Batch management in production order for WM managed components

Hi Experts,
Iam having WM managed components in my production order which are batch managed as well. I have to do batch determination for these WM managed components.
I would like to know the steps involved in it and the required configuration.
Can anybody throw some light on this please
Thanks & Regards
Enrico

Enrico,
For setting up Batch determination in production order please follow
[Batch determination in production order|http://help.sap.com/saphelp_470/helpdata/en/25/283c3f4f7811d18a150000e816ae6e/frameset.htm]
http://help.sap.com/saphelp_470/helpdata/en/25/283c3f4f7811d18a150000e816ae6e/frameset.htm
As far as WM managed components it will still be the same as WM transfer order is created only after goods movement document is posted.
Hope this helps. Else please come back.
thanks,
Ram

Similar Messages

  • Batch determination in production order for a component

    Hi All,
    Is there any FM or BAPI which can determine batch for a component in production order and save it. I don't want to use call transaction method for CO02 as this determines batches for all components in production order during saving process

    Hi,
    Look at BAPI 'BAPI_MATERIAL_GETBATCHES'. This might help you.....
    Here ia sample code:
    CALL FUNCTION 'BAPI_MATERIAL_GETBATCHES'
    EXPORTING
    material = MATERIAL
    BATCHNUMBER =
    plant = PLANT
    expirydatefrom = DATE
    EXPIRYDATETO = 99991231
    AVAILABLEDATEFROM =
    AVAILABLEDATETO = 99991231
    IMPORTING
    RETURN =
    TABLES
    batches = it_batches.
    Regards,
    Raj.

  • Multiple batches for a production order and mapping with components

    Hello Gurus,
    Our business requires to create multiple batches for one production order + they want to trace which component in the production order has been issued to the main equipment.
    For example, I am creating production order for 'A' equipment for 4 qty. Business wants to create 4 different batches for these equipment
    Lets say now 4 batches are created A001, A002, A003 and A004.
    Now lets assume 2 nos of 'B' component are required for 1no of 'A' component. So the requirement of B component is 8.
    Lets say 8 batches are generated B001, B002 ......B008
    Now lets say batch B001 and B002 are issued for A001 and packed together. How do we map this?
    I understand we can do some enhancement for creating the multiple batches but I still dont know how to map them with each other.
    Please help

    Hi Ethan
    There is a functionality called WIP batches, that allows you keep the batch traceability within an order.
    With WIO batches you can track which batch of component was used to produce each batch of finished product.
    See this link for more details:
    Work-in-Process (WIP) Batch - SAP Library
    BR
    Caetano

  • Batch is not determined automatically in PRODUCTION order for components

    Hi All,
    Am working on the batch determination for the components by Goods receipt date(FIFO) during production order confirmation.
    All the required settings are completed upto batch determination.But when click on the batch determination tab,batch is not picking in production order confirmation goods movement screen even though three batch stocks are available.
    Kindly find the attachment for your reference.
    Would grateful to your quick response.
    Thanks!
    Asirvad

    Hi,
    In general it should not be a problem. Request you to check below:
    For the Batch Determination to work in production order for the components, you should have a value for the “batch entry” field. The values if set to “3” will carry out batch determination automatically and if set to “blank” will not carry out batch determination for the components in the production.
    As well please refer the link for step by step checking.
    SAP Batch Determination - SAPs'WORD - We SAP For Your Cause
    Hope success :-)
    Regards,
    Krishnendu.

  • Filter for batch determination of production order

    Filter for batch determination of production order
    Dear guru ,
    We trigger batch determination manually for every production order using CO02.
    How can I understand whose are the production orders arenu2019t taking place batch determination?
    Checking all the production orders is too heavy ?
    Does exist a massive transaction (coois or others)  where I can select the production orders with components not assigned to the batch ?
    Thanks in advance

    Hi
    In COOIS > In the initial screen select  Documented Goods movement  in the list Field along with and other selection criteria and run the Report
    In the list of orders > Expand corresponding order to view Documented goods movements list with the components with and w/o batch numbers
    Regards
    Brahmaji

  • Batch Determination in Production Order Component Overview Screen on the basis of FIFO, Thickness, Grade, width etc.

    I am facing a difficult scenario. Pl. help me out. In my Business Process I am assigning Batches in Production Order Component Overview Screen. Here I am assigning relevant batches to BOM Components manually, My Management want SAP to suggest batches automatically on FIFO basis, thickness, grade, width & first batches should automatically assign to Production order.  Can you pl. tell me how to configure this scenario.
    Or can I pull stock overview screen at Production Order Component screen to assign relevant batch to BOM Components
    Once batches assigned in Production Order component screen cannot be changed. It can be changes by specific persons only.

