Dear Gurus
Is there any standard report where we can see the batches along with their characteristic values in a  single screen for a particular material or for a particular production order or for both combined
Regards
Sandip Sarkar

Dear Vishal
Thank you for your response In bmbc or the tables you mentioned nowhere we can find the values for the characters . Actually I am posting goods for a production order and I want to know what are the batches I have posted along with their characteristics and values for that production order . If you can kindly throw some light again
Regards
Sandip Sarkar

Similar Messages

  • Same Batch Number with different characteristics value

    Dear Gurus,
    I have the following scenerio:
    The finished goods should be maintain in batch with external number  and at the time of confirming the finished goods in co11n the client want to capture the finished goods value like length, width and diameter.
    So we propose the batch characteristics with class type of 022 for finished good and we maintain the character as length, width and diameter under the batch class 022 and assign the batch class in finished good classification view.
    Now the requirement is we want to capture the batch characteristics value length width and diameter with same batch number for multiple confirmation.
    Example:
    Confirmation      Batch number               batch Class               Length     width     Diameter
    1                        1000                              022                              100        50             20
    2                        1000                              022                              120        25             10
    3                        1000                              022                              150        70             30  
    Now at present we are trying to capture the batch characteristics with same batch number but our standard system will not allow to maintain the different batch characteristics value under same batch number. If we overrite the batch characteristics in msc2n transaction the last value maintained be copied to all batch number. but we want same batch number with different batch characteristics value.
    Please share your idea and try to solve..
    Regards,
    Vimal

    Dear Vimal,
    It is not possible to maintain multiple batch characteristics in one batch.
    Work around is to create original batches and assign to your production order.  During CO11N, generate one batch per confirmation.  There is a report in batch information cockpit to link between original batch and batch per confirmation. 
    Rgrds,

  • Stock Report with batch number and its Charactristc values

    Our material are batch managed and Char values are entered at the time of GR. We need to prepare stock report showing batches for the material, their stock and characteristics values.
    Like to know what tables we should use to find the char values. I could not find value in table CAWN

    Hi,
    For characteristcis link and values use below tables:
    Characteristics :
        CABN                   Characteristics ( o.a. batch/vendor)   
        CABNT                 Characteristics description
        CAWN                  Characteristics  ( o.a. material)
        CAWNT                Characteristics description
        AUSP                   Characteristic Values
       Class types and objects :
        TCLAO                 Several class types for object
        TCLA                    Class types ( vb. lfa1 => v10 en 010)
        TCLAT                  Class type text
        TCLT                    Classifiable objects
        TCLC                   Classification status
       Links :
        INOB                    Link between Internal Number and Object
        KLAH                  Class header data  
        KSSK                  Allocation Table: Object (vb.matnr) to Class 
        KSML                  Characteristics for a class (internal number)
    for batch stock 0 use tables ilken MCHB, MCHA etc,
    hope this helps
    Reg
    Dheeraj

  • Verification field for Batch number - Transaction LM05

    Hi Experts,
    Can some one help on the issue of adding a verification field for BATCH NUMBER on the screen 2502 and make it work.
    Requirement : Add Verification field for batch number and build the logic to verify the batch number -  as the SAP standard does for other fields.
    I have proceeded to some extent and seems like I am not winning.
    Steps done :
    1. Copied physical screen 2502 (SAPLLMOB)  to screen 9502(SAPLXLRF)
    2. Changed the screen to subscreen and removed the OK_CODE from the element list.
    3. Created the project ZMWMRF502 and assigned user exit MWMRF502 to this project.
    4. In the components of the project assigned 9502(SAPLXLRF) to 1502((SAPLLMOB).
    5. Assigned the screen 9502 to logical screen 0502 in the config.
    6. In the transaction LRFMD given the username and variant '1'.
    Now When I execute the transaction LM05 and give the TO number, the system calls my screen 9502 with new field seen in that.
    But the screen is completely greyed out with no data in that.
    I checked PBO and PAI of my new copied screen.
    In all the modules which I received from the copy of SAP standard screen there is no code except name.
    I mean to say that names of all modules exist but when I double click on any module it ask me to create a new object.
    If I have to create module similar to SAP there is a lot of coding in side. How do I proceed further.
    Can some help me.
    Thanks and regards
    Joshi

