Batch Determination in Process Industry (PP-PI)

Hi all,
I'm having an issue at the moment wherein when I user manually execute batch determination for a material, system will prompt business that Batch determination for the selected material without selection data.  Upon hitting Continue, system will advise that no search strategy could be found.  I understand that the batch strategy needs to be configured for this error to be resolved but the point is not setup as a category product and shouldn't be required a strategy.
How can I stop the system from requiring the batch strategy before the material can be allocated a batch number?
Cheers
Patrick

Dear
Why are you going manul mode where you have option to determine the batch automatically based on the following set up
Define the batch determination search strategy for process order in COB1 with sort rule in CU70.
On the initial screen of your application choose Logistics>centrel function>batch management>Batch determination>For process order -->Batch search strategy --> Create.
On the initial screen of your application choose Batch search strategy -->Create.
Choose the strategy type, say choose co02
Choose the key combination-
Enter the required dat-->say plant ,production order type, product,valid from and component for which you want to have this
Choose Selection criteria push button. Choose a sort sequence.
If no values have been entered, enter the selection class and the characteristic values.
Go back to the screen on which you create a batch search strategy.
Choose Sort if required(it should be defined earlier(in CU70- here you are giving the charateristic name on which you want to sort)
For component you need to use MBC1 with search stratgey as ME01 for your plant movement type and material and assign the sort rule and search procedure here.
Check also in COR4, for the combination of plant and order type...you have selected search procedure-CO0001
Batch management> Batch serach procedure allocation and check activation
T.Code to be looked specifically OMCG , CORC
Hope it will help you.
Regards
JH

Similar Messages

  • Issues during Component Batch Determination for Process Orders

    Hi,
    I am encountering a strange issue during component batch determination of process order.
    1. During creation of process order, when I execute batch determination, systems does determination based on strategies we have set and when I click on Copy it gives an error
    "Log cannot be saved: Object/subobject not specified"
    Message no. BL201
    *Diagnosis
    Log save cancelled because at least one log contains no object or subobject.
    Object and subobject are needed to classify application logs because there are several log types. Only a few logs are managed in main memory at runtime, so this classification is not needed.
    If the logs are to be saved in the database, object/subobject must be specified for later retrieval.
    Procedure for System Administration
    Object/sub object can be passed when a log is created (function module BAL_LOG_CREATE) and changed with BAL_LOG_CHANGE.
    The possible values for object and sub object must be configured in transaction SLG0.*
    If I save the order with CRTD status and come back again in change mode and do determination, It works fine.
    Again when the order is in REL status and do the determination, It gives the same error.
    This happens only for a specific plant, In other plants batch determination works in all scenarios.
    I checked for all plant related Config for batch determination and coudn't find any discrepancies.
    Please advise how to resolve this issue. Thanks in advance for your help
    Regards,
    Aheesh

    There Is no direct solution for your requirement just try this work around.
    While defining the batch determination search strategy for process order in COB1, there is one column Quantity proposal where you can attach the Routines (This is written in ABAB code )  make use of this, define New Routines with ABAB help to fulfill your requirement. Try this if found useful award full points.
    Regards,
    Ajay Nikte

  • Reg Batch determination using Process messages

    Dear all,
    Please suggest which BAPI to used so that we can carryout batch determination using process messages
    what we need is batch should be picked using FEFO during process message processing
    Thanks in advance
    Regards
    venkat

    Dear,
    In process order you can't find out the date on which batch determination is carried out
    only possible way is activate Order Change management
    So that changes will be recorded, if the batch determination is carried out IN CO02,
    You can see the changes in table PCDHDR, PCDPOS
    or by program RSSCD200,RSSCD150 &RSSCD100
    or through AUT10
    If Batch determination is carried out No change log means, at that time of creation batch is determined

  • Infinity Component Qty Proposing during Batch Determination in Process ordr

    Hi Guys,
    During Batch Determination in Process order, component determination proposing with Infinity quanity (i,e 999,999,999,999) with old batches,  even though there is no stock available against these batches. (MMBE)
    Please advise me if I miss any config / master data maintenance.
    regards,
    Purna

    Unfortunately, I cannot access OSS note.  If you can, try to use search term Batch Determination Infinite Quantity.
    Anyhow, do you have the available stock that can use for the prod.order?  The OSS mentioned that the ATP at batch level also search the available stock within RLT.  If none is found, then the infinite quantity is proposed.  In order to avoid the search for batch stock with zero quantity, try to set the selection criteria with LOBM_MENGE > 0.
    However, the best way is to archive the batch stock with zero out from the system.   Use SARA with MM_SPSTOCK object, and flag "Only consider batch stock records without stocks".  Only MCHB table (Batch stock records) will be deleted.  The batch masters are not.
    Hope it helps.