    Hi,
    Automatic Batch Determination for production order components is possible by configuration.
    You can also refer below discussions to map your scenario.
    Batch determination in production order | SCN
    Automatic Batch Determination in Production order
    Regards,
    Naresh

  • Automatic Batch Determination   in Production order

    Dear All,
    We are using automatic batch determination is based on FIFO (first Mfg first out) for components..After releasing the order.
    I have maintained Batch Class in all the materials which are used as a all material special Characteristic LOBM_HSDAT as a one of the class characteristic. as we want batch determination  on GR date for few material and for few material LOBM_VFDAT for self life material and its class.
    Then create Sort Rule CU70 mainatained the same LOBM_HSDAT in it. and one with LOBM_VFDAT.
    Then create Batch serch Strategy (USE T.Code COB1- search strategy CO01the respective sort rule and selection critoria.for All ROH HALB and Finish material.
    In Material Master of all component in MRP 2 view select value 3 (Automatic Batch Determination) for BATCH ENTRY. All ROH HALB and Finish material
    After mainting above all prerequisite I should able to do the Automatic Batch Determination as per my selection Rule.
    But Automatic Batch Determination  in Production order after release is not working.
    Please need your help.
    Regards,
    Manish
    Edited by: manish gurnule on Dec 30, 2008 5:26 AM

    Dear,
    Define the batch determination search strategy for process order in COB1 with sort rule in CU70.
    On the initial screen of your application choose Logistics>centrel function>batch management>Batch determination>For process order -->Batch search strategy --> Create.
    On the initial screen of your application choose Batch search strategy -->Create.
    Choose the strategy type, say choose co02
    Choose the key combination-
    Enter the required dat-->say plant ,production order type, product,valid from and component for which you want to have this
    Choose Selection criteria push button. Choose a sort sequence.
    If no values have been entered, enter the selection class and the characteristic values.
    Go back to the screen on which you create a batch search strategy.
    Choose Sort if required(it should be defined earlier(in CU70- here you are giving the charateristic name on which you want to sort)
    For component you need to use MBC1 with search stratgey as ME01 for your plant movement type and material and assign the sort rule and search procedure here.
    Check also in COR4, for the combination of plant and order type...you have selected search procedure-CO0001
    Batch management> Batch serach procedure allocation and check activation
    T.Code to be looked specifically OMCG , CORC
    Hope it will help you.
    Regards,
    Madhu

  • How do we do production orders for same item code in different sizes

    Hi,
    We have Items which we buy as a single sheet of material and our customers can ask for us to cut the complete sheet into different sizes before despatching it. i.e
    Item Code Sheet1: Sheet size 100mm x 100mm
    Customer asks for sheet to be cut into 10 off 10mm x 10mm sheets, which we presently put on the sales order as a line note
    We then generate a production order for this item and indicate on the production order printout the line note
    We've recently had a customer who has asked for Item 1 in two different sizes on the same sales order ie
    Order Line 1 Sheet1 Qty:1 Line note: cut into 10mm x 10mm sheets
    Order Line 2 Sheet1 Qty:1 Line note: cut into 50mm x 50mm sheets
    When generating the Production order SAP combines the items into
    Product No: Sheet1
    Planned Qty: 2
    Where as we want it to create 2 production orders 1 of each different sizes items.
    I know I can create BOMs for those two sizes, but customers can ask for the sheets to be cut to whatever size they want. Is the best method to create BOMs on the fly for each different sizing option or are there alternative methods that are easier to manage ?
    Thanks
    Carl

    Hi Carl Rutter,
    You have to creat 2 special production order for this item. when issue the component make sure you issue the stock as per the cosumption becaue one have 10mmx10mm and the another item have 50x50 in this case you issue component by square inch wise. for example 10*10 = 100 squre inch.
    50*50 = 2500 square inch so the cost will be approtionate. you can Use multiple uom method to obtain this, other wise you have covert into stock then you issue the component. If you want traxk size wise ,you can use batch option for Finishe goods.
    Regards
    Sridharan

  • Batch assignment in Production order

    I am using a bulk material M1 and packing it into a finished material F1. Both M1 and F1 are batch managed. The BOM of F1 calls for M1. I create a production order for F1 and assign a batch to M1 in the order. On release of order I want F1 to be assigned the same batch # as M1 in the order. Can I do this? Is there a user exit?
    thanks a lot

    Hi,
    Theres an exit PPCO0007 before saving the Production Order. Perhaps you can do some tweaks there.
    Thanks,
    Kumar P

  • Production order for a multiple materials codes...

