BAPI or FM to change an inspection Plan

Hi everyone,
I have a requirment,when a specification (Recipe managment) is changed ,the data accordingly should be updated in the inspection plan that is linked with that.
Can you pelase let me if i have any function module or BAPI which can be used to update the existance inspection plan.
I have a BAPI to create INSPECTION PLAN but i didn't find any bapi to change INSPECTION PALN.
Thank you in Advance.

Hello Parankusham,
Unfortunately, there is no BAPI for changing the please.You can look into the engineering workbench CWBQM and which possibilities it offers you in your case.
Thanks
Amber

Similar Messages

  • FM/BAPI for changing the inspection plan

    Hi,
    I need to change the inspection plan.
    Can anyone suggest any FM or BAPI please.
    When I am trying to use BAPI  BAPI_INSPECTIONPLAN_CREATE for this purpose,
    I am getting the below mentioned errors:
    E  BAPI                001
    A CPCL               006 Task list Q Q0000171 1 already exists
    A CPCC_DT         210 For further processing, the routing entry is missing
    Thanks in advance.

    Hi,
    Could you please help me with the fields that need to filled for this purpose ?
    I am currently filling the TASK and INSCHARACTERISTIC structures with the following fields filled:
    TASK:
    TASK_LIST_GROUP
    GROUP_COUNTER
    VALID_FROM
    VALID_TO_DATE
    TASK_LIST_USAGE
    PLANT
    TASK_LIST_STATUS
    TASK_MEASURE_UNIT
    LOT_SIZE_FROM
    LOT_SIZE_TO
    INSPCHARACTERISTIC:
    TASK_LIST_GROUP
    GROUP_COUNTER
    ACTIVITY
    INSPCHAR
    QUANTITATIVE_IND
    MSTR_CHAR
    PMSTR_CHAR
    CHA_MASTER_IMPORT_MODUS
    CHAR_DESCR
    UP_TOL_LMT_IND
    LW_TOL_LMT_IND
    TARGET_VAL_CHECK_IND
    TARGET_VAL
    UP_TOL_LMT
    LW_TOL_LMT
    But still I am getting the error mentioned above(previous message).
    Thanks
    Shilpika

  • How to display changes of inspection plan via t-code :CBWQM ?

    Dear all,
    We are using ECM for inspection plan updating, Is it possible to see changes in detail like QP60,QP61 via T-code : CBWQM ?
    Regards,

    QP61    Display change documents insp.plan?

  • Change of inspection Plan

    Dear all
    a lot with the insp. type 04 is created.it has status REL and it has a plan. Now please guide me how can i change its plan with some other usage.is it possible

    Hi Ahmad,
    As you have described the lot status is REL not INSP ok then you can revert it from REL to CRTD again.
    Follow the steps.
    - Run trx QA02, Enter the lot number.
    - Now follow the path Inspection Lot->Function->With Draw Approval---> Click over it and save. The lot status will changed from REL to CRTD.
    - Now the cancellation of samples is also mandatory.
    - So run trx QAC3, enter the same lot number enter the trx. and save
    - Go back to QA02 and assign new Inspection plan
    Regards,
    Shyamal

  • LSMW for Inspection Plan

    Hi Sapiens,
    I am a requirement to upload the Quality Management data through LSMW.
    1) Quality Info Recrod
    2) Inspection Plan
    For the first one, I could able to create Project in LSMW and successfully do for over 200 customers.
    I am saying problem in creating and uploading the Inspection Plan data.
    I created one inspection plan with a material in QP01 (Tcode), and assigned one customer in "Material Assignment".
    We have only hand full of materials (6-10 max) with MICs (10 - 15 max). So I using the same Inspection plan for material and I want to assign all the customer in Inspection plan at "Material Assignment". But at "Run Batch Input Record" in LSMW, it is failing. due to the below errors.
    1) Field MAPL-PLNAL(2) is not an input field
    2) Field MAPL-MATNR(2) is not an input field
    3) Field MAPL-WERKS(2) is not an input field
    I understand that these fields are repeating, as these fields are required in "Material Assignment" tab, where I will mention Counter, Matl, Plant and Customer. but it is saying these fields are not for input. If I dont use these fields in Field mapping then it will throw an error during actual recording.
    So, I need some inputs on it and all of your suggestions will be valuable.
    Awaiting of your reply on this soon.
    thanks,
    Mukesh

    Hi Mukesh,
    I would suggest to go for BAPI instead of LSMW for the inspection plans, if possible.
    Regards,
    Rahul

  • Inspection plan BDC reg

    Hello friends,
    We have writting one BDC for creating and changing the inspection plan, In this, the plan creation is successfully done.
    when we go for change, the system throws the error "task list is invalid create task list".
    once we log out the session and login again that uploaded inspection plan is shown with out any error.
    we can't address this issue?  Kindly help us to fix this....
    regards,
    sathes

    Hi,
    Please clarify that uploaded inspection plan is created one or changed one. To execute the changes for inspection plan the criteria in task list might be inavalid. Hence triggering the error. Please create new task list group in IA05. Thanking you.

