Hi All,
We will like to know periodic background job requirements in systems like MDM. May be rough volume of these jobs (defination) will help.
Do these systems have process chains like BI and APO systems.
Also do these systems have some interfaces with ECC / R/3 systems to transfer the data. (for e.g. in APO we have CIF interface)
Thanks a lot for all your help.
Best Regards,
Vithal

Hi Zanwar,
my apologies for wrong answer.
as per my knowledge, i only know these things.
1. Periodic background job requirements in systems like MDM may be.
Ans: - seeing for MDM server heartbeat
        - Import & Syndication server start/stop process
        - MDM server performance
       - maintaning & cleaning log files
etc.
2. Do these systems have some interfaces with ECC / R/3 systems to transfer the data. (for e.g. in APO we have CIF interface)?
Ans: yes, MDM have Generic extractor (mdm_clnt_extr) and MDMGX to extract data from R3 systems.
- also you can use custom scenarios using XI as middleware
like: Proxies, Idocs.
- Abap apis is another method to integrate R3-MDM.
3. Do these systems have process chains like BI and APO systems?
Ans: i think mdm have but nort sure.
BR,
Alok
Edited by: Alok Sharma on Jan 30, 2008 12:35 PM

Similar Messages

  • Background job requirement  in Systems like GRC

    Hi All,
    We will like to know periodic background job requirements in systems like GRC. May be rough volume of these jobs (defination) will help.
    Do these systems have process chains like BI and APO systems.
    Also do these systems have some interfaces with ECC / R/3 systems to transfer the data. (for e.g. in APO we have CIF interface)
    Thanks a lot for all your help.
    Best Regards,
    Vithal

    Hi all,
    I think I have some commun issues with Vithalprasad about scheduling GRC Control Access background jobs (especially the FireFighter jobs) with an external scheduler (we are also using SAP CPS).
    I have to specify that for now we are using the internal job scheduler of GRC to schedule both ABAP and Java jobs which are dependant the one from the others.
    But we would like to schedule all of them in SAP CPS: it is possible for the ABAP programs, but not (?) for the Java jobs (we have not any NetWeaver Java Scheduler, since we have the 7.0 version of NetWeaver).
    Please feel free to ask me precisions.
    Have anyone an idea about the way to make this work ?
    Thanks for your help,
    Regards,
    Yi Jiang

  • Monitoring of File in FTP Server generated by background job in ECC system

    Hi,
    There is a background job in ECC system, which generates a file in FTP server. However the issue is that even if the background job is successfully executed, there are instances where the file is not generated in FTP server. Is there any way by which we can monitor such file in FTP Server?
    Regards
    Nishu Shah

    Hi,
    I guess this is not a solman question. Anyway, how do you perform the FTP?? custom code?
    Cheers,
    Diego.

  • Normal Background jobs in Sender System

    Hi,
    Is that the normal daily operation jobs should be stopped in Sender system during the TDMS migration process.
    Will this make TDMS migration process faster?
    In our sender system the problem is not the availability of batch process but I am trying to analyze that if we stop the normal daily operational jobs then can the data selection will be faster...
    I think Yes !
    What are your comments?
    thanks !
    Regards,
    Santosh

    It depends what those background jobs are doing. If they are heavily loading the database (reading and writing) it can be faster if you stop them.
    Markus

  • ORA-20000 error when executing background jobs in BI System

    Hello Experts,
    We newly installed NW2004s System. Few BI related background jobs are showing Error no: 4 or Error no: 3 in SM50. Also few BI related background jobs are giving error "ORA-20000 occurred when executing SQL statement (parse error offset=0)". Please let me know what does Error 4 or 3 mean in SM50 and how to resolve Ora-20000 error?
    Thanks

    This may be to do with insufficient authorization for the user (for creating statistics for example). Check OSS note 963760.