    Hi Dez,
    If you go in to transaction LM05 and input a number of TRANSFER ORDER, it will take you to a screen where the system will populate the fields pertaining to that particular transfer order.  In that screen we have normal fields as well as verification fields for that particular field. These screens are used on scanners. When the scanner scans the material slip, the corresponding value such as material number, storage bin number etc will be get populated in the verification field.  When the user selects next then the system will perform a check for the two values and pops up an error message if required.
    So there are verification fields for material number, storage type, quantity etc but not for batch.  Our user requirement is to put a verification field just by the side of batch number field and perform same operation as it does for other fields.
    Hope you understood.
    Thanks and regards
    Joshi

  • Creation of Batch number

    Hi Experts,
    I have a probelm with the Transaction MIGO to restrict the ignore the batchnumber entered by the user.
    If the user is not enter the batch number, then i can generated the new number by using the following 2 UE's
    EXIT_SAPLV01Z_001 (ZXVBZU01)  & EXIT_SAPLV01Z_002 (ZXVBZU02) and it is working fine.
    If the user enters , then System first check that whether it is already exist in the Database . If it won't find then automatically it is considering the same number.Which needs to be stopped.
    Any body has an idea about this requirement, to ignore the user entered value.
    Actually, there are 2 more exists, EXIT_SAPLV01Z_011& EXIT_SAPLV01Z_012 there i can't change the value of the batch number.
    Any suggestion or Any alternative way or Any idea Please......?
    Warm Regards,
    Vijay

