Batch class at plant level

Hi Guys,
Is it possible to assign batch class for a material at plant level, the scenario is the material is produced in two plants the batch characteristics for the both plants are different , and hence i want to assign two different batch class to a material .
Thanks and regards
Thamizhchelvan G

Thamizhchelvan,
You cannot have Plant wise Batch Class as this is client level data.
What can be done is assign all the possible characteristics to the Batch Class and assign that class to Material master and you can define the Inspection plan with MIC which are as required by individual Plants, based on this Results would be recorded and Inspection Results can be transferred to Batch Classification for that particular data.
Regards,
Prasobh

Similar Messages

  • Batch Management at Plant Level

    Hi,
    I need to activate batch management only for the DC. All the other plants are not batch managed. I have maintained the Batch at plant level. Where now do I indicate that only the DC plant is to be activated?
    Thanks,
    Lee

    Hi SantoshSP,
    I have maintained the tick in the material master. But this is not specific to the plant data. How will it know to which plant it must be batch managed?
    Thanks,
    Lee

  • Block internal batch number at plant level

    Dear Experts,
    I have activated the internal batch number assignments at client level. But for some plants or one of the company code, I want to block the internal batch number creation during the goods receipt at production order confirmation(CO11N). Is it possible ? How? Can we restrict for some of the plants/comany code and allow for other plants/company code?

    Check this link:
    http://help.sap.com/saphelp_46c/helpdata/en/25/2838bf4f7811d18a150000e816ae6e/content.htm
    FF

  • Process for batch level at plant level

    Folks,
    In case we have set batch level at plant level, how does the system reacts in case of an STO? I.e. I ship batch 1 for material 1 from plant A to plant B. In plant B, this batch might already exists as the level of batches is on plant level. HOw will the GR react? Will it create a new batch number in plant B?
    Regards,
    MdZ

    Hi,
    Thanks for the reply. Just to be sure; in case of a scenarion in which we have an STO, an outbound delivery with message type SPED which creates the inbound delivery and copies over the batch numbers in the inbound delivery and we do a GR on the inbound delivery, the system will try to do GR for these specific batches. Will the system then also either receive the batches on the inbound delivery in case these do not exist and create new ones in case they do exist?
    Regards,
    MdZ

  • Documentary Batches with Batch Management at Material Level

    Hi,
    We have configured batch managment at the material level, and turned on for our materials. This applies to all plants that a material is extended to. Problem is that some plants don't have capability to (or do not need to) trace individual batches. So a "Generic" batch number approach is usually used in those few plants - but this of course still requires that the "Generic" batch number be supplied in all transactions. Some of those plants have just a more limited requirement of batch traceability (e.g. just at receipt or despatch, but not anything else like physical inventory).
    The functions of Documentary Batches seem most appealing. However, according to documentation, and in our tests, it seems that the batch management setting will always suppress the documentary batch functions in a plant, even if we only want generic batches.
    Does anyone know how to allow documentary batches for certain plants to override the "Batch at Material level" setting? P.S. We are not able anymore to re-configure the batch to material-plant level.
    FYI - I have searched Forums, Wiki, Support portal, SAP Help and Release Documentation.
    Cheers,
    Jeff

    hello Gurus,
    Can any body Download OSS note 41715  for me from Marketplace as i dont have access so please.
    regards,
    ninad

  • Changing Batch Level from Material Level to Plant Level.

    I want to create the batch class with the class code 22 instead of 23. As the batch class is maintained at the Material Level, not at the Plant Level. So is it possible to change the batch class from Material to Plant Level and create batch class with code 22.
    Kindly suggest.

    Hi, Thanks for ur reply.
    I have applied SAP notes and changed the batch status from material level to plant level...But still i am getting the class type as 23.
    What are the next steps to be done. Currently in OMCT, Batch Level Conversion tab is active and rest all the tabs are in inactive state. so please guide.

  • Batch management level change to plant level

    Hi,
    Currently,i am using batch managment at material level.I have created material and has its stocks.
    I need to convert it to plant level..How can i convert it to plant level?
    Thanks
    Srini

    Hi,
    Please check the OSS Note 41715 - Resetting batch level from material to plant level.
    Hope it helps you.
    Kuber

  • Batch Management @ Plant level in ECC 6.0

    Hi,
        I want activate the Batch Management @ Plant level in ECC 6.0 and when select the Plant level and save it , i am getting the information error like " THIS Type of conversion is not Yet Activated" .
    So i needs to activat @ plant level , what i needs to do for further.........
    Thanks & Regards

    Defining Batch Level
    Use
    This transaction enables you to set the batch level for batch management. Three unique options for a material are available:
    u2022     At plant level
    u2022     At material level
    u2022     At client level
    Prerequisites
    If the material or client level for a material is chosen, check that no materials exist in stock. If a material exists in stock, the level may not be changeable.
    IMG Menu     Logistics - General >  Batch Management > Specify Batch Level and Activate Status Management
    Transaction Cod >> OMCE

