Basic Instance Scheduling Question

I scheduled a report to be run at 5 am everyday within the CR Server CMC.
Reports runs fine but:
1: The report name/file name is not what I specified. It starts with ~cc
2: It does not output to the right folder. It puts it in c:\Program files\Business Objects\Business Objects Enterprise 12.0\Filestore\output\----
I am new to this. Please help.
pchada

Hi,
I would suggest you post your question into the Crystal Reports Sever/ BusinessObjects Enterprise forum.
Ingo

Similar Messages

  • Basic and scheduling  dates & time calculation in process order creation

    Hi guru's,
    i have one requirement, i need to calculate and display the basic and scheduled dates & times based on the given input i.e material , plant , process order type , quantity , UOM and scheduling type ( for corresponding scheduling type user will provide either start date or finish date ) using RFC. can  u plz provide any function module for this purpose or logic for calculating the same  , as i am working on version 4.7ee .
    Awaiting for a quick response.
    Regards,
    Madan

    Dear Rohan,
    1.Check the length of break timings defined in the resource that is assigned in the phase.
    2.Check in OPUZ whether for the process order type and plant combination whether scheduling is to include the break time also
    (whether the check box for scheduling with breaks) is included.
    Check and revert back.
    Regards
    Mangalraj.S

  • Error in instance schedulling

    Hello experts,
       I have a web intelligence report that I have copied to test a change of dimension. Since that I copied it, the instance schedulling of both Web I Reports(the original and the copy) are failed. The error message is "The Web Intelligence server cannot be reached. Contact your Business Objects administrator (Error: RWI 00236)".  What I can do to restaure the this Web Intelligence Report instance schedulling ?
    Thanks,
    David

    Hello PadawanGirl,
    No, it happens only with this report. All the other reports are executing normally, even reports that use the same universe.
    Regards,
    David.

  • Basic Hyperion Workspace question

    Is there any way to Drill-Down to data by double-clicking on the chart item in Hyperion Workspace? I can do this in Hyperion Reporting Studio.

    hi all,Hi Neerav
    I have very basic clone database question
    If i create database A and clone database B using A...
    I want to know that any operation done on A will be automatically done on Cloned database B.Oops....Now you're asking about rocket science. Sorry, I don't know.
    I know about some basics:
    Streams or Replication--> Which can give you data on B in read-write mode.
    DR--> For safeguarding your database and B will work as DR solution.
    Hope u understandNo, please make us understand.
    Regards,
    S.K.

  • Basic recording/feedback question

    I'm recording basic vocals against accompaniment tracks using an APOGEE ONE and Audio-Technica 40 series AT8449 condenser mic. I use only headphones, no external speakers.
    If I record with "monitoring" on I constantly battle feedback/distortion, especially on songs with a wide dynamic range. When the feedback protection kicks in the message indicates that I'm getting feedback through my external speakers (which I don't have), I can minimize the problem by turning "monitoring" off but I lose the reference vocal. I know I must be overlooking something very simple. Any help is appreciated.

    hi all,Hi Neerav
    I have very basic clone database question
    If i create database A and clone database B using A...
    I want to know that any operation done on A will be automatically done on Cloned database B.Oops....Now you're asking about rocket science. Sorry, I don't know.
    I know about some basics:
    Streams or Replication--> Which can give you data on B in read-write mode.
    DR--> For safeguarding your database and B will work as DR solution.
    Hope u understandNo, please make us understand.
    Regards,
    S.K.

  • Basic PDF/SSL Question

    Okay, I know this is a basic question, and I'm not sure if this is really where I should be posting it, but maybe someone out there has experience with this.
    I have a PDF form sitting on a secure server.  I have it set up to email the completed PDF back to our company when the user clicks the SUBMIT buttton.  Whether or not the PDF is secure coming back to us would be dependent on the email server the user uses - not that the form sits in a secure area on our server or that the PDF is security settings are set, correct?
    Any input appreciated.
    Thanks
    Q

    hi all,Hi Neerav
    I have very basic clone database question
    If i create database A and clone database B using A...
    I want to know that any operation done on A will be automatically done on Cloned database B.Oops....Now you're asking about rocket science. Sorry, I don't know.
    I know about some basics:
    Streams or Replication--> Which can give you data on B in read-write mode.
    DR--> For safeguarding your database and B will work as DR solution.
    Hope u understandNo, please make us understand.
    Regards,
    S.K.