    Dear...
    Could you please suggest me the SAP solution for the below production strategy.
    This production process is of heat treatment. Actually I am doing heat treatment of Cast and Forge items. These items weights are in the range of 150 kgs to 40000kgs. For example I am having a 40 tons heat treatment furnace. So at a time I can load the materials upto 40 tons. I am having different materials of different sizes and chemical compositions.  But heat treatment cycle(Routing) is same. So I can load different types of materials i.e. upto 40tons for the heat treatment for which same type of heat treatment is required. Sometimes this may be a single item .. if the weight of the items is 40 tons. If it is single item...then there is no problem. If I am loading different items...and if execution process is same for all the items, then how can I map this in the SAP. So that I can create a single order for different Items of different materials and quantity. I need to do the confirmation of these items with respect to the same item. Please suggest me...how can we map this scenario into the SAP.
    Thanks in advance.
    Regards,
    Surya.

    Hi surya,
    As per the heat treatment process concern, total cycle time is constant, and load is also constant (if we havenot changed).
    i hope u have defined workcenter formula and routing accordingly.
    i think creating single production order for multiple material is not possible, instead of thsi, i would suggest one way,
    > Since u have to maintain stock for Heatreated items, create sepearte Material code for each item to be heatreated.
    > Create BOM ,Routing  for New Material code.
    > Acitvate Batch management for New Material Code has been created.
    >Now create Production order for each material to be processed in one cycle, Assign the Batch Number manually.Batch number repersents your Heat treatment cycle number and same can de used for traceability.
    >Confirm the each order seperately, Now the Heatrement process cost will be updated and stock will be posted to heatreated storage loaction.
    But i am worrying about capacity planning and scheduling, For my knowlegde purpose i would like to know your existing scenoria, like workcenter formula and  routing operation values has been assigned , if u wish plz share with us.
    Please come back with your ideas..
    regards
    Pradeep

  • Query on Batch Determination in Production Order

    Dear Gurus
    I have one query on batch determination in production order against the scenario given below, which need your help .
    We know that it is possible to allocate the same component batch to two concurrent production orders at the same time in SAP.  But as per the business requirement its not possible physically. So business want to update the batch selection logic to exclude the already allocated batch to any open production order.
    In my understanding it cant be done without any enhancement, but require your expert opinion before coming to any conclusion.
    If you have any idea to achieve the solution kindly let me know.
    Thanks

    Dear
    I am not sure whether you can change the Batch SELECTION logic  for concurrent production order .As far as I know batch selection is done on Batch search strategy /sort Rule
    Explore SAP Help : http://help.sap.com/printdocu/corePrint46c/en/data/pdf/LOBM/LOBM.pdf
    Refer this useful thead from expert :Userexit in Batch determination and external number ranges for batches
    Regards
    JH

  • Batch split  during  production order confirmation

    Hi All,
    This is the process which  is followed  at our  customer  end, they want  to  split the batches  during  confirmation,
    1.Production order created
    2.While  going through each operation, some components are failing in the in-process inspection and  they need to be quarantained  for  further  process,(it may be rework, scrap, etc)
    3.Now  the  question is  we  want  to create  individual  batches, say  for  example out  of  100qty  which went  operation number 10,   50  were found  to be o.k.  and  the  remaining  50 are  having  defects, we want  to  create  two  different  batches  for this  scenario at  the  time  of  confirmation.
    Is there anyway  in SAP todo  this , like userexit
    Has anybody  has  gone through  similar  scenario's
    Thanks in advance
    Regards
    Venkat.

