Batch derivation in production orders

I am using batch derivation to send sender batch data to receiver batch data. Is there a way I can send the sender batch # to the receiver batch #. I want the produced batch# to be the same as the component batch#?
Can I do this
thanks a lot

thanks Vishal. When I look at batch derivation and create the conditions using DVS1 and DVR1 i do not see the option of transfering batch number from sender to receiver. I see other options like expiration date etc but not batch number. Is my understanding incorrect?
Or are you telling me to set up conditions using DVR1 and DVS1 and still use user exit PPCO007
thanks

Similar Messages

  • Batch derivation in Production order

    Hi all
    I am using batch derivation successfully by copying the sender batch expiration date to the receiver batch expiration date. Is there a way that I can copy the sender batch number to the receiver batch number?
    thanks a lot

    John,
    I don't think you can do that.  The sender/receiver functionality only works between existing batches.  The batch is created first, then the data is transferred.  You can't send data to a batch that hasn't been created yet.  If the batch is created, you can't really change the batch number after the fact.
    At least not via batch derivation.
    Craig

  • Issue regarding Batch determination in Production order as per Expiry date.

    Dear all,
                    first of all  happy Navratri.
    I have issue regarding batch determination in production order.
    I have to compare P.O header materialu2019s expiry date and issuing components expiry date at the time of batch determination.
    lets take example,  Material having self life is u201CXu201D years and batch determination against PO is based on FEFO with the help of self life we can determine Expiry date of manufacturing material  suppose it is u201CYu201D  I have to introduce restriction at the time of good issue if expiry date of issuing components u201CZu201D is less than expiry date u201CYu201D.
    Please give your valuable suggestions either standard or through SAP enhancements.
    thanks & Regards
    SIVA

    Dear
    Thanks for your reply, i am layman about batch derivation can u elaborate it.
    Thanks & Regard

  • Batch Determination in Production Order Component Overview Screen on the basis of FIFO, Thickness, Grade, width etc.

    I am facing a difficult scenario. Pl. help me out. In my Business Process I am assigning Batches in Production Order Component Overview Screen. Here I am assigning relevant batches to BOM Components manually, My Management want SAP to suggest batches automatically on FIFO basis, thickness, grade, width & first batches should automatically assign to Production order.  Can you pl. tell me how to configure this scenario.
    Or can I pull stock overview screen at Production Order Component screen to assign relevant batch to BOM Components
    Once batches assigned in Production Order component screen cannot be changed. It can be changes by specific persons only.

    Hi,
    Automatic Batch Determination for production order components is possible by configuration.
    You can also refer below discussions to map your scenario.
    Batch determination in production order | SCN
    Automatic Batch Determination in Production order
    Regards,
    Naresh

  • Automatic Batch Determination   in Production order

    Dear All,
    We are using automatic batch determination is based on FIFO (first Mfg first out) for components..After releasing the order.
    I have maintained Batch Class in all the materials which are used as a all material special Characteristic LOBM_HSDAT as a one of the class characteristic. as we want batch determination  on GR date for few material and for few material LOBM_VFDAT for self life material and its class.
    Then create Sort Rule CU70 mainatained the same LOBM_HSDAT in it. and one with LOBM_VFDAT.
    Then create Batch serch Strategy (USE T.Code COB1- search strategy CO01the respective sort rule and selection critoria.for All ROH HALB and Finish material.
    In Material Master of all component in MRP 2 view select value 3 (Automatic Batch Determination) for BATCH ENTRY. All ROH HALB and Finish material
    After mainting above all prerequisite I should able to do the Automatic Batch Determination as per my selection Rule.
    But Automatic Batch Determination  in Production order after release is not working.
    Please need your help.
    Regards,
    Manish
    Edited by: manish gurnule on Dec 30, 2008 5:26 AM

    Dear,
    Define the batch determination search strategy for process order in COB1 with sort rule in CU70.
    On the initial screen of your application choose Logistics>centrel function>batch management>Batch determination>For process order -->Batch search strategy --> Create.
    On the initial screen of your application choose Batch search strategy -->Create.
    Choose the strategy type, say choose co02
    Choose the key combination-
    Enter the required dat-->say plant ,production order type, product,valid from and component for which you want to have this
    Choose Selection criteria push button. Choose a sort sequence.
    If no values have been entered, enter the selection class and the characteristic values.
    Go back to the screen on which you create a batch search strategy.
    Choose Sort if required(it should be defined earlier(in CU70- here you are giving the charateristic name on which you want to sort)
    For component you need to use MBC1 with search stratgey as ME01 for your plant movement type and material and assign the sort rule and search procedure here.
    Check also in COR4, for the combination of plant and order type...you have selected search procedure-CO0001
    Batch management> Batch serach procedure allocation and check activation
    T.Code to be looked specifically OMCG , CORC
    Hope it will help you.
    Regards,
    Madhu

