BAPI to change maintenance plant on Equipment

Hi everyone,
Is there a BAPI which changes the maintenance plant on the equipment. I tried both
BAPI_EQMT_MODIFY and
BAPI_EQUI_CHANGE unsuccessfully.
If any of you have an idea of any BAPI which does the same or if the plant can be changed with the above BAPI's please help.
Thanks
Aneesh

Hi Aneesh,
When using BAPI_EQMT_MODIFY are you populating with BAPI_ILOA-MAINTPLANT = "Your value" as well as BAPI_ILOA_X-MAINTPLANT = 'X'
Don't forget to call BAPI_TRANSACTION_COMMIT if you have no errors in your return table as well.
Kind Regards,
Richard.
Edited by: Richvdl on Nov 30, 2010 6:08 PM

Similar Messages

  • FM or BAPI to change Maintenance plant and Planning Plant for an equipment

    Hi Experts,
    I need to change the Maintenance plant and Planning Plant for an equipment. Is there FM or BAPI available for the same?
    Thanks,
    Peri.

    what doesn't it do the same ? it contains planning plant and maintenance plant which you can update ??
    if you expect that SAP delivers custom functions for every possible question a developer has you can better search for an other job. SAP makes generic functions and you can use them for you're own sollutions.
    it is also expected that you try to work things out for you're own sollution.
    you can find sample code quickly enough if you search where the function is used
    like RISTEQ01
    kind regards
    arthur

  • Table for maintenance plant for equipment & functional location

    Hi,
    I am trying to identify a table that will give me maintenance plant for a particular equipment & functional location.
    Can you help me identify this.
    Regards,
    Vijay

    Hi
    ITOB is Table for Functional Location which will give Maintenance Plant & for Equipment which will give Maintenance Plant
    Regards,
    Rakesh
    Edited by: RAKESH ASHOK MANE on Jul 29, 2010 4:32 PM

  • Error when trying to change maintenance plant of a PM equipment

    We need to change the maintenance and planning plant of an equipment in order to specify his new location when it is transfered. Although it is described as a normal procedure in SAP help, we receive error message IO 231 saying that "maintenance plant A and planning plant B are in different controlling areas" and SAP does not let us proceed with the plant change ! Did anybody have the same experience ? I believe that it is probably a customizing setting somewhere in FI-CO ! Any help is welcome.

    Hi Thyagarajan,
    here is what you find in SAP help:
    <u><b>Changing the Maintenance Plant</b></u>
    <u>Prerequisites</u>
    It may be necessary to change the maintenance plant for a piece of equipment. For example when it is to be installed at a functional location which is in another maintenance plant, or when it is to be used in another maintenance plant from now on.
    However, you can only change the maintenance plant for a piece of equipment, when the piece of equipment is no longer installed at a functional location.
    <u>Changing a maintenance plant has the following consequences:</u>
    -The system automatically clears all fields of the master record that are dependent on the maintenance plant.
    -A change of maintenance plant can result in a change of company code, which causes the system to clear all fields that are dependent on the company code.
    -The company code change can produce a change in the <b>controlling area</b>, which means that the system clears all fields dependent on the controlling area.
    So for me, it is clear that having plants in different controlling areas should not prevent us from changing the equipment maintenance plant.
    Message was edited by:
            Eric Canivet

  • BAPI to change maintenance plan(IP02)

    Is there any BAPI available to change maintenance plan(IP02).

    I doubt if you have any bapi's for your purpose.

  • Changing Maintenance plant to Planning Plant

    Dear Experts,
    We have requirement like this.
    Now under 1000 Planning Plant , 1001,1002 are maintained as matainance plant.
    Now we have planned to change 1001plant as Planning plant, means accordingly we have changed the configuration.
    Now are transporting the changes to PRD, So here before importing to PRD what are all the activities has to be considered.
    As per my knowledge
    1] We have to close the all the maintenance order, Notifications, Service orders has to be closed.
    2] To change the Planning plant from 1000 to 1001 for all the equipments and functional location.
    Apart from above mentioned activity, if any further steps need to be carried out please suggest.
    Regards
    DON

