Batch at the time of GR
Hi
At the time of GR the batch no is created automatically.Vendor is one of the characterestic in the batch.
How the value for the characterestic 'vendor' can be updated automatically?
Regards
Soumen
Hi
You have to give all the vendor names as the characteristic values in the Characteristic "vendor" (CT04)
When the system creates the automatic batch, it will directly go to the characteristic screen. There you have to select the values by F4 option.
since we have given multiple options in the values, we have to manually decide which value should be selected.
Thanks & Regards
Bala
Similar Messages
-
How do I batch adjust the time on select images?
I took photos with the iPhone and a handheld point and shoot in another time zone. The iPhone automatically adjusted time to the time zone I was in. I forgot to manually adjust the point-and-shoot and so there is now a two hour time difference.
Is there a way to batch correct the time on select images in iPhoto '09?Sure. Use the Photos -> Adjust Date and Time command
Regards
TD -
How do I batch restore the time on my NY images to 6 hours earlier in Aperture?
Hi,
I think my camera is stuck on European time. Batch changes only seem to deal with time zones and I don't know how to use that to achieve what I need.
Thanks,
RaphaelAperture ha stwo time adjustments:
One adjustment is for correcting the Time Zone: If your camera was set to a different timezone then the actual time, you use "Metadata > Batch Change"
You set "Camera's Time Zone" to the Time Zone your Camera has been set to, when you took the pictures.
You set "Actual Time Zone" to the Time Zone you want the images to show.
For example: If your camera is stuck on European time, but you took the pictures in London, set the "Camera's Time Zome" to "MET" (Paris) and the Actual Time to GMT (London).
The second adjustment is for correcting inaccuracies. If your camera's time is inaccurate - e.g. off by several minutes, you can correct that by "Metadata > Adjust Date and Time". The panel will show the current time for one of the images and you can adjust this to the correct time. All other selected images will be adjusted by the same amount.
Regards
Léonie -
Enter batch at the time of creation of trnasfer order
Hi,
We have set up batch managment at material level.
We have some material in warehouse without batch managed.
For these materials when i am moving from storage location by two step method Intially i am able to generate amaterial document for the two step method movement type 313.
When i am doing the transfer order for the material document i am getting an error message saying that 'enter a Batch' inspite of the material is not a batch managed material
Message no. M7041
kindly help me how to resolve
Suniltry to enter a date of manufacturing on the batch tab on item detail area and see if the system is generating any batch no. by itself. U can enter date of manufacturing as todyas date also.
-
Dear all'
PO is craeted with a material and a specific batch for the material.Now the problem is the vendor sometimes delevers the material lot wise ..It is nedded to craete a separate batch at the time of the GR Against the particular PO each time.
How to solve this problem ,Kindly suggest.
Regards;
Joydeep Mukhopadhyaybelow the item overview in MIGO is an icon with 4 arrows pointing to each corner, some say it looks like a snowflake. With this button you can distribute the received quantity to several batches or several locations.
-
Batch selection at the time of GR for Process Order
HI experts,
I have the following problem -
I have got a process order of 51, at the time of order creation I have assigned/created 2 batches for the process order using some development and making use of user field. Now at the time of GR after final confirmation, I want to select the batch number for the required quantity, i.e I want to do the GR for both batches, and I want to select the specific batch from the assigned 2 batches. I am facing a problem that , the GR by default selects the first batch of the order and the batch number field greys out. I am not able to select the second batch if I go for second GR of the same process order.
How can I make the field selectable , such that I can select the required batch at the time of GR.
Regards
A S KThere is a possibility to use batch split- kindly check if you are able to do this
Reg
Dsk -
BAPI's for copy batch characterestics at the time of Goods Recipt save
Dear members,
I am copying the Batch characteristics values of the order(Process order) to new batch at the time of GOODS RECEIPT (GR) in repack process.
Can anyone please let me know there are any BAPI's for copy batch characteristics values to New Batch in GR(MB31 or MIGO) at the time of Goods Receipt SAVE.