  • Basic wifi service question

    basic wifi service question
    A Windows-using friend of mine subscribes to a service from Verizon that is sort of like a cell phone for a computer - wifi service that you can access from theoretically anywhere, for something like $60 a month -
    as far as I can determine, one CAN get this for Mac but ONLY if you have a 15 or 17 inch laptop with PC slots - unless I am missing something. It requires a special kyocera card.
    Another company, T-Mobile, offers a similar service, but with no MAC access at all.
    So my question is: is there a similar service, wi-fi access theoretically anywhere (or even just anywhere in New York City) ? Hopefully with just the regular mac airport card and not any additional special hardware?
    Thanks!
    Will

    Hello WillFriedwald2
    The kind of service your describing is probably a 3G and GPRS service.
    Phone companies now offer mobile high speed connections using EDGE technology or GPRS2 and supply a 3G or GPRS PCMCIA card.
    However some companies are now offering a package whereby you get high speed 3g and gprs and also wifi.
    So to use this service on a laptop that has no PC card slot you need to get a 3G or GPRS2 phone that supports blue tooth then you can connect your laptop to the phone over bluetooth and therefore access high speed internet.
    But if you had a desktop mac such as a G5 you would be better just getting a regular cable or dsl connection in your home and invest in a wireless router.

  • Basic JDBC transactional question

    Hello all,
    I have (what I believe) is a basic transactional JDBC question.
    Here's what I want to do:
    begin transaction
    select a row from a table where (some condition).
    that row may or may not exist.
    if the row exists: update the row
    else if the row does not exist, insert a new row
    end transaction
    I want this entire thing to be atomic .. I don't want the select to complete, then have something else come in there before the update/insert takes place.
    I'm using MySQL .. I seem to remember hearing about some proprietary MySQL command which would do a SELECT + UPDATE atomically .. which would be fine, but I can't find it.
    Wrapping this with a row-level lock would be fine too .. I'm just not sure how to do that in JDBC.
    Thanks!
    -d

    By thte way, and not that it helps the orignal poster, who's using MySQL, but Oracle has a proprietary MERGE statement that does "insert or update" in one go. For example:
    MERGE INTO bonuses D
       USING (SELECT employee_id, salary, department_id FROM employees
       WHERE department_id = 80) S
       ON (D.employee_id = S.employee_id)
       WHEN MATCHED THEN UPDATE SET D.bonus = D.bonus + S.salary*.01
         DELETE WHERE (S.salary > 8000)
       WHEN NOT MATCHED THEN INSERT (D.employee_id, D.bonus)
         VALUES (S.employee_id, S.salary*0.1)
         WHERE (S.salary <= 8000);

  • Basic Clone database question

    hi all,
    I have very basic clone database question
    If i create database A and clone database B using A...
    I want to know that any operation done on A will be automatically done on Cloned database B.
    Hope u understand
    Thanks,
    Neerav

    hi all,Hi Neerav
    I have very basic clone database question
    If i create database A and clone database B using A...
    I want to know that any operation done on A will be automatically done on Cloned database B.Oops....Now you're asking about rocket science. Sorry, I don't know.
    I know about some basics:
    Streams or Replication--> Which can give you data on B in read-write mode.
    DR--> For safeguarding your database and B will work as DR solution.
    Hope u understandNo, please make us understand.
    Regards,
    S.K.

  • Difference Between Basic Date Scheduling and Lead Time Scheduling.

    Dear FRndz,
    Kindly help me out the difference between the Basic Date Scheduling and Lead Time Scheduling.
    Regards,
    SRini

    Dear,
    Basic scheduling :
    1.Basic dates are calculated.
    2.Exact to day.
    3.No cap reqmts are generated.
    4.Uses the inhouse production time from material master.
    5.Carried out automatically during planning run.
    In basic date calculation ( order start date/ order finish date ) the system always
    calculates backward scheduling.
    1. From the reqmts date the system subtracts the GR processing time to
    calculate the order fininsh date.
    2. From the order finish date the system subtracts the inhouse production time to calculate the order start date.
    3. From the order start date the system subtracts the opening period given in scheduling margin key to calculate the order opening date.
    Lead time scheduling :
    1.Exact to second
    2.ie production start date /time and finish date and time are calculated.
    3. cap reqmts are generated.
    4. uses times from routing.
    5. carried out only if the scheduling mode in MD02 screen is kept with indicator 2.
    From the order finish date the system subtracts the float after production to calculate the production finish date.
    From the production finish date the individual operations in the routing are scheduled backwards to calculate production start date.
    From the production start date the system subtracts the float before production
    to calculate order start date.
    Same thread.
    https://forums.sdn.sap.com/click.jspa?searchID=19281092&messageID=3548465
    Please refer this link,
    [Difference|scheduling]
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Basic Flex RPC question