  • Inspection Plans

    Hello all..
    We have data in SAP...we need to move it from one plant to another.
    I need to move the inspection plans from one plant to another..I need to make source files for this in order to use LSMW, can anyone tell me how to make source files for Inspection plans, which tables to use and which all field to include???
    Regards
    Neha

    Hi,
    I think above solution is ok to make your work easy, but if you want that control then you can use Engg Change Number functionality.
    1. every year create inspection lot manually with inspection type 89.
    2. check for inspection plan changes
    3. Generate Change number and with that change number change the inspection plan.
    4. now for change number we have release strategy. we can use this release strategy.
    Please try and let me know if that is working.
    Regards,
    Chaitanya Parchure

  • Create Inspection plan at once for many materials through QP01. Possible?

    Dear Friends,
    Is it possible to create Inspection Plant for more than one material at onece through QP01 when operation activity and Characteristics are same. I will change the Characteristics specifications afterwards.

    As suggested in earlier reply you can assign multiple materials to one inspection plan.
    But you may still need more than one plan because of
    1. UOM is maintained in Inspection plan header. So you have to create different inspection plan if you receive materials in different Unit of measures.
    2. Usage is also at header level, so depending on configuration, usage for 01 inspection type may be different from usage for 0101 inspection type.
    If you like the user exit approach.
    1. Create a dummy material and assign default inspection plan to this material.
    2. In the user exit change the inspection plan assignment.  Assign inspection plan from this dummy material.
    Form us this was a very useful approach during testing or for new material where inspection plan was not created in time.
    Once this default inspection plan is assigned, inspection lot is released even without inspection plan. If we need,  we can always change the default inspection plan in QA02 transaction before RR
    AK Marwadi.

  • Master data changes not updated in Inspection Plan- QP01

    Hi
    We created all the QM master data . After that we did some changes in inspection chars and in the sampling master data.but the values are not reflecting in the Inspection plan . How to update the changes in the inspection plan. We are trying to find indIvidual as well as Mass update
    Any input will he highly appreciated
    Thanks
    JJ

    Dear JJ
    Another easy method will be maintaining MIC as referenced mic. instead of maintaining it as complete copy model you can make it referenced. any changes in the mic can be updated automaticalyin the inspection plan using the referenced functionality.
    The issue being wherever the mic goes will be changed,
    Regards
    gajesh

  • BAPI INSPECTION PLAN

    I am Creating the Inspection Plan by using the BAPI's but
    (BAPI_INSPECTIONPLAN_CREATE) i got this error message.
    here FU26FR is the INpection method and master inspection characterstic.
    the error related to inspection plan charactrstics
    how to over come this error please tell me.
    for good answer i will give the reward points
    message :
    Specify a valid data import mode for master inspection characteristic FU26FR

    Hi,
    Check the Bapi documentation....
    Enter the reference for the master inspection characteristic in the field CHA_MASTER_IMPORT_MODUS (mode for reference to the master inspection characteristic).
    "L" for reference
    In this case, the master inspection characteristic must be completely maintained. In parameter INSPCHARACTERISTIC, you must only enter data in the fields, in which data cannot be transferred from the master inspection characteristic.
    "C" for copy (flexible reference)
    In this case, the data is copied from the master inspection characteristic to the inspection characteristic.
    "N" for creating a flexible reference
    In this case, no data is transferred from the master inspection characteristic. You must enter all fields in parameter INSPCHARACTERISTIC.
    For "L" or "C", you can copy the control indicators for the inspection characteristic directly from the master inspection characteristic. For "N" or if you do not enter a master inspection characteristic, you must enter the control indicators individually or enter a key for the control indicators in field PRESET_CTRL_INDS_KEY, if you have defined this key in Customizing.

  • Creating Inspection plan using BAPI

    HI all,
    I am using the FM 'BAPI_INSPECTIONPLAN_CREATE'. I am unable to update the Inspection characteristics as multiple entries. Its getting updated only the last item.
    Expecting answer from the experts.
    Ravi.

