Batch at material level

Hi all,
I want to use batch at material level.
i.e. for every material number batch should start from the same series.
e.g. If I want to use batch for 5 materials say A,B,C,D,E.
And I have given batch number range as 0000000001 to 9999999999, then when I do GR for A, then first batch shud be
0000000001, after this if I receive mat B, its batch should also b 0000000001. Then again if I receive mat A, then next batch shud b 0000000002, again next if I receive mat C, then its first batch shud b 0000000001.
Will it b possible if I activate batch at material level or need some other configurations also?
Regards....
Edited by: sapsarang on Dec 7, 2010 5:39 AM

Unfortunately SAP does not fulfill your requirement via a configuration. But there is the option of a user exit that gives you enough flexibility.
You can use SAP enhancement  SAPLV01Z for this purpose.
o   EXIT_SAPLV01Z_001. You use this exit to replace the number range
    object and/or interval proposed by the system with your own number
    range object and/or interval.
    In addition, you can, for instance, stop the system from assigning
    an internal number depending on the material or plant. You can also
    use this exit to stop the dialog box from appearing.
o   EXIT_SAPLV01Z_002. Using this exit, you can either change the number
    assigned by the system, or assign your own number.
Check the documentation at this node in IMG for more information:
Logistics - General > Batch Management > Batch Number Assignment > Configure Customer Exits for Intern. Batch Number Assignment
Your requirement is a generic one and often used in the food industry.
Regards,
Aroop

Similar Messages

  • Documentary Batches with Batch Management at Material Level

    Hi,
    We have configured batch managment at the material level, and turned on for our materials. This applies to all plants that a material is extended to. Problem is that some plants don't have capability to (or do not need to) trace individual batches. So a "Generic" batch number approach is usually used in those few plants - but this of course still requires that the "Generic" batch number be supplied in all transactions. Some of those plants have just a more limited requirement of batch traceability (e.g. just at receipt or despatch, but not anything else like physical inventory).
    The functions of Documentary Batches seem most appealing. However, according to documentation, and in our tests, it seems that the batch management setting will always suppress the documentary batch functions in a plant, even if we only want generic batches.
    Does anyone know how to allow documentary batches for certain plants to override the "Batch at Material level" setting? P.S. We are not able anymore to re-configure the batch to material-plant level.
    FYI - I have searched Forums, Wiki, Support portal, SAP Help and Release Documentation.
    Cheers,
    Jeff

    hello Gurus,
    Can any body Download OSS note 41715  for me from Marketplace as i dont have access so please.
    regards,
    ninad

  • Client level, plant level and material level batch

    Hi,
    Can any body tell me wat is the actual meaning of
    !) Client level batch,
    2) plant level batch,
    3) material level batch
    with exa. please.
    Thanks
    Nilesh Ithape

    Hi,
    Below is the extract from the IMG Documentstion..
    ====================================================================
    Batch numbers can be unique at the following levels:
    at plant level
    at material level
    at client level for a material
    If you choose plant level, the batch number is unique in conjunction with the respective material and the plant. If you choose material level, the batch number is unique together with the material. At client level, the batch number is unique in the whole client.
    To change the batch level, you have to start a conversion program. This program first checks whether conversion is possible and outputs an error log containing all batch numbers that occur more than once at the new level. Now you need to manually transfer these batch records to batch numbers within Inventory Management using a transfer posting 'material to material'.
    If you change the level from plant level to a higher level, it is possible that batches with the same batch numbers in different plants are actually identical.  In this case, all you have to do is remove stocks (including previous period stocks) so that all batches with the same batch numbers, except one, can be reorganized.
    When you convert from plant level to material level, the material is then to be handled in batches in all plants in which it is defined.
    =========================================================
    Hope this helps..
    Regards,
    Siva

  • Batch determination at material level.

    Hello SAPians,
    I have a question about the batch management at material level.
    i have maintained batch determination policy at material level in system conversions also get done... now my problem is here ,i want to reassing it to plant level.. please help me in this becoz system is not supporting me as it showing the error that this implementation is not yet done in system...
    even i tick the batch determination in MM03 purchase view it is not allowing me ... and one more i did this in development server but it is assigned to all means dev, qlity as well to production servers...
    which field i forgot to maintain please clarify me..
    Waiting for the response.
    Regards,
    Ninad Kshirsagar

    hello Gurus,
    Can any body Download OSS note 41715  for me from Marketplace as i dont have access so please.
    regards,
    ninad

  • Changing Batch Level from Material Level to Plant Level.

