Baseline Date issue via FB60

Hi SAP experts,
Can anybody help with the issue below:
FB60 (vendor invoice) was entered.
Invoice Date entered manually by accident with date 01/04/2020
Baseline date is used automatically as Invoice Date 01/04/2020
Date was corrected manually in tab Basic Data 01/04/2011
The problem is:
If you enter in the document (FB03) and go to additional details, the Baseline date still shows 01/04/2020
How can this be solved so that the Baseline date in Additional Details view, shows the correct Baseline Date??
Any help is most welcome
Regards
Roger

Hi,
Baseline date gets defaulted to the Document date in your case and this is controlled by Payment terms configured in OBB8.
Baseline date can be configured as 1) Document date 2) Posting date 2) No Value (means you enter it at the time of entry) 4) Entry Date.
Probably this is the reason that doc date gets defaulted n FB60.. you can go to FB02 in Change document  and make the baseline date correction.
Regards,
SAPFICO

Similar Messages

  • Baseline Date Issue

    Dear Experts,
    I am facing a peculiar problem. In the payment terms configuration i have mentioned Posting Date as the baseline date. The invoice is created in our company when the goods are dispatched. At this point only the invoice is made and accounting/release to accounting is not done. Later, when the Bill of Lading comes back to us the accounting document is created. Now the system is expected to take the later (accounting) date as the baseline date but it is taking the invoice creation date as the baseline date. Please suggest a solution.
    Warm Regards,
    Mukesh

    In export sales, this situation would be there predominently, where the Billing Date and Bill of Lading date differs and client insists that actual sales should be considered only based on Bill of Lading Date.
    Since you already set the Posting Block as per your original post, whenever user tries to release the billing document via VF02, you can populate two fields
    Bill of Lading Number and
    Bill of Lading Date
    via Function Module EXIT_SAPLV60B_001 in include ZXVVFU01 and whatever date user is keying in, that should be your posting date.  This means, irrespective of your billing date, actual FI postings (sales) will happen only based on the date whatever user enters.   If need, you can also add couple of more fields depending upon clients' requirement.
    G. Lakshmipathi

  • Baseline date control in FB60 with Special GL Indicator

    Good Morning Experts,
    T Code: FB60
    Scenario 1: Post invoice without SGL Ind.
    Result: Baseline date has been picked authomatically from Posting date.
    Scenario 2: Post invoice with SGL Ind
    Result: Baseline date has not been picked.
    Analysis: The payment terms setting has been checked.
    Requirement: I need the Baseline date to be picked authomatically from Posting date entered in scenario 2.
    Edited by: Bibhuranjan Das on Mar 11, 2011 6:31 AM

    Hi,
    First check in F-43 transaction to see if baseline date is calculated.
    As you have said that you checked the payemtn term where everything is correct. Still.....
    If Vendor is diffrent...
    1. Check Payment term is entered in the master and called up in the document.
    2. Substitution has been defined but failed to apply.
    3. Check the field status of GL (Recon A/c) for vendor if Baseline date is optional.
    If at all you fail to identify, i will recommend to involve your ABAPer that will solve your problem as well as save your time.
    Regards,
    Chintan Joshi

  • Inventory posting-default baseline date

    Hi Expert!
    i have opened a forum regarding invoice posting-how to set document date to be as the dafault baseline date in MIRO,FB60,FB65,FV60 and FV65.. I got the path given by prashant "SPRO=>FA=>Accounts Receivable and Accounts Payable=>Business Transactions=>Incoming Invoices/Credit Memos=>Maintain Terms of Payment" but will it affected to all company codes?? I only want to set it up for 2 company codes only.. is it possible to do so?
    Then one more thing is, in the path i can see payment terms 0001, 0002 and 0003 but however they're different than payment terms which are being using currently..K160,K165... where can i check payment terms againts company code?
    Please advise..

