Batch determination configuration for process order.

Hi,
Can anybody help me to configure batch determination for process order in step by step.
My requirement is
1. multiple selection of component in process order.
2. click on batch determination icon.
3. system will check batch, valuation type, stock. Assign batch,valuation type, storage location automatically in the process order confirmation(COR6N)-Goods movement tab.
Thanks,
Jishu

Hi Jishu,
Please refer below documents whcih will help you on batchdetermination
http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/c09b7216-65da-2b10-bdb5-870cf9916350?QuickLink=index&…
http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/f0caed4a-40f9-2c10-349a-96ec617a8161?QuickLink=index&…
Regards,
R.Brahmankar

Similar Messages

  • Configuration for Process order for Forms

    Hi,
    I want to develop a layout for Process Order.
    Where we will do configure Print Program & Layout for Process Order like
    what we do in NACE for SD&MM related layouts!
    Will this Process Order supports both SAP Script & SMART Forms!
    Can anybody clarify!
    Thanks,
    Deep.

    Hi ,
         In Process order transaction ,in output options declare the form name and output type. In TNAPR table in SE11 create on row with the above o/p type and form name. I think  both forms will be possible.
    Actually where ever script form possible means there you can create smartform also.
    Thanks.
    Suma.

  • Batch determination issue in process order Material quantity calculation

    Dear Gurus,
    We are facing issue in auto batch determination in process order (Material quantity calculation ).
    eg Material X  is active material 200 KIA used in BOM as
    10  X   200  KIA  
    20  Y   10           Filler
    30  Z
    40  X   200  KIA
    50  Y
    60  Z
    We select line item 10 and 40 and do Batch determination system proposes 2 batches for line item 10 as Batch A and B
    and for line 40 again Batch A (with 0.01 KIA) and batch B proposed which is wrong.
    For line Item 10 Batch A and B
    For line Item 40 Batch B and C or as per FIFO logic.
    As Batch A should be consumed in Line item 10 then it proposed Batch B and so on....
    We have already maintain data in COB1.
    Can any body explain what is wrong in determination.
    Regards,
    J.H.Pert

    Hi Pert,
    Follow the below link you have some idea OK.
    Any questions revert me back.
    Batch search strategy
    Regards,
    Madhu.G

  • Error in manual batch determination while creating process order

    Hi Expert,
    Manual batch determination is happening for some of material and for some material it is working firne  when creating process order,
    Pleae assist
    Thanks
    Intekhab

    Dear,
    please open this prd order in change mode CO02 then press tab button cost calculation near release button in order header screen now do not save this order go to edit >log> cost calculation
    There it will show the error tht occured during costing
    Please refer this thread,
    Cost error when saving production oredr
    Regards,
    R.Brahmankar

  • Replace the component after batch determination in the process order.

    Hi dudes,
    How we can replace component for which batch determination done with a new component in a process order. can any body suggest if its possible.
    thanks in advance.
    Robert

    Hi,
    i am not able to delete the component in the materials overview after the batch allocation done by batch determination rather giving batch manually.
    i.e if i give batch directly in the batch field i can able to delete that entire component row, but if do batch determination for that component once its done i can't  able to delete.
    thanks in advance
    Robert.

  • Batch determination Problem in process orders

    Dear Friends,
    i am getting problem of BD for components in process order that the FIFO sequence is not
    showing.
    !. I have made settings like Strategy Plant/order type
    2. Charecteristic in the class and sort rule LOBM_VFDAT
    3.  Class assigned to materials.
    4.  raw materials batches have maintained Ex.date, date of produced(at the time of GR by 561)
    5. Order type i have assined search Proc.
    in the order strategy info showing sort rule correctly in theprocess order, But the sequence it showing
    is neither with GRn date or not with Exp date.
    kindly guess what might be the problem...
    Regards
    Robert

    Dear,
    For FIFO you can use the Characteristic  LOBM_LFDAT for FIFO if is LOBM_VFDAT then in plant storage data 1 view maintain the SELD then assign these Characteristic to class in CL02 then assign this calss to material master.
    Then craete sort rule in CU70 withCharacteristic  LOBM_LFDAT or LOBM_VFDAT
    then assign it to serch strategy in MBC1 or COB1 with selction criatoria.
    In OPL8 assign this serch procedure.
    Then create the order and check the result.
    Regards,
    R.Brahmankar

  • Table/Structure for process order's auto batch determined component.