    Dear Vanket,
    In the operation you can confirm Yield, Scrap and rework quantity.
    In your case in each operation you need to create a batch for each qty what you enter.
    As I told you before batch can be created either production order release or during GR.
    In each operation you are not going to perform GR, hence batch creation is not possible.
    You have 2 options as I see.
    1. Create different intermediate materials and have production orders for each operation so that you can do the GR for each production order.
    You can have the same batch for each stage material so that issuing material and production materials are different but batch is same.
    If there is any defective quantity you need to decide you want to scrap it or you want to go for rework. If you want to go for rework then, using trigger point function you can create a auto rework order for the qty of rework entered during confirmation.
    2. Second option is you can create a production order as you are doing now, but you need to create batch manually in MSC1n transaction for rework as well as yield qty.
    You can confirm the yield qty and rework qty, but you cannot assign the batch as you are not performing GR. You can enter the batch number in the confirmation text field for information purpose. During the final operation when you do the GR, assign the batch to yield qty and post. About the rework qty you are not going to post qty to store, you need to create rework order and confirm the qty, during GR you can assign the batch and do GR.
    If you ask me if you need to strict process to represent your case you need to go for first case.
    Please go through the above carefully and test the cycle and come back if you need any clarification.

  • Issue regarding Batch determination in Production order as per Expiry date.

    Dear all,
                    first of all  happy Navratri.
    I have issue regarding batch determination in production order.
    I have to compare P.O header materialu2019s expiry date and issuing components expiry date at the time of batch determination.
    lets take example,  Material having self life is u201CXu201D years and batch determination against PO is based on FEFO with the help of self life we can determine Expiry date of manufacturing material  suppose it is u201CYu201D  I have to introduce restriction at the time of good issue if expiry date of issuing components u201CZu201D is less than expiry date u201CYu201D.
    Please give your valuable suggestions either standard or through SAP enhancements.
    thanks & Regards
    SIVA

    Dear
    Thanks for your reply, i am layman about batch derivation can u elaborate it.
    Thanks & Regard

  • Batch split in production order confirmation

    Hello
    any body please suggest me how to map collective batch split during production order confirmatio.
    i am using t.code CO11n.
    in goods movement i am having qty as 2000 kg.
    In this 200kg i want split in to 100 batches as 20 kg each. my client wants to put no batches it should automatically divided 2000kg and need to split 100 batches in to each 20 kg. how can i map this. is there any function module in our SAP.
    Please suggest any body on this.
    Thanks & Regrds
    Bhakta

    Hi Onat,
    Thanks for ur reply.
    I want to split GR101. actually. i have shown individually to my client means select line item and split one by one. but theey are saying that 200 times to do this is not possible.  please suggest ow resolve this.
    Thanks & Regards
    Bhakta

  • Automatic capture of batch number as production order

    Hi,
       How to make the order number to capture automatically while confirming the production order.As it should pick the order by default in the goods movement screen.
    Abap coding and user exit to perform this.
    Regards,
    Deepak GS

    Hi,
    Batch determination uses characteristic values assigned to batch classification for sorting batches and make a selection. A series of customization steps should be completed for batch determination. You will have to learn by reading SAP help or threads throughout this forum. Check out threads below.
    [Batch Determination within Production Orders;
    [Automatic Batch Determination;
    narainmech wrote:
    >      But for GR it is ok, if this is required for the child item level , while doing the confirmation when the issue is happening in bith cases 1. BAckflush 2. Manual issue
    >
    > Here in both the case it should pick the batch automatically.
    According to which criteria do you want batches to be selected, order name? Are there batches in the system named after production order for components of the order? No matter what, selection must be based on batch characteristics.
    Regards.

Maybe you are looking for

  • How can I add a custom title to multiple ALV reports selected by layout?

    Greetings and good day, everyone! Within the past week or so, I posted a question asking the best way to create a program that would generate multiple ALV reports.  I got some great ideas, and I've actually coded up a few simple demos based on your f

  • No longer able to set retention choices on a per-podcast basis

    iTunes 11.1 has deleted 47 GB of my podcasts, not once, but twice.  I've restored from backup, so am back in business, but this is ridiculuous. There is no longer a way to manage the retention policy individually for each podcast. If you click on a p

  • Is there a way to convert Crystal Reports to Microsoft SQL Server 2005 reporting services?

    Post Author: Lourdes Hernandez CA Forum: General Our department has always worked with and we love Crystal Reports. Unfortunately, certain reports now need to be converted to Microsoft SQL Server 2005 reporting services which from what I read I think

  • How to add music/files to itunes?

    I reanctly found my old music on a flash drive. I have been trying to add the files to itunes, but it is not working. I am going through the normal procedure, bu adding files to libary, but nothing is happening... Would be great if someone could give

  • No underline in PDF iBooks?!

    Hi and tnxs for reading. While it was possible to underline PDFs on Preview, now this operation is not possible on iBooks on the MAC unless we create another copy which is stored somewhere else... is this correct? Is that normal? Tnxs.