Base unit of measure is different from Idoc to purchase order toSAP System.

Hi Gurs,
vendor send a purchase order for confirmation through EDI, the base unit of measure in the Idoc is PA( Parcel). For this same material the unit of measure in R/3 system is PC.( Piece). I got a error on this.I checked in CUNI, In Unit of measurement ST (PC) is already assigned to  unit PCE in EDI. But i dont want to change the  Conversion.I need this also and I want to create a new conversion ST(PC) is assign to PA( Parcel).
Please help in this.
Is it possible to maitainthe ISO-code PA into table Units of Measurement of Dimension?
Edited by: Vadivel Karalam on Nov 1, 2010 1:13 PM

Hi,
You are getting the error because as part of the std ( For ALE/EDI) the unit of measurement that is maintained is PC whereas if you look at another unit of measure that you have mentioned, the std doesn't define anything under the ALE/EDI setup.
Because of that all the conversions are coming with PC. So pls goto general settings and check unit of measure menu. There for each of your units, there is a section for ALE/EDI, set up the relevant UoM and the issue should get resolved.
Hope it helps.

Similar Messages

  • PLANT FOR GOODS ENTRY DIFFERENT FROM PLANT IN PURCHASE ORDER

    Good Morning.
    My customer, asked me, if it was possible to make a purchase order in a single company and relevant purchase organization and plant, and the  goods entry for another plant referred to another company.
    Ex. Purchase Order for Company 01 and Plant 01
    Goods Entry for Company 02 and Plant 02.
    Thank you in advance for your cooperation
    Francisco

    Hi Francisco
    It is not possible to have PO on 1 Co and Plant 1 and GRN on Co 2 and plant 2.
    Whereas it is not logical also.
    Because Plants are Valuation area and ,If you have balance sheet on valuation area then in that case you can understand what would have happened if this scenario would have been feasible.
    Well what you can do..
    Create PO on Co Code1 and Plant 1
    Do MIGO ..so u will receive material in Plant 1 ...eg store location 1
    Then after that do Intercompany Stock Transfer
    A number of procedures are available to enable you to transfer materials from one plant to another:
    Stock Transfer Between Plants in One Step
    Stock Transfer Between Plants in Two Steps
    Stock Transport Order Without Delivery
    Stock Transport Order with Delivery via Shipping
    Stock Transport Order with Delivery and Billing Document/Invoice
    Please click on the below link to get more info on Stock transfer
    http://help.sap.com/saphelp_470/helpdata/en/4d/2b90dc43ad11d189410000e829fbbd/content.htm
    let me know if you need more info
    Regards
    Shailesh Meshram
    SAP MM/SNC

  • Base unit of measure

    Dear Expert
    my query is whenever i add new base unit of measure what are the effect it had on the system , i mean how base unit effect in the back end ...how system process base unit of measurement .
    Regards

    Dear usmfarhan 
    Actually Base unit of Measurement is the UoM which u want to maintiain ur inventory in the system.
    i.e whater u r buying it from vendor ...it might be in Ea or Box or Carton
    And you want to store in KG
    So you can have Additional unit of Measurement and its conversion that can be defined in AMterial master in additional unit of measurement
    Let us say Base UoM is KG and ur Ordering unit is TON
    So u have to define Conversion rule as 1 Ton = 1000 KG in material master.
    ,While changing Base unit of measurement you should make sure that stock should not be there.
    Secondly neither Purchase order for Raw material not Sales order for FG should exist in the system ,Neitehr routing should exist for FG
    Or else system will not allow u to change UoM
    Regds
    shailesh

  • BOM Unit Different from Base Unit of Measure

    Dear PP Experts,
    I have following Scenario in some of wires which are .
    Base Unit of Measure - Coil
    Conversion Factor
    1 Coil - 100 Metres (Already Maintained in mm01)
    Suppose, one manufacuring item consist of 0.5 Metre of Wire. We want to use Metre in BOM, how can we use it.
    Please help, full points if helped.
    Ishu

