any bapi for updating scheduling agreement ME38 txn
i have checked bapi BAPI_AGREEMENT_MAINTAIN
but how to maintatin schedulines over there

first see the documentations.
Regards
Peram

Similar Messages

  • I want to know the name of bapi for schedule agreement

    hi,
    please give me the name of bapi for schedule agreement (mm module) .
    ok bye
    sreenu.

    Hi,
    As Rich Mentione there is no BAPI for Schedule Agreeement.
    You can Try : ME_UPDATE_AGREEMENT_PO  -Update Pur Document
                  ME_READ_OUTLINE_AGREEMENT_DISP --Read outline agreement item (From Agreement no and item no)
    Lanka

  • BAPI for Scheduling Agreement Scales

    Hello,
    I want to add Scales to my Scheduling Agreement.
    Tried using BAPI_SAG_CREATE, I was able to successfully create a Scheduling Agreement but it says that "No scales exist". According to the FM documentation, scales are not supported during the creation of outline agreements.
    Tried using BAPI_SAG_CHANGE using the Scheduling Agreement created but I always get a dump and points me to a standard code.
    Runtime Errors         GETWA_NOT_ASSIGNED
    ABAP Program         SAPLMEOUT
    Include                      LMEOUTP14
    Row                          1,454
    Module type              (METHOD)
    Module Name           POST
    If these BAPI will not work, my last option would be BDC.
    Thanks in advance.

    first see the documentations.
    Regards
    Peram

  • Is there any BAPI for scheduling agreement (VA31) ?

    Hi All.
    I need to creat scheduling agreement (T-code:VA31) using some data uploaded from EXCEL,but i can not find correct BAPI.
    Someone tell me try the two below:
    BAPI_AGREEMENT_MAINTAIN
    BAPI_SALES_DEL_SCHEDULE_CREATE
    But the two seem not effective, because they have no import parameters such as: SO type, sales organization, division, sold to party, valid from date,valid to date, material-number, quality etc.
    These parameters are obligatory when creat scheduling agreement(t-code: VA31) manually.
    My sap release is ECC6.0.
    How can i do? if there is no bapi , i use BDC ?
    MSN : [email protected]
    Best Regards.
    Jordy.

    Hi,
          Please try with the BAPI <b>BAPI_SALES_DEL_SCHEDULE_CREATE</b>.
    Regards,
    Hema.
    Reward points if it is useful.

  • Commom BAPI for Scheduling Agreement and PO

    Hi,
    I am trying to post a PO and a SA through IDOC, I have found two different IDOC type for this two. Can any one suggest any BAPI or Message type, which can post PO as well as SA.
    Thanks,
    Kuntal

    For PO : BAPI_PO_CREATE
    For SA : BAPI_SAG_CREATE

  • Bapi for scheduling agreements!

    Hi can any one help me in changing the rate KBETR in ME32L transaction.
    Actually I cant find any parameters related to rate in BAPI_Agreement_maintain.
    If not, can some one suggest me the correct BAPI in changing it.
    Thank you.
    Shekar.

    Sorry, unfortunately that wasn't helping me.
    Actually I was looking for some thing where in I can populate the field KBETR from KNOP table i.e rate.
    If you can help me in finding this, that would be really helpful.
    Thank you,
    Shekar.

  • Inbound Delivery For Scheduling Agreement Lines using LSMW

    Hi,
    We need to create inbound deliveries for scheduling agreements. Our scheduling Agreements are too big with 200 lines. But the vendor used to send only few discrete lines in his ASN. Is it possible to create inbound deliveries for the Scheduling agreement using LSMW? Is there any standard BAPI or IDOC available to handle this in LSMW? Has anyone done this before?
    Our requirement is as follows.
    1. Create Inbound Delivery for few lines of the Scheduling Agreement
    2. The delivery quantity of the inbound delivery will be a partial quantity of the Scheduling Agreement
    3. Materials are batch managed and the batch number for each inbound delivery item need to be captured.
    4. Vendor's ASN Number and its item number need to be captured at inbound delivery header and item level respectively.
    Note: Delivery Schedule of the Scheduling Agreement is not used in the above scenario.
    If you have any input, it will be really appreciated.
    Regards,
    SP0526

    Hi,
    You can give your scheduling agreement number in the field Purchase Order.
    If you want select from the list, you can click on PO tree (just under create inbound delivery). There selet document category as "L". You will get the scheduling agreement list.
    Regards,
    Prabu