    Hi.  I apologize for such a basic question.
    But when it comes to Flex RPC via BlazeDS does it use blocking IO?  Meaning say if we want to make 5 rpc calls.  1 of them takes 5 minutes and the rest of them 1 second.  The ones that are quicker will return first right?  All 5 are using the same service destination and new RemoteObject instances.
    The reason why I'm asking is that we're seeing behavior where the IO seems to be blocking.  The server side rpc calls aren't getting called until after the one before it finishes.
    thanks in advance.

    Basically, Flex is single threaded, so it might work serially.
    Anyway, you can reuse a single RemoteObject instance...

  • Basic  XML Publisher Question: How to access tags in the higher levels?

    Hi All,
    We have a basic question in XML Publisher.
    We have a xml hierarchy like below:
    <CD_CATALOG>
    <CATALOG>
    <CAT_NAME> CATALOG 1</CAT_NAME>
    <CD>
    <TITLE>TITLE1 </TITLE>
    <ARTIST>ARTIST1 </ARTIST>
    </CD>
    <CD>
    <TITLE> TITLE2</TITLE>
    <ARTIST>ARTIST2 </ARTIST>
    </CD>
    </CATALOG>
    <CATALOG>
    <CAT_NAME> CATALOG 2</CAT_NAME>
    <CD>
    <TITLE>TITLE3 </TITLE>
    <ARTIST>ARTIST3 </ARTIST>
    </CD>
    <CD>
    <TITLE> TITLE4</TITLE>
    <ARTIST>ARTIST4 </ARTIST>
    </CD>
    </CATALOG>
    </CD_CATALOG>
    We need to create a report like below:
    CATALOG_NAME     CD_TITLE     CD_ARTISTCATALOG 1     TITLE1     ARTIST1
    CATALOG 1     TITLE2     ARTIST2
    CATALOG 2     TITLE3     ARTIST3
    CATALOG 2     TITLE4     ARTIST4
    So we have to loop at the level of <CD> using for-each CD. But when we are inside this loop, we cannot access the value of CAT_NAME which is at a higher level.
    How can we solve this?
    Right now, we are using the work-around of set_variable and get_Variable. We are setting the value of CAT_NAME inside an outer loop, and using it inside the inner loop using get_variable.
    Is this the proper way to do this or are there better ways to do this? We are running into troubles when the data is inside tables.

    you can use
    <?../CAT_NAME?>copy past to your template
    <?for-each:CD?> <?../CAT_NAME?> <?TITLE?> <?ARTIST?> <?end for-each?>

  • BI Publisher report scheduler questions

    Question 1: Is there a way to cancel a scheduled report? I have users that scheduled reports in BI Publisher but these reports take too long to run that the users decide to cancel it. It seems that there is not an option to do this. I have admin rights, so I think that I should be able to do this but I don't see any option. If there is a way to do this can someone please explain how.
    Question 2: If a scheduled report is running while the BI Publisher application is re-started,  can the status of the report be changed from 'C' to 'F' in the xmlp_sched_ouput schema? During the development of an application that uses the scheduler from BI Publisher, we have re-started BI Publisher application serveral times while a scheduled report is running. When we query BI Publisher schema, we can see that the status of the report that was running before the application is re-started keeps showing 'C' (for current). How we can change this status? Is there any configuration that I need to change to for the change to be automatic?
    Thanks in advance for your help.

    Try like this. Make sure your BIP parameter name and Presentation variable name matches; i assume Region
    SELECT distinct REF_REGION_CODE
    FROM REGION
    WHERE REF_REGION_CODE BETWEEN '01' AND '10'
    and (LEAST(:Region) is null OR
    REF_REGION_CODE LIKE (CASE WHEN :Region='' THEN '%%' ELSE :Region END)
    or
    REF_REGION_CODE = substr(:Region,1,2) )
    SELECT distinct REF_REGION_CODE
    FROM REGION
    WHERE REF_REGION_CODE BETWEEN '01' AND '10'
    and (LEAST(:Region) is null OR
    REF_REGION_CODE LIKE (CASE WHEN :Region{}='' THEN '%%' ELSE :Region END)
    or
    REF_REGION_CODE = substr(:Region,1,2) )
    If this is not working try to tweak with single quotes for Region
    Edited by: Srini VEERAVALLI on May 30, 2013 1:18 PM