Thanks,
Srinivashi srinivas,
did you find any solution for this problem. we are facing the same issue and currently thinking of few alternatives to deal with it. whether to use BADI for Batch derivation or to use a BAPI.
thanks,
Kunal -
Part -1 Not Capturing at the time of GR
Hi Friends,
I am biffurcation 100 kg of qty in to two batches at the time of GR system is updating part-1 only for one batch whereas there is no part 1 entry for second batch.
Need your help why this is happening
Regards
VivekDear,
Two way,
1) Cancel Good receipt document with MIGO t-code and create new document for material receipt and capture part 1.
2) Go J1IEX - capture excise invoice against your material document.
Than post it with J1IEX.
Regards,
Mahesh Wagh -
You can batch change the time zone, and you can change the date and time, but can you batch change the date on photos? I would like to change the date on a number of images to a certain date, but I don't want to have to change the date on each one manually one by one.
Your answer solved the issue, but left me perplexed about something else. For the sake of example, I am going to be talking about scanned images here. Now, this may be a totally moot point, because scanned images may behave differently than regular images from a camera regarding date and time. I have changed all of the scans so that the dates are all the same day. This is the day that I scanned the images. However, when I view the project in the Projects browser, the date shows a range from well before the date I set to well after it. This seems very odd to me, because none of the scanned images in the project have the dates shown in the projects browser. Do you know anything about this?
Mac
Message was edited by: macorin -
FIFO at the time of 541 and 543
Dear experts,
I am having two issues here
1. We are having subcontracting scenario.We want to issue componets to the subcontractor on the basis of FIFO based on batch.System will have to propose the quantities available for the batch at the time of Transferposting with 541
2. When we do the GRN for Finished Product, System has to pick the batchs based on FIFO from the parts provided to Sub contractor.
Please advise me how can I do this?
3. An another issue is that If have issued partial quantities of material to the subcontractor with respecr to PO,System has propose the remaining quantities of PO at the issuesing the material next time.
Please provide the solution
Thnks in advanceYou will have to set up a batch search strategy for this, both for 541 and 543 movements.
For this make sure the following configuration is present:
Logistics - General -> Batch Management -> Batch Determination and Batch Check -> Batch Search Procedure Allocation and Check Activation -> Allocate IM Search Procedure/Activate Check.
Provide the standard search procedure ME0001 both for 541 and 543O movements.
Maintain the batch search strategy at the appropriate level using MBC1. The system will propose the batch while performing MB1B.
Check this thread and the associated links for further information.
Re: Batch management in Subcontracting ??
Regards,
Aroop -
Next inspection date is not updated in batch / prposed at the time of UD
Hi
I have configurted the system for retest of batches, the system successfully creates the inspection lot but when does not propose next inspection date at the time of UD nor it updates in Batch Master.
I entered inspection interval days in QM View, the system entered the first inspection date correctly. Also Batch Restriction is working properly.
Kindly help.
regards
MobashirHi Shaymal & VRMP
I have checked the system, the only problem I am facing is that the system does not show next inspection date dialog box at the time of UD where I can see the next inspection date being set by the system
Say, I use QA07 (Triggered Manually) on 19.jan.08. The Next inspection date was 26.jan.08 and Initial Run in Days was 10 (days), the system created inspection lot on 19.jan.08 successfully. At the time of UD it automatically set 29.jan.08 as the next inspection date (i.e. 19.jan.08 + 10 days) istead of 06. Feb.08 (i.e. 26.jan.08 + 10 days) without showing dialog box / suggesting next inspectino date.
regards
Mobashir
Edited by: Muhammad Mobashir on Jan 19, 2009 7:11 AM -
Batch number coming automatically at the time of Process order release
Hi All,
I want the system generated batch number for header material to come automatically at the time of process order release.
At present ,the batch number is entered manualy dering process order creation.
Can anyone pls guide abt the settings required for the sameDear,
Define the production scheduling profile CORY then
Auto Batch Creation = 2 On release.
Then assign this to your FG or SFG materials in work scheduling view in material msater MM02. Then create new order and check.