    Hi,
    I think you can restrict by using FM EXIT_SAPLV01Z_001, this i copied the FM documentation for your reference. Just read the FM documentation you will get an idea
    You can restirict by using automatic generation using number ranges
    <<Function module Documentation>>
    Functionality
    You can use this customer function call (CFC) to replace the standard number range (object, subobject, number range, and year) with one of your own. This is used subsequently to determine a new batch number.
    Number assignment is carried out using the central number assignment.
    The communication structure X_BNCOM contains the application data known up to this time. You can extend this structure in the DDIC using structure BNCOMZ.
    Using the parameter CUST_NO_INTERNAL, you can suppress the number assignment function. Then you can either generate a batch number in function module EXIT_SAPLV01Z_002 using your own criteria or suppress the entire number assignment function.
    Using the parameter MESSAGE_WHEN_AUTO, you can decide if a dialog box is to appear before a new number is assigned. This only happens during online processing.
    Example
    You can define internal batch number assignment according to your requirements via the enhancement SAPLV01Z with the exits EXIT_SAPLV01Z_001 and EXIT_SAPLV01Z_002
    SAP delivers a total of 6 examples for batch number assignment:
    1. Copying the production order number to the batch number
    2. Copying the sales order number to the batch number
    3. Material-type-dependent batch number assignment
    4. Material-number-dependent batch number assignment
    5. Including the date in the batch number
    6. Including the plant number in the batch number
    For examples 1 and 2 you have to use the exits EXIT_SAPLV01Z_001 and EXIT_SAPLV01Z_002.
    For examples 3 and 4 you have to use the exit EXIT_SAPLV01Z_001.
    For examples 5 and 6 you have to use the exitEXIT_SAPLV01Z_002.
    For a detailed description of the examples, see below.
    Prerequisites
    1. Internal batch number assignment via the customer exit is activated:
    To do this, in Customizing, choose Logistics general -> Batch management -> Batch number assignment -> Activate internal batch number assignment.
    2. Maintaining the number range object
    Two number range objects are provided for batch number assignment:
    Standard number range for batch number assignment BATCH_CLT
    Number range for material-type-dependent or material-number-dependent batch number assignment BATCH_MAT
    Activities
    1. Use the SAP enhancement SAPLV01Z:
    a) In transaction CMOD, create either a new project or use an existing project.
    b) Add the SAP enhancement SAPLV01Z to the project.
    2. Copying the example code:
    a) Choose Component.
    b) Choose Change.
    c) Choose:
    EXIT_SAPLV01Z_001 for examples 1-4
    EXIT_SAPLV01Z_002 for examples 1-2 and 5-6
    d) Choose Edit -> Copy SAP source text.
    The example code is copied to the relevant table in the function module exit.
    e) To copy the example, remove the comment symbol before the include it pertains to.
    3. Activate the project.
    When you activate the project, the enhancement with the function module exits EXIT_SAPLV01Z_001 and EXIT_SAPLV01Z_002 comes into effect.
    Examples
    Example 1
    Copying the production order number to the batch number
    When a batch is produced, the process order number or production order number is copied as the batch number. This type of assignment is only possible in connection with process orders or production orders.
    Outwith an order, a number range is determined for batch number assignment. In this example, it is the standard number range BATCH_CLT.
    If the order has not yet been saved (for example, when a number is assigned when the order is created), a temporary number is created. A message appears prompting you to save the order. The system then assigns an order number which is accepted as the batch number.
    The system checks whether a batch already exists with this number. If this is the case, the system aborts internal batch number assignment with a corresponding error message.
    Note:
    In this example, note that the include LXVBZB21 in EXIT_SAPLV01Z_002 has to be activated at the same time, as actual batch numbers are not assigned until this is activated.
    Example 2
    Copying the sales order number to the batch number
    If a batch number is assigned in connection with a sales order, the sales order number is accepted as the batch number.
    If there are no sales orders, a number range object is defined with a number range from which the batch number is taken. If a batch already exists with this sales order number, the batch number is assigned externally.
    Note:
    In this example, note that the include LXVBZB22 in EXIT_SAPLV01Z_002 has to be activated at the same time before actual number assignment can take place.
    Example 3
    Material-type-dependent batch number assignment
    In the number range object BATCH_MAT a separate sub-object is created for each material type. Note that the number range object is maintained accordingly or batch number assignment cannot take place.
    For example, if the material "flour" belongs to raw materials, it is maintained in the sub-object ROH, and the batch number is taken from the same number range as the material "eggs" which also belongs to the raw materials group.
    Example 4
    Material-number-dependent batch number assignment
    In material-number-dependent batch number assignment, materials that are handled in batches must be maintained in the table BNMAT, which specifies the assignment of the material to the number range.
    If there is no assignment in the table, the system aborts batch number assignment. An error message appears informing you that batch number assignment is not possible and specifying the table that has to be maintained.
    Each material number is assigned a number range object, a sub-object, and a number range in the table BNMAT. This is how each material receives its own batch number range.
    The number range object BATCH_MAT is an example of this. The material numbers are divided into groups via their material type that match the sub-object. Each material number is then assigned its own number range by table BATCH_MAT. The number ranges used must be maintained in the number range object.
    Examples 5 and 6
    Including the date or plant number in the batch number
    The number ranges for the batch numbers must be defined in a way that ensures that no characters are overwritten by the templates.
    Parameters
    X_BNCOM
    CUST_NO_INTERNAL
    NR_RANGE_NR
    OBJECT
    SUBOBJECT
    TOYEAR
    MESSAGE_WHEN_AUTO
    MESSAGE_DONE
    Exceptions
    CANCELLED
    Regardas
    Krishna

  • Batch Number Transaction Report

    Dear Experts,
    Is it possible to modify the form settings of Batches table in Batch Number Transaction Report as I need to add in some user-defined fields into it?
    Below is the layout of my Batches table in the report:
    Batches
    #   Item No   Item Description   Batch   WhsCode   Qty   Status   Manufacturing Date
    and I would like to add in Width, Length & Height columns in the table.
    I can't preset the value of length, width & height of the item in Item Master Data because different batches of same item will have different length, width & height. So I created these fields (Width, Length, Height) in Goods Issue & Goods Receipt and assigned different values there. After that, I need to do some references at Batch Number Transaction Report to find out which batches got the specified measurement of that item.
    Thanks in advance.