    Hi PP Gurus,
    We're struggling to get the Structure/Table name where data pertaining to process order component which is batch managed and automatically batch determined goes. We know RESB is the table where it gets updated after saving Process order. But we want the structure/table name before saving the Released Process order. Can anybody please help to get it?
    Thanks,
    Abu Arbab

    Abuarab,
    I think it will in structure CAUFVD. Following are the enchancements available as of ECC 6.0,
    PPCO0001  Application development: PP orders
    PPCO0002  Check exit for setting delete mark / deletion indicator
    PPCO0003  Check exit for order changes from sales order
    PPCO0004  Sort and processing exit: Mass processing orders
    PPCO0005  Storage location/backflushing when order is created
    PPCO0006  Enhancement to specify defaults for fields in order hea
    PPCO0007  Exit when saving production order
    PPCO0008  Enhancement in the adding and changing of components
    PPCO0009  Enhancement in goods movements for prod. process order
    PPCO0010  Enhancement in make-to-order production - Unit of measu
    PPCO0012  Production Order: Display/Change Order Header Data
    PPCO0013  Change priorities of selection crit. for batch determin
    PPCO0014  Select process orders for external relationships
    PPCO0015  Additional check for document links from BOMs
    PPCO0016  Additional check for document links from master data
    PPCO0017  Additional check for online processing of document link
    PPCO0018  Check for changes to production order header
    PPCO0019  Checks for changes to order operations
    PPCO0020  Process order: Display/change order header data
    PPCO0021  Release Control for Automatic Batch Determination
    PPCO0022  Determination of Production Memo
    PPCO0023  Checks Changes to Order Components
    Regards,
    Prasobh

  • Issues during Component Batch Determination for Process Orders

    Hi,
    I am encountering a strange issue during component batch determination of process order.
    1. During creation of process order, when I execute batch determination, systems does determination based on strategies we have set and when I click on Copy it gives an error
    "Log cannot be saved: Object/subobject not specified"
    Message no. BL201
    *Diagnosis
    Log save cancelled because at least one log contains no object or subobject.
    Object and subobject are needed to classify application logs because there are several log types. Only a few logs are managed in main memory at runtime, so this classification is not needed.
    If the logs are to be saved in the database, object/subobject must be specified for later retrieval.
    Procedure for System Administration
    Object/sub object can be passed when a log is created (function module BAL_LOG_CREATE) and changed with BAL_LOG_CHANGE.
    The possible values for object and sub object must be configured in transaction SLG0.*
    If I save the order with CRTD status and come back again in change mode and do determination, It works fine.
    Again when the order is in REL status and do the determination, It gives the same error.
    This happens only for a specific plant, In other plants batch determination works in all scenarios.
    I checked for all plant related Config for batch determination and coudn't find any discrepancies.
    Please advise how to resolve this issue. Thanks in advance for your help
    Regards,
    Aheesh

    There Is no direct solution for your requirement just try this work around.
    While defining the batch determination search strategy for process order in COB1, there is one column Quantity proposal where you can attach the Routines (This is written in ABAB code )  make use of this, define New Routines with ABAB help to fulfill your requirement. Try this if found useful award full points.
    Regards,
    Ajay Nikte

  • Warning message during batch determination while doing GR for process order

    Hi Experts,
    During delivery against process order for all SFGs and FGs, we are getting warning message u201CInvalid batch according to selection criteria in batch determinationu201D.
    Following settings maintained for batch determination in process order.
    Condition table for order/material type maintained
    Access sequence maintained for order/material type
    In strategy type above access sequence has been maintained. The common class and sort sequence created for all materials in the plant have also been assigned to this strategy type. In batch split changes allowed box has been checked and quantity proposal maintained as 1.
    In search procedure control maintained for order/material type. Search procedure has been assigned to all process order types and check activated.
    In spite of the above when GR for order is taking place , system is throwing warning message.
    GI of components is being done through backflush and without any warning message.
    Please advise how to ensure proper batch determination during GR against order.
    Regards
    Sm.

    Issue resolved by removing required indicators from characteristics which were not being valuated but were maintained in the class assigned to SFGs/FGs.
    Regards
    Sm.

  • Batch determination for process orders

    Hi All,
    My requirement is complete batch batch is proposed in process order  batch determination even though the requirement is of less qty.
    For example the required qty. for component XYZ is 20 units but the available batch is of 40 units. Now requirement is that no batch splitting should happen & complete batch of 40 units is determined.
    This is required to do Material quantity calculation.
    regards,
    Mohit Goyal

    There Is no direct solution for your requirement just try this work around.
    While defining the batch determination search strategy for process order in COB1, there is one column Quantity proposal where you can attach the Routines (This is written in ABAB code )  make use of this, define New Routines with ABAB help to fulfill your requirement. Try this if found useful award full points.
    Regards,
    Ajay Nikte

  • FEFO logic in batch determination for process order release

    Batch determination for a particular material in a process order was following FIFO logic . We needed to change it to FEFO hence we made the necessory changes in COB1 how ever the process order relase is still taking the batch whihs is not the first expiry batch
    Kindly help in batch determination with FEFO for process order release.

