Batch split  during  production order confirmation

Hi All,
This is the process which  is followed  at our  customer  end, they want  to  split the batches  during  confirmation,
1.Production order created
2.While  going through each operation, some components are failing in the in-process inspection and  they need to be quarantained  for  further  process,(it may be rework, scrap, etc)
3.Now  the  question is  we  want  to create  individual  batches, say  for  example out  of  100qty  which went  operation number 10,   50  were found  to be o.k.  and  the  remaining  50 are  having  defects, we want  to  create  two  different  batches  for this  scenario at  the  time  of  confirmation.
Is there anyway  in SAP todo  this , like userexit
Has anybody  has  gone through  similar  scenario's
Thanks in advance
Regards
Venkat.

Dear Vanket,
In the operation you can confirm Yield, Scrap and rework quantity.
In your case in each operation you need to create a batch for each qty what you enter.
As I told you before batch can be created either production order release or during GR.
In each operation you are not going to perform GR, hence batch creation is not possible.
You have 2 options as I see.
1. Create different intermediate materials and have production orders for each operation so that you can do the GR for each production order.
You can have the same batch for each stage material so that issuing material and production materials are different but batch is same.
If there is any defective quantity you need to decide you want to scrap it or you want to go for rework. If you want to go for rework then, using trigger point function you can create a auto rework order for the qty of rework entered during confirmation.
2. Second option is you can create a production order as you are doing now, but you need to create batch manually in MSC1n transaction for rework as well as yield qty.
You can confirm the yield qty and rework qty, but you cannot assign the batch as you are not performing GR. You can enter the batch number in the confirmation text field for information purpose. During the final operation when you do the GR, assign the batch to yield qty and post. About the rework qty you are not going to post qty to store, you need to create rework order and confirm the qty, during GR you can assign the batch and do GR.
If you ask me if you need to strict process to represent your case you need to go for first case.
Please go through the above carefully and test the cycle and come back if you need any clarification.

Similar Messages

  • Batch split in production order confirmation

    Hello
    any body please suggest me how to map collective batch split during production order confirmatio.
    i am using t.code CO11n.
    in goods movement i am having qty as 2000 kg.
    In this 200kg i want split in to 100 batches as 20 kg each. my client wants to put no batches it should automatically divided 2000kg and need to split 100 batches in to each 20 kg. how can i map this. is there any function module in our SAP.
    Please suggest any body on this.
    Thanks & Regrds
    Bhakta

    Hi Onat,
    Thanks for ur reply.
    I want to split GR101. actually. i have shown individually to my client means select line item and split one by one. but theey are saying that 200 times to do this is not possible.  please suggest ow resolve this.
    Thanks & Regards
    Bhakta

  • Change Work Center during production order confirmation

    Dear All,
    I must to modeling this situation:
    I created an production order. In routing I used an work center A.
    After I confirmed a half of quantity, the work center A was damaged and I must to change it, with the work center B.
    The system allow this change, but when I checked the costing, the situation isn't real. The system counted the costs just for the work center A, and no for work center B.
    My question is: it's possible to change the work center, during production order confirmation and the costs updated with new cost?
    Thank you for your answer!
    Regards,
    Marian

    once a Order is released, the Process order detaisl for that order is frozen.
    however if you want to do it, change the order status to CRTD after reversing the Movements done.
    Do READ MAster data , this will copy the new Work center , redo the previously done Moevements.
    if the change is long term.
    or
    Just manually add the new work center and do the processing. if the change is temporary.