  • RSBDCSUB not scheduling background job in PRD system

    hi all,
    i have created one background program to re-run all error session from sm35 using program RSBDCSUB..
    tables: APQI.
    data: ls_apqi type apqi,
          it_apqi type standard table of apqi .
    select * from apqi into table it_apqi
    where progid eq 'SAPMHPS0'
    and qstate eq 'E'.
    LOOP AT IT_APQI INTO LS_APQI.
      SUBMIT RSBDCSUB WITH MAPPE EQ LS_APQI-GROUPID
                      EXPORTING LIST TO MEMORY
                      AND RETURN.
      clear: ls_apqi.
    ENDLOOP.
    it work fine in development and test syetem....
    problem is when i run in production system...i am getting message that "0 session(s) transferred to background processing".but in developement and test system i am getting "1 session(s) transferred to background processing.
    what could be the reason?
    any athorization issue...

    hi all,
    When i run RSBDCSUB program in foreground.I got this message "submit RSBDCBTC not successfully executed".
    i checked system log..
    "job SM2345 is invalid"
    but test system its working well....
    regards,
    krishna...

  • Background Job - Requirement to download file to application server

    Dear All,
    If I want to execute one function module in background and the FM is downloading file to application server, the FM is not downloading file to application server. Can you please suggest whether it is possible to download file to application server when it is in background mode? I know it is not possible to download file to presentation server.
    Thanks and regards,
    Atanu

    Hi,
    Yes, it is possible to download a file to application server in background mode. check the path ur sepcifying to the Function module to download the file...in T-Code AL11 check if the path exits.
    reward if helpful
    Regards,
    Rahul

  • Background job not automatically poopulating Dependant Demand

    Hi Users,
    We've recently set up a POS & PA using the DP-BOM selection and characteristics, manually created PPM's and generated CVC's using the BOMS. All of this is set up fine in our SCM 7.0.
    The background job has created the forecasts for the ouptput products but NOT the input product.
    Now if I call up the parent material, and then choose to show the input products the dependant demand is generated. If I now return to the material with the dependant demand, it now shows the demand from the parent.
    Or, if the forecast is genereated interactively, then the dependant demand is poopulated.
    Is there an automated method to populate the dependant demand when using background jobs? I would like to think that we don't have to query every sales BOM parent in DP and drill into the input products to load the dependant demand?
    Please let me know if there is an easier way to do this as part of the background processing.
    Thanks
    Edited by: Paul_111 on Mar 31, 2011 4:20 PM

    Hi Andand,
    Thanks for your reply and sorry if my post is confusing.
    As far as the PPM with imputs A & B, output C - I have this relationship working and calcuclating demand in DP no problems.
    If I now add a new PPM combination inpput X, Y and output Z. Create the BOM CVC and TSO so its all set to go. Add to selection profiles and background jobs.
    Now, if I run the background job to create the forecast and this runs successfully. Now I check my products.
    Z has the forecast generated, X & Z have no dependant demand showing.
    The only way I've found that pushes the demand to X & Z is:
    - open product Z in demand planning and then choose the option to show input products from the header
    OR - from demand planning, select the univariate forecast to run interactively.
    My issue:
    The background job (if run alone) does not push the forecast on Z to X & Y.
    And if I show the input products or create forecast (as bove) the dependat demand is shown on X & Y.
    This is going to be a slow process if we have to do this everytime we run the backgound job.
    What am I missing when running the background job?

  • Background job scheduling problem in APO

    Hi fellow SDNers,
    i am going through this peculiar problem of background job scheduling:
    scenario is like , i have an CSV (excel file) in aplication server which would load data into the infosource, which i have scheduled to run in backhround (in infopackage) ,after event is triggered (option in scheduling tab of infopackage...THE SCHEDULING OPTIONS)
    now everything seems to be fine.. but the data is not getting loaded...?? could u lease help me out..how to load data from excel file (in background), after an event gets triggered.
    thanks in advance,
    Rohan

    hi Alexander,
    i am triggering the event from BP_EVENT_RAISE FM in APO  by passing the  event id... this would automaitically raise the event...just like sm64
    Thanks
    Rohan

  • Scheduling Background Jobs at OS level

    Hi all,
    How to schedule Background jobs at operating system level.
    Thanks
    vijay

    Hi,
    Create a event, create the job and schedule after this event has occurred and from OS call sapevt <eventname> name=sid nr=<instance name>
    Regards
    Umesh K

