Bar/line combo for cr8.5

Post Author: Mike M
CA Forum: Charts and Graphs
We are trying to create a bar graph with a line graph superimposed on it.  We have created two graphs, 1 a bar graph, the other a line graph and put them on top of each other.  In the analyzer mode, we have set the area colors of the front graph to be transparent.  In design mode, when we view this, it works well (we see the bar graph with the line graph over top of it).
Our problem is, when we try to view the same report through our application (vb6), the transparent area shows up white.  We tried a test where we set the area colors to blue and viewing the report in the design mode, shows blue.  Viewing through our applications, goes to white.  Is there somehow a way of setting the area colors of the graph at runtime?

Yes, I create a formula row with a zero in the first column. The row should be hiden. This has to be at the top of the grid and include the row in your data ranges for the chart.

Similar Messages

  • I want the tooltip of dvt graph(bar line combo) to be shown as percent.

    I want the tooltip of dvt graph(bar line combo) to be shown as percent.
    <dvt:y1Axis >
    <dvt:numberFormat numberType="*NUMTYPE_PERCENT*" decimalDigit="0" scaleFactor="SCALEFACTOR_NONE"/>
    </dvt:y1Axis>
    <dvt:markerText rendered="false">
    <dvt:y1Format>
    <dvt:numberFormat numberType="*NUMTYPE_PERCENT*" decimalDigit="0" scaleFactor="SCALEFACTOR_NONE"/>
    </dvt:y1Format>
    </dvt:markerText>
    Is anything wrong with my config.
    Thanks !

    I want the tooltip of dvt graph(bar line combo) to be shown as percent.
    <dvt:y1Axis >
    <dvt:numberFormat numberType="*NUMTYPE_PERCENT*" decimalDigit="0" scaleFactor="SCALEFACTOR_NONE"/>
    </dvt:y1Axis>
    <dvt:markerText rendered="false">
    <dvt:y1Format>
    <dvt:numberFormat numberType="*NUMTYPE_PERCENT*" decimalDigit="0" scaleFactor="SCALEFACTOR_NONE"/>
    </dvt:y1Format>
    </dvt:markerText>
    Is anything wrong with my config.
    Thanks !

  • Combo chart - different colors for Bar/Line

    Hi,
    In a combo chart is it possible to have different colors for bar and lines......................In our report- combo charts the intersection of bar/line is NOT visible beacuse of same color.

    Yes, I create a formula row with a zero in the first column. The row should be hiden. This has to be at the top of the grid and include the row in your data ranges for the chart.

  • For no apparent reason the top tool bar line has dissappeared and if i place mouse over the top of page, FireFox will come up but not "File" and now cannot find "Prinit". "History", etc. Help???

    The tool bar line has suddenly disappeared and cannot print or check history. Also, bottom tool bar has disappeared so cannot see clock, shift to other programs.
    Only happens with FireFox. If I access any www site via FireFox, same problem. I have re-booted several times, same problem.
    MS 7 Prof OS
    Dell Latitude

    Upgrade your browser to Firefox 8 and check
    * getfirefox.com

  • Need a JavaScript to enable/view Multi-line option for Text fields.

    Hello All,
    I need a JavaScript to enable/view Multi-line option for all the Text fields in PDF Form.
    Assume that I have a PDF form of Fields from F1 to F100 and it contains 25 Checkboxes, 25 Combo Box and 50 Text Fields. Now i need a javascript for which i need to enable Multiline for only Text Fields. So Is there any JS for which i can enable the Multiline option for only Text fields and not for ComboBox or Checkbox.

    Hi timo,
    Thanks for your help. iam trying to use the iteraor approch to do this. but i don't know how to fetch the data entered in the form that was built by the iterator. can you please tell me .
    thanks

  • Bar & line chart together

    Hello friends,
        We have a requireemnt where we need to project Bar & line graph in single chart in ABAP code. We need secondary axis also for line chart. We searched DWDM but could find the chart of our requirement.
    We used Graphic_matrix_3d but it can have only one chart type. If we use chart type as line all the entries in graph will be line. But we need 2 in bar & 1 in line format
    Can you please help!!!!
    Thanks & regards,
    Suresh

    Hi,
    you can look at classes cl_gui_chart_engine or cl_igs_chart_engine and you can also download the SAP chart Designer from SDn-Downloads to draw line and bar chart together.
    Thanks & Regards,
    Sarita Singh Rathour

  • Line grph for below result set

    Hi all,
    I need to get line graph for the below
    with dates as Y axis and Tack Name in X Axis.
    Please help me on this .
    Regards, Subathra

    Hi Subathra,
    If I understand correctly, it seems that you want to create a Range chart to display range bar for each task. If in this scenario, I suggest we can refer to the following similar thread:
    http://social.technet.microsoft.com/Forums/en-US/be1d7ff3-7981-4384-ab91-068323fe42b9/range-chart-to-display-timeline-start-and-end-dates-side-by-side
    If there are any misunderstanding, please provide us more information about the report. If possible, provide us some screenshots about the desired chart. So that we can make further analysis and help you out.
    Thanks,
    Katherine Xiong
    Katherine Xiong
    TechNet Community Support

  • What is this message: Base Line Date for rule 11 not set ?

