Batch manual assignment

Hi Friends,
i had problem releasing a process order. in transaction COR2, material list, i am manuaaly assigning a batch in one of the component but the problem was when i tick the green flag to reease the order, the system give me an error message that batch was not found but when you check the batch master, the batch i am assigning in the order were existing. although i observed that when you go in transaction MMBE to check the unrestricted stock, there is a negative sign on the right side of the figures of stock assigned for that batch. what does it mean? will it be the reason that's why the system does not found that batch?
thank you so much!

Dear,
it is clear from the message, the batch is not maintianed in the combination of
Material
Batch
Plant
Storage location
I doubt you chek the storage location what you have enetered and the batch maintianed....it may not be same.
example
what you can see in MMBE
Material -X
Plant -X
Storage location -X
Batch -X
stock - 50
what you have enetered in the transaction
Material -X
Plant -X
Storage location -Y
Batch -X
pl check the combination and come back
Edited by: Rajesha Vittal on May 15, 2008 12:08 PM

Similar Messages

  • Batch no. assignment to SFG/FG same.

    Hi PP Gurus,
    Please let me know any possibility for assigning the same external no. range for Semi-finished and Finish good? Is it possible using standard SAP ECC 6.0?
    Regards,
    Abu Arbab

    Hi Abu,
    You can use the same Batch No. of Semifinished to finished material.We are also going with the same rule.
    You can do it via 2 ways.
    1) By Manually :- Assign B.No. of Semifinished materials to the  Batch No. tab in process / Production order goods recept tab.
    2) By using User Exit As I have mention in my erlier reply.
    But before all this setting pls check your Batch Level settings  - Through T.Code OMCE.
    There are 3 selction for it.
    - Batch Unique at Plant level
    - Batch Unique at Material Level (select this radio button)
    - Batch Unique at Client level for Material.
    Regards,
    Dhaval

  • Batch no assignment as per material type

    Hello All
         I have requirement wherein the batch no is dertermined based upon the material type, I have used userexit EXIT_SAPLV01Z_001 for the same, initially it was finalised that batch no would be inernal, so I went for internal batch no assignment wherein I was using no. range object BATCH_MAT & I have defined sub-object for each material type & assigned no. range interval for each sub-object. It was working fine.
              Now  there is a requirement that for material type ROH(raw material) batch no has to be externally assigned. Kindly suggest how this requirement can be catered. Looking forward to your valuable inputs.
    Regards,
    J K Tharwani

    Thanks Aneesh for your valuable inputs,
            I am able to resolve my problem, what I have done let me explain you here, I have used same user exit which I have mentioned in this thread & I have defined a subobject ZROH under No Range object BATCH_MAT with no range interval as: AZZZZZZZZZ-ZZZZZZZZZZ(External).
    Now for movement type 101 I have I have done little change in the customization of Batch Management. I have set indicator as "B"(Automatic/manual & check in user exit) in following node:
    SPRO>Log Gen>Batch Mgmt>Creation of new batches>Define Batch creation for goods movements.
          The above settings have resolved my problem.
    Regards,
    J K Tharwani

  • Automatic external batch number assignment

    Hi gurus,
    I'm facing to an huge issue.
    I've created an subcontracting PO. Into this PO, I have inserted a external batch number to a component.
    When I make a good receipt with MB0A transaction. movement type 101 for the finished product and movement type 543/O for component. the external batch number is populated in the material document. But I don't want the MB0A transaction populates this bactch number. I want to input it manually in this transaction.
    Is it possible to disengage the automatic external batch number assignment by the MB0A transaction and insert a external batch number manually?
    Thanks for your help.
    L. YDIR

    Try this exit, its for external bacth number assignment EXIT_SAPLV01Z_003 .
    EXIT_SAPLV01Z_003. Using this exit, you can replace the proposed number range object BATCH_CLT and/or external interval 02 with a number range object and/or external interval you have defined yourself.
    You also have the option of suppressing the batch number check, for example, based on the material or plant.
    Further : EXIT_SAPLV01Z_003. Using this exit, you can replace the proposed number range object BATCH_CLT and/or external interval 02 with a number range object and/or external interval you have defined yourself.
    You also have the option of suppressing the batch number check, for example, based on the material or plant.
    Just wanted to ask : which version of SAP are u working on?  is it some old version?  coz I see u using MB* Transactions, while SA now recommends most goods movements by MIGO TCODE, aslo most new enhancements are for MIGO .

