Background Scheduling of Calibration Order

Dear Experts,
I want to scheule my calibration order in QM for calibration of Test Equipment in background.
I have created my maintenance order for calibration of Gauges / Instruments (which are defined as Equipments). The dates for the calibration have been calculated based on time. When I go to the transaction of scheduling the order & save, the inspection lot for calibration is generated & the equipment task list is assigned to the lot.
I want this to automatically happen in background. This is because I have thousands of equipments, for which I can not schedule the calibration manually.
Regards,
Prashant

hi
you can use the IP30 deadline monioting for this purpose,ask your abaper to run the T code in frequent ( Weekly,Fortnight and etc)
regards
thyagarajan

Similar Messages

  • Background Scheduling of Maintenance order for Calibration.

    Dear Experts,
    I want to scheule my calibration order in QM for calibration of Test Equipment in background.
    I have created my maintenance order for calibration of Gauges / Instruments (which are defined as Equipments). The dates for the calibration have been calculated based on time. When I go to the transaction of scheduling the order & save, the inspection lot for calibration is generated & the equipment task list is assigned to the lot.
    I want this to automatically happen in background. This is because I have thousands of equipments, for which I can not schedule the calibration manually.
    Regards,
    Prashant

    Hi,
    Please check below link if this can help it.
    http://help.sap.com/saphelp_scm2007/helpdata/en/c3/9e443cfb06e532e10000000a114084/content.htm
    Regards,
    Anil

  • Maintenance Planning & Scheduling of calibration order

    Hi
    I have to schedule calibration inspection of a few equipments in such a way that system automatically create inspection lot & calibration order daily.
    Whether user enter calibration result or not, inspection lots in future should be created automaticallly.
    I created a single cycle plan using IP41 and start the schedule using IP10, the system created first inspection lot automaticaly but always require me go to to scheduling and save the plan again if I want to create next inspection lots. How can I configure/set the system in such a way that it creates inspection lots/calibration order automaticaly
    Plz also tell after taking usage decision of inspection lot whether I need to do some act on calibration order such as technical completion or business completion.
    Thanks in advance

    Dear Chris,
             In maintenance plan go to Maintenance plan scheduling parameter & put Schedule Period '360' Days in sub screen under Call control parameter.
    Then Go to IP10and make automatically scheduling it will make plan for whole yera.
    Regards... Rakesh Saxena

  • Manual Technical completion of Calibration Order

    Hi,
    When I schedule planned calibration order, record results and as soon as when I take usage decision, order becomes technically completed automatically and takes reference date as planned date that is shown on IP10 against each call.
    Is there any possibility to take technically completion manually, specially for calibration order (Order type PM05)?
    Or Is it possible to set default reference date exactly on the date when I perform or take usage decision?
    Regards,

    This is because automatic Technical Completion of Maintenance Order has been configured in your system. To Change it follow the path as specified below:
    SPRO>Quality Management>Quality Inspection>Inspection Lot Completion>Define Follow up Actions
    In follow up actions select QM_PM and double click on Function Modules. Now Uncheck the Sync Update and the AfterPosting Indicator to manually Complete the Order.
    For the reference date to be derived from Usage Decision Date, the following user exit IWO10004 might be helpful in catering your requirement.

  • Background Scheduling - Deadline Monitoring

    Hi Experts,
    I have created new maintenance plan , its around 250 for Mechanical and 250 for Electrical
    Maintenance plan having strategy like every two month , every three month , every six month etc..
    Scheduling period is 3 year
    Now scheduling will be done through IP10 one time , but after first call object scheduling will get hold.
    I want to make it background scheduling - Deadline Monitoring
    Now the requirement is , For Example :
    Maintenance plan X have PM plan date is 21.07.2014
    Maintenance plan Y have PM plan date is 24.07.2014
    Maintenance plan Z have PM plan date is 29.07.2014
    As per above example each equipment will have different plan date , background scheduling can be done through IP30 but by the date is concern how can make it possible ?
    Please advise each maintenance plan has to be run as per their plan date.
    Thanks,
    Abhishek

    Hi Mr.Jogeshwara,
    Nice Document , Its really useful
    But my query is each equipment have different plan date , as explained in above example
    If Maintenance plan have Cycle Unit 60 day and Plan X date is on 21.07.2014 then 21.07.2014+60day , same as if maintenance plan Y date is 25.07.2014 then 25.07.2014 +60day
    Like that
    background scheduling needs to be done as per cycle unit
    If i will do background scheduling together of both the above maintenance plan X and Y then scheduling will be run exactly after 60 day and order will be generated in advance for Maintenance plan Y.
    Hope you understand my query.
    Thanks,
    Abhishek

