Batch determination Problem in process orders

Dear Friends,
i am getting problem of BD for components in process order that the FIFO sequence is not
showing.
!. I have made settings like Strategy Plant/order type
2. Charecteristic in the class and sort rule LOBM_VFDAT
3.  Class assigned to materials.
4.  raw materials batches have maintained Ex.date, date of produced(at the time of GR by 561)
5. Order type i have assined search Proc.
in the order strategy info showing sort rule correctly in theprocess order, But the sequence it showing
is neither with GRn date or not with Exp date.
kindly guess what might be the problem...
Regards
Robert

Dear,
For FIFO you can use the Characteristic  LOBM_LFDAT for FIFO if is LOBM_VFDAT then in plant storage data 1 view maintain the SELD then assign these Characteristic to class in CL02 then assign this calss to material master.
Then craete sort rule in CU70 withCharacteristic  LOBM_LFDAT or LOBM_VFDAT
then assign it to serch strategy in MBC1 or COB1 with selction criatoria.
In OPL8 assign this serch procedure.
Then create the order and check the result.
Regards,
R.Brahmankar

Similar Messages

  • Batch determination issue in process order Material quantity calculation

    Dear Gurus,
    We are facing issue in auto batch determination in process order (Material quantity calculation ).
    eg Material X  is active material 200 KIA used in BOM as
    10  X   200  KIA  
    20  Y   10           Filler
    30  Z
    40  X   200  KIA
    50  Y
    60  Z
    We select line item 10 and 40 and do Batch determination system proposes 2 batches for line item 10 as Batch A and B
    and for line 40 again Batch A (with 0.01 KIA) and batch B proposed which is wrong.
    For line Item 10 Batch A and B
    For line Item 40 Batch B and C or as per FIFO logic.
    As Batch A should be consumed in Line item 10 then it proposed Batch B and so on....
    We have already maintain data in COB1.
    Can any body explain what is wrong in determination.
    Regards,
    J.H.Pert

    Hi Pert,
    Follow the below link you have some idea OK.
    Any questions revert me back.
    Batch search strategy
    Regards,
    Madhu.G

  • Error in manual batch determination while creating process order

    Hi Expert,
    Manual batch determination is happening for some of material and for some material it is working firne  when creating process order,
    Pleae assist
    Thanks
    Intekhab

    Dear,
    please open this prd order in change mode CO02 then press tab button cost calculation near release button in order header screen now do not save this order go to edit >log> cost calculation
    There it will show the error tht occured during costing
    Please refer this thread,
    Cost error when saving production oredr
    Regards,
    R.Brahmankar

  • Replace the component after batch determination in the process order.

    Hi dudes,
    How we can replace component for which batch determination done with a new component in a process order. can any body suggest if its possible.
    thanks in advance.
    Robert

    Hi,
    i am not able to delete the component in the materials overview after the batch allocation done by batch determination rather giving batch manually.
    i.e if i give batch directly in the batch field i can able to delete that entire component row, but if do batch determination for that component once its done i can't  able to delete.
    thanks in advance
    Robert.

  • Batch determination configuration for process order.

    Hi,
    Can anybody help me to configure batch determination for process order in step by step.
    My requirement is
    1. multiple selection of component in process order.
    2. click on batch determination icon.
    3. system will check batch, valuation type, stock. Assign batch,valuation type, storage location automatically in the process order confirmation(COR6N)-Goods movement tab.
    Thanks,
    Jishu

    Hi Jishu,
    Please refer below documents whcih will help you on batchdetermination
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/c09b7216-65da-2b10-bdb5-870cf9916350?QuickLink=index&…
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/f0caed4a-40f9-2c10-349a-96ec617a8161?QuickLink=index&…
    Regards,
    R.Brahmankar

  • Batch not updated in process order

    hi all,
                When i am doing batch determination and goods issue through coik pick list batch not update in process order. presently we are not doing batch determination in process order.after goods issue component batch fields are grey out in the process order

    HY,
    Batch field are filled only if you do Batch determiantion of components whether it is by auto or manual.And it is logical also becasue if you split the material qty. in more than one batches during goods issue( whether it is in COIK or in COR6N)then think what should be the case in Component screen in process order?
    As soon as you complete the Goods Issue This field becomes gray but the filled of Quanity withdrawn is update with qty you have withdraw.
    Regards
    Dhaval

  • Batch determination at time of order creation

    Dear All,
    When i am creating process order at the time system not allowing me to execute batch determaination after release only it is allowing me to do.
    My requirement is At the time of order creation i want assign batches ( Execute Batch Detrmination)for the material.
    how to do this one, kindly hel me
    Regards,
    s.sakthivel