  • Read Error logs after running the background jobs

    Hi,
    How to read the error logs after running the background jobs. In our scenarion we are running the COHV transaction to release the production orders in background. But we are not finding the error logs after background job. We would like to read the error logs and correct for further processing.
    Kindly suggest.
    Thanks & Regards,
    N. Laxman

    Hi
    you can check the  back ground jobs defined by any user in SM37 and where you can see the spool and job logs as well.
    plz check in your case and revert back
    Regards
    Anupam Sharma

  • BWREMOTE background job canceled in sap r/3 system

    Hi my friends,
    Thanks for your help ahead.
    Today I checked the background job in SAP R/3 created by BWREMOTE via SM37. It showed me some jobs had been canceled.
    I displayed its log, the detail message is:
    ==========================================
    Step 001 started (program SBIE0001, variant &0000000083494, user name BWREMOTE)
    DATASOURCE = ZQM_NOT_SHFGRP
    Call up of customer enhancement BW_BTE_CALL_BW204010_E (BTE) with 1,593 records
    Result of customer enhancement: 1,593 records
    Call up of customer enhancement EXIT_SAPLRSAP_001 (CMOD) with 1,593 records
    ABAP/4 processor: SAPSQL_INVALID_FIELDNAME
    Job cancelled
    ==========================================
    Then I displayed the "Long Text" of the job log. It is
    One of the field names in the SELECT clause was not recognized.
    Error analysis
    The SELECT clause was specified in an internal table at runtime.
    It contains the field name "TPR00", but this does not occur in any of
    the database tables listed in the FROM clause.
    Information on where termination occurred
    The termination occurred in the ABAP/4 program "SAPLXRSA " in
    "EXIT_SAPLRSAP_001".
    The main program was "SBIE0001 ".
    Source code extract
    008840 concatenate 'TPR'
    008850 day_temp+6(2)
    008860 ' = '
    008870 ' ''' zshift '''' into
    008880 cond .
    008890 append cond to itab .
    008900 select schkz into i_not_shfgrp-zzschkz from t552a
    008910 where zeity = '2'
    008920 and mofid = 'CN'
    008930 and mosid = '28'
    008940 and ( schkz = 'SFTA' or
    008950 schkz = 'SFTB' or
    008960 schkz = 'SFTC' or
    008970 schkz = 'SFTD' )
    008980 and kjahr = day_temp+0(4)
    008990 and monat = day_temp+4(2)
    > and (itab) .
    009010 endselect.
    I guess that there is not a field named TPR00 in table t552a.
    Next, I opened the 'project management of sap enhancement' via CMOD, entering the project name and chosing 'Display'.
    Then Double click the Components 'EXIT_SAPLRSAP_001', we can see the function module 'EXIT_SAPLRSAP_001'. In the source codes, there is an include program, it is 'INCLUDE ZXRSAU01.'.
    Then, I double clicked the Include program and find the position program terminated. The source codes are:
    ZQM_NOT_SHFGRP *
    when 'ZQM_NOT_SHFGRP'.
    loop at c_t_data into i_not_shfgrp .
    l_tabix = sy-tabix .
    clear :mbatch ,zshift,cond ,zfield, zcharg, day_temp .
    refresh itab.
    if i_not_shfgrp-ausvn is initial.
    else.
    aa = '080000'.
    bb = '160000'.
    cc = '235959'.
    day_temp = i_not_shfgrp-ausvn.
    if i_not_shfgrp-auztv ge aa and
    i_not_shfgrp-auztv lt bb .
    zshift = 'MSHF' .
    elseif i_not_shfgrp-auztv ge bb and
    i_not_shfgrp-auztv le cc .
    zshift = 'LSHF'.
    else .
    zshift = 'NSHF'.
    day_temp = i_not_shfgrp-ausvn - 1.
    endif.
    concatenate 'TPR'
    day_temp+6(2)
    ' = '
    ' ''' zshift '''' into
    cond .
    append cond to itab .
    select schkz into i_not_shfgrp-zzschkz from t552a
    where zeity = '2'
    and mofid = 'CN'
    and mosid = '28'
    and ( schkz = 'SFTA' or
    schkz = 'SFTB' or
    schkz = 'SFTC' or
    schkz = 'SFTD' )
    and kjahr = day_temp+0(4)
    and monat = day_temp+4(2)
    and (itab) .
    endselect.
    endif.
    I found that we got a TPR00 during concatenation. In other words, day_temp+6(2) = 00. But I think it is impossible. I can not explain this.
    Any ideas, my friends. Many thanks.