    Hi,
    You have to change BOM, Task list, maintenance plans, authorisations etc.
    Where ever there is planing plant assignment exists there and all.
    Regards,
    NNR

  • How to change planning plant in Maintenance order

    Hi experts ...
    In maintenance order , depending on equipment , the planning plant gets defaulted . If Equipment is installed in another FL whose planning plant is different , the order's planning plant doesn't change (Greyed) . Is there anyway to change planning plant in orders
    NPB

    We have maitenance and planning plant same .Equipment was in maintenance plant XYZ and planning plant XYZ earlier . Now the same equipment is in maintainance plant ABC and planning plant ABC . In order , I am able to change maintenance plant  to ABC , but unable to change the planning plant to ABC .
    If I do not change planning plant and change only maintenence plant , what are the effects in cost reporting ? Since ultimately cost is settled to equipment cost center (which is now changed to ABC cost center) , I feel there will not be any effect . Old planning plant may only affect search right ? ....Please advise ...
    NPB

  • Bapi to change Equipment stock information??

    hi all,
    I am trying to find a BAPI which changes stock information of Equipment. ( we can change the stock information from ie02 in the serdata tab ) i tried BAPI BAPI_EQUI_CHANGE but for storage location and stock type there are no fields.
    Any pointers to how to acheive it would be highly appreciated...
    Regards,
    Sreekanth

    Only option is BDC

  • Change in Maintenance plant

    Hi experts can u brief me what is the effect of changing the maintenance plant in the equipment in plant maintenance of SAP?

    You are moving the Equipment to another organizational unit.
    Maintnenance plant of the Functional locaiton should also be changed (same as the Equipment).
    After chaning the plant, the equipment is a technical object of your current plant.
    Babu

  • Maintenance plant in organisation structure & equipement master

    Hi Gurus
    There is small confusion about fixing the organisation structure.In fact the client is supplying thier asset (equipment) to customers and charging rental. The Nurses are mainly supplying the equipment and then doing periodic visit, trouble shoot. Nurses spreads all over the country and they do service according to patinet location. If any issues on equipment technicians are solving. The nureses are assigning by delegator for work , however the periodic visit is planning and doing by nureses. About the repairing the workshop technicians by receiving from the client stores.
    When considering to this all points I dont thing we need to insert a maintenance plant in master data, organisation structure. Is it right? I think there will be 3 planner groups delegator , nurses and workshop. Also the work center is not required since we track  visits are tracking by sales and just notifcation is information purpose we decided to use. Is it right?
    Regards
    Thenna

    To identify the equipments based on location, you have to create the maintenance plant & location, assign the location to maintenance plant.
    Create one maintenance plant (planning plant also same) & create work centers according to that. I guess, work centers are required as they are doing service to the patients.

  • Creating Equipment With Same Equipment No. In Different Maintenance Plant

    Dear Gurus,
    Is it possible to create equipment with same equipment No. (external Numbering) in different maintenance plant of same company code?
    We have 2 plants, plant 1000 & plant 1100 & the geographlocal locations are different. These 2 manufacturing plants belong to same company code. We have implemented plant maintenance system for plant 1000 & now want to roll out the same system at plant 1100. In plant 1000 we have equipment with equipment No. M323 (External Number). Now we want to create equipment with same no. in plant 1100. How can this be done? or is it necessary to have different no.? please advice.
    Regards,
    Abhijit Khandekar

    Dear Friend
    As Equipment master data is client specific, you cannot have the same equipment number for same category of equipment, though plants are different.
    Yes, you can do it if equipment categories are different.
    I hope this will resolve your query if not let me know.
    Regards
    Makarand Gurjar
    SAP PM consultant

  • IE02 - Auto clearing of Maintenance Plant when dismantling

    Hi,
    Can anyone suggest a User Exit or Badi whereby we can automatically clear the Maintenance Plant (ITOB-SWERK on the Location tab) whenever equipment is dimantled via the Structure tab in IE02, please?
    Thanks
    Jan

    Hi,
    There is no BADI available but there is some USER EXITS ....
    EXIT_SAPMIEQ0_001
    EXIT_SAPMIEQ0_002
    otherwise try the BAPI...BAPI_EQUI_CHANGE
    for changing the maintainence plant..
    Try this if it suits your purpose...
    Edited by: Prakash S on Mar 19, 2009 9:19 AM