    Hi Sachin. I think you have misunderstood what I mentioned before.
    I want the report to show like this
    Item No.   Item Description              Batch   WhsCode   Qty   Direction   Status        T     W        L
    A893S     Pine 14 x 125 x 1030mm          A123    WH01       100   In        Released   14   125    1030
    A893S     Pine 14 x 125 x 1030mm          A123    WH01       -10  Out       Released     14   125    1030
    A126B     Ash 14 x 125 x 1090mm          J123     WH01        50   In         Released   14   125    1090
    In fact, below is the result table that I get
    Item No.   Item Description                Batch   WhsCode   Qty   Direction   Status        T     W        L
    A893S     Pine 14 x 125 x 1030mm            A123    WH01       100   In           Released   14   125    1030
    A126B     Ash 14 x 125 x 1090mm            J123     WH01        50   In            Released   14   125    1090
    using this query
    SELECT T0.[ItemCode], T0.[ItemName], T0.[BatchNum], T0.[WhsCode], T0.[Quantity],
    case when T0.[Direction]=0 then 'In' when T0.[Direction]=1 then 'Out' end Direction,
    Case when T1.[Status]=0 then 'Released' end Status, T2.[U_Height], T2.[U_Width], T2.[U_Length]
    FROM IBT1 T0 
    INNER JOIN OIBT T1 ON T0.BatchNum = T1.Batchnum and T0.Itemcode=T1.ItemCode
    INNER JOIN IGN1 T2 ON T1.ItemCode = T2.ItemCode and T0.Quantity = T2.Quantity
    WHERE T1.[ItemCode] =[%0]
    Thanks,
    Xavier

  • Link between storage location and batch number to retrive the salk3 field

    HI,
    In my report i need to give the output as follows
    For each lgort with related batch number we need to get the salk3.So i need to get a link between lgort , batch number to retrive the salk3.can any one give the tables from which i can get the link and retrive the data.
    note: My report output should look like the fields lgort batch  and unrestriced value of stock in tcode mb52.
    subhashini.
    Edited by: subhashinikb on Apr 1, 2011 9:38 PM

    Hi,
    In 2 steps, u can get the unrestricted stock value.
    step1: Get material no (MATNR), plant (WERKS), batch (CHARG) and unrestricted stock (CLABS) from table MCHB by sending Storage location and batch number.
    Step2: Get standard price STPRS from table MBEW based on condition where MATNR = MCHB-MATNR, BWKEY = MCHB-WERKS and BWTAR = MCHB-CHARG.
             unrestricted value in MB52 will be (MCHB-STPRS) * (MCHB-CLABS).

  • Batch number is not generating by the system at the time of Goods receipt

    Dear All,
    This is regarding Batch number that the system generates internaly at the time of Goods receipt,but the same is not generating the batch number.
    I checked all the configs but i could not trace it out.Can any one help me to solve the issue.
    Thanks in advance,
    With Regards
    Vinod

    Hi,
    Follow the steps:
    1.Field---VFDAT adn table-MCHA should be created as a charecter in CT04signed to a class in CL02N.
    2.create MM01 and add the class to it in classification view.
    3.In mm01 plt storage1 view give data for remainning shelf life and total shelf life and in purchasing view activate batch management.
    4.OMJ5- activate SLED for your plant and mvt type 201.
    5.opj2- set BD for your plant.
    6.create sort sequence in cu70 and assign your charecteristic value to it.
    7.create batch serch strategy in MBC1 for access sequence(plt/matrl/mvt typ) create a condition record.
    8.Do a GR using 501 and enter SLED related details.(production date and exp date values)
    Repeat the above step and enter diffrent values for SLED details.
    So now two batches are created with SLED as the charecteristic.
    9.Do a GI using 201 mvt tye in MB1A and enter * in batch field(system will determine the batch using the SLED value basedon the criteria(ascending or descending which was set in the sort rule.)
    Reg,
    Deepak.

