Base Unit Of Measurment in Material

Dear Experts,
    Base UoM in material master is in Metric Tonne "MT",While Creating the BOM of the Material My Base qunatity is also in MT by default but I want to change Base Uom to in KiloLiter "KL".But system is not allowing to change.
In system there are many Transactions iof material in current period.
Please suggest as it is in production server.
Thanks,
GBS

Hi,
If I understand you correctly, you have to change Item Master to the lower UoM KL.  Then you may use this as a base UoM in BOM.
Thanks,
Gordon

Similar Messages

  • Changing Base Unit Of Measure in Material Master

    Dear All,
                  We need to change the base unit of measure of certain materials who have been assigned inspection plan. We have deleted the material from Inspection Plan and later even the plan. But still the system not allowing to change the BASE UNIT OF MEASURE. The error thrown by the system is : Material is assigned to inspection Plan.
    Please guide in this regard as changing the material for us will be a very cumbersome act.
    Regards

    Hi Rohan,
    Please check 'display errors' in MM02 when you are trying to change the BUoM. It will say what prevents you from doing that.
    Please check:
    http://www.sap-img.com/materials/change-base-unit-of-measure.htm
    BR
    Csaba

  • Follow up material with different base unit of measure

    Hi all,
    I have the BOM with material Mat1 as a component. The base unit of measure of Mat1 is KG.
    Is it possible to replace Mat1 with Mat 2 material in MRP once the Mat1 warehouse stock is depleted.
    The base unit of measure of Mat 2 is KGK.
    The required quantity of MAT1 should be recalculated from KG to KGK accordanly unit ratio.
    Please, expain, where does it maintain?
    Thanks,
    Peter

    Hello Peter,
    You can use follow-up setting (set Mat2 as follow-up of Mat1 in MRP 4 view of material master if this follow-up scenario is valid for all BOM) with discontinuation indicator '1', w/o effective-out date. In this case Mat1's stock will run out (no PldOrd, PR, etc) will be created, and from the date, when Mat1's stock runs out, MRP will calculate with Mat2.
    As I told you, according to my best knowledge, you cannot realize this with different base unit of measures. (you have to change the buom of one of the related material masters or create a new material master if you cannot cope with buom-change).
    Follow-up group scenario can also be used but I guess different buoms will be a problem in that case as well.
    Maybe there are better solution but I'm not aware of it...
    BR
    Csaba

  • Material Master MATMAS IDOC and base unit of measurement

    Hi
    We are using SAP standard material master IDOC type MATMAS05 to trigger IDOC. Our material master is having base unit of measure as "G". We are not using ISO unit of measurement. But Material master IDOC, segment E1MARM is populating base unit of meaurement (MEINS) as "GRM".
    Any idea why IDOC is picking ISO unit of measurement instead of material master base unit of measurement.
    Any idea how to send base unit of measurememt as "G" instead of "GRM" in DOC segment.
    Thanks
    Nilesh

    There are ISO codes for country keys, currency keys, units of measure and shipping instructions. According to SAP design guidelines, you should use ISO codes for an IDoc if they are available. When you set up the IDoc, the SAP codes have to be replaced by ISO codes.
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/BCMIDALEPRO/BCMIDALEPRO.pdf

  • Base unit of measure is cahnging after creation of material master

    Hi
    I have created a material with material type Raw material with BUM  "Ton" , after save the material, when iam checking the material with display mode, the BUM is changed into "EA",i dont know where the sustem picks the BUM as "EA", kindly suggest where i have to do the configuration settings.
    Thanks

    Hi,
    Have you created the New Material referencing from another material.
    Please check the following links for details. It should be able to answer your queries.
    [Re: can't able to change into alternate UOM]
    [Re: variable order unit]
    [Re: Base Unit of Measure]
    Hope it helps,
    Best regards
    Amit Bakshi
    Edited by: AMIT BAKSHI on Aug 4, 2011 12:44 PM

  • Changing Base Unit Of Measure (Material Master)