    Hello all,
    I am doing some test.
    Cenario:
    I need to create a Scheduling Agreement in transaction: VA41
    The material I am using to create the VA41, I have just created.
    I created in MM01 the views: Basic Datas 1 and 2, Sales View 1,2 and 3 and Account View 1.
    Issue:
    When I am creating the VA41 and I enter the material, the system shows the messages:
    1) Dates from:: Base line date for rule 11 not set
    2) Dates from:: Base line date for rule 9 not set
    *obs: the messages dos not block the creation of VA41. It is a information message.
    Question:
    What that means? What will happen if I do not fix that? What should I do in order to not have more these messages?
    Tks & Rgds,
    Barbara
    Message was edited by:
            Barbara Barbos

    Hi
    Please check whether you have assigned - payment terms both at company code and sales area level
    VVR

  • Hey iphone an iphone 3g and i only have about 13 apps and the yellow bar on itunes for my phone is way to big i deleted all my photos all my music every thing i ryed restoring ans all it still takes up space for sum reason ?? please someone help me

    hey iphone an iphone 3g and i only have about 13 apps and the yellow bar on itunes for my phone is way to big i deleted all my photos all my music every thing i ryed restoring ans all it still takes up space for sum reason ?? please someone help me

    If Other (the yellow bar) is too big something is corrupted.  The only solution (that I know of) is to restore from your most recent backup using iTunes (see http://support.apple.com/kb/ht1766).

  • Single line item for multiple line item payment.

    Hi
    I have booked the 3 vendor invoices (in FB60) for a single vendor. Now today i paid (with F-53) all the three invoices together. One payment document number was generated.
    However when i saw the vendor line item, i saw that three debit line items was generated for the clearing the open invoices (i..e 3 credit line items). so when i say vendor line item report, there were total 6 cleared line items (3 for credit i.e invoice and 3 for debit i.e. payments)
    But is it possible to get  single debit line item for all the three invoices cleared. If yes, please let me know how i can get it.
    If i will have one single line item for payment, vendor report would be simpler. Please help

    Hi,
    1. If you do payment through F-53, then each invoice have separate payment line item. This is not avoidable. If you do payment through F110, then you can group the line items for payment, so there only one payment line item for many number of invoices.
    2. While clearing through F-44, system is generating automatic line items because, there are exchange rate fluctuations. You can't avoid these line items, as these automatic line items only match Debit and Credit amounts in order to post the document.
    Rgds
    Murali. N

  • Mass change of payment in customer line item for all open line item.

    Hello,
    We have updated the new payment as per the new agreement with customer in customer master. We want this new payment term should also be updated in all the open invoices which are not cleared. Is there are way we can do the mass change in Payment term as the open line item in the customer where line item are more than 50. Please let me know the transaction code for the mass change of payment term in Customer account balances.
    Thanks and Regards,
    Rajesh Kumar Mantri

    Hi
    you can find the way to change the payment terms
    first check weather the payment term field is having change option in your document change rules in the line item for you customers.
    Financial Accounting (New)Financial Accounting Global Settings (New)DocumentRules for Changing DocumentsDocument Change Rules, Line Item
    if the payment term BSEG-ZTERM(payment term) is there for your customer and having deselcted check box for changing document you cannot change payment term for your company code.
    This can done client level or company code level.
    if the payterm  can be changed you do changes to payment terms mass level.
    Thanks
    ANJI

  • Issue with report (S_ALR_87013611) that is actual/plan line items for Cost

    Hi Gurus,
    I am having issue with the report (S_ALR_87013611) that is actual/plan line items for Cost Center.
    When i execute the report for a cost element  510200 the amount is 23,380.13, but when i drill down on it by double click on that amount the value in obj curr is 15468.91. Hence there is the differnce. When i futher drill down by double click on the amont of 15468.91 and i go to display group currency and take the total it is 23380.13 and display in local / doc currency the amount is 15468.91. I guess due to this there is difference. The cost center & the cost elements are the same i have checket it.
    My concerns is that the group curr is USD and obj curr / local curr is USD. So is group curr and doc curr is USD then when i click on dislay curr and select group curr why the amounts are changing.
    Kindly adivce