  • Multiple batches for a production order and mapping with components

    Hello Gurus,
    Our business requires to create multiple batches for one production order + they want to trace which component in the production order has been issued to the main equipment.
    For example, I am creating production order for 'A' equipment for 4 qty. Business wants to create 4 different batches for these equipment
    Lets say now 4 batches are created A001, A002, A003 and A004.
    Now lets assume 2 nos of 'B' component are required for 1no of 'A' component. So the requirement of B component is 8.
    Lets say 8 batches are generated B001, B002 ......B008
    Now lets say batch B001 and B002 are issued for A001 and packed together. How do we map this?
    I understand we can do some enhancement for creating the multiple batches but I still dont know how to map them with each other.
    Please help

    Hi Ethan
    There is a functionality called WIP batches, that allows you keep the batch traceability within an order.
    With WIO batches you can track which batch of component was used to produce each batch of finished product.
    See this link for more details:
    Work-in-Process (WIP) Batch - SAP Library
    BR
    Caetano

  • In consistency during Batch Derivation in Process Order

    Hi,
    During Batch Derivation in process order, multiple old batches of sender material proposing even though actually only single Batch of sender material determined, and transferring the characteristic values from old batches to the Receiver material which is in-correct. (I am working with SAP ECC 6.0)
    Can any one advise if required to execute/run any program to correct the system in-consistency,
    regards,
    Purna

    Dear Pruna,
    please check if the correct level of WUL is defined in derivation rules 
    Mostly the problem is caused by default value 99 here. You can check and
    change the value in transaction DVR2.                                   
    BR Sabine

  • Query on Batch Determination in Production Order

    Dear Gurus
    I have one query on batch determination in production order against the scenario given below, which need your help .
    We know that it is possible to allocate the same component batch to two concurrent production orders at the same time in SAP.  But as per the business requirement its not possible physically. So business want to update the batch selection logic to exclude the already allocated batch to any open production order.
    In my understanding it cant be done without any enhancement, but require your expert opinion before coming to any conclusion.
    If you have any idea to achieve the solution kindly let me know.
    Thanks

    Dear
    I am not sure whether you can change the Batch SELECTION logic  for concurrent production order .As far as I know batch selection is done on Batch search strategy /sort Rule
    Explore SAP Help : http://help.sap.com/printdocu/corePrint46c/en/data/pdf/LOBM/LOBM.pdf
    Refer this useful thead from expert :Userexit in Batch determination and external number ranges for batches
    Regards
    JH

  • Batch management in production order for WM managed components

    Hi Experts,
    Iam having WM managed components in my production order which are batch managed as well. I have to do batch determination for these WM managed components.
    I would like to know the steps involved in it and the required configuration.
    Can anybody throw some light on this please
    Thanks & Regards
    Enrico

    Enrico,
    For setting up Batch determination in production order please follow
    [Batch determination in production order|http://help.sap.com/saphelp_470/helpdata/en/25/283c3f4f7811d18a150000e816ae6e/frameset.htm]
    http://help.sap.com/saphelp_470/helpdata/en/25/283c3f4f7811d18a150000e816ae6e/frameset.htm
    As far as WM managed components it will still be the same as WM transfer order is created only after goods movement document is posted.
    Hope this helps. Else please come back.
    thanks,
    Ram

  • Automatic batch management for Production order receipt

    Hello ,
    I have a requirement to setup & activate Batch Management only for Production order Good Receipt . I am looking out for what all configuration / data setup will be required to complete this .
    To start with I have following questions .
    1. Whether such activation is possible only for Production order Good receipt - 101 mov.type
    2. IF yes , is Batch management activation status be at material or plant level .
    3. As I need automatic assignment , should I be selecting Internal batch management .
    4. What should be selected for valuation for Goods movement in Inventory management.
    5. Is it necessary to have batch determination by maintaining Condition tables / Access sequence
    6. What would be standard Class / characteristics to be maintained for automatic determination.
    Also I will have to work with the running system where Material are already active and have stock in system . What precautions will I have take if I have to activate the Batch Management in a running system.
    Appreciate all your expert advise.
    Regards,
    Lawrei

