Baseline date as GR date

Hi,
Baseline date is configured based on Payment Terms, that can be possible using customizing, there is no relation with GR date and other dates.
Still if you want set the Baseline date with some other default date or PO date, or GR date, -
IT IS POSSIBLE
by enhancements
directly applying enhancements will not work for you, you just have to work smartly by applying 2 enhancements to get the desired results
I tried it on ECC 6, and it is working very fine

I understand the proposed solution but I do not think this should be a custom coding requirement.  The underlying assumption of the invoice payment term is that goods / services have been delivered.  The transfer of title should be a configurable trigger for the vendor payment baseline date.  Many consumer goods are shipped FOB to the customer destination with a 3-4 week shipping timeline.  Normal payment terms run 30-45 days.  We want our baseline date to start when the title transfers.  I can understand the GR document does not take the place of a proof of delivery but it is much closer to the the point where we actually transfer title then when we normally receive the invoice (2 days after vendor shipment).  Of course I have been through the argument that the invoice document date should be manipulated but I do not buy into it because it envokes a form of dispute management on a standard flow.  Initially I went down the path of GR based IV which follows the same logic as above for the release of ultimate payment.  I am confused as to why the standard solution does not provide an equivalent configuration for baseline date computation.  Can anyone explain why this is the case or whether I am just missing something obvious?

Similar Messages

  • Baseline Date for Due Date Calculation required for S/L indicators

    Hello,
    Iu2019m facing the following problem
    Iu2019m trying to insert an invoice (using a customer master record) but the system blocks me because the field ZFBDT (Baseline Date for Due Date Calculation) is a Required entry.
    The strange thing is  that if I use a S/L indicators the field is mandatory, if not the date may be defaulted.
    I checked in OB41 but there are non differences between Special PK and normal PK.
    Any ideas?
    Thanks in advance
    Alberto

    Dear Alberto,
    the field "Due On (BSEG-ZFBDT)" cannot be controlled with field status.
    It is controlled by field attribute of screen painter (Tcd: SE51).  If
    you look at element attribute for "Due On" field, a flag for required
    entry is activated.  In this case, field status has no control over
    the field.
    As of release 3.1G, field BSEG-ZFBDT is hardcoded in most FI screens
    to be mandatory and cannot be influenced by any field status
    changes. This situation is only valid when posting with special G/L
    indicator (ie PK 29/39).
    SAP development team has determined that this is a critical field.  The
    reason behind this is that this special GL screen and the data entered
    here are very important to many other programs. This data affects
    liabilities and receivables where due date is necessary almost
    everytime. Thus, we changed this field in this screen in order to
    prevent problems in many other areas. The reason is explained further
    in note 95079.
    I hope this helps You.
    mauri

  • Interest Calculation on posting date and due date

    Hi
    I want vendor interest calculation on due date as well as posting date. Let me know how to get it. According to me only its possible on the basis of one date only.

    HEllo!
    In the report RFINTITAR, you use the interest indicator customizing:                                                                               
    IMG   > Prepare Item Interest Calculation   > Ref. Date                                                                               
    (table V_T056UX)   >  field Ref.                                                                               
    (FI Item Interest Calculation: Reference Date)                                                                               
    You have the possibility to define what You need to be considered as 
    incoming payment due date, choosing between:                                                                               
    1 Value Date (or Baseline Date for Net Payment)                      
    2 Document Date                                                      
    3 Posting Date                                                       
    4 Payment Baseline Date                                                                               
    As you can use one interest indicator per customer/vendor you can use only of the dates is used. But, in this
    program you can use the BADI FI_INT_CUS01. Please, check if you can meet your business requirements using the methods
    of the BADI.
    REgards,
    REnan

  • AR - New estimated payment date after due date

    Dear friends,
    In the event the Client is not paying within the expected due date that was calculated as "Net Due Date", we normally give the Client a grace period, and the need is to record this new estimated payment date in a date field, that the SAP user will manually introduce. The Net Due Date must not be affected as in case of having debt interests, they will be calculated on that basis. But I can not find a suitable way to implement it.
    Regards,
    Érika Iranzo
    (PS: Extra information: We calculate the "Net Due Date" (FAEDT) of the our clients and vendor's invoices from the "Baseline Date for payment" (ZFBDT) plus the highest number of days within the terms of payment "Cash discount days 1" (ZBD1T). So that the due date is calculated as FAEDT = ZFBDT + ZBD1T. Additionally we also consider a region-specific calendar)
    Edited by: EIranzo on May 14, 2009 10:14 AM

    I found the field Grace Days RFOPS-TOLER that seems to be useful for my purpose, does any one know how can I make it visible when editing a document?
    Thanks,
    EIranzo

  • Post date and due date

    Hi all,
    can any  tell me what you mean by 'posting date' and 'net due date' and' clearing date'?
    what is the difference between them?
    Table is-BSID
    BUDAT-posting date
    ZFBDT-Baseline date for due date calculation
    AUGDT-clearing date.
    thank u
    sunny.