  • Error during Production Order Confirmation

    I get a real wierd error during production Order confirmation.  The error message is
    "Additional items are not allowed
    Message no. ZOAL010"
    Can anyone throw some light on this?
    Regards
    Raj

    it is not std SAP message.
    you can check the user exit for confirmation.
    check in transaction code CMOD/SMOD for CONF*

  • Serial nos entry during production order confirmation in CO15 - User Exits

    Hi all,
    Is there any user exit existing for a serial nos screen pop-up during production order confirmation.
    Regards,
    Sravan Kumar V

    Hi,
    For serial numbers at the time of goods receipt, u have to activate sr. no. mgt for that particular finished product. This can be done by assigning sr. no. profile in the material master record of that material in work scheduling view. once this is done , system will automatically prompt for sr. nos at the time of goods receipt. I am not aware about any user exit.
    Thanks & Regards,
    Vijay Patil

  • Equipment as PRT's during Production Order Confirmation

    Hi Gurus,
    During Production Order confirmation I cannot see whether I have consumed equipments as PRT which are attached to operation.
    The operation is showing CNF status as well the Order.
    How can I see whether which Equipment was used for each operation since there can be more than one equipment as a PRT's for a single operation.
    Regards
    Nilesh

    I use Production Order confirmation hence saw it in CO14 and checked that PRT's are in PRT REL status..I guess this is what you mean to say right??
    Thank you so much for your response.
    Regards
    Nilesh

  • Recording shift during Production order confirmation

    Hi All,
    Is there a way I can record the shift during production order confirmations using CO15, CO11 or CO11N? I do not see the shift field in the confirmation screen.
    Thanks & Regards
    Subbu SP

    Dear,
    If you don't want to use the standard functionality of SAP or you are on lower version then you can go ahead with  enhancement.
    CONFPP07   Single Screen Entry: Inclusion of User-Defined Subscreens  by using this you can define shift in confirmation.
    For more details refer this link,
    Re: Shift usage in confimation.
    << Moderator message - Point begging removed
    Points unassigned >>
    Regards,
    R.Brahmankar
    Edited by: Rob Burbank on Oct 20, 2010 4:28 PM

  • Error during Production Order Confirmation mfbf ( backflush)

    in my company in sap when i using mfbf for production Order confirmation of tractor then during backflush using mfbf tcode order confirm but in my store dept no metiral cunsume  so please regards this problem
    with warm regards
    pritpal singh

    Dear Pritpal,
    sorry dear,today i cant check  my inbox immediately. Anyway my mail id is [email protected]
    have checked as per my previous post.
    regards
    pradeep

  • Batch split ina Production order

    I am doing a batch determination for a component in a Production order. The component qty in the Production order is say 600.  I do a batch determination for the component all the available batches are diplayed with a suggested batch based on the SORT rule provided. If I try to change the qty on the batch determination screen which is less than 600 then by default it still picks up 600. In a way it does not allow me to determine a batch qty which is less than 600.
    But on the batch determination screen if I select multiple batches ( batch 1 = 100, batch 2 = 400 )whose sum total qty less than 600 example say 500 , then it creates split batch records for batch 1 and batch 2 and creates another record for the component called as 'batch total records' for quantity 100.
    1) My question is ..is there a way that the system gives a warning message saying that selected batches have only qty = 500 and not 600.
    2) When I do a confirmation for the order using CO15 , on the goods movement screen only qts batch 1= 100  and batch 2 = 400 are proposed for the component But NOT  the remaining qty of 100 for the unallocated 100.
    Am i missing something here

    May be the sort rule is based on the quantity and not on Batch.
    Please check this. If this is based on the FIFO for batch then it should select the batch which was posted first rather than on quantity.
    Hope this helps you.

  • Error during production order confirmation - costing related

    Dear All,
    When i am confirming a production order through CO15 following error is coming and system is not allowing to proceed further
    Enter rate EUR / SAR rate type M for 01.01.1998 in the system settings
    Kindly guide me how to avoid this error

    Dear,
    Please go to OB08
    Then enter the details Currency Type M
    Then put the valid date from date
    Then put the currency from
    Then put the currency to
    in last columan put the rate
    as
    Exc rate   Valid From              Ratio(From)            From                                Dir.Quot                   Ratio               To
    M              01.01.2011    X        1                           AED (Currency)      =                         x             1                    EUR (Currency)
    Thanks,
    MS

  • Serial Nos entry for FG during Production order confirmation in CO11N

    Hi all,
    Can anybody explain me how can we confirm the assemblies serial no wise for FG in CO11N.  this is a stringent requirement for my client.
    Withthis  they can track which assembly n upto which operation was that confirmed.
    Thank you