  • PAYMENT BATCH를 MANUAL하게 CANCEL 하는 SQL

    제품 : FIN_AP
    작성날짜 : 2004-05-17
    PAYMENT BATCH를 MANUAL하게 CANCEL 하는 SQL
    =====================================
    PURPOSE
    고객사에서 간혹 Payment Batch의 Status 가 Formatting, Confirming 으로
    멈추어 있어서 고객이 다시 Cancel을 할 경우 Cancelling 상태로 머물면서 Payment Batch Request 가 진행이 되지 않을 경우가 있다. 이때 해당 Concurrent Request 는 취소하고 해당 Payment Batch에 대해서 Datafix Script 을 통하여 Status 를 Cancelled 로 변경할 수 있도록 한다.
    Problem Description
    Payment Batch Stauts 가 Cancelling 상태에서 변하지 않는다. Concurrent Request 는 끝나지 않고 계속 Hang 상태에 머물러 있다.
    Workaround
    Solution Description
    다음 sql 문을 이용하여 직접 cancelled 상태로 변경한다.
    1) DELETE from ap_checkrun_conc_processes_all
    where checkrun_name = '<payment batch name>';
    2) DELETE from ap_selected_invoices_all
    where checkrun_name = '<payment batch name>';
    3)     DELETE from ap_selected_invoice_checks_all
         where checkrun_name = '<payment batch name>';
    4) DELETE from ap_checkrun_confirmations_all
    where checkrun_name = '<payment batch name>';
    5)     UPDATE ap_inv_selection_criteria_all
         SET status = 'CANCELED'     
         where checkrun_name = '<payment batch name>';
    status update 시 canceled 라고 반드시 입력해야 함에 주의한다.
    CANCELLED 라고 L을 2번 입력하면 취소되었다고 인식 하지 않는다.
    Reference Documents
    143668.1

  • External Ref. in Manual Assignment in Single Positions

    Hi,
    We create future position in product type 70D. 70D is mapping under Manual Assignment in Single Positions. Many open contracts create same date and same price but only contract no. is diff.
    At the time of we create close deal system show date wise qty., price, value in Manual Assignment in Single Positions screen, but contract no not display. We enter contract no. in external ref field.
    It is possible to external no. field in Manual Assignment in Single Positions screen, or any text field like internal ref, assignment etc. display this screen.
    Regards,
    Vishal Patel

    Hi,
    The assignment screen is generated using standard structure screen - TRQS_LOT_ASSIG_ITEM_SCREEN. If you want to include any new field in the display, the program should be modified, but will no longer supported from SAP.
    But please note that system displays the lot assignment in the chronological order within a single date, so you can select the respective lot using the available display itself.
    Regards
    Prasad AV

  • Is there a video tutorial which shows how to manually assign pages to menu items?

    I have a need to build out two separate menus. In order to do that, I need to be able to manually assign pages to the menu. Thanks

    Here's a tutorial on adding a Manual horizontal menu widget that should help - http://www.adobekb.com/building_your_first_website_pt07.html#addingmanual.
    Basically you just need to switch to a Manual menu type through Menu options, select the menu item and link/edit its label. You add more menu items to the menu by hitting the + symbol that appears when a menu item is selected.
    Thanks,
    Vinayak

  • Batch Class Assignment

    Dear All,
    I have created a material with batch management & i have assigned a Class of type "023" in the classification view.
    When i open the same material again there is no class assigned to the material.
    this is happening to all materials.....
    plzzz guide
    Cheers

    Hi,
    Refer below thread which is similar to your problem,
    [Class not assgin|Re: Batch class assignment on a material]
    Regards,
    Dhaval

  • Enter batch number - No Automatic Batch Number assignment allowed for plant

    Hi SAP Gurus,
    Upon checking the created new Goods receipt for Purchasing Order in tcode migo_gr, checking with the Batch tab, we can't see a batch number, then clicking the classification tab showing the message Enter batch number - No Automatic Batch Number assignment allowed for plant - XXXX
    the question is there any missing configuration based for this kind of error? ive checked the availability check for the plant and it already setup. Hope for your kind responses.
    Thanks

    HI,
    Kindy check the below configuratoin
    Logistics - General>Batch Management>Creation of New Batches>Define Batch Creation for Goods Movements
    for your movement type check what is the Strategy for the new batches.
    here you should assigne only automatic.
    Also let me know what is the level of batch mgt> is it at client level, Plant level, Material level.?
    reg
    Dsk

  • How to do the internal batch no. assignment using SAPLV01

    what is the use of internal batch no assignment using the exit mentioned above? where we use it?