  • Client level, plant level and material level batch

    Hi,
    Can any body tell me wat is the actual meaning of
    !) Client level batch,
    2) plant level batch,
    3) material level batch
    with exa. please.
    Thanks
    Nilesh Ithape

    Hi,
    Below is the extract from the IMG Documentstion..
    ====================================================================
    Batch numbers can be unique at the following levels:
    at plant level
    at material level
    at client level for a material
    If you choose plant level, the batch number is unique in conjunction with the respective material and the plant. If you choose material level, the batch number is unique together with the material. At client level, the batch number is unique in the whole client.
    To change the batch level, you have to start a conversion program. This program first checks whether conversion is possible and outputs an error log containing all batch numbers that occur more than once at the new level. Now you need to manually transfer these batch records to batch numbers within Inventory Management using a transfer posting 'material to material'.
    If you change the level from plant level to a higher level, it is possible that batches with the same batch numbers in different plants are actually identical.  In this case, all you have to do is remove stocks (including previous period stocks) so that all batches with the same batch numbers, except one, can be reorganized.
    When you convert from plant level to material level, the material is then to be handled in batches in all plants in which it is defined.
    =========================================================
    Hope this helps..
    Regards,
    Siva

  • About the effect for batch level conversion from material to plant level

    Dears,
    Now  we use batch management at material level in our system, now we want to change to batch level from material level to plant level, what effects or risks it will bring during the process of conversion?
    Thanks a lot
    Zhongkai

    Hi
    check the following SAP help link it is very helpful:
    http://help.sap.com/saphelp_40b/helpdata/es/d2/1d4b6e5733d1118b3f0060b03ca329/content.htm
    at the link you can find the following
    Specify batch level and activate status management
    In this IMG activity, you specify the following:
    the level at which batch numbers are unique
    whether batch status management is active in the client
    the plants in which batch status management is active
    the initial status of new batches
    Batch level
    Batch numbers can be unique at the following levels:
    at plant level
    at material level
    at client level for a material
    If you choose plant level, the batch number is unique in conjunction with the respective material and the plant. If you choose material level, the batch number is unique together with the material. At client level, the batch number is unique in the whole client.
    To change the batch level, you have to start a conversion program. This program first checks whether conversion is possible and outputs an error log containing all batch numbers that occur more than once at the new level. Now you need to manually transfer these batch records to numbers within Inventory Management using a transfer posting 'material to material'.
    If you change the level from plant level to a higher level, it is possible that batches with the same batch numbers in different plants are actually identical. In this case, all you have to do is remove stocks (including previous period stocks) so that all batches with the same batch numbers, except one, can be reorganized.
    When you convert from plant level to material level, the material is then to be handled in batches in all plants in which it is defined.
    Standard settings
    In the standard R/3 System, batches are unique at plant level.
    Activities
    To change the batch level, proceed as follows:
          1. Choose the level at which you want your batches to be unique.
          2. Save the new settings and choose Back.
          3. Select function Batch level -> Conversion.
          4. If necessary, carry out the conversion in test mode first.
    Further notes
    Note that you cannot reset conversion from plant level to a higher level in the standard.
    If you create a client by copying an existing client, initially, there are no settings in the target client at batch level. The system makes the settings in the target client only when you have carried out an activity (maintaining master data or posting a goods movement, for example).
    SETTINGS BEFORE/AFTER CLIENT COPY:
    Source client Target client
    Client level Material level
    Material level Material level
    Plant level Plant level
    Batch status management
    Batch status management is an additional function provided by the standard R/3 System.
    Standard settings
    Batch status management is not active in the standard R/3 system.
    Activities
    To activate batch status management, proceed as follows:
          1. Choose Batch status management active.
          2. Save the new setting and choose Back.
          3. Choose Batch status management -> conversion.
          4. If necessary, carry out the conversion in test mode first.
    Further notes
    Batch status management is linked to the batch level. At material and at plant level, the status management settings are valid within the client, that is for all plants. However, if you have defined batches to be unique at plant level, you have to select the plants in which status management is to be active using function Plants with status management.
    If you activate status management, all existing batches are assigned status 'unrestricted'. If you deactivate status management, the systems transfers all restricted batches to unrestricted stock within conversion. Restricted stock only exists if status management is active.
    If you create a client by copying an existing client, status management is automatically activated if batches exist in the target client, independent of the settings in the source client. If no batches exist in the target client, it is not activated. In this case, you have to activate or deactivate status management manually, if required.
    Plants with batch status management
    Activities
    To select the plants in which status management is to be active, proceed as follows:
          1. Set characteristic Batch status management for those plants in which batch status management is to be active.
          2. Save your settings and choose function Back.
          3. Choose function Batch status management -> conversion
          4. If necessary, carry out the conversion in test mode first.
    Initial status of a new batch
    Using this function, you can specify for each material type which initial status new batches are to be assigned. However, if you use a quality management system, this specifies the status of the batches.
    Hope it will help
    Best Regards