  • Change batch number field during post goods issue

    Hello,
    During one step transfer posting i want to change the batch number during goods receipt via transaction VL02N.
    I have tried using the below exits and badi without success.
    Exit EXIT_SAPMM07M_010
    mb_document_badi
    LE_SHP_GOODSMOVEMENT
    Below is the code i have implemented in the exit
    clear v_vbeln.
    select single vbeln into v_vbeln
       from likp
    select * from likp
        where vbeln = i_mkpf-le_vbeln
        and   vstel = c_vstel
        and   werks = c_werks
        and   lfart = c_lfart.
        IF sy-subrc = 0.
          e_charg = 'X'.
        ENDIF.
    If any body has implemented same functionality kindly help.
    Regards,
    Koustubh

    Hi,
    In the BADI LE_SHP_GOODSMOVEMENT, inside method CHANGE_INPUT_HEADER_AND_ITEMS, loop the parameter CT_XIMSEG.
    For each line in CT_XIMSEG, change the value of CT_XIMSEG-CHARG according to you logic and modify the internal table CT_XIMSEG transporting the valude of CHARG.
    Check whether now it is getting updated in MSEG.
    Regards,
    Harish

  • Logic to retrieve batch number in batch split scenario for a material

    Hi All!
    LIPS-CHARG gives the batch number for a material in normal scenario.But in batch split scenario for a material what should be the logic to retrieve the field batch number based on POSNR,VBELN and UECHA in LIPS.
    UECHA corresponds to higher level item of a batch.
    I had been given the following logic to do the same but it is not pulling any values inspite of a batch split available for the material.The logic is
    Select lips-charg (batch number) where  lips-posnr = lips-uecha ( higher level item batch)
    Please advise
    Regards
    Praneeth

    Hi Praneeth,
    The way LIPS records are in a batch split scenario is that let us say you have a delivery with one line item 00010. Now if this splits into two batch split items, then you will find in LIPS 3 records, one with line item 00010, one with 90001 and another with 90002. Both 90001 and 90002 will have a UECHA of 00010, whereas for 00010, this field will be blank. So the logic is to create two internal tables one where UECHA is blank and another where it is not blank and use it.
    SELECT * FROM LIPS
             INTO TABLE I_LIPS
            WHERE VBELN = P_VBLEN.
    I_LIPS_TEMP[] = I_LIPS[].
    DELETE I_LIPS_TEMP WHERE UECHA IS INITIAL.
    *-- This table will not have only the batch split items not the main items.
    LOOP AT I_LIPS WHERE UECHA IS INITIAL.
    *-- loop at the main items.
      IF I_LIPS-CHARG IS INITIAL.
    *-- batch is not there on the main item, see if it is there on any batch split items.
        READ TABLE I_LIPS_TEMP WITH KEY UECHA = I_LIPS-POSNR.
         do whatever
      ENDIF.
    ..... do whatever
    ENDLOOP.

  • Automation of batch number copy from RESB to AFPO using COR2/COR5

    Dear exports,
    As subject, I need to copy batch number from RESB-CHARG to AFPO-CHARG AUTOMATICALLY.
    I made enhancement in user exit ZXVBZU02. It works manually when click "create button" under tab "Goods recpt" in transaction COR2 after batch number determination (assign value to RESB-CHARG first).
    For automation, I'd like to do copy by either RELEASE (in COR2 or COR5) or SAVE (in COR2) this process order instead of clicking "create button".
    I found an BAdI WORKORDER_UPDATE, and put break-points in method AT_SAVE, AT_RELEASE, IN_UPDATE. But somehow it's NOT stopped.
    I think I may pick the wrong BADI, or no such solution.
    Your help is most welcome.
    Thanks alot.
    Steven
    Edited by: Steven Zhang on Oct 29, 2008 10:48 AM

    YES, badi is active. Also the break-point was placed in before_update (actually, I prefer at_release). It's bypass all those methods.
    Now I am suspecting whether this is the right BADI. From naming, it looks it is. But as we knew there is a tool (useful report), it can report all enhancements (including user exit and BADI) according to transaction. The badi WORKORDER_UPDATE is not listed in both COR2 and COR5.
    How? pls throw a light on this.:(
    By the way, I'm using ECC6.
    rgds,
    Steven