    Hi,
    QI am working on make to order scenario .For delivery of order may I see the batch no.of esch order.
    A. Yes you can see batch number for each order
    QHow system will get the internal number batch.
    A. there are two possiblities assign you batch number at production order before release or assign batch or each GR at the time of executing GR transaction.
    QI have config. batch management.
    A.In Material master you also have to tick for batch managemnt relevency
    QWhat should be the next process.
    A. Consult again if any thing missing
    Regards,
    Syed

  • Internal Batch No. Assignment for Materials generating different series.

    Dear Experts,
    Required your Valuable suggestion on Batch Number assignment.
    My Client Requirement is he has only 5 Materials for which Batch Management needs to be activated.
    Consider These 5 Materials are 10000, 10001, 10002, 10003, 10004, and 10005. These 5 Materials should have an Independent Internal Number Range. All these Materials belong to same material type.
    Like for example consider
    10000 material the Batch internal  number should be u201CA00001, A00002, A00003, A00004u2026..etc
    Similarly for 10001 material the Batch internal number should be u201CB00001, B00002, B00003, B00004u2026..etc
    Similarly for 10002 material the Batch internal number should be u201CC00001, C00002, C00003, C00004u2026..etc
    Similarly for 10003 material the Batch internal number should be u201CD00001, D00002, D00003, D00004u2026..etc
    These no. ranges need to be picked up automatically at the time of Goods Receipt.
    Is there any User Exit Or Customer Exit available on this. Kindly suggest your Valuable Suggestion on this.
    Best Regards

    Try with user exits EXIT_SAPLV01Z_001 and EXIT_SAPLV01Z_002.
    Per OSS note 148765 - Sample source code f.internal batch no. allocation, it looks you can assign the internal number range based on material number.
    Regards,

  • Internal Batch no. assignment

    Friends,
    Can we have Internal batch no. assignment active for a specific plant only?
    Regards.

    >
    James Bh wrote:
    > Friends,
    >
    > Can we have Internal batch no. assignment active for a specific plant only?
    >
    > Regards.
    Check this related link. Its discussing of 2 different number ranges on plant meaning it can be applied for specific plant.
    Internal Batch number customer exit problem.

  • FBICR3 - Manual Assignment

    Hello FICO Expert,
    Need your help for the T-Cdoe FBICR3.
    Problem :
    User run the T-code FBICR3 and manually unassigned those items still have different then manually assigned it again.
    After the manually assigned process, the data matched with no  'difference show'.
    But after system run the update, those manually matched items will BACK to original.
    Please help to provide some hint for the trouble shooting.
    Thanks

    Hi,
       Basically YES.
      Process 3 selects the Open items at the end of the period. The difference shown will in this case represent that only one side has posted a "payment" (cleared the item)
    Kind regards

  • Batch number assignment after receiving the goods

    iam receiving material from my customer say 100 units, i am giving the challan that i have received 100 units from u, and the challan number will be 1000
    After that i have to do job work, in the received 100 units,
    50 i have to issue to production for different process
    50 i have to issue to production for different process
    I need to give batch number for first 50 units issued to production as 1000A
    I need to give batch number for second 50 units issued to production as 1000B
    How to do in SAP???

    Hi
    You can assign the same material to different batches
    To assign a batch number to the material, you can do it during goods issue in MIGO or MB1C.
    In MB1C, you can give the Material , Qty and Batch No. Use movement type 561 to receive the goods in MB1C
    Hope this helps
    regards
    Anand

  • Batch Number assigned to Process Order

    Hi Experts,
    Which table should I use if I want to get the Batch number assigned in a process order?
    Thanks,
    Kumar

    Hi,
    If u want to get the batch number of Process Order FG then u can get it from AFPO.If u want item level then get it from MSEG table.
    Regards
    R.Brahmankar