    Hi,
    You use the standard terms of payment or customize terms as per your requirement with default baseline date controls.
    These are stored in table V_T052.  You can choose any of these terms as per your requirement.  If you use page up or down
    key, you go to the next page and see other terms or click positiion tab to view K160 or K165.  These terms of payments
    are either assigned during transaction or directly assigned to Vendor Master or Customer Master in Company Code data.
    If you want to see the terms of payment assigned to the vendors/customer in two of these company codes use SE16N
    and view through tables LFB1(vendors) KNB1(Customers).  You cannot make a specific assignment to the company code.
    Regards,
    Sadashivan

  • FB60 - Credit Note: Baseline Date Determination

    Hi  Experts
    At present I have an AP function who use FB60 to post manual Invoices and Credits to Vendors. The issue is that when a Credit is selected (Doc Type: KG) the baseline date and the subsequent due date are not being determined and have to be entered manually. The system will not let the user proceed until the data has been entered.
    If FB65 credit (Doc Type: KG) is processed using the same data (Vendor, Date, Payment Terms etc) as used in FB60 the system determines the baseline date and due date.
    I have also compared back to the legacy SAP 4.6 System and this functions correctly, the baseline and due dates are determined automatically.
    I have worked through all of the standard configuration: Doc Types, Screen Layouts, Transaction Variants, Posting Keys, Default Values, Field Status Groups etc and cannot find the issue.
    Please advise if you have any ideas or have experienced the same. My next step is to request one of the programmers to take a look.
    Thanks. RS

    Hello,
    This is intended design from SAP.
    See below OSS note:
    https://service.sap.com/sap/support/notes/1446873
    Because a credit memo is usually considered to be "due immediately", there is no indication which date the system should propose as a baseline date for payment (document/posting/CPU/other date?) if the terms of payment key (field ZTERM initial) is missing. For this reason, the user must set the required baseline date for payment manually.
    To avoid this inconvenience, you have the following options:
    1. Instead of the procedure described above, you use transaction FB65 (FB75) that is provided for this business transaction, because this is configured accordingly.
    2. In the business partner master data, you define a terms of payment key for credit memos (field LFB1-GUZTE or KNB1-GUZTE). This can be used to give the program a default value for the baseline date for payment.
    3. In your processing options (in FB60 You will find a button called EDITING OPTION in the top left), you set the #Always Use Payment Base Deadline# indicator (field RFOPTE-XZFBO='X').
    Hope this helps.
    Regards,
    Karthik

  • Baseline Date in FB60

    Hi,
    We are using FB60 to create a vendor invoice.
    Normally the ‘BaselineDt’ would default  as per the configuration in payment terms and the baseline date can be changed during the document entry, now my problem is eventhough the default for the baseline date is set as document date in the payment term, the document is not getting defaulted at the time of the document entry some times, the date is posting date.
    Can anyone let me know whether there is any other setting for this default for baseline date or am I missing something in vendor master.
    Thanks
    Suresh

    Have you configured all of your payment terms the same, i.e. to work of the document date or posting date?
    This is an area you should check.
    Remember you are saying sometimes, is that the same vendors or it happens for a vendor once and then not again.
    To me it sounds like a payment term that has been configured to run off the posting date. You should be able to spot this by creating a query on BSIK.

  • Baseline date mesg not appear when call transaction FB60 in custom tcode

    Hi Experts,
    One of the custom tcode which calls the standard tcode FB60.
    If we give the last month date in payment date, it should shows the 'Due date is in the past' message and if we give next year as payment date i.e, more than 365 days, then show 'Baseline date foe pmnt is 700 days after the document date : check'.. These messages are coming when we call the standard tcode FB60 directly.
    But if call it in the custom tcode, these messages are not appear.
    Thanks,
    Mani.

    Hi Experts,
    One of the custom tcode which calls the standard tcode FB60.
    If we give the last month date in payment date, it should shows the 'Due date is in the past' message and if we give next year as payment date i.e, more than 365 days, then show 'Baseline date foe pmnt is 700 days after the document date : check'.. These messages are coming when we call the standard tcode FB60 directly.
    But if call it in the custom tcode, these messages are not appear.
    Thanks,
    Mani.

  • Different Baseline Date in Invoice Transaction and Payment Transaction

    Hi All,
    I have one issue. When I post the invoice transaction in FB60 and input the baseline date 22.08.2011. Then I post the outgoing payment with document date 20.08.2011 and then I checked the baseline date in vendor line item, the baseline date not in 22.08.2011 but it is defaulted into 20.08.2011 (document date when perform outgoing payment). Why the system cannot link the baseline date in invoice transaction and document payment? It makes unconsistency in baseline date. Kindly need your help to share if you ever found the same issue like this and also the SAP Notes if you have it.
    Thanks a lot.
    Best Regards,
    John

    Dear John11 
    If your selecting your payment terms in invoice system automaticaaly pics dates what you config. in OBB8
    But it is not requried to give any baseline date for payment transaction
    Regards
    shankar