  • Batch shelf life expiry date at Plant level

    Hi All,
                We have a requirement from the client to maintain Batch shelf life at plant level.
    Current process: Batch shelf life expiry date is maintained at the global level.
    Requirement: Shelf life data to be maintained at Global level and plant level both.We want flexibility to maintain shelf life both at Global level and plant level .
    If any one has worked in this scenario then kindly throw some light to resolve this issue.And also let me know if we move ahead to maintain shelf life data at  global n plant level then which all the area it will get effected in other stream reagrding shelf life best before date.
    This is very critical requirement from client prospective as we have legacy system involved like LIMS & COREDB.
    Your valuable input will be highly appreciated.
    Thanks n Regards,
    Vikas Soni.

    Hi Vikas,
    A doubt out of your query,
    How the expiry date is maintained Globally .
    Whenever a GR is done then the expiry date will be tagged to the particulat batch & the expiry date is valid for the batch in the particulat plant. Am I right?
    Thanks & regards
    Mahesh

  • In future batches are maintained in plant level

    dear all,
    when i am doing MB1A ,MB1B,MB1C  after i save the document there is a message saying that in future the batches are maintained at plant level. I am not getting the document generated number. because of this i am unable to find whether the document generated or not. how to overcome this
    regards
    anup

    Some one has most likley changed the batch level.
    Please go to transaction OMCT and have a look around there to figure what has gone on
    http://help.sap.com/saphelp_46c/helpdata/en/25/283aac4f7811d18a150000e816ae6e/frameset.htm
    That will explain this transaction and settings in this,.
    Edited by: Adeel Sarwar on Sep 18, 2008 10:04 AM

  • How Can We Change Batch Management Level From Client level to Plant Level?

    Hi all,
    I want to know whether it is possible to change the batch management level from client to plant level.Pls Help..

    Hi,
    Refer SAP Note 891902 - FAQ: Batch level

  • Batch Management - Changing Material level to Plant level

    Hi friends,
    We are configuring batch management for ECC 6.0 with CRM 5 .
    I can see the batch level in my system as Material level. But we would like to convert  batch level in to Plant level. when i try to convert the batch level i am getting error "This type of conversion is not implemented".
    There is no batch record exists in the stock.
    Please clarify why can't able to change to plant level from material level.
    Thanks

    YOu need to use  the OSS note 41715
    This will explain what exactly you need to do.
    Please go through the above OSS note.

  • Material Classification view at plant level

    My company has multiple plants set up with materials and I would like to know on the business side if there is a way to tell if the Classification view tab is missing for plant & material.
    I've tried using SE16 MARA, table view, but it show materials at the client level with Classification view but not set up at the plant level. Tks,

    Dear Friend
    Which Class type are you using in the classification view? What batch classification you can use is dependent on the batch level you have chosen.
    E.g. if your batch level is plant, then you have 022 batch class, While for material and client level you have Class Type 023. If you are going by the above e.g then you should be looking in to tables like MCHA, MCHB..........
    You might be interested in following tables if you are using Classification.
    KLAH Class Header Data
    KLAT Classes: long texts
    KSML Characteristics of a Class
    AUSP Characteristic values
    KSSK Allocation Table: Object to Class
    CABN Characteristic
    CAWN Characteristic values
    Thanks & Regards
    SE
    Thanks & Regards
    Gopal SP

Maybe you are looking for

  • Multiple agentry servers installed in the same  system?

    Hello Experts,           There are two agentry servers installed in the same system,but in different drives(C and D drive).I have given access to one server remotely,in the sense the applications to the server in one drive are published by other deve

  • Open item Mangement  not selected

    hi all We have created a GL A/c CST Recoverable-  A/c code No. 673210 on 02.02.07 (TC FS00) as a Balance Sheet account but due to oversight we didn’t mark the Account management as OPEN ITEM MANAGEMENT and Line Item Display. Latter we have marked lin

  • How Far Back Oracle Keep AWR Reports

    Hello, A quick question: Does anyone know how far back Oracle retain AWR reports in the database? Is this something that we can customize? If it is, can someone offer some insights? Thanks!

  • Quality Management - Usage Decision error

    Hi all, My scenerio is - There is a material ABC which is procured from the supplier. The Quality of the material is 'below standards'. However, material ABC, in Tcode QA11 Usage decision was done as ACC1 (accepted). Since the material ABC is not mee

  • What is "AU Net Send" and "AU...Pitch?"

    I am having problems starting up Final Cut Express. When I do, the splash screen pauses on "AU Net Send" and then skips to something about "AU Pitch", which is where it dissappears. I have not installed any thrid party software or antyhing...I'm just