Bapi for availability check in VL03n

Hi all,
Is there any bapi for availability check in VL03n??
points will be rewarded.
Regards
madhu

Goto esnips.com
search for bapi
u can get
REWARD POINTS...

Similar Messages

  • Custom program for availability check and update for existing sale order at Item level(VA02)

    Hi,
    I came to know Bapi_Saleorder_Simulate can be used for availability check and update an existing sale order.but there is no sample program explaining the process.I have tried this by passing parameters ORDER_HEADER_IN , ORDER_ITEMS_IN  ,ORDER_PARTNERS and ORDER_SCHEDULE_EX(for getting details),also i have assigned the sale document number ,custom document type(ZSO) in ORDER_HEADER_IN . while executing the BAPI I am getting the error external number range is not assigned for the document type ZSO . I am confused on seeing this error. It is possible to do availability check for existing sale order using this BAPI. Please explain how to achieve this.It will be really helpful if it is expalained with an example.   
    Regards,
    Shanmuga

    Hello, I think you may have been misinformed about this BAPI updating a sales order at item level. As far as I understand it this BAPI can be used to simulate the creation of a sales order which obviously would include and ATP check. This is why it is giving the error because it is simulating creation but you are entering a value in a field that should be automatically generated (i.e. the sales order number). For change the sales order at item level have you looked at BAPI_SALESORDER_CHANGE? I pretty sure this BAPI both updates sales order (header or item level) and can do an ATP first.
    Points are always welcome if you feel an answer has been helpful.

  • ATP Buckets of Global settings for Availability check

    Hi ALL
    I have changed the Bucket Parameters and activated ATP time series in Global Settings for Availability Check in Devolpment Server.
    I try to transport these settings but ATP Buckets (Active) are not transprting to the Quality.
    Please give your suggestions , how to transport these settings to the quality and prodction envirorment?
    Thanks
    Kanth

    Hi Datta,
    Thanks for your time and reply.
    There is a requirement before you transfer changes to ATP bucket paramters .
    >Can you please eloborate your above statment.
    Make sure that the updating of ATP time series is activated in Quality and also in production system.
    You set this indicator in Model and Planning Version Management from the SAP Easy Access screen by choosing Master Data -> Planning Version Management -> Model and Version Management.
    >You mean that i need to activate ATP Time series in all envirorments for which i need to delete the version.In our process already PPDS was implemented and  running in Production.We cannot delete the active version.
    These settings are not transpotable?
    Regards
    Kanth

  • Column 'Qty for availability check' in MB24

    Can somebody tell what is the logic for calculating column 'Qty for availability check' in MB24.

    Hi,
    This quantity comes from table RESB.
    In RESB, it is updated at the time of Creation/Change of Reservation logic: stock available in unrestricted - reserved.

  • MB24 - Quantity for availability check

    Can anybody explain 'Quantity for availability check' in MB24 (reservation list)
    It is not the quantity available. Then can include a column which will show actual available quantity as unrestricated stock in the same report ?

    hi Balaji,
                     Choose Logistics or Accounting -> Project System ->Material ->Execution -> Delivery from project.
    An entry screen appears.
    Enter the project definition, for which you want to see the deliveries that have been created.
    Choose  Deliveries.
    An overview of the deliveries appears.
    Select a delivery and choose Select.
    An overview appears with the quantities of the delivery items.
    I hope you get your question resolved....
    AWARD AND HELP....
    Regards,
    Priyanka.P

  • Please tell me configuration settings for Availability check

    HI gurus,
    Please telllme configuration settings for Availability check
    regards
    DVSK

    Please read the "Rules and Regulations" of the forum b4 posting any question.  This topic was discussed in this forum quite frequently and had you taken efforts to search, you would have got it.
    Please check this thread
    [can any body explain the configuration settings of AVAILABILITY CHECK|can any body explain the configuration settings of AVAILABILITY CHECK with.]
    thanks
    G. Lakshmipathi