    Dear,
    In material master you maintin alternate unit as meter in plant data/storage 1 as unit of issue This will default this unit in BOM item
    In the BOM, in the component enter the above material code and enter the qty as 0.5. system will default meter as the unit of measure in BOM.
    Please come back if required
    Edited by: Rajesha Vittal on Feb 16, 2008 8:35 AM

  • Follow up material with different base unit of measure

    Hi all,
    I have the BOM with material Mat1 as a component. The base unit of measure of Mat1 is KG.
    Is it possible to replace Mat1 with Mat 2 material in MRP once the Mat1 warehouse stock is depleted.
    The base unit of measure of Mat 2 is KGK.
    The required quantity of MAT1 should be recalculated from KG to KGK accordanly unit ratio.
    Please, expain, where does it maintain?
    Thanks,
    Peter

    Hello Peter,
    You can use follow-up setting (set Mat2 as follow-up of Mat1 in MRP 4 view of material master if this follow-up scenario is valid for all BOM) with discontinuation indicator '1', w/o effective-out date. In this case Mat1's stock will run out (no PldOrd, PR, etc) will be created, and from the date, when Mat1's stock runs out, MRP will calculate with Mat2.
    As I told you, according to my best knowledge, you cannot realize this with different base unit of measures. (you have to change the buom of one of the related material masters or create a new material master if you cannot cope with buom-change).
    Follow-up group scenario can also be used but I guess different buoms will be a problem in that case as well.
    Maybe there are better solution but I'm not aware of it...
    BR
    Csaba

  • Material Master MATMAS IDOC and base unit of measurement

    Hi
    We are using SAP standard material master IDOC type MATMAS05 to trigger IDOC. Our material master is having base unit of measure as "G". We are not using ISO unit of measurement. But Material master IDOC, segment E1MARM is populating base unit of meaurement (MEINS) as "GRM".
    Any idea why IDOC is picking ISO unit of measurement instead of material master base unit of measurement.
    Any idea how to send base unit of measurememt as "G" instead of "GRM" in DOC segment.
    Thanks
    Nilesh

    There are ISO codes for country keys, currency keys, units of measure and shipping instructions. According to SAP design guidelines, you should use ISO codes for an IDoc if they are available. When you set up the IDoc, the SAP codes have to be replaced by ISO codes.
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/BCMIDALEPRO/BCMIDALEPRO.pdf

  • Base unit of measure issue during CIF

    Hello,
    we have one APO system which is connected to two R/3 systems (System A and System B).
    Actually one product number was coming years ago from System A with base unit of measure EA.
    We now need to add the same product number (with a different Business system group) via CIF coming from system B, but the source base unit of measure is ST.
    CIF interface stops with error "Error Text: Base unit of measure for product xxx" ....
    So actually I am looking for a way to add product xxx to the integration model in System B and transfer data to the APO system without removing the products and all linked master and transaction data from APO and creating new data.
    Maybe there is a workaround ...
    Thanks for any ideas and thoughts.
    Kind regards,
    Andrea

    Andrea
    One way is to add ST as alternate unit of measure in APO product master . This is because you cannot change the base unit of measure in APO without deleting all the dependent objects.
    After that you will be able to CIF over the data . But then you  have to remember one thing . Whenever you change the material master for this material in R/3 and CIF it over , the alternate UOM ST  will get wiped out in APO and you have to maintain it manually.
    Thanks
    Aparna

  • Units of measure are different

    Hi friends,
    I am trying to reverse the material document and its giving me erros as below please suggest how to solve this
    Units of measure LB / EA are different
    Message no. M7182
    Diagnosis
    The stockkeeping unit contained in the material document to be cancelled is not the same as the stockkeeping unit contained in the material master record. However, a document can only be cancelled if the stockkeeping units are identical.
    System Response
    In this case, the system will not cancel the material document.
    Procedure
    To carry out the reversal, re-enter the given transaction using the relevant reversal movement type.
    Regards
    Vishal