Now for automatic generation i have to set internal number asignment for batches.
Batch will create for movement type say 101 SPROLogistics - GeneralBatch mangment--Creation of New Batches --Define Batch Creation for Goods Movements. so it will have same logic in MM for 101 GR against PO will be internal number range but no effect in SD.
Regards,
R.Brahmankar
Edited by: R Brahmankar on Mar 12, 2010 12:40 PM -
No New Batch number creation at the time of Material Transfer Movement(309)
We are upgarding from 4.6C to ECC6.0. We have an issue in regards with the material movement type 309. At the time of creating the material tranfer using the same material as issuer and receiver, the same plant and storage location ( this process is used by the business to diferentiate batches).
In 4.6C a new batch number is created automatically when 309 movement is posted; stock and characteristics transfered are allocated at the new batch created automatically.
The same case in ECC6.0 does not create a new batch as done in 4.6C. We have looked for any SAP note or forum discussion without success.
If anybody has an answer for this issue, let us know.As a matter of fact these configuration has been checked before, additionally we compare configuration at 4.6C and ECC6.0 and it is the same but the new batch creation (for this specific case) is working at 4.6C, not at ECC6.0.
-
Warning message at the time of GR for a material with Batch Management
Dear All,
I am new to MM,
We are using batch at plant level. For some materials user dont want maintain
Batch classification in Material Master. At the time of Goods Receipt posting with ref-to PO user getting warning message like <b>For batch 0000000139 of material 212030602400000 4F10, no class could</b>. I check system messages setting transaction code OCHS for batch management, but I didnt found this type of message in the list.
Plzz can any one help me where I need to change system settings?
Thanks in advance.
Meeravali shaik.HI,
Check in the IMG node Logistics general > Batch Management > Define attributes of system messages.
Regards,
RitiG -
Automatic and manual batch determination at the time of Goods receipt
hi,
where i can have the settings for automatic and manual batch determination at the time of Goods receipt and goods issue..
E.g.: If i am receiving material from vendor then my requirement is system will generate batch automatically...
Where we can get this setting?
Tx
UtsDear,
You assign the batch number either
Manually
Automatically, using internal batch number assignment, refer to Customizing for Batch Management under Internal batch number assignment.
Internal batch number assignment is activated for the complete client, unless you exempt individual plants or materials using a customer exit (see Configure customer exits for intern. batch number assignment in Customizing for Batch Management).
The R/3 System informs you that the internal batch number assignment is active. You are however only informed once per transaction, for example, when you enter the first item on the multiple-entry screen.
Please refer: http://help.sap.com/saphelp_45b/helpdata/en/25/283cb44f7811d18a150000e816ae6e/frameset.htm
Regards,
Syed Hussain.
Maybe you are looking for
-
RFC & BAPI with Visual Studio 2010 (C/ C++)
Hello, I would to develop, into MS Visual Studio 2010 (c/ c+), a application that allows establishing a RFC connection to SAP (ECC6) and call a Z program, or call a BAPI from my c/c+ application. Can you recommend a good documentation, possibly with
-
I have a black iphone 5 and my flash doesn't work it used to work every once in a while but stopped
I have a black iphone 5 and my flash doesn't work it used to work every once in a while but stopped I went into the camera app and tried to see if it would flash when I took a picture but I saw it light very faintly and hasn't done lot up since. Shou
-
Hi there, Does someone know in SharePoint 2010 list view - How to filter on a multiline text box field - the view filter does not allow me to select it. Thanks,
-
Why aren't my logged-in sessions sustained on certain forums?
I belong to a large list of auto enthusiast sites, and recently several of them have started required me to log in each time I access the site, even though I always check boxes like "Remember me each time I visit" when I log in. It can't be a cookie
-
Best way to sync contacts and calendars to non apple devices
Hi. I need to be ale to share my calendars and contacts so I can access them on non apple devices. I've tried using google but find the syncing of contacts from osx address book to be really unreliable. Does anyone have any advice on the best way to