    Try to look if there is any filtering criteria applied in the report to which you drill-down.
    The difference can be also caused by the "value type" - some reports show actual and statistical costs together in one column while the others strictly show (are defined to show) only e.g. actual costs (type 04) and not the statistical costs (type 11)

  • Updated my mac to mountain lion 10.8.3 and now my app store, mail or facetime won't open. Also, I am not longer able to play videos through firefox. I tried downloading the combo for mountain lion and it refuses to install? Can anyone help me?

    updated my mac to mountain lion 10.7.8.3 and now my app store, mail or facetime won't open. Also, I am not longer able to play videos through firefox. I tried downloading the combo for mountain lion and it refuses to install saying that I need to see developer. Whenever I try to open my appstore, mail or facetime it says that the programmes need to be installed and might not be compatible with this version of mac operating system. Can anyone help me?

    It's not a bad install of Mountain Lion. I've had the same thing happen to me, but it affected not only Mail, but a variety of other programs including iPhoto and MS Office, where I had to delete preferences, caches, and reinstall the OS as well as the program itself. I'm still having issues with Mail, so I've gone to another program.
    Everything was fine upon the initial install. I restarted my iMac about two weeks after the install, and that's when the issues began to happen. I've reinstalled Mountain Lion twice, but the same issues arise.
    As I mentioned above, you'll need to figure out which preferences are causing the issue, then reinstall the program, as a fresh reinstallation will do you no good unless you wipe the drive completely.
    Here's a thread that helped me with iPhoto:
    https://discussions.apple.com/thread/4794375?start=0&tstart=0

  • BAPI Error: No schedule lines due for delivery up to the selected date

    Hi,
    I have created a program to create delivery orders with reference to sales orders using BAPI - BAPI_OUTB_DELIVERY_CREATE_SLS.
    After execution I get the error: No schedule lines due for delivery up to the selected date
    Please help.
    Thanks in advance!!!
    Regards,
    Sriram

    hi,
    this is to inform you that,
    please check the schedule line date in the sales order because the date is not matching here for the BAPI to upload.
    here,  for example the schedule line is 4 days after and you are running BAPI today. that will mismatch no.
    the same thing is happening in uploading case also.
    so please check the date.
    because in teh sales order if teh schedule line date is today it will accept the uploading with out throwing any errors.
    regards,
    balajia

  • Schedule line blocked for delivery

    Hi Friends,
    Can you please tell what does Schedule line blocked for delivery ( LIFSP )  means?can you please explain the business process involved in this?
    Regards.
    Dinesh

    At schedule line level, the following are some important prerequisites must be fulfilled, else the same would be set as blocked:
    1. The schedule line must be due for shipping on the specified selection date.
    2. The schedule line is due for shipping as the material availability date or the transportation scheduling date is reached.
    3. The schedule line is not blocked for delivery.
    4. The delivery quantity must be greater than one.
    5. The items in the order must be fully processed.
    6. The product status of the material must permit delivery.
    7. No credit check are pending.
    Regards,
    Gauravjit
    Reward Points if solution is helpful.

Maybe you are looking for

  • Action with new file with size from selection

    Hello, I try to record an action that takes a copy of the current image and creates a new file with the same dimensions. The action I record always has the file size of the new image hardcoded in it. I tried to set Preset to Clipboard, but this is no

  • HT1277 After recently upgrading my desktop I can no longer recieve emails from my IMAP account it continues to come up with password incorrect yet I have not changed it - HELP!

    After recently upgrading to Maverick my desktop computer and all other devices will not recieve emails from my IMAP account, it keeps asking me for a password which has never been changed in 8yrs, please help as it was my business account from so lon

  • HP LaserJet 2605

    There seems to be a few problems with poor color printing qualities. Laser colours don't match screen colours on 2605dn Options 07-10-2010 08:31 AM I have a LaserJet 2605dn. I recently replaced all 3 colour toner cartridges (with the exception of the

  • Context Index Peformance

    Hi, I want to create a context index on one column which contains large text. And the table contains millions of records and daily inserts happen into the same table. My question is 1.Do we need to run any procedures after inserting the records daily

  • Images not Appearing after Deinstall

    We deinstalled Portal30 and the Login Server for 3.0.8 using Oracle Portal 3.0 Configuration Assistant. (9iAS 1.0.2.2). Then reinstalled. Now the images appear when we go to the gateway.htm page but do not appear on the Oracle portal30 or portal30_ss