Batch selection at the time of 543 movement
Hi All,
This is regarding subcontracting process.
Whiles preparing 57f4 challan, we made a 543 movement with specific batch, now while taking GRN for same PO we need to select batch for 543 movement which system shows as FIFO defined in batch search strategy, but user can select any batches out of nos of batches.
We need that system should alllow only those batches which we issued at the time of 541 mvt.
Can anybody suggest?
Thanks
Nilesh M.
Edited by: Nilesh Malvi on Dec 23, 2010 8:21 AM
There is no way to exactly Map 541 batch with 543 batch .
Practically its not possible to determine and point that the 541 batch and 543 batch will be one and the same.
Once you have sent the material to the vendor, it is in his custody, and you cannot control in what order he has consumed the batches. Thats why we use FIFO method.
Only way is to enter the batch in the PO->Components screen itself.
check below thread
Re: Batch Determination - Sub contracting
Similar Messages
-
Batch selection at the time of GR for Process Order
HI experts,
I have the following problem -
I have got a process order of 51, at the time of order creation I have assigned/created 2 batches for the process order using some development and making use of user field. Now at the time of GR after final confirmation, I want to select the batch number for the required quantity, i.e I want to do the GR for both batches, and I want to select the specific batch from the assigned 2 batches. I am facing a problem that , the GR by default selects the first batch of the order and the batch number field greys out. I am not able to select the second batch if I go for second GR of the same process order.
How can I make the field selectable , such that I can select the required batch at the time of GR.
Regards
A S KThere is a possibility to use batch split- kindly check if you are able to do this
Reg
Dsk -
Batch Determination at the time of Production Order Confirmation
Hi,
I am working with Batch Determination at Item Level.
I already have configured system to generate Batch Automatically at the Time of Production Order Release.
But now i want to generate Batch Automatically at the Time of Production Order Confirmation
Please help me with the necessary Configurations which would be required into achieving the same.
Thanks in advance.
HarrisHi,
I have maintained the same for my Order Type in OPJ2 but still the same is not being picked at the time of Order Confirmation and it is being put to COGI mentioning the error as No batch specified in production order
Also if i try to Manually Select the Batch through in Goods Movt. of CO15 it is giving a msg that No Strategy could be found.
I have done following settings:
1. Have maintained Condn Records in MBC1 for the component whose batch is to be determined.
2. In material master in MRP2 Batch Determination: 2
3. In OPL8: Batch determination search procedure
4. In OPJ2: BD ticked for that relevant Order Type
5. In OPKP: Automatic Batch creation kept as BLANK.
Please support
Thanks
Harris -
Automatic and manual batch determination at the time of Goods receipt
hi,
where i can have the settings for automatic and manual batch determination at the time of Goods receipt and goods issue..
E.g.: If i am receiving material from vendor then my requirement is system will generate batch automatically...
Where we can get this setting?
Tx
UtsDear,
You assign the batch number either
Manually
Automatically, using internal batch number assignment, refer to Customizing for Batch Management under Internal batch number assignment.
Internal batch number assignment is activated for the complete client, unless you exempt individual plants or materials using a customer exit (see Configure customer exits for intern. batch number assignment in Customizing for Batch Management).
The R/3 System informs you that the internal batch number assignment is active. You are however only informed once per transaction, for example, when you enter the first item on the multiple-entry screen.
Please refer: http://help.sap.com/saphelp_45b/helpdata/en/25/283cb44f7811d18a150000e816ae6e/frameset.htm
Regards,
Syed Hussain. -
Automatic Batch Creation at the time of GR
Hi all,
I have configured automatic batch craetion in GR and same is working in Test client. And transfer the same to Quality but same is not working in quality.
I have checked all IMG object for batch are in sync. and I am clue less now what to do?
Thanks
SanjayHi Gurus,
I have same issue system is supposed to assisgn batch
automatically at the time of G R but we are entering batch manually
Checked all suggestions from ramki
Is there anything else could cause this problem
Is this issue resolved
Please provide solution
Will reward full points
Rgds
justin -
Avoid the delivery creation in MIGO/MB1B at the time of goods movement
Hi All
Can anyone please help me to know, How to skip the delivery creation step in MIGO/MB1B at the time of goods movement (311) indebug mode.
In which part of the code the delivery creation logic would be written...?