  • MRP To Generate SCHEDULE LINES for Scheduling Agreement

    Hi
    I have followed the below steps but still the Schedule lines is not generated for scheduling agreement.
    1Maintain MRP views 1,2,3,4 for the material in material mste.(MM01)
    2. Maintain Purchase Info Record for the vendor plant & material combination.(ME11)
    3. Create Scheduling agreement using ME31L
    4. Maintain source list for the material & the scheduling agreement # and Line item set the MRP relevant indicator 2 (Necessary ?) ME01
    During Run MRP for the material.the below details entered///
    Processing key NETCH Net Change in Total Horizon
    Create purchase req. 1 Purchase requisitions in opening period
    Schedule lines 3 Schedule lines
    Create MRP list 1 MRP list
    Planning mode 1 Determination of Basic Dates for Planned
    Run MDBT or MD02 but still doesn't create the schedule lines......Anything else missing.
    MRP1:
    MRP Procedure: PD
    MRP Group: 0000 (External Procurement only)
    Lot Size: EX (Lot For Lot)
    MRP2:
    Procurement Type: F
    Sched Margin Key: 000
    MRP3:
    Avilablity chec: 02 (Individual requirement)
    MRP: 4
    Nil

    Raj,
    Source List a Mandatory for Scheduling Agreement, if you want to create automatic Scheduling line.
    Plz use (2) in MRP RELEVENT tab in ME01 (Source List).
    rest of the thing is ok, make sure a material master(MRP 2 VIEW) in that view you have to give a planed delivery days. it is must.
    HOPE IT WILL WORK
    Regards:
    Poision

  • Exit for role determination via exit for scheduling agreement and contract?

    Hi..
    I have a requirement to fetch the agents in run-time for PO,PR,SCHEDULE AGREEMENT, CONTRACT..
    For PO i am using EXIT : - M06E0005
    For PR release i am using EXIT :- M06B0001
    By using above 2 exits i am getting the agents at run-time...
    Same way i need the EXIT for SCHEDULE AGREEMENT and CONTRACT..
    if there is any EXIT for this please share with me..
    Regards,
    Imtiaz Khan

    Hi Imtiaz,
    Ideally you should have your agent determination logic in workflow itself instead of determinining them in EXIT.
    Can you tell me why you are determining agents in exit and how you are making use of it ?
    Also let us know how your workflows are getting trigger for all these documents.
    Regards,
    Ibrahim

  • Delivery Schedule for Scheduling Agreement

    Hi Gurus,
    Can I do GR for scheduling agreement(with delivery schedule) if the GR is earlier than delivery date? What should I do to be able to do so?
    Thank you very much

    Hi
    'Propose all Items" is ticked so that MIGO proposes all the items irrespective of the delivery date and quantity. This means that even if the delivery date has not yet been reached or the complete qty has been received, the system will still allow you to do the GR.
    Hope this clarifies.
    Thanks

  • Schedule lines for schedule agreement

    Hi,
    I need get all schedule lines for schedule agreement (all schedule lines = all visible in tab analysis u2013 all lines for all forecast dlv. sched).
    I check table VBEP and VBEH and I canu2019t find all items.
    Could you help?
    Thanks in advance,
    E

    Hi Manju,
    For this you need to set creation indoactor for planning run in SPRO.
    The path is spro-MM-CBP-Carry out overall maintenance of plant parameters-Click on maintain-give your plant-click on external procurement under planning run-here you can give your option for the schedule line creation.
    Traction code is omi8. Hope this will help you.
    Cheers
    Ravi

  • Idoc Message type for Scheduling agreement

    Dear Experts,
    How to configure to create Idoc for Scheduling agreement (not the releaseed schedule lines) ?
    I am trying to use message type ORDERS05 but it is not working.
    Will any body guide me preferably step by step process for this ?
    Thanks in Advance,
    Best Regards,
    Raju

    Hi Anji,
    Thanks for the Reply. But i think ORDRSP is for Order Confirmations.
    But I have to send Outbound Idoc for a Schedule Agreement.
    Whether the same  Idoc type & Messge type used for SO/PO(e.g ORDERS05, ORDERS/ORDCHG) can be used for Scheduling Agreement.
    Please Advice.
    Regards,
    Anbalagan