    Rk
    The blw explation for inventory side, i don't have idea for prod order side
    If Batch Management is active for the materials then use following process;
    First create characteristic in CT04 for Batch Creation Date, under "Addnl data", enter Table Name MCH1 or MCHA (As per Batch Class 022 or 023) and Field ERSDA and save it.
    Assign this characteristics in CL02 in your Batch Class.
    CU70 - Create a Sort Rule and specify the Characteristic of Batch Creation Date and activate "Ascending" indicator.
    Now assign the Sort Rule in MBC1 and keep Selection criteria as "O" for the Strategy type.
    Now do batch determination in MIGO.

  • Batch Number field in IDoc for Process Orders (message type LOIPRO01)

    Hello PP experts,
    Just wanted to ask if anyone of you have worked with message type LOIPRO01 (IDoc for process orders)
    There is a segment-field in this IDoc  E1RESBL-CHARG which has description of "Batch Number"
    We tried to assign a Bath Number for an Order (using t-code COR2 --> "Goods Recpt" tab under "Receipt" section), generated an IDoc for this order, but upon checking the E1RESBL-CHARG field of the IDoc it is not populated with the Batch Number.
    The material in the process order is FERT, so technically we're trying to assign a Batch Number in one of the process orders for a Finished Goods material type,  so not on the component level.
    Can anyone here verify:
    1. is the E1RESBL-CHARG field of IDoc LOIPRO01 intended for the Product Batch Number?  If Yes, how do we populate that for in the IDoc?  --> Do I need to have a Reservation/Dependent Requirement for the Product for the Batch Number to be populated in the IDoc?
    2. If E1RESBL-CHARG can not be populated for a Product that has no Reservation/Dependent Requirements, Do I have any option of populating this field with just the Batch Number assigned to the Process Order of that product?

    Solved - LOIPRO01 IDoc does not pick up the Batch Number from AFPO table, instead from table RESB.    We need batch from AFPO and just created a lookup using the Process Order Number as import param

  • Auto Batch selection during GI for Process order

    Hi Gurus
    My requirement is that the system should select available batches of raw materials automatically during goods movement for Process order using COR6 and Goods issue for order MB1A . Could any body plz let me know the procedure in detail

    Dear,
    You need to define the batch search procedure MBC1 with serach strategy as ME01 for your material plant and movement type assign selection condition and sort rule and save the condition record.
    Please refer this thread for details,
    BATCH SELECTION DURING ISSUE
    Please come back if any problem.
    Regards,
    R.Brahmankar

  • Batch determination at time of order creation

    Dear All,
    When i am creating process order at the time system not allowing me to execute batch determaination after release only it is allowing me to do.
    My requirement is At the time of order creation i want assign batches ( Execute Batch Detrmination)for the material.
    how to do this one, kindly hel me
    Regards,
    s.sakthivel

    Craig- you are correct. That setting is about how to create a batch for the Material produced , does not have any impact on the batch determination for the raw materials consumed.
    I dont think there is a way to do the batch determination before releasing the order. The other option isto go for the automatic release of the order at creation - this option will carry out the batch determination automatically once an oder is created and order will be released. check with PP consultant on this.
    Hope it helps.
    Thanks,
    Ram

  • User exit for process order

    Hi experts,
    I need user exit for a process order (COR1). While saving the process order batch number has to generate based on the production version.
    I used the exit PPCO0007, but its not working. Is there any other exit available r not?
    Can u tell me exit name at process order creation?
    Naren

    Thanks for your reply.
    I maintained Production scheduling profile in workscheduling view. The number range i used in the user exit is not generating at the time of release. Is there any other user exit is available for process order.
    Yesterday i got another problem. While releasing the process order it is giving a message as release rejected. I went to the log details. In that no batch could be determined message came. I deactivated the user exit and tried. The std number range also it is not taking. I went to goods receipt tab and click on the batch creation button. There also it is giving message as no batch could be determined. How to resolve it. I checked everything in material master and as well as settings. I didint get the solution.
    Please help me.
    Naren

Maybe you are looking for