           Can any body tell me for some materials Automatic batch is not creating after releasing the process order.
Regards
Ravi

Dear,
Go to MM02 of these materials click on work scheduling view and check which scheduling profile is maintained there.
Then go to CORY and check same scheduling profile for Auto Batch Creation. If scheduling profile is missing then assign same in work scheduling view of material master.

Similar Messages

  • Batch determination during process order release

    Dear Experts,
    I am facing a problem, and not able to figure out the reason. There is material having base unit as 'EA' and Issue unit as 'NO' and conversion is 10 NO= 1 EA. The same material is maintained in the BOM as 1 NO. At the time of creation of process order, system is copying the same quantity in the process order (1NO). When I release the process order, the batch determination is happening. Now the issue comes, instead of doing batch determination of 1 NO, system is doing batch determination for 1 EA (which is equivalent to 10 NO.!). Can anyone help me to find out the reason for same.
    Thank you.
    Sagar

    Dear Mohit,
    If you want to go for external batch numbering during order release then
    - Set no automatic Batch creation in order in T.Code CORY.
    This setting only restrict the automatic Batch Creation in order only.But to fulfill second your requirement of restricting order release or save without assigning external batch no you have to either go for,
    - User exit.Below are the user exits which are trigger at the time of order saving
    PPCO0006 to predefine entries for order header fields when
    an order
    PPCO0001 to provide information at the time of saving (for
    production orders and process orders)
    PPCO0007 to check or change header data when saving
    or
    - Create screen variant using T.code SHD0 and make Batch Field compulsory.
    Regards,
    Dhaval

  • Issues during Component Batch Determination for Process Orders

    Hi,
    I am encountering a strange issue during component batch determination of process order.
    1. During creation of process order, when I execute batch determination, systems does determination based on strategies we have set and when I click on Copy it gives an error
    "Log cannot be saved: Object/subobject not specified"
    Message no. BL201
    *Diagnosis
    Log save cancelled because at least one log contains no object or subobject.
    Object and subobject are needed to classify application logs because there are several log types. Only a few logs are managed in main memory at runtime, so this classification is not needed.
    If the logs are to be saved in the database, object/subobject must be specified for later retrieval.
    Procedure for System Administration
    Object/sub object can be passed when a log is created (function module BAL_LOG_CREATE) and changed with BAL_LOG_CHANGE.
    The possible values for object and sub object must be configured in transaction SLG0.*
    If I save the order with CRTD status and come back again in change mode and do determination, It works fine.
    Again when the order is in REL status and do the determination, It gives the same error.
    This happens only for a specific plant, In other plants batch determination works in all scenarios.
    I checked for all plant related Config for batch determination and coudn't find any discrepancies.
    Please advise how to resolve this issue. Thanks in advance for your help
    Regards,
    Aheesh

    There Is no direct solution for your requirement just try this work around.
    While defining the batch determination search strategy for process order in COB1, there is one column Quantity proposal where you can attach the Routines (This is written in ABAB code )  make use of this, define New Routines with ABAB help to fulfill your requirement. Try this if found useful award full points.
    Regards,
    Ajay Nikte

  • Change Production version during creation of Process Order COR1

    Hi,
    Scenario:
    Based on the entered Material, Plant and Order type system need to trigger a popup asking the user to select the Production Version. This should happen before clicking on SAVE button, so that all the values will be populated correctly based on the changed VERID.
    I did not find a user exit that enables to change the Production Version (VERID) value. So I thought of displaying the popup in the user exit EXIT_SAPLCOZF_003 which will be triggered before initial screen appears, export the selected value and pass it to a User Exit or BADI where VERID can be changed. But cannot find a user exit to do it.
    Please help me find a User Exit or BADI to change the Production Version during creation of Process Order using COR1 transaction before clicking on SAVE button.
    Thanks,
    Manoj.