    BUDAT-posting date
    -> to determine the book-period (bkpf-monat)
    ZFBDT-Baseline date for due date calculation
    -> determine date when an obligation becomes due
    due date = zfbdt + bsik-zbd1t (or ZBD2t or ZBD3t)
    AUGDT-clearing date
    -> date when open-item becomes a cleared item
    by payment or reversal or...
    A.

  • Posting date or document date

    hi all,
    for baseline date, i can base on posting date or document date.
    may i know where in spro, we can define the baseline date to be based on posting date or document date to calculate the net due date depending on the days in payment term?
    example
    posting date 20-08-2008
    document date 18-08-2008
    payment term 10 days
    so net due date is either 30-08 or 28-08 depending on posting or document date.
    thanks

    Hi,
    When you are creating a payment term with Tcode OBB8, there a radio button option is available. Choose among the four options.
    1) Posting Date
    2) Document Date
    3) Entry Date
    $) No Default.
    Hope this will fix ur issue.
    Thanks,
    Srinu

  • GR date is previous date of PO

    Dear All,
    My client have an requirement that they do not want to do GR before Purchase order date.That means in MIGO document date or posting date must not before the date of Purchase Order Date.How it can be done?What is the configuration?
    Thanks & Regards
    Dipayan Bose

    always see both parts of the medal.
    warehouse people want be as accurate as possible, which is even needed for reliable reports and statistics.
    if the goods arrived physically on August 10, but the PO is not created yet, then you have several problems
    - the stock figure in SAP does not match the physical stock
    - the stock may not be used (proposed for use) if not visible in SAP
    - it creates a lot trouble if this happens at a time where physical count is conducted
    - you may be in trouble if it is hazardous material and an incident/accident happens with that material
    if the PO is created after the fact, and you dont allow accurate receipt date, then you may have a wrong baseline date for payments to your vendor, which can result in dunning activities and even rebates may forfeit.
    that a receiver enters a wrong receipt date may really be an exceptional error.
    instead of stopping the receiver, you should analyze why the buyer is late with the order.

  • Data Federator - View Data in DF

    Hi,
    Can we view data in Data Federator if data source is SAP BW

    >
    > Although you may have tested the connection, check your "leselect" log file
    >
    Checked in leSelect.log
    Could not start server: Connect to SAP gateway failed
    >
    > Is it a case of resolving the DNS name? check in BW via RZ11 that the name is fully qualified as that is what DF is expecting.
    >
    Tried. However what parameter supposed to be entered. should it be I_RFC_DEXTINATION ?

  • Can't view changed data in journal data

    Hi,
    I have implemented JKM Oracle 10g Consistent Logminer on Oracle 10g with the following option.
    - Asynchronous_mode : yes
    - Auto_configuration : yes
    1. Change Data Capture -> Add to CDC, 2.Subscriber->subscribe (sunopsis),
    3. Start Journal
    The journal has been started correctly wothout errors. The journalized table has always the symbol "green clock". All is gook working.
    And then i inserted 1 record in source table, but i can't view changed data in journal data. I can't understand why journal data was generated.
    There are no errors.
    Help me !!!

    Did your designer was on the good context ?
    Look the list box at the top right of the Designer interface.
    You must have the same as the one where you define your journalization.