  • Batch Determination in process orders

    Hi All,
    This is regarding batch determination in Process Orders. We have components which are batch managed. When we do a batch determination system shows up old batches  qty in available qty field in batch determination which were already consumed for different process orders.When checked in stock overview (MMBE) there was no stock available for this material.
    Can you please explain me how the batch detmination in done in the system. Why is the system looking for old batches for which there is no stock available.
    Kindly reply to the mail.

    Hi
    Pl follow the below path and transection and check the settings..if missing pl make necessary settings
    Batch management> Batch serach procedure allocation and check activation
    T.Code to be looked specifically  <b>OMCG , CORC</b>
    Pl reward if this is helpful or come back if you need another help
    BR
    Sumit

  • Exclude quality inspection batche from Batch Determination in process order

    Dear Gurus,
    When doing batch determination in process order, the system taking quality inspection batches for selection.
    I have checked in OPJJ , quality inspection stock is select but if i remove , it will effect MRP process
    How to exclude quality inspection batches from Batch Determination?
    Thanks in anticipation.
    Regards,
    Sandy

    Hello,
    I also have the same requirement. Can some one provide solution.
    Regards,
    Naren

  • Automatic batch determination in process orders

    Hi,
    How batch determination can be done automatically for components in process orders?
    regards,
    Mohit Goyal

    Dear,
    Define the batch determination search strategy for process order in COB1 with sort rule in CU70.
    On the initial screen of your application choose Logistics>centrel function>batch management>Batch determination>For process order -->Batch search strategy --> Create.
    On the initial screen of your application choose Batch search strategy -->Create.
    Choose the strategy type, say choose co02
    Choose the key combination-
    Enter the required dat-->say plant ,production order type, product,valid from and component for which you want to have this
    Choose Selection criteria push button. Choose a sort sequence.
    If no values have been entered, enter the selection class and the characteristic values.
    Go back to the screen on which you create a batch search strategy.
    Choose Sort if required(it should be defined earlier(in CU70- here you are giving the charateristic name on which you want to sort)
    For component you need to use MBC1 with search stratgey as ME01 for your plant movement type and material and assign the sort rule and search procedure here.
    Check also in COR4, for the combination of plant and order type...you have selected search procedure-CO0001
    Batch management> Batch serach procedure allocation and check activation
    T.Code to be looked specifically OMCG , CORC
    Hope it will help you.
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Nov 11, 2008 11:31 AM

  • Batch determination in Process Order

    Hi Guys
    I am doing the automatic batch determination on the process order release. It gets rejected and the error is CO 691: You must enter the batch for material 1025301
    Now when I do the manual batch determination in the process order. On clicking the batch determination button I get the message: No Check exist for planning (item: 0010, mat: 1025301) message number C2119.
    Can you guys please advice how to resolve this error please!
    The SAP version in 4.7
    -Rahul

    Hi Ram,
    You are right. I am not getting batches with zero stock.
    By inadequate stock, I mean, say, for a raw material, I find from MMBE 1.448 kgs are there in the unrestricted and 1.448 kgs in reserved for the batch. When I check in the material list of the process order, total 9200 kgs are booked by the batch. How is this possible?
    Does the system cannot do the batch splitting automatically. Because everytime it is not possible to calculate the remaining stock and enter it manually in the order.
    Thanks and Regards,
    Jyoti

  • Manual or automatic batch determination in process order

    Hi, how to know for particular process order, whether we should do manual batch determination or automatci batch determination for components without viewing the material master?

    Dear Sir,
    Used MSC2N, if it allows the cahnge in the no, then it is mannualy cfreate or else it is being created automatically
    Regards
    Bhupendra Singh

  • Batch determination during process order release

    Dear Experts,
    I am facing a problem, and not able to figure out the reason. There is material having base unit as 'EA' and Issue unit as 'NO' and conversion is 10 NO= 1 EA. The same material is maintained in the BOM as 1 NO. At the time of creation of process order, system is copying the same quantity in the process order (1NO). When I release the process order, the batch determination is happening. Now the issue comes, instead of doing batch determination of 1 NO, system is doing batch determination for 1 EA (which is equivalent to 10 NO.!). Can anyone help me to find out the reason for same.
    Thank you.
    Sagar

    Dear Mohit,
    If you want to go for external batch numbering during order release then
    - Set no automatic Batch creation in order in T.Code CORY.
    This setting only restrict the automatic Batch Creation in order only.But to fulfill second your requirement of restricting order release or save without assigning external batch no you have to either go for,
    - User exit.Below are the user exits which are trigger at the time of order saving
    PPCO0006 to predefine entries for order header fields when
    an order
    PPCO0001 to provide information at the time of saving (for
    production orders and process orders)
    PPCO0007 to check or change header data when saving
    or
    - Create screen variant using T.code SHD0 and make Batch Field compulsory.
    Regards,
    Dhaval

  • Trigger automatic batch determination at process order confirmation

    Hello, colleagues.
    I have a requirement for batch determination triggered automatically for all components when I backflush them in CORK/COR6N transaction.
    Batch determination facility has already been set up both for process order and for IM MvT 261. Everything works perfectly.
    There is only one issue: I have to select components and click "Batch determination" button manually for each partial confirmation.
    I want batch determination triggered automatically when I save confirmation.
    Batch determination at the moment of order release is not an option for the current business enviroment.
    I've checked all relevant threads already, but found no solution.
    The solution seem to be found in this thread but no details provided:
    Automatic batch determination during goods issue
    Any help will be highly appreciated.