  • Cost of batch number in the past

    hello
    is there a way to see what the cost of a batch number was at a specific date(in the past) as well as the quantity on hand in the past?
    The client wants the following information :
    Batch Number
    WHS
    Item Code
    Description
          Quantity
    Weight
             Tonnage
    Cost
    CJ77974
    A01
    CC 0.70X1300 04
    CC 0.70X1300 EN10268 HC 260
    23 260.00
    1
    23260
    CJ78006
    A01
    CC 0.70X1300 04
    CC 0.70X1300 EN10268 HC 260
    20 530.00
    1
    20530
    CJ77925
    A01
    CC 0.70X1300 04
    CC 0.70X1300 EN10268 HC 260
    6 790.00
    1
    6790
    CZ80386
    A01
    CC 1.00x1400 F65
    CC 1.00X1400 G3135 SPFC 440
    23 170.00
    1
    23170
    They this want to see the cost and quantity on hand for e.g. 30/05/2014(a date in the past).
    Any advise will really help.
    thanks
    Janice

    Worked for me too. options->options->privacy->remember download history

  • Check a UDF of batch number when I create Goods Issue or Delivery

    Hello,
    I manage my items with batch number and I want to block the creation of all  Goods Issue or Delivery in function of the value of a UDF (created the OIBT table).
    I think I can achieve this by using the stored procedure SBO_SP_TransactionNotification, but I never used it and I don't know if (and how) I can retrieve the selected batchnumbers of my documents.
    Is it possible to do so, or do you have any better suggestions???
    Thank You,
    Xavier.

    Hi Xavier,
    You can find some additional information about the SBO_SP_TransactionNotification stored procedure here:
    [https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/e991e2b9-0901-0010-0395-ef5268b00aaf]
    The stored procedure only returns the following;
    - Object type
    - Transaction type
    - Num_of_cols_key (number of columns in the primary key of the object)
    - List_of_key_cols_tab_del (the list of the columns in the primary key)
    - List_of_cols_val_tab_del (the values of these columns)
    So the stored procedure doesn't directly return the information you want. You would have to link this with a DI application to access the document in question using the value of the primary key returned by the stored procedure. (Or through using an SQL query also using the primary key returned by the SP).
    Please note however, that SBO_SP_TransactionNotification is designed for notification purposes only. SAP can only support any issues arising out of use as a notification mechanism; the use of this stored procedure to block transactions or work as an authentication step are not supported. Please see SAP note 1011154 for more information.
    Regards,
    Niall

  • Cost by Batch Number

    Just to be sure, there is no way to manage an item cost by batch number?
    Thank you

    Thank you for replying, actually I do manage my raw materials by batch, but when release them from inventory, they get released with a cost valued by average or FIFO depending on the Item settings but, what I need, is to get the cost at batch level, not at item level.
    Im guessing it is not possible, could it be done by sdk?
    Thank you!

  • Updating Batch Number while delivery creation from sales document

    Hi Experts,
         I have to write code inside user exit MV50AFZZ which updates batch number during delivery creation. Suppose I have a sales having more than one line items. Each line item have different material numbers, and one material number may have more than 1 batch number. And all these batch numbers have to be updated for their corresponding material numbers. Batch  number corresponds to LIPS-CHARG. So how we can maintain values for this field more than once for a particular material number?

    Hi Pankaj,
    Were you able to update the Batch Number?
    What is the function Module that you used? and where exactly did you code in the logic?
    Thanks,
    RV

Maybe you are looking for

  • Upg 10gr2 to 11gr2, process flow: RPE-01003: An infrastructure condition...

    Hello. I am in a bit of a pickle right now after upgrading OWB from 10.2.0.4 to 11.2.0.3, and I'm here requesting a sanity check. Due to the need of a database upgrade, OWB also has to be upgraded and the data warehouse that has been functional and s

  • Safari not displaying updated website

    I maintain a website for a client that is all mac-based. I work primarily on a pc, but have a mac so I can check the design. Recently when I make a change to the website, specifically images, the client can not see them on their mac for 24 hours+. I

  • Quicktime 7 / intel and third party codecs?

    Hi, i'm running QT 7.1.1 on a new MacBook Pro. Now I can't view any of my files created with third party codecs (includes Avid, Blackmagic and Cinewave files) or export using these settings. All were working fine on my Powerbook before I transferred

  • Settlement Order - Settlement Rule

    Hi people, Could you help me in the follow situation? We have a Internal Order where we put the settlement rule to many other Orders by "equivalence number". This Order, we would like to settle every month with the "equivalence number" updated. But,