    Hi
    1. How to check this? (Any successful changes in material master only took place when there is no open document from SD, PP, MM & FI for that material. )
    2. Base unit of measurement cannot be changed.  The reason being material movement history is there in table - MSEG mainly which otherwise create inconsistency in reporting.  -
    Is this line applicable for current period or previous period in current year or previous period previous year???
    3. There are no existing purchase requisitions, purchase orders, or scheduling agreements for the material. -
    is this means open / pending purchase orders  or the the PO's created in system with respect to material where the GR and IR is already done
    4. You can change the base unit of measure if there is no stock of the material during current and previous period----
    is this means the term " previous preiod" is previous period in the current finacial year   or its applicable for the previous preiod in previous financial year
    5. Post the stock in the previous period to the current period  - -
    how can we do this???
    Vijay

    See this OSS note : especially the last sentence:
    From OSS note 138767
    Within the material master record maintenance, you want to change the base unit of measure (base unit). During the change, the system performs extensive checks in order to avoid inconsistencies in the applications which use the material master.
    In particular, the following checks are performed:
    The base unit must not be defined as an alternative unit of measure for the material
    No International Article Number must be assigned to the base unit
    No proportion/product units must be defined for the material
    No configurable material must be assigned
    The material must not be used as a configurable material
    Stock must neither exist for the previous period nor for the current period
    No physical inventory must be active
    No reservations or dependent requirements must exist for which the deletion indicator is not set
    No planned orders must exist
    No purchase requisitions, purchase orders or scheduling agreements must exist for which the deletion indicator is not set
    No WM transfer requirements, no WM quants or no WM posting change notices must exist
    The material must not be a bill of material
    The material must not be contained in a bill of material
    The material must not be used as a production resource/tool
    The material must not be used in task lists
    No standard cost estimate must exist for the current or future period
    No production orders must exist
    No planned independent requirements must exist
    No run schedule headers must exist
    If the base unit has dimensions, no serial number profile must be assigned
    No sales and distribution documents must exist which have status Not processed or Partially processed.
    Solution
    If necessary, all reasons mentioned above must be eliminated by archiving the objects listed
    1) SAP checks this for you. A new button will appear in MM02 and after you click this button to check the error log, you will see which documents exist.
    2) I have not seen that an existing movement will restrict the change of a BUoM.
    3) No purchase requisitions, purchase orders or scheduling agreements must exist for which the deletion indicator is not set
           it is not caring about GR done or IR done. it telling you that the deletion indicator has to be active. As a deletion indicator can be reset easily, you probably have to archive the documents
    4) the previous period is the period before the current period.
       today we have February, hence the previous period is January.
    5) first make sure your current stock is higher than the stock of the previous period. if it is lower, then you have to create inventory in current period first e.g. with 202 movement with current date.
    Then you issue the previous period stock with 201 movement and previous period date (make sure periods are open in OB52 and MMRV allows posting to previous period).
    Finally you issue the left stock in the current period with 201 and current date.
    Now previous period and current period stock is zero. After the change of the base unit you have to get the stock back into the system
    Edited by: Jürgen L. on Feb 2, 2010 3:58 PM

  • Error while defining alt unit of measurement in material master

    All SAP gurus,
    i am trying to define a alt unit of measurement in a finished material, the base unit of measurement is in MT, and the sales unit is nos. the conversion formula is 53 nos = 1kg i.e. 1MT = 53000 nos. as conversion can be done only with base unit of measurement i am giving 53000 nos = 1 MT, but system unable to calculate the conversion as it is not taking mere than 3 digit after decimal.
    e.g.    if 53000 nos = 1 MT
    then  1 nos should be = 0.000018 MT
    but system not taking this value as this value contain 6 digit after decimal
    suggest me what can be the way out? with detailed steps. can i increase the post decimal value or i have to define another middle alt unit of measurement (like KG). and if that is to be done then how.
    Regards
    BKR

    Hi,
    With help of Basis team check the decimal places for u r user ID.
    In t-code SU01 >>> Under Default tab
    Kapil