  • Program position with any currency for availability check - PS/IM

    Hi,
    I have the following scenario:
    1. Controlling area currency is USD. Local currency is BRL. We do purchase req.(CJ20n) for materials and services in USD, BRL and EUR. The P.O. is done in a second moment through MM.
    2. Investment program uses USD for checking availability control. The currency for any program position is also USD.
    3. System performs the availability control using exchange rate cat. "M" in OB08. We buy within one of those 3 currencies (USD, BRL and EUR), it translates to USD, and then we see how much was committed in USD.
    Because of these differences between dates in exchange rates, the client wants the system to perform availability check with any currency.
    For exemple: if we have USD 1000 in program position on 04.15.09 at rate of BRL 2,40 we would have BRL 2400 to purchase. If the P.O. is posted in a different date with a different exchange rate we would have more (or less) value to purchase depending on the rate, say 06.15.09 rate is 3,0 we would have BRL 3000 in local currency.
    The client doesn't want this to happen. they want to commit only the first value.
    They want that in IM program position would have for branch XYZ 3 different limits, one for each currency say 1000 USD, 2000 BRL and 1000 EUR. When P.R. is done it would check what currency is buying, perform availabilty check and then commit only the value requested and avoid increase or decrease values in local currency.
    As long as I know IM standard doesn't work this way. Some thoughts and ideas would be a great help.
    Best Regards,
    Ubiratan Chaves.

    Hi Ubiratan,
    I understand that you are doing availability control on USD (controlling area currency), although the statement in your point 2. should be corrected - the availability control is not tied to the IM program but to the budget profile used in the project...
    Availability control per transaction currency is not possible...you can have availability in controlling area currency, as you have...or in object currency (which for a project in your case would have to be local currency)...you can try this, but it only works if your project hierarchy is using the same currency (I just faced a similar issue and had to also use USD because the proejct had multicurrency WBS in it...)
    Bottom line...maybe you can try "adjust" the budget to the currency fluctuations with transaction IMCRC3...the idea would be to use a specific exchange rate type that has the current exchange rate and run this transaction to "trim" the budget to the real exchange rate...
    hope it helps,
    Luis

  • Materials in stock at u loc consider for Availability check but not for MRP

    Dear ALL,
    Please solved the problem by settings in the customizing  we are able to set the materials  at stock U location (serviceable )should not be considered in Mat Availability  for PM orders
    Settings we have made for all storage locations in U * By excluding storage location stock from MRP
    If storage location stock is excluded from MRP at plant level, no receipts for this storage location will be created in the planning run.
    so we are able to run the availability check perfectly
    But now MM dept.is not accepting this as they want this stock to be considered for MRP
    Has anybody done this scenrio successfully please reply the solution
    Regards
    Pratap

    A way that I think of, is to set the ATP at SL level, so in PM order you check only in a specific location, not in all the plant.
    Of course that you need to let all SLs to be relevant for MRP, otherwise this stock is not considered for planning.

  • User exit for availability check.

    Hi Friends
    We are maintaining a Z table for combination of values of plant and order type.
    It is required that while creating a order through IW31 for a plant and order type combination, the system should check the Z table for these values. If present, then standard availability check should be disabled for this order.
    Is there any user exit to accomplish the same.
    TIA.

    Hi,
    Check
    IWO10009 PM Order: Customer Check for 'Save' Event.
    I would suggest u to check this link :Re: Component split in WO based on availability check.
    regards
    pushpa

  • Design for Availability Check for the Receiver System

    Hi,
    Scenario: Request has to be diverted depending on the availability of receiver System.
    Design: During Runtime, we will make RFC Lookup call in mapping to Receiver System, to check it availability and accordingly I will determine the Receiver.
    Issue: We had the Receiver System Up, the Availability Check using Lookup to Primary Receiver system was successful,  but due to table lock issues in the receiver system, request for RFC and Proxies was not responded back. So we got call dumped in PI saying service unavailable exception.
    Is there any better design for to handle this kind of scenarios, inorder to have functionality available round the clock?
    Regards,
    Manikandan R

    Hi Mani,
      You need to identify the availability of the system at mapping level only,i think the approch is to write UDF or simle JAVA Map to check the availability and return same status out put based on that you can route the message.
    use wait step in BPM give some particular time to wait,then process the message,in this case we are going check only once. if you want check repeatedly use loop and put your mappingt,but this is not at all adviceble.
    other way develop scenario ,if system down means communication channel throws error,based on that raise a alert,so that appropriate people will take action.
    but most of cases availability of system is 24 hours , but i am not sure about your case.raising alert is the good idea.
    Regards,
    Raj

  • Need a BAPI for Credit Check

    Hi Experts,
    I am in need of a BAPI (not a function module) for performing Credit Check.
    I already found a BAPI - BAPI_CREDITCHECK for this purpose, but it is not working properly when invoked from an external system.
    I am now searching for any other BAPI available for this purpose.
    My requirement is such that I CANNOT USE Function Modules instead of BAPIs.
    Seeking your expertise in this regard.
    Thanks in advance.
    Regards,
    Keerthi