    Craig- you are correct. That setting is about how to create a batch for the Material produced , does not have any impact on the batch determination for the raw materials consumed.
    I dont think there is a way to do the batch determination before releasing the order. The other option isto go for the automatic release of the order at creation - this option will carry out the batch determination automatically once an oder is created and order will be released. check with PP consultant on this.
    Hope it helps.
    Thanks,
    Ram

  • Batch determination problem

    Hi dudes,
    i have made all settings that necessary for batch determination for components in process order, from condtion table to search strategy(COB1), but when i am doing BD for componets in process order, the sorting rule and selection class is not picking as procedure automatically. If i select startegy Info and  select the same then BD is working fine.
    Can you give idea the where any setting is missing?
    thanks in advance.
    Robert

    Hi,
    I have made all settings that necessary for batch determination for components in process order
    Will you share which settings you have made so far?
    Have you maintain Batch Determination Procedure in your Order Type dependnent paramter (T.code COR4).Also for auto batch determination you have to maintain batch entry 3 in material master for all batch managed BOM components.
    Regards
    Dhaval

  • Problem in process order creation.

    Dear Sir/ Madam
                             i am facing a problem while process order creation.
    the problem is:
    Error when calculating cost for order ATFEDEC11  "see log Log is deleted when saving
    Do you still want to save?"

    Hi,
    The log for production order preliminiary costing is not saved. Therefore, once the order is saved, there is no log available anymore (this is by the way a question of PP; none of the logs is saved).
    Hope that helps...
    Regards,
    Declan

  • I have Problem in Process Order ,

    Dear , I have Problem in Process Order ,
    See we have Numbe of process order , that status is REL CRCR DLV PRC CSER BCRQ BRRQ GMPS*
    Now i want to Mass TECO all order , but i can not TECO because status should be CRFI ,
    So
    1) how can i change staus all order at once to CRFi?
    2) Can i do the TECO in staus CRCR ?
    3) Any other solution
    REGARD
    SAP

    Hi,
            It is NOT possible to do the process order TECO with the status CRCR , this has to be changed to CRFI
    you can change the status to CRFI  from CRCR in the following way
    1) go to CO54 -T-code
    enter the plant & Date range
    enter the process message category PI_CRST ( sap std) or relevent category defined for you plant
    select the to be sent option
    2) here you will get list of process messages related to control recipes, click on the SEND (ctrlshiftF12)
    process message will be processed & Control recipe status will be cahnged to CRFI for CRCR
    Thanks,
    Rajaniaknth

  • Batch reservation & Allocation in process order

    I am allocating batch to process order components(for active ingridient)While I am allocating the batch I am able to select the batch which has all of its quantity reserved,which is not desireble.Any solutions please??/
    Eg.In MMBE my batch stock(say for batch AA11) is as follows:Unres stck 100 & reserves 100
    If I am determing batch for a different process order where this component is used,I am able to select the same batch,even though it has no open quantities.
    Please suggest

    Hi Rele,
    Please check in CO09 transaction for the availability of this batch stock whether it is free or confirmed to any other component like.
    Regards
    R. Senthil Mareeswaran.

  • Problem in Process order confirmation ( while doing batch splitting)

    Hi All
    In our Industry we have sceneraio
    we create Internal order and assign internal order to sales order
    Once MRP run take place
    Planned order created and converted to process order
    Process order released
    once we try to do confirmation of process order
    example suppose process order header matl qty : 8
    and in final confirmation while Goods receipt(101) of Fert
    we do batch splitting (example 4 batch : each qty : 2)
    but some time system not allows to do Goods receipt (movement type101)
    system gives "Error confirm order not allowed"
    please need urgent help
    Thanks in advance
    Sunil Singh

    Hi Sunil,
    During your first confirmation you must have activated "Final confirmation" Indicator, probably this is blocking from further confirmation.
    Please check whether current system status of the order contains "CNF" if so, please cancel the previous confirmation and then redo confirmation with "partial" button active. Final confirmation should be activated only when it is the last confirmation for the order.
    Hope this will resolve the problem, reward your points....
    Regards,
    Prasobh

  • Automatic batch determination problem - Unable to view available batches

    Hi,
    I have a issue related to batch determination in process order, Here is my data set up:
    I am trying to to perform batch determination for process order. I see i have batches available in stock.
    And my selection criteria is below:
    LOBM_RLZ ( Remaining shelf life for batches) - 3d
    LOBM_LFDAT (Batch determin. delivery date) - 02.02.2010 ( mm/dd/yyy format)
    LOBM_VFDAT ( Expiration date, shelf life) - 05.02.2010
    Batch classification view in MSC3N shows following data:
    Date of last goods receipt - 27.01.2010
    Expiration date, shelf life - 22.01.2011
    Status shows 'Released'
    Batch serch strategy is maintained in COB1 for order type, plant, and material. Please find the data maintained in COB1
    Date of last goods receipt - BLANK ( No value maintained)
    Remaining shelf life for batch - 3D
    Expiration date, shelf life - BLANK ( No value maintained)
    Please suggest me why i am unable to determine batches in process order. Any inputs whould be of great help. - Many thanks!
    Regards
    Seshu
    Edited by: Amarendra Seshu on Feb 2, 2010 1:45 AM