    I want to create the batch class with the class code 22 instead of 23. As the batch class is maintained at the Material Level, not at the Plant Level. So is it possible to change the batch class from Material to Plant Level and create batch class with code 22.
    Kindly suggest.

    Hi, Thanks for ur reply.
    I have applied SAP notes and changed the batch status from material level to plant level...But still i am getting the class type as 23.
    What are the next steps to be done. Currently in OMCT, Batch Level Conversion tab is active and rest all the tabs are in inactive state. so please guide.

  • Batch Material level and Material Master

    Hello,
    We have defined the batch level on level "Material" because we want the batchnumber to be unique for a material - independent of the plant it is used in.
    I would like to know if with this setting of the config, the material X marked with the flag "Batch Managed" in its master record, should be managed with batches in all Plants or is it posbilbe to exclude some plants (for instance plants belonging to other country) from managing the material X in batches?
    Thanks for any reply,
    Aart.

    you can only exclude plants from managing batches for a common material if your batch level is plant level.
    with material level, all plants have to manage a common material with batches.

  • Batch level settings conversion from plant-to-plant to material-level

    If someone has worked on conversion of Batch level settings within SAP from plant-to-plant to material-level batch management, please let me know what are the challenges involved in doing this. Thanks.

    Check help !!!
    To change the batch level, you have to start a conversion program. This program first checks whether conversion is possible and outputs an error log containing all batch numbers that occur more than once at the new level. Now you need to manually transfer these batch records to batch numbers within Inventory Management using a transfer posting 'material to material'.
    If you change the level from plant level to a higher level, it is possible that batches with the same batch numbers in different plants are actually identical.  In this case, all you have to do is remove stocks (including previous period stocks) so that all batches with the same batch numbers, except one, can be reorganized.
    When you convert from plant level to material level, the material is then to be handled in batches in all plants in which it is defined.
    Standard settings
    In the standard delivery batches are uniquely defined at material level.
    Activities
    To change the batch level, proceed as follows:
    1. Choose the level at which you want your batches to be unique.
    2. Save the new settings and choose Back.
    3. Choose Batch level -> Conversion.
    4. If necessary, carry out the conversion in test mode first.
    Further notes
    Note that you cannot reset conversion from plant level to a higher level in the standard.
    If you create a client by copying an existing client, initially, there are no settings in the target client at batch level. The system makes the settings in the target client only when you have carried out an activity (maintaining master data or posting a goods movement, for example). The client level is not transported. If you copy a client with client level, you have to manually set the client level in the target system.

  • Batch Management - Changing Material level to Plant level

    Hi friends,
    We are configuring batch management for ECC 6.0 with CRM 5 .
    I can see the batch level in my system as Material level. But we would like to convert  batch level in to Plant level. when i try to convert the batch level i am getting error "This type of conversion is not implemented".
    There is no batch record exists in the stock.
    Please clarify why can't able to change to plant level from material level.
    Thanks

    YOu need to use  the OSS note 41715
    This will explain what exactly you need to do.
    Please go through the above OSS note.

  • Batch Management @ Plant level in ECC 6.0

    Hi,
        I want activate the Batch Management @ Plant level in ECC 6.0 and when select the Plant level and save it , i am getting the information error like " THIS Type of conversion is not Yet Activated" .
    So i needs to activat @ plant level , what i needs to do for further.........
    Thanks & Regards

    Defining Batch Level
    Use
    This transaction enables you to set the batch level for batch management. Three unique options for a material are available:
    u2022     At plant level
    u2022     At material level
    u2022     At client level
    Prerequisites
    If the material or client level for a material is chosen, check that no materials exist in stock. If a material exists in stock, the level may not be changeable.
    IMG Menu     Logistics - General >  Batch Management > Specify Batch Level and Activate Status Management
    Transaction Cod >> OMCE

  • In Migo,the batch managed material automatically goes into restricted sk.