    Hi,
    Sales Unit is basically Unit of measure in which the material is sold. A value in this field significes that you want to use a unit of measure differing from the base unit of measure.
    If the field does not contain an entry, the system will assume that the unit of measure is the base unit of measure.
    Whereas, Base Unit of Measure in which stocks of the material are managed. The system converts all the quantities you enter in other units of measure (alternative units of measure) to the base unit of measure.
    You define the base unit of measure and also alternative units of measure and their conversion factors in the material master record.
    Now, if you change Sales Unit (as you can't Change Base unit of Measurement*), System will prompt the canged Sales Unit as an alternative to BaseUoM at time of Sales Doc. Creation.
    IMP: You can't change UoM in Sales Doc, once subsequent processes are carried-out.
    Best Regards,
    Amit.
    *NOTE: refer link:
    http://www.sap-basis-abap.com/mm/changing-base-unit-of-measure.htm
    for better understanding.

  • Base Unit Of Measurement error

    Dear Sir \ Mam,
    Our some materials base unit of measurement is in KG, and we want to make bills, excise RG1 entry in KG for milligram sales or material transfer. How to go for such transaction, system is not allowing for such transactions.
    Pls Note : We can't create two separate materials code for these UOM issue materials.
    Requesting a help.
    Regards,
    Randhir Padwal

    Hi,
    As per my understanding you have base unit in KG and you want to material issue and sales in miligram unit. If this is requirement then you may try to assign "sales unit" for material master in "sales:sales org1" view. you have to also give the conversion rate from KG to miligram in additional data.
    for issuing you have to maintain issue unit "miligram" in material master view "Plant data/stor1"
    Regards,
    mukesh

  • Changing Base Unit Of Measure in Material Master

    Dear All,
                  We need to change the base unit of measure of certain materials who have been assigned inspection plan. We have deleted the material from Inspection Plan and later even the plan. But still the system not allowing to change the BASE UNIT OF MEASURE. The error thrown by the system is : Material is assigned to inspection Plan.
    Please guide in this regard as changing the material for us will be a very cumbersome act.
    Regards

    Hi Rohan,
    Please check 'display errors' in MM02 when you are trying to change the BUoM. It will say what prevents you from doing that.
    Please check:
    http://www.sap-img.com/materials/change-base-unit-of-measure.htm
    BR
    Csaba

  • How to correct CIF error Base unit of measure does not exist?

    Dear experts,
    I'm trying to cif a location product with base unit of measure KG in R/3 and alternative unit of measure well maintained.
    it gives me a CIF queue saying that
    "Base unit of measure ZXX does not exist (Product 0000000000000XXXXXX has not been created)"
    I do not understand why, the unit ZXX does not exist in the alternative unit of measure for any of the materials managed
    I also checked CUNI table and ZXX is not there neither in R/3 or APO,
    Thanks for your help
    E

    Looks like the Alternate UOM --Zxx is not maintained in APO.
    2 ways to do this:
    (1) program- RSIMPCUST
    Re transfer all your UOM settings from R3 to APO
    (2) Manual Maintenance in APO:
    SPRO>SAP NETWEAVER>GENERAL SETTIGNS>Check UNits of Measurement
    Thanks
    Kumar

  • Base unit of measure can not be changed since EAN is already assigned.