  • Invoice posting - set document date as baseline date

    Hi Expert!
    I have issue regardig invoice posting.
    When invoice posting transactions are done, the baseline date in the transaction is changing due to unknown reasons. The baseline date should not change and should be the document date. This in turn is having effects on the culculation of the due date for the payment terms.
    In this case, i would like to make the document date as the default baseline date and remove the option of changing the baseline date. Please guide me on how to do it step by step.. Please also advise step by step how can i do that in transaction MIRO, FB60, FV60, FB65 and FV65..
    Thanks..

    prashant,
    let say i have 3 company codes but i want to set the document date as the default for baseline date only for 2 company codes, how? If i tick on document date in the path u've given, will it be affected to all of company codes?
    Where can i check for the payment terms against company code? Because payment terms in the path u've given seems like different than what is being using in the PO currently..
    In the path there are 0001, 0002 and 0003 but payment terms which are being using in the PO are K160, K162....
    Please advise..

  • System captures the baseline date as the document date

    Hi All,
    User has changed the Baseline date as 05/11/2011 in the parked document 12345644/ 54123456 via t-code FV60, however, when the document was posted, the baseline date u201Cdefaultsu201D to the document date.
    Appreciate any one suggest me on this issue
    Nandha

    Hi Ravi,
    The system is defaults to capture the document date as baseline date,  the user wants to change the baseline date which has been captured by the system, then he changed the baseline date while posting the vendor park invoice.
    later he is saying that the changed baseline date is not taken again it has taken the document only. why it has happend like this.
    one question:- is user can change the baseline date while posting the vendor invoice ?  if he can change how the system should be configured for this where the setting should be made to take baseline date as given by the user.
    Appreciate any one suggest me on this request.
    Thanks
    Nandha

  • SD Billing to FI Accounting: How to make Baseline Date equal to Entry Date?

    Hello,
    I have configured Baseline Date to be equal to Entry Date in the Payments Terms in OBB8. I have assigned this payment term to the Customer as well as the Sales Order.
    But still, when I release a Billing Document to accounting through VFX3, the Baseline Date in the Accounting Document is taken as the Document Date/Posting Date.
    What does the configuration in Payment Terms do?
    How can I get the Baseline Date to equal the Entry Date?
    Any help is greatly appreciated.
    Cheers!
    Bharath

    Just copy from the standrad delivered 0001 to some Z001 and change the date to entry date.
    For me it is working fine. Also try first individually using FB60 or FB70 to llok at the behaviuor of the system.
    reward if useful
    sarma

  • Base Line date issue

    Hi Experts,
    I have an issue on base line date.
    We have uploaed Vendor Open item cutover data through LSMW in foreground mode.  After uploaed we found that the base line date 30.07.9999 is automatically picked wrongly in some of vendor open items.  Some of the vendor items with same payment term is picked baseline date correctly. I have corss checked in LSMW upload fields and upload excel file and also i have checked in LSMW constant values and any field mapping for baseline date but there is no such mapping and constant values in the LSMW.   If i make manual posting of the same vendors its fetching the correct base line date.
    now the issue is how to identify the cause, is it uploaed through lsmw or manual input because client is asking how it is picking defaul 9999 year. Is there any way to identify through FI Tables.
    Kindly suggest some solution.
    Thanks in Advance.
    regards,
    Surendra.

    Hello Surendra,
    The baseline date is controlled by your terms of payment and in
    customizing the transaction is OBB8. You have four choices ->
    No default - Indicator that no default value is required for the
                 baseline date for payment. You then have to enter the base
                 date manually during document entry.
    Posting date - Indicator that the posting date is to be proposed in the
                   base date field during document entry.
    Document date - Indicator that the document date is to be proposed in
                    the base date field during document entry.
    Entry date - Indicator that the entry date is to be proposed in the
                 field "Base date" during document entry.
    The system will not re-determine the baseline date if the posting
    date is changed. Similarly, if the invoice date is changed and the
    baseline date is based on the invoice date, it will also not be
    re-determined once enter is pressed.
    regads
    Ray