    Hi,
       you can check the BAPI_INSPECTIONPLAN_CREATE for the named purpose, the values you named are in the structure BAPI1191_CHA_C please read the BAPI documentation:
    Functionality
    You can use this function module to create inspection plans and all its subordinate objects.
    You can create a key date view and the complete history of an inspection plan. It is useful to have a history when transferring data from external systems.
    Example
    You want to create an inspection plan with operations and inspection characteristics for key date 01.01.2000. Make an entry in the following tables for each object:
    TASK
    OPERATION
    INSPCHARACTERISTIC
    If you want to assign test equipment to the inspection characteristic in field ITEM_NO_OF_PRODUCTION_RESOURCE, you must have assigned this test equipment in PARAMETER PRODUCTIONRESOURCE.
    Notes
    If no error occurs during the transfer of data, the export parameters GROUP and GROUPCOUNTER contain the key for the task list created. A COMMIT WORK must be executed for writing data to the database.
    All errors that have occured are logged in the export parameter RETURN. If there are inconsistencies, the inspection plan to be created is rejected
    <b>Reward points</b>
    Regards

  • MIC changes in routing/inspection plan

    Hi, we have created qualitative inspection characterisics (without characteristics attribute control indicator) with incomplete copy model type. This is already assigned in inspection plan and in routing. Now our users want to assign characteristics attribute.  We changed the MIC control indicators. this is not reflecting in the routing/inspection plan.
    Could anyone suggest the best way to update the inspection characteristics in inspection plan as well as in routing.

    Dear !!!!
    Please Follow this steps
    1.Check Inspection Setup What u have given
    2.Create a Quality Work center with control Key QM01
    3.Create Master Inspection Characteristic in QS21
    4.Create Quality Plan QP01 make sure your usage type 5 0r 6
    5.Assign inspection characteristics in master inspection whatever u have created in QS21 save
    6.Go to QA32 check with selection by material or by plant
    7.Then go to QE51n and run by selection condition by material or by plant Results recording starts
        Then click on the Inspection lot make the inspection and save it will prompt saying that results save under operation
    9.Then go to Usage decision QA32
    10.Move Material From Quality To Unrestricted.
    Thatu2019s all the Steps
    With Regards
    Pushpalas

  • Inspection Plan - Change order date Combination issue

    We are facing 1 issue in our system.
    The Inspection plan assignments with new change orders is not assigning the correct inspection plan.
    Example:
    Plan                       Change Number               Valid from Date
    1                              CO-1                                1/01/2007
    2                              CO-2                                1/01/2008
    3                              CO-3                                1/01/2010
    The plan selected when Change order CO-2 is cut in, is plan 1 but should be Plan 2. We believe the date on the CO does not drive the selection of the most current plan. When plan 3 is implemented after plan 2, Plan 2 is selected.
    Any one has faced this kind of issue in your exp?
    Edited by: Tom_Eric on Apr 28, 2010 10:49 PM

    No reply

  • Change Inspection Plan

    Hello everyone,
    I have a problem, I change a control indicators of characteristic in the inspection plan, but it doesn't take effect.
    whether I need to set other setting? Thanks in advance.
    zhigang
    Edited by: zhigang lu on Oct 16, 2009 5:29 AM

    Hi,
    Please also check under QM client settings in SPRO to ensure that the "replace master inspection characteristics" box is ticked as this will allow changes in the MIC to update the references in the inspection plan. Also check the QM settings at plant level if you have ticked master inspection characteristics with history then if you do a change in the MIC it will create a new version and not update the inspection plans. If this is ticked you will have to manually go into the inspection plan and assign the new MIC version.
    Regards,
    Roderick

  • Assignning materials to a Inspection Plan by BAPI? QM

    Dear sappers,
    I a help with QP02. I need 2 Functions modules or BAPI's: 1st for assigning material-plant to an Inpection Plan and 2nd for cancelling the assignment of material-plant to the Inpection Plan automatically.
    I have checked all BAPI's in SE37, but more effort is needed.
    I know this is a real thread, so thanks for your help.
    Does anybody have any brilliant idea?
    Thanks a lot.

    Hi Gerard,
    I am looking for an automated way of assigning materials/plants to inspection plans and also for cancelling such assigments. I assume it is not far from the requirement you describe.
    Have you found a way to solve it ?
    Best regards,
    Thomas

Maybe you are looking for