    Hi,
    We would like to change the UOM from EA to SET .In order to tag MM # as BOM Header and ZCEN (Serial number profile)but the error massage appears as below print screensystem is not allowing to do so ,throwing following error message:
    "Base unit of measure can not be changed since EAN is already assigned."
    Could you help to resolve the same.
    Thanks,
    Amit

    Hi,
    Thats correct you must be getting Error message M3 341 ,
    EAN international article number is tied with material number in basic data view with EAN Category and seperate number range
    EAN is a standardized unit that uniquely identifies a material relating to a unit of measure or type of packaging.
    The International Article Number (EAN) is assigned by the manufacturer of the material. In this case, the EAN identifies the
    manufacturer uniquely. A company can assign EANs using "in-store" numbering techniques known only to the company.
    If you still want to change UOM you need to first remove the EAN assigned..please explore further if you have internal number range
    for EAN or external ..etc
    Thanks
    Diwakar

  • Base unit of measure is cahnging after creation of material master

    Hi
    I have created a material with material type Raw material with BUM  "Ton" , after save the material, when iam checking the material with display mode, the BUM is changed into "EA",i dont know where the sustem picks the BUM as "EA", kindly suggest where i have to do the configuration settings.
    Thanks

    Hi,
    Have you created the New Material referencing from another material.
    Please check the following links for details. It should be able to answer your queries.
    [Re: can't able to change into alternate UOM]
    [Re: variable order unit]
    [Re: Base Unit of Measure]
    Hope it helps,
    Best regards
    Amit Bakshi
    Edited by: AMIT BAKSHI on Aug 4, 2011 12:44 PM

  • Changing Base Unit Of Measure (Material Master)

    Hi
    1. How to check this? (Any successful changes in material master only took place when there is no open document from SD, PP, MM & FI for that material. )
    2. Base unit of measurement cannot be changed.  The reason being material movement history is there in table - MSEG mainly which otherwise create inconsistency in reporting.  -
    Is this line applicable for current period or previous period in current year or previous period previous year???
    3. There are no existing purchase requisitions, purchase orders, or scheduling agreements for the material. -
    is this means open / pending purchase orders  or the the PO's created in system with respect to material where the GR and IR is already done
    4. You can change the base unit of measure if there is no stock of the material during current and previous period----
    is this means the term " previous preiod" is previous period in the current finacial year   or its applicable for the previous preiod in previous financial year
    5. Post the stock in the previous period to the current period  - -
    how can we do this???
    Vijay

    See this OSS note : especially the last sentence:
    From OSS note 138767
    Within the material master record maintenance, you want to change the base unit of measure (base unit). During the change, the system performs extensive checks in order to avoid inconsistencies in the applications which use the material master.
    In particular, the following checks are performed:
    The base unit must not be defined as an alternative unit of measure for the material
    No International Article Number must be assigned to the base unit
    No proportion/product units must be defined for the material
    No configurable material must be assigned
    The material must not be used as a configurable material
    Stock must neither exist for the previous period nor for the current period
    No physical inventory must be active
    No reservations or dependent requirements must exist for which the deletion indicator is not set
    No planned orders must exist
    No purchase requisitions, purchase orders or scheduling agreements must exist for which the deletion indicator is not set
    No WM transfer requirements, no WM quants or no WM posting change notices must exist
    The material must not be a bill of material
    The material must not be contained in a bill of material
    The material must not be used as a production resource/tool
    The material must not be used in task lists
    No standard cost estimate must exist for the current or future period
    No production orders must exist
    No planned independent requirements must exist
    No run schedule headers must exist
    If the base unit has dimensions, no serial number profile must be assigned
    No sales and distribution documents must exist which have status Not processed or Partially processed.
    Solution
    If necessary, all reasons mentioned above must be eliminated by archiving the objects listed
    1) SAP checks this for you. A new button will appear in MM02 and after you click this button to check the error log, you will see which documents exist.
    2) I have not seen that an existing movement will restrict the change of a BUoM.
    3) No purchase requisitions, purchase orders or scheduling agreements must exist for which the deletion indicator is not set
           it is not caring about GR done or IR done. it telling you that the deletion indicator has to be active. As a deletion indicator can be reset easily, you probably have to archive the documents
    4) the previous period is the period before the current period.
       today we have February, hence the previous period is January.
    5) first make sure your current stock is higher than the stock of the previous period. if it is lower, then you have to create inventory in current period first e.g. with 202 movement with current date.
    Then you issue the previous period stock with 201 movement and previous period date (make sure periods are open in OB52 and MMRV allows posting to previous period).
    Finally you issue the left stock in the current period with 201 and current date.
    Now previous period and current period stock is zero. After the change of the base unit you have to get the stock back into the system
    Edited by: Jürgen L. on Feb 2, 2010 3:58 PM