    Hi Manoj,
    So - almost four years later - I saw your post and I saw myself in the very same situation as you did...
    I found a solution for those who wants to change the production version of the production order from the sales order creation: create an enhancement in the function module 'MD_VERSION_SELECTION' and you are good to go.

  • In consistency during Batch Derivation in Process Order

    Hi,
    During Batch Derivation in process order, multiple old batches of sender material proposing even though actually only single Batch of sender material determined, and transferring the characteristic values from old batches to the Receiver material which is in-correct. (I am working with SAP ECC 6.0)
    Can any one advise if required to execute/run any program to correct the system in-consistency,
    regards,
    Purna

    Dear Pruna,
    please check if the correct level of WUL is defined in derivation rules 
    Mostly the problem is caused by default value 99 here. You can check and
    change the value in transaction DVR2.                                   
    BR Sabine

  • QI stock batch assignment in Process order component

    I have stock of raw material in MMBE against different batch and stock type. Suppose I have 3 batches - B1, B2, B3 for raw material R1.
    Now in MMBE R1 RM has stock in unrestricted stock batch B1, B2 and QI stock B3.
    If I am creating a process order for FG with RM R1, then in component overview screen in COR1 / COR2 T-code I am able to add manually batch No. B3 against R1 RM. If I am saving as well the batch No. B3 from QI is also saved along with process order.
    However, we have restrcited issue of stock from QI stock. But, is ther any way that during Process order saving system will show error message if any batch is determined manually in component overview from QI stock.
    Any exit or, standard Config is there to restrcit it?
    Please suggest

    Hi Susanta Roy,
    System will pops up the message of material shortage for the batch no. B3 which you have manually selected from QI stock, try this once you maintain the manual entry of batch no. B3 in the cor1 0r cor2, just click on the 'Material Availability check' Tab on the same screen system will pops the message pf material shortage.
    Also maintain the tick mark to Check material availability when saving order (network) in OPJK for your plant and order type for the both Availability check.
    Please check and revert.
    Thanks
    Hrishi

  • Strategy Types in Batch Search Strategy (Process Order)

    Hi Expert,
    What are the difference between the strategy types - Order type/Plant/Mat, Order type/Plant, Prod Material?
    For Order type/Plant combination- If my criteria is to do automatic batch determination at process order release against the sort rule characteristics (LOBM_LWERT) GR received date. I maintained LOBM_LWERT in all material classes, now in selection criteria which class I will choose as different materials contain different class in the class type 023.
    I am confused.
    In case of Order type/Plant/mat- number of master data is huge.
    Pls suggest
    Krish

    Got answer.closed

  • Problem during Process Order Confirmation - COR6N

    Dear All,
    We are into process industries
    Till now we are creating different BOM for each section and different process orders for each BOM.
    For example Pulverize, Acid MIXING, Continuous Rotery, Blending and Packng.
    Now we have created new BOM for FG - showing all input/output of  RM, SFGs.  In Recipe, define operation for each section. and assign operation to material.  I have attached screenshot of Recipe Operation.
    During process order confirmation, system shows movement type of all material perfectly during each phase. But during confirmation of last phase system does not show 101 movemet of FGs.
    I have checked in Recipe, control key is ok i.e. Automatic GR,  in OPK4 setup is also correct.
    We have created new BOM and Recipe. There is no change in other configuration parameter.
    Thanks and Regards,
    Nirav

    Hi Nirav
    The automatic goods receipt is defined by the operation/phase control key.
    Control key PI03 has the automatic goods receipt setting by defaul.
    Analyzing the screenshot I could observe that this control key is assigned to all the opration/phases, however, it should only be assigned to the last operation/phase, where the goods receipt will actually take place.
    For all the previous operations/phases you should use a different control key, without automatic goods receipt, such as PI01.
    BR
    Caetano