  • Base unit of measurement while saving production order

    Hi
    While saving production order I am getting following problems:
    "Material has no base unit of measure"
    Whereas UOM is there, I also can see that as soon as I  enter qty while creating the order. System automatically prompts the UOM.
    I also donot find any problem in MRP run, planned order creation etc
    So what can be the problem?
    Edited by: BNR on Nov 24, 2008 5:22 AM

    Dear,
    It may be data base problem as you are getting this problem fequently so please check with Basis person.
    Have you defined the any production unit in both material master WS view & in routing or any other alternative unit of measurement please check?
    Regards,
    R.Brahmankar

  • Base Unit Of Measurement error

    Dear Sir \ Mam,
    Our some materials base unit of measurement is in KG, and we want to make bills, excise RG1 entry in KG for milligram sales or material transfer. How to go for such transaction, system is not allowing for such transactions.
    Pls Note : We can't create two separate materials code for these UOM issue materials.
    Requesting a help.
    Regards,
    Randhir Padwal

    Hi,
    As per my understanding you have base unit in KG and you want to material issue and sales in miligram unit. If this is requirement then you may try to assign "sales unit" for material master in "sales:sales org1" view. you have to also give the conversion rate from KG to miligram in additional data.
    for issuing you have to maintain issue unit "miligram" in material master view "Plant data/stor1"
    Regards,
    mukesh

  • Base unit to change in material master

    we  assigned base unit of measurement to one of our material code say KM and after that we created routing .When we come to know that base unit is wrong and instead of KM base unit required was KG then we delete routing for the material.After that when i tried to change base unit of meas. in mat master system is giving me error
    Routings already exist that are assigned to the material.  
       RType RtgGrp   GpC Plant                                
       N     50013509 1   UHVC                                                                               
    I want to know how it is possible?
    Is there anything remain?

    If SAP tells you that you have routing, and even shows which one, then oyu have not really deleted it.
    BOM Deletion - Transaction CS02, open the BOM header view and select menu "Material BOM > Delete.
    Routing Deletion - Transaction CA02, select the routing overview button and select the routing line to be deleted, press the deletion button.

  • Unit of Measurement in Material Master

    Hello Experts...
    I have an intresting issue on Unit of Measurement. I would like to maintain alternative unit of measurement as per below..
    1 EA = 1 EA
    1 ROLL = 5000 EA
    1 CT = 150,000 EA
    However the field UMREZ length in the material master allows me to enter upto 5 digits...and also it is not possible to enter decimal digits here.
    Have any one of you faced this kind of issue, if any one faced what would be the solution for this...?
    Look forward to hearing from you..
    Cheers
    Umakanth..

    Hi Umakanth,
    For increasing the numerator for conversion of base unit of measure, UMREZ  would be  appending the structure SMEINH by requesting Access Key from SAP.
    Even though its not a suggestible decision to append standard SAP structure , if the requirement demands we may need to do that.
    Cheers!
    Sudhakar Reddy

  • Unit of Measure in material master

    Hi
    I have a Raw material consider (Forging) for which material master is maintained  "PC"  as Base unit of Measure. I have defined in Additional Unit of Measure as 500 KG = 1 PC. Also my order unit is also maintained as PC.
    Here when they procure castings they order it as 1 PC only. But when the actual material comes there may be some variation in weight.  The client wants to make payment on actual weight basis only .
    Also stock keeping unit and issue of material is done as PC only.
    Please guide me how to address this issue.
    Regards
    Kumar.