    Hi
    In Migo,the batch managed material automatically goes into the restricted stock.The batches are created at the time of receiving and i want it to be receive it in unrestricted stock.
    Note:The batches are received at the time of receiving.
    Regards:Vijay

    do your customizing in IMG > Logistics General > batch management > Specify Batch Level and Activate Status Management
    there is a button for initial status for new batch.
    make sure that there is no flag in the status column of the entries shown.

  • SLED Check @ material level

    Hi All,
    We are procuring materials without batch mgmt.
    For some materials SLED check is to be done for a particular plant and 101 movement .
    I have seen its in (plant+movement) level but I want at material level SLED check.
    How to configure?
    Thanks in advance
    Shuva
    Edited by: Jeyakanthan A on Dec 27, 2011 12:24 AM

    Hi,
    As you are procuring material and want to control Without Batch Management, follow the process:
    In material master(MM02) , maintain total shelf life and minimum remaining shelf life of the material in general/plant data .During MIGO, you need to enter Production Date which in turn system calculate and would not allow to post the GR document, if the material life less then minimum remaining shelf life period.
    For example:
    Create Material MM01 (OR do enter in MM02 for any material).....In Gen Plant data/storage- 1 view, Maintain required values in the Field of--- >Total Self Life ( letu2019s say 180days) and in Min. Remaining shelf life ( is 100days)
    Go for GR(MIGO) for material, the system will ask for Date of Production of that material which you need to enter and from that the system automatically calculates it SLED. You have two options with cause:
    Option-1:--- > If you are receiving today ie..21.12.2011 and production date is 10.11.2011{ falls within 100days }, then system will post GR without any message.
    Option-2:--- > If are receiving today ie..21.12.2011 and production date of material is 21.08.2011{ not falls within 100days }, then system will not post GR and you will have ERROR message.
    More refer link:
    http://help.sap.com/saphelp_47x200/helpdata/en/a5/63348743a211d189410000e829fbbd/frameset.htm
    Regards,
    Biju K

  • Activating batch-specific material unit of measure

    Hi all,
    my client has a SAP ECC 5.0 system with over 30 plants, which are currently using batch management. For a new plant we have the need to work with the batch-specific material unit of measure to have KG as base UOM and to calculate the quantity of bags regarding the batch specific conversion factor.
    Does anybody now which impact will follow on the current batch management and stock in the other plants after activating the batch-specific material unit of measure in the Customizing?
    Thanks in advance,
    Robert

    Hey all,
    I found something in standard SAP... You can use a dependency on the level of the batch class and in there it is possible to write some calculation code.
    Thanks for the input,
    Philippe

  • Batch wise material value

    i wanted to see batch wise material's op stock, closing stock, receipt value, issue value (qty wise and value wise), then which report we can consider. i am looking mb5b but in this either batch is appearing or value is appearing, but batch, value both are not coming in one screen

    u can c only a limited information for the batch.
    if u want all these infrmation, then a report has to be developed thru ABAP development

  • Vendor evaluation at material level

    Hi friends,
    I have one requirement from client. A vendor supplies many materials. My client want to get report of vendor rating of the vendor for each material and material groupwise.
    Can this objective can be achieved?
    Please suggest.
    Regards

    Hi,
    When you run Vendor Evaluation (for all criteria), sysytem keeps log of all material level points the Vendor has achieved. You can view the same in transaction ME64.
    Regards,
    Prashant

  • Restrict Authorization at Material level during production confirmation

    Hi SAP Gurus,
    I would like to ask if its possible to restrict authorization at Material Level during production confirmation.
    Our scenario is we have SFG and FG which are handled by different group of people but it has the same Order Type. Now we want to restrict authorization such as one department can only confirm SFG and the other department can confirm FG only.
    Is it possible to set authorization at material type or production scheduler level. IF not possible, is there other way except creation of new Order Type?
    Thanks,
    Raymond

    Hi Raymond,
    DO you mean I should create a customized table for this?
    Yes
    Are there no standard way?
    As per my knowledge, you can control through production order type, so you need to create seprate order type for this
    Thanks,
    Sankaran