  • Background Scheduling is not triggered

    Hai all,
    We are doing ecc6.0 upgrade from 4.6c. While creating a production order the order number should be automatically updated in a z-table(using user wf_batch).
    For this they are using a Function module which is scheduled for every 5 min. The FM is stored in a business object.
    But whenever we create a production order, the background scheduling was not triggered.
    We are not able to find the program for this scheduling.It shows no jobs were found.
    How to schedule the Function module or the business object? or is there any other way to execute the business object or find the job in SM37?
    Regards,
    Kumar C

    Hi,
    We are implementing OWS. We have successfully installed and deployed OWS but yet to open the OWS applicaation. we are defining the entire CCD parameters. Apprreciate help on the same, whether you have have any setup document. A business flow or the process flow on OWS.
    Sincerely appreciat your help. My id: [email protected]
    Regards,
    Abhijit

  • Mass Scheduling of Process Orders

    Hi,
    Is there any way to do mass scheduling of process orders?
    If yes whether it can be scheduled in background?
    regards,
    Mohit

    HI
    try with CORM.
    after entering the values in selection screen,
    select program in top menu -->execute in back ground or press F9.
    or use SM36 to craete teh job with programe PPSFCACT
    -ashok

  • Calibration  order

    Hi experts,
    I am created calibration order usin PM05. while releasing it giving error "No inspection lot created".
    I have checked in SPRO inspection 14 is assigned.
    How to created a inspection lot for order
    How to create order from task list
    pls explain
    rgds
    sp

    Hi
    For Usage decision... do in TCODE : QA11
    Check out this scenario [Caliberation order|http://help.sap.com/saphelp_46c/helpdata/en/fe/67ec5c9d6f11d189b60000e829fbbd/frameset.htm]
    It will be very helpful
    I dont think u can create order from task list
    You can do my creating a Maintenance plan, assign a task, schedule it... order will be created at respective intervals...
    - Pithan

  • COHV daily automatic background scheduling

    Hi Experts,
    I have created a variant for order selection to TECO orders in COHV background scheduling, which I want to run daily. There is a date field also in the selection i.e variant. Is there a way in which I can update the date also automatically on a daily basis without ABAP development?

    Dear,
    I think this is possible from BS22 transaction with status profile/selection profile
    http://help.sap.com/saphelp_46c/helpdata/en/a5/63198843a211d189410000e829fbbd/frameset.htm
    Or carry out the same functions automatically through batch job in background in mass processing but it is not advisable.
    Please refer this link,
    [COHV Background|https://forums.sdn.sap.com/click.jspa?searchID=18396109&messageID=6369072]
    Regards,
    R.Brahmankar

  • Gui_download Function module is not working in Background Scheduling

    Hi Experts,
    Function modules like GUI_DOWNLOAD are not working in background scheduled jobs, It is raising an exception. Though it is working fine in foreground execution.
    Please provide me solution for this challenging task.
    you could be rated well for this question.
    Thanks,
    Rama Krishna.

    Hello,
    work with open dataset and close dataset...
    just loop over itab and transfer itab field for field into a string field separated by ;
    Here is an extract of coding:
    OPEN DATASET p_dath FOR OUTPUT IN TEXT MODE ENCODING DEFAULT.
      LOOP AT itab_pos.
        CLEAR satz.
        MOVE itab_pos-vbeln TO satz-vbeln.
        MOVE ';' TO satz-fill1.
        MOVE itab_pos-kunnr TO satz-kunnr.
        MOVE ';' TO satz-fill2.
        MOVE itab_pos-ktgrd TO satz-ktgrd.
        MOVE ';' TO satz-fill3.
        MOVE itab_pos-fkdat TO satz-fkdat.
        MOVE ';' TO satz-fill4.
        MOVE itab_pos-budat TO satz-budat.
        MOVE ';' TO satz-fill5.
        MOVE itab_pos-cpudt TO satz-cpudt.
        MOVE ';' TO satz-fill6.
        MOVE itab_pos-fkimg TO satz-fkimg.
        MOVE ';' TO satz-fill7.
        MOVE itab_pos-netwr TO satz-netwr.
        MOVE ';' TO satz-fill8.
        MOVE itab_pos-vrkme TO satz-vrkme.
        MOVE ';' TO satz-fill9.
        MOVE itab_pos-ktgrm TO satz-ktgrm.
        MOVE ';' TO satz-fill10.
        MOVE itab_pos-matnr TO satz-matnr.
        MOVE ';' TO satz-fill11.
        MOVE itab_pos-mattxt TO satz-mattxt.
        MOVE ';' TO satz-fill12.
        MOVE itab_pos-gewei TO satz-gewei.
        MOVE ';' TO satz-fill13.
        MOVE itab_pos-brgew TO satz-brgew.
        TRANSFER satz TO p_dath.
      ENDLOOP.
      CLOSE DATASET p_dath.
    It is not so comfortable as it is with GUI_DOWNLOAD but it works in background!