Thanks and regrds
KarunaHi:
It looks like to me if there is validation working in background . Please check in GGB4 there will validation active for this asset class . Low value asset check restricts you from posting an amount as specified in OAYK. Please check.
Br -
BOM selection at the time of confirmtion
Dear Experts,
My client has requirement that BOM should be selected at the time of confirmation if there are multiple BOM's are available for the same material.Is it possible ??.
Edited by: manjit_pune on Mar 7, 2012 10:07 AMHello Manjit,
As a SAP fucntion, BOM should be selected/exploded at the time of MRP so that SAP would be in position to plan the components accordingly. What the reason or benefit of selecting relevant BOM at the time of confirmation ??
In any case, this function is not possible in standard SAP.
Regards,
Anup -
No Accounting entry at the time of 101 movement.
Dear gurus,
Currently we are taking goods receipt against purchase order - 101 movements But we do the same due to material master inspection set up it mvoes to quality stock as well as accounting entry is getting passed.
Is it possible whether at the time of 101 movement only material moves to quality inspection but accounting entry will not pass. Accounting will happen when User clears the quality.
Please let me know whether this is possible
Rgds,
SaurabhHi!
With the movement type 103 the stock does not go into your own stocks: Only the purchase order is updated, but none of the stock tables is updated. Therefore, the stock cannot go to quality inspection.
Only when you finish the process and receive the stock fully with the movement 105 is when you can decide the destination of the goods (unrestricted, quality, blocked).
So, resuming, there is not any process that fully meets your needs: Either you work with the movement 101 and quality inspection (but in this case the accounting document will be created with the goods receipt) or you work with the goods receipt blocked stock and the movements 103 and 105 (but in this case the movement 103 will not increase your stocks).
You can read more about this process in the SAP Library:
http://help.sap.com/saphelp_470/helpdata/en/4d/2ba31643ad11d189410000e829fbbd/frameset.htm
then Goods Receipt -> Goods Receipts for Purchase Orders -> Goods Receipts into Goods Receipt Blocked Stock
Esther. -
I am trying to play a season on my computer but it will not play. The timer does not move and all i get is a black screen. Should i just repurchase the season. the season does play on my ipod.
http://support.apple.com/kb/ts3694
Error 20, 21, 23, 26, 28, 29, 34, 36, 37, and 40
These errors typically occur when security software interferes with the restore and update process. Use the steps to troubleshoot security software issues to resolve this issue. In rare cases, these errors may be a hardware issue. If the errors persist on another computer, the device may need service.
Also, check your hosts file to verify that it's not blocking iTunes from communicating with the update server. See the steps under the heading "Blocked by configuration (Mac OS X / Windows) > Rebuild network information > Mac OS X > The hosts file may also be blocking the iTunes Store." If you have software used to perform unauthorized modifications to the iOS device, uninstall this software prior to editing the hosts file to prevent that software from automatically modifying the hosts file again on restart. -
Batch creation at the time of order creation & confirmation on the batch.
Hi all,
My client's requirement is while creation of the production order of say 100 pcs, system should create 4 batches, each of 25 (this might be different every time) of that order & also the confirmation (CO11) should be done on those batches.
Also if the order contains 10 operations then confirmation of operation no. 0020 should not be possible before confirmation of 10, whether it is for partial & whole quantity.
You can say these batches will reprsent the lots.
Regards
SmanS
Edited by: SAP PP Consultant on Mar 9, 2009 8:05 AMHi SAP PP
You can use this function to automatically create a batch for the material to be produced.
You can make the following settings in Customizing (production scheduling profile):
No automatic creation of batches in production orders
Automatic creation of batches during order creation
Automatic creation of batches during order release
To carry out automatic batch splitting via batch determination, proceed as follows:
Select the component that you wish to split and choose Component ® Batch management ® Trigger batch det.
The system lists all batches that meet the selection criteria and that have available stock on the requirements date.
Distribute the required quantity as required over the existing batches.
Choose .
The system copies each batch as a separate component into the component overview screen.
For more information refer to Batch Determination.
To carry out manual batch splitting with manual batch assignment, proceed as follows:
Select the component for which you want to carry out batch splitting. Choose Edit ® Insert ® Batch split.
Enter the batch number and the required quantity manually in the component.
Save your entry.