    There is only one issue: I have to select components and click "Batch determination" button manually for each partial confirmation.
    I want batch determination triggered automatically when I save confirmation.
    Konstantin,
    As far as I know this not possible with any standard configuration.
    Please wait for other experts comments also.
    Br
    KK

  • Automatic Batch determination for process order components

    Hi ,
    If we maintain the batch entry at MRP2 for the process order component  as 3 - automatic batch determination upon order release ,if  automatic batch determination is not happening for the order components and system is stopping to enter the batch for the component at order release , what else settings do we need to check ?
    Please advice
    Thanks ,
    MK

    Hi MK,
    You need to go thru these configurations/setup:
    1- CORC: Search Procedure is enter for Order type and Plant combination (PP-PI)
    2- Assign the Search Procedure in transaction COR4 or OPL8 (COR4 for PPPI ot OPL8 for PP)
    3- Batch Determination condition is maintained in COB1: this will generate the automatic determination of the batches.
    4- Take a look of the field Batch Entry in MM02 (MRP2). This was already done by you.
    Of course all your batches need to have the corresponding classification and you should assign correctly the search procedure in COB1.
    Try with the previous steps and come back if you still don't get the automatic batch determination.
    Best Regards,
    Mariano

  • Batch Determination in Process Order Creation - COR1

    Hi All
    I have a requirement wherein i have to map the standard sap methodology of batch determination that happens in a process order. Currently, in the tcode COR1, whenever a user selects a component material and triggers batch determination, sap determines a list of eligible batches based on the search strategy & condition records
    defined in the config.
    What i want to know is that whether this list of batches can be generated in a custom program, using some standard FM, BAPI etc? or if i have to manually implement the logic, how to go about incorporating the search strategy & condition records in the logic.
    Any pointers will be appreciated.
    Regards
    Ravish Garg

    HI Madhuri
    It is not directly possible to use this FM to to evaluate all new batches and compare the Batch results with the batch search strategy.
    To be able to use this FM properly, its necessary to pass the correct structures to its importing parameters, which can be determined using 2-3 FM's before this and fetching data from the standard tables.
    Cheers
    Ravish

  • Batch determination for process orders

    Hi All,
    My requirement is complete batch batch is proposed in process order  batch determination even though the requirement is of less qty.
    For example the required qty. for component XYZ is 20 units but the available batch is of 40 units. Now requirement is that no batch splitting should happen & complete batch of 40 units is determined.
    This is required to do Material quantity calculation.
    regards,
    Mohit Goyal

    There Is no direct solution for your requirement just try this work around.
    While defining the batch determination search strategy for process order in COB1, there is one column Quantity proposal where you can attach the Routines (This is written in ABAB code )  make use of this, define New Routines with ABAB help to fulfill your requirement. Try this if found useful award full points.
    Regards,
    Ajay Nikte

  • Full batch quantities selected in batch determination in process orders

    In batch determination of a process order, how can you require that only full batch quantities be selected?  I do have selected multiple batch splits.  But would rather it pick full batch sizes up to the requirement quantity.

    Dear,
    full batch sizes up to the requirement quantity
    What it mean?Up to my understanding you want to restrict multiple Batch Determination..Correct me if I Wrong.
    If  yes then
    In Batch Determination Strategy (COB1) set No. Batch Split allowed up to 1 only..
    Regards,
    Dhaval

Maybe you are looking for

  • Open invoice posting while concelling in next month other than it was creat

    Hi Gurus, Please help..... Is there any way to do the following requirement??? In transaction code : VF11, where we cancel billing document , Invoice posted in old / closed financial period and got cancelled in current period, the cancel invoice shou

  • Change of font in iMovie 10

    I am having trouble in changing the font on the title...

  • Keyboard characters are  no displaying correctly

    MacBook Version 10.6.8 My keyboard is not displaying the correct characters. The letters and numbers are OK but characters such as the question mark, colon, the at sign, etc do not display correctly. I've tried a portable keyboard and the same thing

  • Raw update CC

    for three days I tried to install the new Photoshop / After Effects / Bridge and Flash Raw update and after 8 attempts as following the instructions given by you guys on the site  Installing / Reinstalling I keep getting the same annoying error! the

  • Trace a session that runs as a batch

    Hi, I am trying to identify the SQL which is causing an error in a batch program I am running. I am unable to bounce the database as its production, is it possible to enable trace without shutting down the database, and for a session that does not ye