  • System not allow to change planning plant

    Hi Experts,
    My problem is I changed company  code , maintenance plant  & planning plant in old system as per client requirement. They are using same system from last 4 years. I changed all require setting in customization but now problem is that in  equipment task list system does not allow to change the planning plant in header data of  IA02 T code. I updated the new planning plant in Function location master,Equipment master , Work center & assign it planner group but even system shows the old planning plant in task list header data. System shows the planning plant data in display mode.
    Pl advice from where system link the planning plant field in task list header data.
    Thx in adavance.
    AVI DDS

    Avi
    Pete is right. There is no way you can change the planning plant in the Task Lists
    Task list creation is done for a planning plant & you will not be able to use the existing tasklist for your updated equipments having different PPlants.
    The only way to proceed is to create new tasklists
    Delete the old assignments of the tasklists to the maintenance item & reassign the new tasklists to the existing items
    In case you dont want the tasklists in the system itself, you will have to delete the tasklists - ie mark the deletion indicator in the change mode & archive the TLs.
    Regards
    Kartik

  • Is there any BAPI  FOR TASKLIST CREATION OF ANY EQUIPMENT ?

    Dear Sir,
    Is there any BAPI  FOR TASKLIST CREATION OF ANY EQUIPMENT .
    Thanks.
    Regards,
    Pooja Joshi.

    Hello Pooja
    Perhaps the following link may be useful:
    <a href="http://www.sapfans.com/forums/viewtopic.php?p=906052">FAQ: Plant Maintenance and Customer Service BAPIs</a>
    Regards
      Uwe

  • FM or BAPI to change Operation data

    Hi,
    Is there any BAPI to change operation data? BAPI_ALM_ORDER_MAINTAIN is not useful in my case. I want to use   IBAPI_ORDER_OPERATION_CHANGE but not able to get proper documentation for same.Can anyone give me a sample code about how to use IBAPI_ORDER_OPERATION_CHANGE?
    My requirement is to tick check box 'Required Splitting' in operation if some conditions are met. I am planning to do this using cuatomer exit. Everything is working fine only i need to know how to use above BAPI. If this doesn't work then as a last option i will go with BDC.
    Regards,
    Kamal

    Hi Kamal,
    Unfortunately I can not see any BAPI which changes operation data of a production order.
    BAPI_PRODORD_CHANGE is available only for changing header details.
    BAPI_ALM_ORDER_MAINTAIN and IBAPI_ORDER_OPERATION_CHANGE are used for changing maintenance or service orders, and not production orders, most probablty this won't work or cause issues.
    I'm afraid BDC is the only option in this case.
    Regards,
    Marcelo Pacheco

Maybe you are looking for

  • Windows Server 2012 Virtual Machine Failure

    I am running Windows Server 2012 R2 Host machine.  In Hyper-V, I created a WS 2012 VM. The VM starts out OK, but after a few hours of work (configure and install SharePoint 2013), starts throwing errors (Machine had to re-boot). Eventually, the VM be

  • Mozilla when open do not repond and thus freezes my computer entirely!

    Mozilla has tendency not to respond to my commands and becomes white completely writing '' NOT RESPONDING''each time i went on internet.It also freezes my computer.i can't even click on start & affect the pc.Does the pro has bugs or what? == This hap

  • IPad mini touch unresponsive after replacing digitizer.

    I just replaced an ipad mini digitizer. The home button works fine but the screen is completely unresponsive. I can get to the lockscreen but can't swipe or do anything. I tried doing the reboot by holding both buttons but same result. Please help.

  • IPad air won't sync to MacBook pro

    I Tried to sync my iPad air to my MacBook pro laptop and it doesn't register under devices on iTunes. The iPad isnt even showing it as charging while plugged into the computer. I troubleshot by plugging in an iPhone 5 and it recognized that device. D

  • Another 'dumb' gamer?

    PL check the 3rd response againts this what is the name space in SAP. any one up for blog on cheating101? ~Suresh