  • Confirmation Control for Scheduling Agreement

    Hello Experts,
    I have got situation for subcontracting scheduling agreement where client doesn't need confirmation control. They want to perform GR against scheduling agreement after creating delivery schedule without extra activity(Confirmation).
    Process flow is:
    1. Create work order(generates purchase requisition for subcontracting activity)(CO01)
    2. Create delivery schedule against purchase requisition for scheduling agreement(ME38)
    3. Create delivery to supplier through ME2O
    4. Confirm Goods receipt(ME38)
    5. Goods receipt(MIGO)
    I am trying to avoid step 4.
    Standard scheduling agreement setup automaticially fetches confirmation control key 0004. If I am disabling it manually, and not performing step 4, system throws message "no GR relevant item in PO"
    Can somebody suggest settings to achieve my scenarion
    Thanks and Regards
    Gyanesh

    Hello PavanKumar,
    The inbound delivery is one type of confirmation you are receiving from the vendor so I dont think you will be able to create the inbound delivery without confirmation control key.
    Hope this helps.
    Arif Mansuri
    Reward if answre is helpful.

  • Message type for Scheduling Agreement - Outbound IDoc

    Hi All,
    I have to create an Idoc for Scheduling Agreement through a Z program based on some conditions. I have bit confusion, whether i can use Idoc type for Orders(e.g ORDERS01..05) & Message type ORDERS / ORDCHG to generate Outbound Idoc.
    Already there is process code for for ORDCHG mappig IDOC_OUTPUT_ORDCHG & ORDERS mappig IDOC_OUTPUT_ORDERS.  Whether there will be any impact on this.
    Appreciate your help.
    Regards,
    Anbalagan.

    Hi Anji,
    Thanks for the Reply. But i think ORDRSP is for Order Confirmations.
    But I have to send Outbound Idoc for a Schedule Agreement.
    Whether the same  Idoc type & Messge type used for SO/PO(e.g ORDERS05, ORDERS/ORDCHG) can be used for Scheduling Agreement.
    Please Advice.
    Regards,
    Anbalagan

  • Release strategy for Scheduling Agreement(SA)

    Dear Forum,
    This issue is with regards to the release strategy for Scheduling Agreement(SA)
    Until now release has only been applicable to contracts at our client site. But we now plan to introduce it for SA as well. Such a feature is available in SAP but the problem is that with the given release strategy GR is not allowed until the release is affected. The system allows you to post the delivery schedule.
    Now what I want is that after making the SA the system should not allow to make delivery schedule if release is not affected.
    We also have MRP run at client site..Kindly suggest the procedure as, how to configure it.Are der any User Exit for the same,if so please discuss..
    Warm Regards
    Nainesh
    SAP ECC 6.0

    Hi,
    What's the SA Type that was created via MRP.
    If it's LP (without release document), release will not do anything BUT
    If it's LPA (release document), then you will not be able to Post the GR until release is affected.
    Thanks.
    Scheduling Agreement can be categories as
    1) LP (without release document) and
    2) LPA (with release document)
    If use LP, you can do GR without release but with LPA, you need to release the schedule line via ME38.
    Thanks.
    NanoSAP  
    Posts: 58
    Registered: 1/5/09
    Forum Points: 6 
       Re: release strategy for Scheduling Agreement(SA)  
    Posted: Jun 26, 2009 8:32 AM    in response to: sathish.kumar           Reply 
    Dear Mr.Satish,
    Thanks a lot for your earliest reply...But my point is i want the system should not allow to make delivery schedule if release is not affected...Though schedule lines are generating through MRP run...Is is possible,by any chance...??

Maybe you are looking for

  • Image is not exporting to PDF correctly

    When I export my document, everything exports fine except one image.  It has been doing this with multiple images, as I've changed the image a couple of times to make sure that the image wasn't corrupted.  Why would it be doing this? How document sho

  • Problem with Administrator

    Hi all, I am VERY new to ColdFusion and am feeling my way around. I have coldfusion MX installed on my laptop (running Windows XP) and so far have been able to run some basic .cfm pages but when I get to start learning about databases I am stumped. F

  • AT200 - need a Replacement Proprietary cable

    Hi All Please help I need a Replacement Proprietary cable for my AT200, Ive lost the orginal I know stupid and know I need to replace the stupid uncommon lead what was Toshiba thinking with adding the port as a means of charging. Also I cant seem to

  • Currency conversion from USD to USD4

    hi all, Is there any FM to convert currency from USD to USD4. Regards, Srilatha

  • Dynamic spelling in IDCS3 - some docs come in all red-lined

    Hi there. I just had this issue pop up recently, now it is popping up in several docs I'm importing for a publication. I import the docs and they come in completely all red-lined as if every word is spelled wrong. When it happened on a previous doc,