jobs after the restart of the system? I was wondering what would happen to the jobs that were active vs. jobs that were released/scheduled......we we need to re run/ re schedule them again after the restart? please advice...thanksHi,
When you say background jobs, I believe what you meant jobs in the "Active" or "Released" status. These jobs will get cancelled as once you shutdown, the work processes are going to stop.
Once, you start the system you can re-run them or re-schedule them. For BI jobs which perform data-loading from other satellite systems (ERP, SCM, or other BI systems in a data-mart kind of a configuration), these data loads will fail & the data in the infoCube, PSA, etc will not be the updated data (may be master or transactional data).
So, for these you'll have to request the BI-Teams to re-run the data load & batch jobs.
- Regards, Dibya
Maybe you are looking for
-
IPod nano repaired and no longer recognized how do I get it to sync again?
I had my ipod nano repaired, during which it was wiped clean. Now when I connect it to my computer it treats it as a new device and won't sync it with my ITUNES...how do I fix this so that it syncs again..please help
-
Error message when trying to play/charge via dock and home stero
My new Nano 5G will play via my stero when I hook it up through my "older" dock. However, I get an error message stating something about the accessory not being supported and it won't charge while in the dock. I noticed the older flat plug that that
-
Hi Friends, I am using below command to find w3wp.exe ID which i have to attach in debugging,But it gives all W3wp.exe list C:\Windows\System32\inetsrv>appcmd list wp. I want to find only Specific 'Application Pool' w3wp.exe ID ? can anyone help me o
-
To make a table available for maintanance(very urgent Pls!)
Hi , My requirement is .I need to create a Z custom table to which some default values are to be maintained. My question is... 1) what is the delivery class that i need to give while creating that Ztable? 2) How to make it open for maintanence? Do i
-
N-level approvala & Hierarchy creation..
Hi friends, We are using SRM 5.0 ( ECS) . I have a little doubt for the Hierarchy creation. Is it possible to assign a group inside any other group? I am trying in PPOMA_BBP but it is showing a warning message. Is it possible to assign g