Regards
Sachin -
Batch determinetion at the time of 541
Dear Experts,
I have a Subcontracting Order(generated through MRP run).At the time of issuing component to the Subcontractor against the order( Through MB1B), I want to determine the batch manually.but i could not find any option there.will anybody guide me regarding this?
Regards
ReshmiDear,
For movement type 541 assign your search procedure T code : OMCG
Maintain conditions record or strategy record. MBC1.
Also note for this you need to maintain a Classes d for you Material. define the characteristics for your material and use same in sort rule CU70 assign it to MBC1 541 movement type.
Or use MB1B With movement type 541 and the batch determination by entering batch '*' star.
Regards,
R.Brahmankar -
Next inspection date is not updated in batch / prposed at the time of UD
Hi
I have configurted the system for retest of batches, the system successfully creates the inspection lot but when does not propose next inspection date at the time of UD nor it updates in Batch Master.
I entered inspection interval days in QM View, the system entered the first inspection date correctly. Also Batch Restriction is working properly.
Kindly help.
regards
MobashirHi Shaymal & VRMP
I have checked the system, the only problem I am facing is that the system does not show next inspection date dialog box at the time of UD where I can see the next inspection date being set by the system
Say, I use QA07 (Triggered Manually) on 19.jan.08. The Next inspection date was 26.jan.08 and Initial Run in Days was 10 (days), the system created inspection lot on 19.jan.08 successfully. At the time of UD it automatically set 29.jan.08 as the next inspection date (i.e. 19.jan.08 + 10 days) istead of 06. Feb.08 (i.e. 26.jan.08 + 10 days) without showing dialog box / suggesting next inspectino date.
regards
Mobashir
Edited by: Muhammad Mobashir on Jan 19, 2009 7:11 AM -
Manual BOM selection at the time of order creation
Dear Experts,
Could you help me to understand if there is any provision to select BOM by user at the time of order creation without the help of production version.Is there any configuration required to make BOM selected manually.
Regards,
Krishna MohanHi karishna,
Please go to T-code OPL8 and in production version use( 1 )Manual selection of production version. Then user can select manually instead of automatic selection.
Regards
Muhammad Umar -
Wrong account group selected at the time creation of G/L master record
hi,
At the time creation of depreciation G/L master account , which has been selected as balancesheet account instead of Pand L account , and the transactions have been posted. when i try to change to P and L account in FS00 it says trasactions exist we cannot change. now how should i change to P and L account is there any way to chance of changing into Pand L account .
if not what should i do please let me know.
regards
santhoshkalvaDear,
Create a new GL (Depreciation) with P and L account then transfer the balance from the existing Balance sheet GL to P&L GL, then try to block or set a deletion flag for the Balance sheet GL. -
Dear all'
PO is craeted with a material and a specific batch for the material.Now the problem is the vendor sometimes delevers the material lot wise ..It is nedded to craete a separate batch at the time of the GR Against the particular PO each time.
How to solve this problem ,Kindly suggest.
Regards;
Joydeep Mukhopadhyaybelow the item overview in MIGO is an icon with 4 arrows pointing to each corner, some say it looks like a snowflake. With this button you can distribute the received quantity to several batches or several locations.
Maybe you are looking for
-
Hello, We have multiple domains configured in our iPlanet Portal Server 3 demo environment. In addition we are using the gateway. In one of these domains the userTemplate.html file is tailored to display Macromedia Flash components at dynamic positio
-
SQL to XI Scenario (message delivery problem)
Hi All Scenario is: Sender Communication Channel is polling data from SQL. From SQL around 2,75,000 records need to be picked up. Communication Channel has successfully picked up data. When i see communication channel monitoring getting an error "Tra
-
SSO ISSUE in production server
hi all i have configured sso in dev quality those are working fine. now i have done it in Production . while maintaing the jco destinations created the model data jco using logon ticket and meta data jco using uidpw. for some time model data jco is
-
Hi, Our database is down and showing Errors in alert log like below ORA-221 : Error on write to control file ORA-206: Error in writing contril file (block 1, #blocks 1) of control file ORA-00202: control file: '/db/app/oracle/Db_1/oradata/orcl/contro
-
How to embed a viedo from youtube?
hi there. i have been stuck on this problem for about 2 days now and have no idea. can anyone tell me how i can embed a youtube video in my flash website (AS3, CS4) If that is not possible i have found a program called videolightbox, but that is in h