  • QM_Change of base unit of measure not possible

    Dear QM Experts,
    Scenario is,
    1.     Material master created with QM view activation.
    2.     The Base Unit of Measure kept as EA
    3.     Inspection plan prepared for material with usage 5 and status 4.
    4.     Material has not undergone any purchase order / production order / routing or any other transactions except inspection plan.
    5.     No movements have done and the stock is zero
    6.     The requirement is to change Base Unit of Measure from EA to KG
    When tried through MM02 system throws an error message as The base unit of measure cannot be changed; choose "Display errors" Message no. M3189
    When viewed through log another information gets displayed as Routings already exist that are assigned to the material. Task list type Q.
    I tried through trial and error method. First material assignment was deleted from task list, problem did not resolve. Thereafter deletion flag put to task list. No impact. At last entire task list deleted. Still system does not allow changing unit.
    Has anybody faced the same problem ever? Whether deletion of task list (By T-Code QSR6) from data base will server the purpose? What are the obligations that one must follow while execution QSR6?
    Or if there is any other solution to this requirement?
    Thanks in advance
    Best Regards,
    Anand Rao

    Hi
    *What are the obligations that one must follow while execution QSR6?*
    By this T code  Deletion is very much possible provided that
    If there are no stocks of the material in the current period and in the previous period
    If there are stocks in the previous period, you can clear them as follows:
    a) Post the stock in the previous period to the current period (for example, using movement type 561) so that the stock for the previous period is the same as the stock for the current period.
    b) Clear the stock with the posting date in the previous period (for example, using movement type 562).
    If no purchase requisitions, purchase orders, or scheduling agreements exist for the material
    Material Is used in any task list/Rauting.
    Now as per your schenario I hope you have checked Inspection lot & PR,PO.
    Error showing Q type of task list.
    Go to PLKO & MAPL table for this material & group & Gr counter check the entry.
    Check deletion Indicator in both the tables. If it has status "X" then this task list is very much possible to delete through QSR6.
    I hope this will add some value to your Execuation.
    Regards
    Sujit

Maybe you are looking for

  • First time log to 9i Portal

    To test whether my personalization portal works fine, I typed http://hostname.papz.login.jsp , and entered log in /pwd ( as rajeev/rajeev , I created during portal install) BUT it shows INVALID LOGIN PASSWORD ? Do Need to enter some other other log i

  • Preview is TOO SLOW with RAW images! PLEASE HELP !!!

    Hi my name is Dario and I am Photographer. After upgrading from Mountain Lion to Mavericks on my current iMac preview app is sick slow with RAW images. On Moutain Lion viewing RAW files from my camera with normal OS Preveiw app was wonderful,fast and

  • Multiple size of db_block

    using oracle 10g on solaris. I have a query with lots of join and some table scan with lob object. when i execute that with 8K block size..then after executing 3 times ,I got physical read 0. but I moved them in a 16K block size.and physical read is

  • My timecapsules loses connection with the modem if it is not shown in dock. Can anyone please tell me what I have to do

    I have timecapsule 2TB. Till one month back it was working fine. Now the internet is connected only if it is shown in dock. If it is removed from the Dock the connection is getting lost. How Can I connect the internet even if it is not shown in the d

  • Problems with Exporting Tabs - Component Export

    Hi, i'm having the following problem. i have two applications in the same workspace. application 630 and 640. now i try to export the tabs from app 640 in "Component Export". in the export file i search for wwv_flow.g_flow_id := nvl(wwv_flow_applicat