  • Correction of batch no.in Process order

    Dear Sirs, One Process Order has been created & all its transactions like co53, co60,co54, cork,mb31 & qa32 all has been furnished. Now it has been found that the batch no.is wrong .
    How to correct this batch no./Process Order ?
    Regards,
    G.C.Gupta

    Hi,
    Dont think about changing Batch No. in Process Order.It is not advisable at all.
    Do as our other expert has suggested.And that stock transfer from using Movement type 309 and t.code MB1B.Use same Material code in both fields (sender and receiver) but assign required B.No in Receiver Batch No. field.
    Regards,
    Dhaval

  • Batch determ. in Process Order doesn't consider Stock Provided to Vendor

    Dear Forum,
    We have a problem with the following scenario:
    We use Process Orders to manage our Subcontracting process. This is standard SAP, where the Operation is defined as 'external', and this works fine.
    The scenario which we can not seem to be able to work is the following:
    When executing batch determination for the component(s) which are batch relevant, the system does not show the batch stocks which are already at the subcontractor, i.e. Special Stock 'O' stock provided to vendor.
    This is strange, because:
    - In the availability check the flag 'W/o subcontracting' is not set.
    - The batches in the subcontracting location fulfil the selection criteria which have been defined in the batch determination Selection Class.
    Does somebody have experience with this? Any hints are welcome.
    Thanks, Mark Voet

    Hi Mark,
    As I understand you determine the batches in the process order.
    From SAP point of view it means that you determine the stock which is to be provided to the vendor. Components with batches are copied into the PO when it is created from the PurReq and system will use this stock (batches) automatically when you execute MB1B541PO reference.
    Later, when you do the GR against this PO, the same batch(es) will appear automatically for components-to-be-consumed (by mvt 543).
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/8b/55a026995011d195a2080009c17b92/frameset.htm
    So, SAP's concept is that the batches which are determined in the order are those batches which are to be sent to the vendor - these batches will be posted from your storage location to the subcontractor. Stock in special stock segement "O" ar at the sc-vendor.
    As per my best knowledge there's no solution in standard system for that if you want to determine such batches in the order which are located at the subcontractor...
    Regards,
    Csaba
    Edited by: Csaba Szommer on Sep 1, 2010 11:43 AM

  • Restriction during process order confirmation

    Hi,
    I want one validation during process order confirmation (mile stone) through t code COR6N  if resource capacity & shift intervals not maintained ( t code CRC2) then process order should not confirmed &  there should be error message. Plz advice how it is possible through customization.
    regards,
    sps.

    Dear shukla,
    Check with this User Exit,
    CONFPI02                                Process order confirmation: Customer spec. input checks 1
    CONFPI03                                Process order conf.: Cust. spec. check after op. selection
    CONFPI04                                Process order conf.: Customer specific input checks 2
    CONFPI05                                Process order conf.: Cust. spec. enhancements when saving
    If the above is not working then check with this BADI
    WORKORDER_CONFIRM at the time of saving,
    Regards
    S Mangalraj

  • Batch Determination in process orders

    Hi All,
    This is regarding batch determination in Process Orders. We have components which are batch managed. When we do a batch determination system shows up old batches  qty in available qty field in batch determination which were already consumed for different process orders.When checked in stock overview (MMBE) there was no stock available for this material.
    Can you please explain me how the batch detmination in done in the system. Why is the system looking for old batches for which there is no stock available.
    Kindly reply to the mail.

    Hi
    Pl follow the below path and transection and check the settings..if missing pl make necessary settings
    Batch management> Batch serach procedure allocation and check activation
    T.Code to be looked specifically  <b>OMCG , CORC</b>
    Pl reward if this is helpful or come back if you need another help
    BR
    Sumit

  • Exclude quality inspection batche from Batch Determination in process order

    Dear Gurus,
    When doing batch determination in process order, the system taking quality inspection batches for selection.
    I have checked in OPJJ , quality inspection stock is select but if i remove , it will effect MRP process
    How to exclude quality inspection batches from Batch Determination?
    Thanks in anticipation.
    Regards,
    Sandy