  • Historic and Current data for Master data bearing objects

    Hi All,
    We are trying to implement type 2 dimensions for all the master data bearing characteristics, where we require historic and current data available for reporting. the master data can have a number of attributes and all of them can be time dependent. We are not getting any 'datefrom' or 'dateto' from the source system.
    For example:
    For Example: The table below shows data entering BI at different dates.
    Source Data day of entering BI
    MasterID ATTR1 ATTR2
    123506 Y REWAR day1
    123506 N REWAR day4
    123506 Y ADJUST day4
    123506 N ADJUST dayn
    The field 'day of entry into BI' is only for your understanding; we do not get any date fields from the source. SID is the field we are generating for uniqueness. It is a counter. EFF_DATE would be the current date for all the data. EXP_DATE would be 31.12.9999 until the attributes change. SID and MasterID together would be the key.
    On day 1 the following data enters BI,
    day 1
    SID MasterID ATTR1 ATTR2 EFF_DATE EXP_DATE
    1 123506 Y REWAR 2/10/2009 12/31/9999
    On day 4, 2 data records enter with same PID,
    SID MasterID ATTR1 ATTR2 EFF_DATE EXP_DATE
    2 123506 N REWAR 2/13/2009 12/31/9999
    3 123506 Y ADJUST 2/13/2009 12/31/9999
    the EXP_DATE of the record of day 1 needs to be changed to current date.
    Also there are two records entering, so latest record would have EXP_DATE as 31.12.9999. And the EXP_DATE of the first record on day 4 should change to the current date.
    so the following changes should happen,
    CHANGE
    SID MasterIDATTR1 ATTR2 EFF_DATE EXP_DATE
    1 123506 Y REWAR 2/10/2009 2/13/2009
    CHANGE
    SID MasterID ATTR1 ATTR2 EFF_DATE EXP_DATE
    3 123506 Y ADJUST 2/13/2009 2/22/2009
    On day n, one data record enters with same PID,
    SID MasterID ATTR1 ATTR2 EFF_DATE EXP_DATE
    4 123506 N ADJUST 2/22/2009 12/31/9999
    The change is ,
    CHANGE
    SID MasterID ATTR1 ATTR2 EFF_DATE EXP_DATE
    3 123506 Y ADJUST 2/13/2009 2/22/2009
    The data expected in P-table is as below, on Day n or after Day n, untill any other record enters for this MasterID,
    1 123506 Y REWAR 2/10/2009 2/13/2009
    2 123506 N REWAR 2/13/2009 2/13/2009
    3 123506 Y ADJUST 2/13/2009 2/22/2009
    4 123506 N ADJUST 2/22/2009 12/31/9999
    Has anyone worked on type 2 dimensions earlier? Or any ideas to implement this logic would be appreciated.
    Regards,
    Sudeepti

    Compound the Master ID with eff date and other attribute as superior objects
    so you will get P-table as
    ATTR1   ATTR2   MAT ID  
    1 2/10/2009 2/13/2009 123506 Y REWAR
    2 2/13/2009 2/13/2009 123506 N REWAR
    3 2/13/2009 2/22/2009 123506 Y ADJUST
    4 2/22/2009 12/31/9999  123506 N ADJUST

  • Not able to change the data of test data containers in production system

    Dear All,
    We have created eCATT scripts in Development SolMan System and moved the transports to Production SolMan System.  Customer wants to change the data at Test data containers and run the scripts in production system but we are not able to edit the data. 
    May be the reason is SCC4 transaction code has set the below option.
    Changes and transports for client-specific Objects
    u2022 No changes allowed
    Customer doesnu2019t want to change the above option and wanted to change the test data containers to give different datau2019s and run the eCATT scripts.
    Could you please let me know the solution for this?
    Your help is really appreciated.
    Thanks,
    Mahendra

    eCatt has the feature where you don't need to transport the scripts or test configuration to our target system. We can keep all our scripts and test data in Solman and run this script any other system in your landscape using the System data container and target system.
    Maintain the production as one of the target system in System container in Solman and point that system while running the script. Change the test data in Solman to run this script.
    Let me know if you need more information
    thanks
    Venkat

  • The Difference between "Cell Data" and "Dimension Data"?

    What is the difference between the tab "Cell Data" and "Dimension Data" in SSAS?

    Article quote: " SSAS provides the way to secure analysis services database/cube data from unauthorized access. Analysis services provides secure access by creating object called "roles". After creation of role, user's windows login credential can be used
    to enroll into particular role because analysis services identifies user from their windows login credentials . You can protect your data in roles at two levels:
    1) Dimension level
    2) Cell level
    If user has been assigned more than one role, analysis services loop through all assigned roles after login. Analysis services finds all permission level for the particular user and  union all the permission levels.
    If two roles has contradictory access for user then particular access will be allowed. Suppose role1 says Australia data access and role2 denies Australia data access then access to Australia data will be allowed. "
    LINK:
    http://www.msbiconcepts.com/2010/10/ssas-data-security-dimension-and-cell.html
    Kalman Toth Database & OLAP Architect
    IPAD SELECT Query Video Tutorial 3.5 Hours
    New Book / Kindle: Exam 70-461 Bootcamp: Querying Microsoft SQL Server 2012

  • Diff B/W master data and transaction data

    Hi all,
    What is the main Diff B/W master data and transaction data.  give me some example ?
    Thanks in Advance
    Krish...