    Hi,
    In OIS2 define a profile and assign procedure PPAU and configure PPAU as
    usage = 03,
    EQ re = 01.
    Assign this profile to assembly as well as product, that profile u have to assign it in material master work scheduling screen.
    Now when you go for confirmation in co11n system will ask you the serial no.
    Now you do the confirmation...you can get what you described.
    This is a standard Sap functionality.First do confirmation and then do goods receipt in MB31 where you assign serial numbers.
    OR.
    An other way is go to COIB here u have to enter the the serial number and material then it will display the this serial number generated against which production order.and if ur generating number of serial number against single production order then it will dispaly all serial number.
    COIB -
    > enter material number and serial number -
    > click on list<>tree--
    >again enter the serial number and material -
    >click on explode it will display the production order and if number of serial numbers are their then it will display at the bottom
    Please check it and refer to below link
    http://help.sap.com/saphelp_470/helpdata/en/dd/f8c817b3f911d1896e0000e8284931/frameset.htm
    Hope will work for you.
    Regards,
    R.Brahmankar

  • Serial number assignment to components during production order confirmation

    Dear all,
    When confirming a production order (Tcodes CO11, CO11N, CO15) the user should have the possibility to add serial numbers for components directly in the goods movements overview.
    A modification for that is describe in the SAP Training documents SCM 310, p. 485-487.
    Do you have any details on the described modification and/or any experience with similar modifications?
    Thank you in advance.
    Best regards,
    Klaudia

    Hi friend,
    Use t-code OIEN... Thr u can see the external number range given for various groups of equiments..
    hope this will help.
    Regards,
    Ravi Thakkar
    INCAT

  • Scrap During Production order confirmation.

    When I Put scrap qty in Co11 screen or co15 Screen, Is movement type 551 gets automatically activated??What are the accounting effects and by what transcation can I see these accounting effects.

    Hi,
    Please check production order header screen Go to --> documented goods movements.
    Regards
    Ranga

  • Batch Classification for Auto GR during Production Order Confirmation

    Dear All,
    I have a scenario,where Auto GR has been activated in last operation of an order.Material is batch managed with certain characteristics.When I use CO11n, and go to goods movement tab,batch for 101 movement type is entered but Batch classification pop up doesn't come.For that we need to select the line item,goto extras and create batch,then Pop up for batch classification comes.But,if we do GR with MIGO & MB31, This classification screen automatically in Co11n. i have tried certain exits also, but nothing works.

    Hi Stuti<
    Refer the below links it will solve the issue.
    [Batch Determination - help|http://help.sap.com/saphelp_45b/helpdata/en/25/283cb44f7811d18a150000e816ae6e/frameset.htm]
    [SDN Thread-1|Re: Batch Determination issue -reg]
    [SDN Thread-2|Batch Determination;
    Regards,
    Shyamal

  • Production Order confirmation - GI - Backflushing

    Hello,
    Our requirement is that during, production order confirmation, even if materials are not available, system should allow us to confirm the order. Later will issue GI through COGI.
    In OPK4, in the tab "Individual Entry General" we have not checked the boxes in 1) Goods Movements & 2) Termination for Incorrect movements.
    Here the important point is , we are making use of the functionality "Back Flushing". Iam afraid system should support our requirement?
    Pl. let me know, what config, should i do for this to happen?
    Best regards,
    K.kumar.

    1 Our requirement is that during, production order confirmation, even if materials are not available, system should allow us to confirm the order. Later will issue GI through COGI.
    This setting is enough for above Requiremnt
    In OPK4, in the tab "Individual Entry General" we have not checked the boxes in 1) Goods Movements & 2) Termination for Incorrect movements.
    2)   we are making use of the functionality "Back Flushing". Iam afraid system should support our requirement?
    No, Backflushing is not a problem,  System will support your requirement.
    There is no configuration is reqd to meet your requiremnt
    Regards,
    Sundaresan

Maybe you are looking for