  • Debit memo(DR doc type) baseline date exceding the payment term days

    Hi All
    For debit memo I am facing a issue where my baseline date for a customer is showing more then the days specified in his(customer's) payment terms.
    sales document category is DR and order is created for some customer xyz and payment terms of that customer is showing 0% UP TO 15 DAYS. But when I check it in FBL5n the Net due dt for that order is showing 180 + 15 = 195days.
    What can be the reason, is it due to some enhancement or some routine or what , I am not able to figure out from where these days are coming for. I have checked MV45AFZZ , RV60AFZA and other exit s, I couldnt find any code which shows these added 180 days..
    Guide me in finding out the source ot this, <removed by moderator>.
    Thanks in Advance
    Regards
    Amit
    Edited by: Thomas Zloch on Sep 30, 2011 3:46 PM

    HI,
    You may need to check the copy control settings between the debit memo request and sales document in transaction code VTAA.
    Select the target document type and source document type, and click on the details (header level). Check the routine that is assigned for the field copying requirements for transfering business data.
    The routine assigned may be copying the base line date from the source document. You may need to assign other routine or you may need to develop your own routine to resolve your issue.
    Regards,

  • Baseline date in Accounting document changed after creation of Invoice List

    Hi all,
    1) User Requirement:-
    Creation of Invoice document(using VF01), Transfer u201CGoods Issue Dateu201D to FI accounting as a Baseline date instead of Invoice creation date.
    To meet the above requirement I did enhancement name: SDVFX008 user exit: EXIT_SAPLV60B_008.
    Its working fine and transfered goods issue date to Accounting(as baseline date) insted of  invoice date.
    2) Problem:-
    After Creation of Invoice List (VF21) system again overwriting baseline date iwith invoice list date.
    Does anyone know how to Stop overwriting baseline date in accounting while creation of invoice list.
    Thanks & Regards
    Sudheer

    Hi Valerie,
    do you recall the User Exit?
    Thanks

  • Baseline Date not chaning using BADI FAGL_SET_SEGMENT

    If someone has worked with this badi FAGL_SET_SEGMENT, can you please help.
    I'm trying to change the baseline date for the vendor invoice created using FB60.  I implemented the above BADI and changed the value of Baseline Date and Cash discount days based on the business logic. But the change is not reflecting in the document.
    Please help.
    Thank you.

    I understand the proposed solution but I do not think this should be a custom coding requirement.  The underlying assumption of the invoice payment term is that goods / services have been delivered.  The transfer of title should be a configurable trigger for the vendor payment baseline date.  Many consumer goods are shipped FOB to the customer destination with a 3-4 week shipping timeline.  Normal payment terms run 30-45 days.  We want our baseline date to start when the title transfers.  I can understand the GR document does not take the place of a proof of delivery but it is much closer to the the point where we actually transfer title then when we normally receive the invoice (2 days after vendor shipment).  Of course I have been through the argument that the invoice document date should be manipulated but I do not buy into it because it envokes a form of dispute management on a standard flow.  Initially I went down the path of GR based IV which follows the same logic as above for the release of ultimate payment.  I am confused as to why the standard solution does not provide an equivalent configuration for baseline date computation.  Can anyone explain why this is the case or whether I am just missing something obvious?

Maybe you are looking for

  • Mac Mini Marantz SR6007: Samsung TV keeps blinking

    Hello, I have looked all over for this and I'm on my last rope. I have a mini bought in 2011 which worked flawlessly with my Marantz SR7002 and my Samsung LED TV. The marantz just died and I've just replaced it by an SR6007. On the mini (and on the m

  • Cleared items on 31.05.11 is shown in the report S_ALR_87013344(GR55, 8A99)

    Hi The user has cleared the vendor account on 31.05.2011 but when he executes the transaction code S_ALR_87013344 vendor open items for profit center he still sees on the 31.05.2011 in this report. That means it is open item on profit center. But in

  • ITunes nearing 1GB of RAM consumption! Any ideas to lessen the load?

    Hello - My name is Erick and I'm an ACMT/Network Engineer. Apple-certified, but not Apple-employed. I have encountered an issue in iTunes which was not resolved with the latest 10.6.3 update and was hoping for any community suggestions or advice. Fir

  • Help cries the dinaosaur

    Hi there from a dinosaur and practically zero proficiency in this technology. Just purchased the Adobe PDF pack with the sole aim to convert a pdf file file into word. 1. How do i access this pack on line 2. What then do I do to convert a pdf into Wo

  • Can't create PDF, Acrobat not activated

    I recently needed to move my system over from XP to Vista since programs were unresponsive due to virus infection.  Re-installed CS3 Design Premium which comes with Acrobat 8 Professional. Had no problem previously creating PDFs, but now sometimes I