    Hi Seshu
    First Try with different selection criteria, ie., with out giving any dates.  Mismatching of dates could be the problem.
    Secondly check the valid from & Valid to date in COB1.
    Regards
    Bala

  • Problem creating process order with ref of sale order

    Dear all,
    Kindly give solution for this scenerio..............................
    I am creating Process Order with ref of sale order manually in cor1. In the COR1 screen copy from field i gave my ref sale order, so that particualr order and batch is assigned to that order only.
    My problem was suppose if sale order is created for 10 tonns, but my batch size and resource capacity is 2 tonns only. so first time i change my batch quantity 2 tonns instead of 10 tonns and created my order and confirmed.
    if i go to second time the same process i am doing creating process order with ref of same sale order but it comes again 10 tonns instead of 8 tonns. why it comes like this already i confirmed 2 tonns in this sale order?
    my requirement is if any process order is created with ref of any sale order and again if i am creating any process order with ref of same sale order left quantity only system should show.
    for this what i have to do kindly help to this
    regards,
    s.sakthivel

    Dear KK,
    Pls check whether ZKIN, ZKQT, ZKOR have all the properties similar to IN, QT, OR respectively. If they are different, please ensure that you know the reason why they are different. This check has to be done at tcode VOV8
    Some fields like sales document category, Transaction group, screen seq group, Doc pricing procedure need to be similar to the parent document unless you know why you have changed them.
    Once this check is done, check the copy controls in VTAA. Before that try creating these documents separately without reference. This shoudl work fine only after which you need to check copy control. If this is not working fine, then there is some problem with the document type settings in VOV8. Testing this is possible only if Reference mandatory field is left empty. Make sure that is properly configured.
    Once this is done, check copy controls in VTAA. You can just copy the copycontrol between IN and QT and QT and OR and create for ZKIN to ZKQT and ZKQT to ZKOR.
    Once this is done, check whether your item category settings are properly done , also the schedule line settings. The tcodes are VOV7, VOV6, VOV4, VOV5 etc.
    Now check whether your material master and customer master are consistent with the item category settings(Item category group).
    Now create the transaction. It shoudl work fine.
    Reward if this helps.

  • Problem in Process Order

    Hi!
    While creating Process Order, storage location is getting filled by default in Material list. The Issue storage location has been kept blank in MRP 2 view of material master.
    Can you advice where can be the problem.
    Thanks in advance.
    Regards
    Dinesh

    You will find in the Production version
    MM02- MRP4 production version--details
    Proposed issue storage location for components
    The proposed issue storage location is used in Repetitive Manufacturing for components for which no issue storage location has been maintained in the BOM. The goods issue of the components are then posted from this issue storage location.
    Dependencies
    If you want the system to use this proposed issue storage location in MRP and in the Repetitive Manufacturing backflush for withdrawing the components, you must make the necessary settings in Customizing for either MRP or for Repetitive Manufacturing. Here, you must define the storage location determination strategy, Only assembly per MRP group by entering the indicator 2 in the ISLoc field.
    You use this procedure when all components lie in one storage location together close to the production line where they are required.
    Regards
    Ratan

Maybe you are looking for

  • So fed up with Verizon?!!

    Why is it that when you call Verizon, no one there seems to answer the same question with the same answer? NO one is ever on the same page. How can Verizon say they truly value their customers? Have they read any of these reviews or better business r

  • Write HTML code in webdynpro

    Hi All,   Can anyone tell me how two to write HTML code in   webdynpro application to make myself clearer. this is what i want. IWDTextView txt = (IWDTextView) view.createElement(IWDTextView.class, "txt" ); txt.setText("<hr>" + "Today Order"); But th

  • Can an Airport Extreme redistribute a network trough ethernet?

    I'm trying to configure my home network but I enconter a small problem. I'm not sure the configuration I'm aiming for is even possible. I'm trying to make my airport join my wireless network and then share the network with a device trough ethernet. T

  • Client 000

    Hi, Why do we need to apply support package thru client 000? Why can't we do it thru some other client?  It was an interview question. Is there any specific documentation or note about client 000 and why do we need to use client 000? Regards....Iyy

  • Operation number in PP and QM

    Hi, does anyone of you know what´s the relation between these two fieds?: 1.- PP -> AFVC-VORNR = '0010' 2.- QM -> QAPO-INSPOPER = '0001' there must be a relation somewhere because both mean the same. Best regards.