    Thanks Adler for your comments .
    With reference to your point , need further clarifications
    1. If batch management is selected to material , this means that it will be active for all movement types for Inventory and cannot be restricted to 101 mov.type .
    I see that in config node
    +Define Batch Creation for Goods Movements+
        +Using this function, you can define for each movement type whether a new+
        +batch is created for a goods receipt and how it is created.+
    Can I not restrict batch creation only for 101 movement , but again here I don't have options to select only for Good receipt for order - Tran/Ev type - WF .
    & what about below config node
    +Define Batch Creation for Production Order / Process Order+
        +In this step you can make the following settings in batch management for+
        +the existing production control profiles:+
    Is it possible in this node .
    Please advise.
    Regards.
    Lawrei

  • Filter for batch determination of production order

    Filter for batch determination of production order
    Dear guru ,
    We trigger batch determination manually for every production order using CO02.
    How can I understand whose are the production orders arenu2019t taking place batch determination?
    Checking all the production orders is too heavy ?
    Does exist a massive transaction (coois or others)  where I can select the production orders with components not assigned to the batch ?
    Thanks in advance

    Hi
    In COOIS > In the initial screen select  Documented Goods movement  in the list Field along with and other selection criteria and run the Report
    In the list of orders > Expand corresponding order to view Documented goods movements list with the components with and w/o batch numbers
    Regards
    Brahmaji

  • Batch split in production order confirmation

    Hello
    any body please suggest me how to map collective batch split during production order confirmatio.
    i am using t.code CO11n.
    in goods movement i am having qty as 2000 kg.
    In this 200kg i want split in to 100 batches as 20 kg each. my client wants to put no batches it should automatically divided 2000kg and need to split 100 batches in to each 20 kg. how can i map this. is there any function module in our SAP.
    Please suggest any body on this.
    Thanks & Regrds
    Bhakta

    Hi Onat,
    Thanks for ur reply.
    I want to split GR101. actually. i have shown individually to my client means select line item and split one by one. but theey are saying that 200 times to do this is not possible.  please suggest ow resolve this.
    Thanks & Regards
    Bhakta

  • Automatic capture of batch number as production order

    Hi,
       How to make the order number to capture automatically while confirming the production order.As it should pick the order by default in the goods movement screen.
    Abap coding and user exit to perform this.
    Regards,
    Deepak GS

    Hi,
    Batch determination uses characteristic values assigned to batch classification for sorting batches and make a selection. A series of customization steps should be completed for batch determination. You will have to learn by reading SAP help or threads throughout this forum. Check out threads below.
    [Batch Determination within Production Orders;
    [Automatic Batch Determination;
    narainmech wrote:
    >      But for GR it is ok, if this is required for the child item level , while doing the confirmation when the issue is happening in bith cases 1. BAckflush 2. Manual issue
    >
    > Here in both the case it should pick the batch automatically.
    According to which criteria do you want batches to be selected, order name? Are there batches in the system named after production order for components of the order? No matter what, selection must be based on batch characteristics.
    Regards.

  • Batch derivation without production

    Experts,
    Can we use the batch derivation functionality if no production module is active? Or do you always need such things like production and process orders?
    Thanks,
    Philippe

    You can only use batch derivation if the batch-where-used-list is updated.  If you have the correct entries needed in that, then yes.
    But usually, without, process or production orders, the batch-where-used list is not fully updated with the records needed to do the mapping.  You'll only have material movement info and that probably won't have enough info for batch derivation.
    Craig

  • Is there any function for the Batch assignment of production order

    There is one function in the CO02(Production Order) which named "BATCH ASSIGNMENT".
    CO02 -> Components -> Batch assignment
    But the function only can assign one material one time.
    This is very boring.
    So we are planning to create a new program for it.
    But I can't find any function moudle or BAPI can be used.
    Could anybody give me some function moudle or BAPI for it?
    Tks

    Hello~~~Is there any body here?

Maybe you are looking for

  • Why the copier function of Photosmart 5520 just can copy A4 size paper?

    I just bought a Photosmart 5520. It works great and have no problem doing photo printing, scanning and wireless printing. However, when I use the copier function. I found that I always missed part of the copied sheet. After checking the setting I fou

  • How to use nvl with to_char on varchar data type

    Hi, I have the datatype as varchar in which i enter date format with timestamp. I am using the quey select nvl(:p_date,pei_attribute8) from per_people_extra_info . Now i need to trucate in date format as Mar,12,2011. I tried using select tochar(nvl(:

  • How do I select and de or unselect groups of songs in my library

    How do I select and de or unselect groups of songs in my library

  • JDBC re-connection to oracle

    I have an application using connection pooling. When the oracle server it is connected to is rebooted/shut down, the connections are of course broken. I can detect this fine but when I try to re-connect to the database with Connection connection = Dr

  • New div in editable content area

    I want to create a new div within the editable area of my DW page (CS4). This is not the template file, but the actual page I'm working on. It will create the div, but I can't get any of the attributes like width and position to apply. Is there a cer