  • Sharing calendars in a small workgroup, basic set up questions

    I am getting no where with the new leopard server and ical server.
    we have an all mac office, new leopard server and are trying to make the ical server work so that users on the network can see and share each others calendars. the level of documentation i have found so far is disturbingly weak ... this can't be this difficult. Has anyone found a basic ... step by step how to use ical server to enable sharing.
    I have managed to publish a calander and view it from another machine ... what i haven't been able to figure out is how someone else might add to that calendar.

    there are a few ways to do this.
    A. manage it on the server
    1. Assuming a bunch of users who are all members of a "staff" or other main group, setup the personal cal accounts in iCal client.
    2. On the server, setup a separate group calendar account in iCal in order to delegate individual access to it.
    3. Add users as delegates, one by one. Repeat until your clicky finger aches.
    4. Stop/start calendar services.
    5. Check the box to show the calendar on the client side. Clients should have access to the group calendar now.
    B. use a resource calendar to avoid having to delegate manually
    1. On the server or any machine bound to OD, create a new resource via Directory.app.
    2. Plug in all the details on the info tab.
    3. Under the scheduling tab, check the "reservable" and "auto-accept invitations" boxes. Make sure the calendar server is listed there, too.
    4. Add "staff" -- or whatever OD group -- as the delegate.
    5. Stop/start calendar services.
    6. Check the box to show the calendar on the client side.
    C. add the group calendar separately for each client.
    1. The URL for group calendars follows this format and needs to be added as a separate account (with same username/pass). Just change the URL to: http://serverFQDN:8008/principals/groups/nameofgroup/
    2. Make sure to show the account (check the box), and you're done.
    obviously, there are varying degrees of inconvenience in each of those techniques. adding one by one either on the server or the client sides is tedious. ical server is still very much "1.0," as far as i'm concerned.
    the least tedious is the resource calendar method, though it may not be ideal for your use. it's not a hack, just a workaround to get the desired behavior.

  • Basic VT / Video Question

    I am upgrading my CM to v4.2 this month and looking to do a limited implemenation of some video. I have read the basics on VT Advantage solution and had some questions I can't seem to find the answers to:
    1. Besides the obvious desktop software and hardware (camera) installation, what additonal configuration changes do I need to make to CM/Unity/gateways to get video working in the environment?
    2. What kind of additional load is now placed on the network with video and what will this do to my current bandwidth configurations?

    Michael,
    First off you should check out the IP Video Telephony SRND if you are thinking about deploying video. Here is the link. (It's a 4.1 reference but should be 99% the same for 4.2).
    http://www.cisco.com/application/pdf/en/us/guest/netsol/ns268/c649/ccmigration_09186a00804ff6ba.pdf
    Somewhat brief answers to your questions.
    1. QoS for video on all network devices. The above guide discusses this but the Enterprise QoS SRND is the best reference. Switched only VT advantage isn't that hard. If you have WAN links then the LLQs should be configured independantly for video and voice(still only one llq though but this will ease admin and give the ability to police the video). Call Manager locations can be created to help enforce Call Admission Control of video calls. Provisioning the bandwidth is going to be one of the harder things to configure.
    ACLs will need to be adjusted for PC/Cam to Phone communication. The phone proxies the connection for the Camera and determines the camera via CDP (local on the phone switch) and then sets up a TCP connection traversing L2 vlans to L3 router and back. So if you have Phone acls they need to be adjusted. Again this is referenced in the above document.
    Regions for video types. You have a few options on video quality. This response will also answer 2. You can choose Cisco wideband, 7mps each direction for the highest quality and low amount of system overhead on the pc cpu. Of course this takes up a total 14mb for video. Should only be used on local lan. Then you have increments of h263. They range from 128 up to 1536. The higher the bandwidth the better the quality and more cpu on the local pc. You will need to use regions to set the desired video codecs and locations to enforce the bandwidth the codecs require.
    Lastly multipoint conferencing and other video endpoint integration. If you want conference with video you need to add MCUs. Currently (not sure on 4.2) CCM has a limitation on determining Video conference resources in an intelligent fashion. Essentially you need to have any video MCUs at the top of your MRGLs in CCM. This leaves the potential for Audio only conferences happening on very expensive video conference bridges. This calls for Device Pool and MRGL design changes for people who really only need multi-point video conferences.
    Read that SRND, great resource.
    Please rate any helpful posts
    Thanks
    Fred

Maybe you are looking for