    Hi,
    check out  the following BAPIs.
    BAPI_CREDITCARD_CHECK.
    BAPI_CREDIT_ACCOUNT_GET_STATUS
    hope it helps.
    Regards
    Rajesh Kumar

  • BAPI for Existence check of Delivery Address

    Hello Everyone,
    Can anyone suggest me of a BAPI or Remote Enabled FM that does an Existence check for Delivery address "AD_ADDRNUM" while creating a Purchase Order? I would appreciate your help.
    Regards,
    Gopal.

    I couldnt find any BAPI or FM for you but you can write your own RFC. Tables: ADRC, ADRP , ADRT may help you. Check them with your address number

  • New calculation for availability check in sales order

    Hi there,
    When a sales order date and hour are changed the system doesn't calculate the new availability date, it maintains the initial one. Does anybody knows if it's possible to calculate it automatically?
    Thank you!!

    Hi,
    I have a doubt..why system should perform ATP check for labour?
    I am assuming because you have mentioned hours.Secondly which date you are changing the requested delivery date?
    Kindly clarify the doubt.
    Regards,
    Amrish Purohit

  • Using BAPI for authorisation check

    Hi,
    I am not sure if I understand what you want to achieve but you can check ABAP statement AUTHORITY-CHECK with addition FOR USER which gives you a way of testing authorization for different user. So if you use some RFC user to get BP partner then you can write your wrapper where you will pass user name to perform authorization check first.
    Cheers

    Hi Julius,
    here is my design:
    1 the search engine logs on to the CRM system using a super user account and fetches some informations about the Business Partner.
    2 Subsequenntly, the search engine builds the URLs for each Business Partner after this pattern:
    http://<serverhost>:<port>/sap/crm_logon/default.htm?crm-object-type=BP_ACCOUNT&crm-object-action=B&crm-object-keyname=PARTNER&crm-object-value=<partner_id>&saprole=MYROLE
    3 Before a user can input a query to search for a Business Partner he/she is prompted to provide the credentials (username and passwort) for the CRM
    4 These credentials are passed to the CRM. Using the credentials and a Authorisation Object i want to check which Business Partner the user is authorised to access.  (For example, the user may be authorised to display only the Business Partner with a Business Role=EMPLOYEE). To perform this step i am looking for a BAPI
    5 Subsequently, the search engine provides as search results only the business partner the user is authorised to access
    6 By clicking on the URL the user can display a Business Partner in the WEB UI
    I hope i culd explain my design.  Thanks for help
    Edited by: Nicolai Zaidman on Jun 1, 2010 10:13 PM
    Edited by: Nicolai Zaidman on Jun 1, 2010 10:21 PM

  • Idoc or BAPI for Inventory check

    Hello Experts,
    We need to do an inventory check for every 5 mints and update an external data base. How can I achive this?
    Please suggest.
    Thanks,
    Suma
    Edited by: Suma B on Sep 17, 2008 4:39 PM
    Edited by: Suma B on Sep 17, 2008 4:40 PM

    Closing thread as there are no replies

Maybe you are looking for

  • GPO enabe\disable status won't hold

    So here's a funny yet really annoying one for you guys. I am trying to edit this "no macro warning access runtime 2003" GPO to make sure that it disables the macro message that shows up every time I open the database. Here's how the GPO looks likeI a

  • Free 3rd party software for these cams?

    anyone ? thanks please fix the E4200 media server in .02 firmware

  • How to place multiple images of hand paintings with drop shadow effects on room backgrounds?

    I want to place multiple images of hand paintings with drop shadow effects on room backgrounds to make them look as if the paintings are hanged on the room walls. I know how to do it one by one, but that takes time and I want to do it in batch at onc

  • Uh Oh, This isn't good

    Now I'm wondering why I bothered. This weekend (last night) I went about the task reinstalling Windows XP, etc. I decided that since I was doing a clean wipe and reinstall I would upgrade my BIOS first from 2.2 to 2.4. This may have been a mistake. A

  • Wifi no hardware installed error.

    I have an iMac running OSX 10.8.3 and get this error. Opening system preferences does not let me turn the wireless on. The wireless is working fine for my Macbook, iphone, and ipad. Help!