    Hi
    With the existing master data you can acheive your requirement.You can maintain the price in info record in Kgs or in PO Item conditions tab you can maintain the price per kg.
    while doing the miro please enter the actual quantity in<b> Qty in PO price unit</b> in Quantity tab ans save the GR.When you do MIRO, system will propose Qty as 1PC and value as <b>Qty in PO price unit X Price per kg</b> maintained in PO.Please try this solution.
    Regards
    Ramakrishna

  • Views and Base unit of Measure is not coming in Chines Lang

    HI All
    Plz Help me.
    I log-In Chines Server, during MM01 the views are coming in English language instead of chines.
    and  during PO creation The Base unit of Measure is not Coming in Chines Language it is displaying Some number??
    I have maintained Source and taget lag in CUnI..but still Im getting this problem..
    How to solve this plz help..
    Thanks and regards
    Ramesh reddy

    Hi
    Please maintain the translation in the Following Configuration
    Logistics - General->Material Master->Configuring the Material Master->Define Structure of Data Screens for Each Screen Sequence
    Select the Specific Screen Sequence & Maintain the languages
    Similarly please maintain the Translations in the Transaction CUNI for the Base UOM in respective languages
    I hope currently in your system only Language EN is maintained
    Thanks
    Madhav

  • Base unit of measure can not be changed since EAN is already assigned.

    Hi,
    We would like to change the UOM from EA to SET .In order to tag MM # as BOM Header and ZCEN (Serial number profile)but the error massage appears as below print screensystem is not allowing to do so ,throwing following error message:
    "Base unit of measure can not be changed since EAN is already assigned."
    Could you help to resolve the same.
    Thanks,
    Amit

    Hi,
    Thats correct you must be getting Error message M3 341 ,
    EAN international article number is tied with material number in basic data view with EAN Category and seperate number range
    EAN is a standardized unit that uniquely identifies a material relating to a unit of measure or type of packaging.
    The International Article Number (EAN) is assigned by the manufacturer of the material. In this case, the EAN identifies the
    manufacturer uniquely. A company can assign EANs using "in-store" numbering techniques known only to the company.
    If you still want to change UOM you need to first remove the EAN assigned..please explore further if you have internal number range
    for EAN or external ..etc
    Thanks
    Diwakar

  • Item category N: Only base unit of measure EA allowed,Message no. CO344

    Dear all
    I am facing  the following  issue,
    Item category N: Only base unit of measure EA allowed
    Message no. CO344
    Diagnosis
    You have entered a unit of measure for a component of the item category N which does not correspond to the base unit of measure maintained in the material master record.
    Procedure
    Use the base unit of measure maintained in the material master record.
    Please give  the solution  for how do handle that issue.
    Thanks&Regards
    K.Muthukamatchi

    Hi
        My requirement is: The item category N should allow me to use alternate UOM.
      When i checked with Item category L, the system allows me to use alternate UOM. I need the same to work for Itm category N also.
    Through  forums, i found that, in standard SAP, system will not allow to use alternate UOM for Item catedory N.
    Is there any config settings to be done for my requirement?
    Kindly do the needful.
    Thanks & Regards,
    K.Muthukamachi

Maybe you are looking for

  • Problems accessing fields in a CMP entity bean from a session bean

    Hello everybody, I'm getting the next problem: when I try to access a field in a CMP entity bean that I have instantiated from a session bean (trhoug entitybean.getNameOfField), I get the error "the entity bean does not exist in the database". This e

  • Existing WEB Journals can no longer be viewed nor shared in IOS7 and does no longer exist in IOS8.

    To the CEO of Apple. I never write comments on a website but this time I need to address my concerns. As a big fan of the Apple products I am disappointed that a nice feature such as the Web Journals is no longer existing. It allowed me to communicat

  • How to ignore white space when parse xml document using xerces 2.4.0

    When I run the program with the xml given below the following error comes. Problem parsing the file.java.lang.NullPointerExceptionjava.lang.NullPointerExce ption at SchemaTest.main(SchemaTest.java:25) =================================================

  • IPad or Mack Book Air?

    I'm in a dilemma right now. My father just took my old HP laptop for his job and now I'm left with a choice of getting either and iPad or MBA. I was origionally going with the air since it would be for taking notes or doing quick write ups and going

  • Why is Safari blocking the latest Java plugin?

    Today, I fired up Safari to access my work server but the required Java applet wouldn't run. Safari displayed "Blocked Plugin" and clicking it said my Java was out of date and/or a security risk. I upgraded to the most recent Java (7.10, I believe) a