    Hello,
    I also have the same requirement. Can some one provide solution.
    Regards,
    Naren

  • Automatic batch determination in process orders

    Hi,
    How batch determination can be done automatically for components in process orders?
    regards,
    Mohit Goyal

    Dear,
    Define the batch determination search strategy for process order in COB1 with sort rule in CU70.
    On the initial screen of your application choose Logistics>centrel function>batch management>Batch determination>For process order -->Batch search strategy --> Create.
    On the initial screen of your application choose Batch search strategy -->Create.
    Choose the strategy type, say choose co02
    Choose the key combination-
    Enter the required dat-->say plant ,production order type, product,valid from and component for which you want to have this
    Choose Selection criteria push button. Choose a sort sequence.
    If no values have been entered, enter the selection class and the characteristic values.
    Go back to the screen on which you create a batch search strategy.
    Choose Sort if required(it should be defined earlier(in CU70- here you are giving the charateristic name on which you want to sort)
    For component you need to use MBC1 with search stratgey as ME01 for your plant movement type and material and assign the sort rule and search procedure here.
    Check also in COR4, for the combination of plant and order type...you have selected search procedure-CO0001
    Batch management> Batch serach procedure allocation and check activation
    T.Code to be looked specifically OMCG , CORC
    Hope it will help you.
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Nov 11, 2008 11:31 AM

  • Regarding Batch No Assignment During Process Order Release.

    hi,
    i have one secenario.
    Suppose I have Process Order For material. PH-5000.
    It have 3 material as ingradients.
    ph-1000 - roh
    ph-2000 - roh
    ph-3000 - Semifinished.
    what i want when Process order for Mateiral ph-5000 get released.
    Batch No of PH-3000(Semifinsehd) get copied to PH-5000 batch no.
    Its Urgent
    Is any Enhancement is theri , pls let me know,
    Thanks,
    you can mail me.
    [email protected]

    Dear Mohit,
    If you want to go for external batch numbering during order release then
    - Set no automatic Batch creation in order in T.Code CORY.
    This setting only restrict the automatic Batch Creation in order only.But to fulfill second your requirement of restricting order release or save without assigning external batch no you have to either go for,
    - User exit.Below are the user exits which are trigger at the time of order saving
    PPCO0006 to predefine entries for order header fields when
    an order
    PPCO0001 to provide information at the time of saving (for
    production orders and process orders)
    PPCO0007 to check or change header data when saving
    or
    - Create screen variant using T.code SHD0 and make Batch Field compulsory.
    Regards,
    Dhaval

Maybe you are looking for

  • Acrobat 9 Standard and Forms

    Hello everyone, First time caller, long time listener. I have a small problem regarding forms in Acrobat. I. have created a PDF from an old word file, with some tables where you can fill out your name. 2. In Acrobat, I open the newly created PDF file

  • How to make the CTI respond to the work area again?

    Hello, i suddenly have a unusual problem (4 me). I  work on a project and i noticed today that the CTI dose not  act according to my work area when i RAM preview. After pressing 0 it just  goes after the end of the work area continuing to render . (g

  • GPU - Will this work?

    I have two Mac Pros: 2006 (actually built in November 2007) which has a new GeForce 8800GT and an Early 2009 which has a 4870 First, as a video editor would I gain much as far as speed, color or other in the 2009, to replace the 4870 with a new 5870?

  • Adding a breadcrumb for multiple image pages

    I'm using a body class tag to highlight each page in the navigation when it loads (i.e., ".oneColFixCtrHdr photos" would change the Photos text in the nav bar from black to white when on that page). Is there also a way to do this with multiple pages

  • Is it legal to use a OSX Lion theme on windows 7

    I have Windows 7 PC.I love the Mac OSX Lion theme and want to get it on windows.The are tutorials on how to this on youtube.I was just wondering is it legal.If it isnt i wont try it.