  • Email background schedule report to gmail or yahoo mail

    Dear Expert,
    My self Nayan Lad having 1 year exp in SAP ABAP.
    Now my request is How can I send mail the background schedule report to some person's personal mail id through SAP.
    Please guide me so I can explore my knowledge.
    Thanks & regards,
    Nayan Lad
    Moderator Message: Please search for available information.
    Edited by: kishan P on Nov 11, 2010 11:03 AM

    hai ,
    please go through this example bcs_example8.
    thankyou,
    anji.

  • MRP-Delivery Schedule for Sales order is not updating in Production order

    Dear Experts,
    I have created Sales order and maintained delivery scheduling, Then Run MRP through MD50,
    We received Planned order then through this we have converted to Prodcution order.
    When we observe the delivery schedule for sales order under assignment Tab in Produciton order which is showing zero instead showing line item of Delivery schedule.
    I am able to see Sales order and Line item but i am not abel to get any delivery schedule line item.
    Please suggest where settings are missing.
    Thanks in advance
    Regards
    Don

    Dear Experts,
    Please provide me solution.
    after Running MD50 transaction against Sales order.
    If I maintained different Scheduling Line Item for First Line item of Sales order.
    The Respective Scheduling Lines should update against Each Production order which has converted from Planned order.
    Thanks in advance.
    Regards
    DON

  • MB5T background schedule ouput in alv format

    Hi all,
    Please help me to get MB5T report ouput of background schedule in ALV.
    I have put that report in bacground scheduling & the output of the same in BEST format but my client want the output in AlV format.
    Please suggest.
    Regards,
    Anant

    Output of MB5T can't be in ALV format in background. In foreground also this is done in two steps., In first system display in BEST format..this can be changed to ALV manually in second step.

  • MC75 - background schedule option not available

    Hi
    i got a requirement to schedule the tcode MC75 in background mode.  But SAP has not given the option in the menu bar -> execute in background option like the tcode MD74. 
    Even the save button is disabled in the tcode MC75 hence not possible to save like a variant.
    I found a SAP notes relevant to that. The note no is 381061. But i am not able to implement the note in my system. I tried to customize the program by copying to zprogram using the code correction given In sap notes 381061. But could not find relevant to background scheduling.
    Can any one tell me how to customize the tcode for background scheduling.
    Regards
    Rajani Yeluri

    Hi Rajani,
    Could you please let me know how did you solve this issue? I am also looking for the same.
    I appreciate your response.
    Thank you.
    Murali

  • Background Schedule - Hardcore Input data

    Hi Experts
             I am developing a BDC, now i want to schedule the program into background.
            So i want to hardcore the input data like
             Select Method (Genrate session/Call transaction)
             Processing Mode
             Update Mode
             Nodata Indicator.
    These data i need to hardcore in the program itself for further processing of background schedule.
              How to do it, pls advise me on this.
    Thanks in advance.
    Regards
    Rajaram

    Hi Rajaram,
    As of my understanding do you want to put the following on your selection screen?
    Select Method (Genrate session/Call transaction)
    Processing Mode
    Update Mode
    Nodata Indicator
    then do so.
    There is a structure for call transaction parameters, which you can use for setting of selection screen and can set the default values as wellin initialization event.
    Structure name : CTU_PARAMS
    Reward pointsif useful.
    Thanks & Regards
    Rajini Rajuladevi
    Edited by: Rajini R M on Jun 4, 2008 8:44 AM

Maybe you are looking for

  • Ni usrp example are not running on window 7 64 bit

    i have installed labview 2012 ,modulation toolkit, mathscript toolkit and usrp device driver 1.2. i am using window 7 64 bit operating system. i am trying to run example of usrp but it was not running it is not able to load NI-MAPro.lvlib files .any

  • Need help with my SL

    hello ladies and gents, i got a zen sleek and a love it only thing that sucks is the lack of assessories. my question is...is there any way to hook up the sleek to you car audio system with using a cassette adapter or FM transmitter. by the way i do

  • Need Help for New Purchase - Macbook Pro 8gb & express slot

    Hello All, I needed some advise or rather clarification on a new purchase of a Macbook Pro. I became a bit disheartened ever since the new Macbook Pros replaced the express slot with the SD card reader. I want a 15" Macbook Pro , with 8gb of expandab

  • Books for C_TFIN52_64 certification

    i want to sit for the exam C_TFIN52_64 exam in sap financial i want to buy exam materials without attending training i have TFIN50 and TFIN 52 but i couldn't find TERP01,TERP02 and SM001 sor solution manager please i need your help i want to sit for

  • Zen Sleek Harddisk prob

    Does anyone know how much it costs to have the hard disk replaced on the Zen Sleek? I bought the 20 gig player last Christmas and it froze up on me a couple of weeks ago. Cannot get it out of recovery mode. I am a little ticked off that a 250.00 play