    select schkz into i_not_shfgrp-zzschkz from t552a
    where zeity = '2'
    and mofid = 'CN'
    and mosid = '28'
    and ( schkz = 'SFTA' or
    schkz = 'SFTB' or
    schkz = 'SFTC' or
    schkz = 'SFTD' )
    and kjahr = day_temp+0(4)
    and monat = day_temp+4(2)
    <b>and (itab) .</b>  => doesn't make sense?!
    endselect.
    endif.
    it seems something got deleted between 'and' and '(itab)'... so, you'll have to recheck the requirements for your select to fill the 'and' statement further.
    so, it should look like
    and monat = day_temp+4(2)
    and <b><some kind of condition that needs to be fulfilled></b>.
    endselect.
    <b><some logic to fill a line in your internal table></b>.
    append cond to itab.
    endif.
    obviously <some kind of condition that needs to be fulfilled> needs to be replaced by a real condition
    and <some logic to fill a line in your internal table> needs to be replaced by some kind of formula
    I assume something like (otherwise it would be really weird to select that field):
    cond = i_not_shfgrp-zzschkz.
    or a formula using the i_not_shfgrp-zzschkz field.
    It would also be a lot better to replace your select ... endselect by a select single as you'll be selecting 1 record only anyways.
    Message was edited by:
            RafB

  • Help required in Background Job

    Hi Experts,
    My client is scheduling background job for creating Cost Document. The job creates cost document and PO simultaneously.
    The requirement is, i need to change the validity start and end date of the PO with the price date of the cost doc.
    I am not aware of background job. Can someone let me know how this can be done.
    Thanks in advance.
    Regards
    Balu

    Hi Balu,
    From this Thread, my understanding is that you are not aware of the SAP Background Job scheduling Concepts and it's implementation. Have a look at the follwing links for how to schedule a Background Job in a SAP System.
    http://help.sap.com/saphelp_nw04/helpdata/en/ef/2c513897110872e10000009b38f889/frameset.htm
    http://help.sap.com/saphelp_wp/helpdata/en/c4/3a7f87505211d189550000e829fbbd/content.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/c8/6a56389f64246fe10000009b38f889/frameset.htm
    Hope this will help.
    Thanks,
    Samantak.
    Edited by: Samantak Chatterjee on Oct 23, 2009 11:15 AM

  • Kicking off Background Job from Another SAP system

    Hi,
    Does anybody know how to kick off a background job from a separate SAP system?? 
    i.e I have a job on our CRM system that is dependant on a Job finishing from our ECC6 system first.
    Does anyone know how to do this?  I know I might be able to use events, is there anything else I should be making use of??
    Many Thanks

    Hi Daniel,
    Guess there is one more solution. In system A write a report (let us name it X) that would trigger a job in system B through an RFC call.
    Now in System A create a job with 2 steps. First step would be normal one, the second one for report X. Only when step 1 is over would step 2 start. So indirectly end of the existing Job A would trigger the required Job B.
    Regards.
    Ruchit.

  • Background jobs and system shutdown

    Hello,
    I would like to know what happens if the BI jobs were not suspended prior to system shutdown? how will that impact those jobs after the restart of the system? I was wondering what would happen to the jobs that were active vs. jobs that were released/scheduled......we we need to re run/ re schedule them again after the restart? please advice...thanks

    Hi,
    When you say background jobs, I believe what you meant jobs in the "Active" or "Released" status. These jobs will get cancelled as once you shutdown, the work processes are going to stop.
    Once, you start the system you can re-run them or re-schedule them. For BI jobs which perform data-loading from other satellite systems (ERP, SCM, or other BI systems in a data-mart kind of a configuration), these data loads will fail & the data in the infoCube, PSA, etc will not be the updated data (may be master or transactional data).
    So, for these you'll have to request the BI-Teams to re-run the data load & batch jobs.