    hi krish,
    MASTER Data is the data that exists in the organization like employee details, material master, customer master, vendor master etc. These are generally created once.
    Master data are distributed throughout the company, they are often not standardised and often redundant. As a result it is very costly to offer efficient customer service, keep track of supply chains and make strategic decisions. With SAP Master Data Management (SAP MDM) these important business data from across the company can be brought together, harmonised and made accessible to all staff and business partners. As a key component of SAP NetWeaver, SAP MDM ensures data integrity via all IT systems.
    Regardless of the industry, companies often work with different ERP and Legacy systems. The result: the business processes are based on information about customers, partners and products which is displayed in different ways in the systems. If the data are recorded manually, there are more inconsistencies: some data sets are entered several times, others cannot be retrieved by all divisions of the company.
    As corporate applications are becoming increasingly complex and produce ever greater amounts of data, the problem is intensified further. Nevertheless, your employees must work with the inconsistent data and make decisions on this basis. The lack of standardised master data easily leads to wrong decisions, which restrict efficiency and threaten customer satisfaction and profitability.
    In a word: in order to save costs and ensure your company’s success it is necessary to consolidate master data about customers, partners and products, make them available to all employees beyond system boundaries and use attributes valid company-wide for the purpose of description.
    TRASNACTION Data - These are the business documents that you create using the master data - Purchase orders, sales orders etc
    http://help.sap.com/saphelp_nw2004s/helpdata/en/9d/193e4045796913e10000000a1550b0/content.htm
    Regards,
    GNK.

  • Query on fetching the no.of days between Invoice date and due date in rtf template embedded BI Publisher Report

    Hi Experts,
    We have a requirement to fetch the value of 'No of days' between Invoice date and due date (Two variable date fields on the template) in an Analysis.
    Please let me know the procedure of how to achieve the same.
    Regards,
    Rev

    it's good for ideas but implementation a bit different
    Oracle Business Intelligence Publisher Report Designer's Guide
    This function provides a method to get the difference between two dates in the given locale. The dates need to be in "yyyy-MM-dd" format. This function supports only the Gregorian calendar. The syntax is as follows:
    <?xdoxslt:date_diff(‘format’, ‘YYYY-MM-DD’, ‘YYYY-MM-DD’, $_XDOLOCALE, $_XDOTIMEZONE)?>
    where
    format is the time value for which the difference is to be calculated
    Example:
    <?xdoxslt:date_diff(‘d’, ‘2006-04-08’, ‘2006-04-01’, $_XDOLOCALE, ‘America/Los_Angeles’)?>
    returns
    -7

  • DSO upload and no data in Active data table

    Hi Experts,
    I have a strange problem.I have loaded data to DSO from DS in BI7. It has the further uplaod to cube.I have activated the DSO and it went sucessfull and had Request ID generated. It has added and transfer records available like 150000 records as I have done full upload. strangly I cannot see any data in Active data table.
    Pls advise how can I check the data I am doing some mistake.I have data mart status for this DSO. the deletion of the DSO and reloading could that create the data not visible in DSO even after activation
    Pls advise.
    Tati

    Hi,
    I believe this got something to do with the display setting.. After displaying the data, get into the settings menu and look for Layout option --> display --> see if there is any default setting applied.. change this setting to something else.. create a setting with all the columns dragged & dropped.. These are the options you can try..
    If this did not resolve.. please try displaying the data from SE16 transaction and post us the results..
    Thanks,
    Naren

Maybe you are looking for

  • Oracle report from 6i to 10g

    hi all, We try to move oracle report from 6i to 10g. however we found that the report's record ordering is different. The case is that, the record in report is ordered according to the attribute "break order". There is no "order by" in sql". It runs

  • M-Audio M-Track problem with Mainstage 3.0.2

    I recently purchased an M-Audio M-Track and wanted to use this to input guitar tracks into Mainstage 3.  However, when I try, it does not recognize any inputs.  The M-Track is working fine, because I can use it without any issue with Mainstage 2 and

  • Photoshop CS3 crashes a lot when moving layers - Help.

    Using: MAC OS 10.5.4 Photoshop 10.0.1 MacBook Pro, 2.5 GHz Intel Core 2 Duo, 4 GB 668 MHz DDR2 SDRAM My crashes are very specific. When I move a layer around in the layers palette, Photoshop will crash. It doesn't always crash when moving layers, but

  • Hide Null Value in Drill Down KPI

    Dear Sir, I have Problem : i want to Hide the Null Value in SSM KPI. This is the link picture ( http://tinypic.com/r/aak9r6/5 ). Thanks for your answer.

  • Exporting XML from Flash

    I have heard that there are ways that Flash can create an external XML file. Most of my searches have revealed that this can be done using PHP for server side solutions. However, I am wondering if there are other ways that this can be done on a local