Batch Splitting in Process order

Dear all,
            I created the process order . Now Executing batch Determination  for Qt 265  of Component X .
Now in Batch Determination screen of Process order, out of three available  batches ,  I am selecting one batch by doing copying
Now in Process order screen component overview , I am getting spilt qty. as 52 as first line item and 213 as second line item with selected batch number.
Why this splitting is coming , How to avoid this splitting ???

Hi,
May be batch selected by you is not available in stock of 265  qty.
Their fore system has taken 52 qty of  another batch.
Just check again MMBe available batches
Or accoriding to your sort rule line item 1 batch say A qty available is 53
Then remaining qty  has taken 213 qty from your batch B in 2nd line item.
If you want to select batch A & if full stock available then remove 52 Qty from 1st line item in batch determine screen & put 265 QTY in front of your batch of  which you want pick full qty.
Regards
SANIL

Similar Messages

  • Batch traceability batch by batch in one process order

    Hi  guys
    Now our plant will consume two batch raw material A (batch A1,A2) to product two batch finished goods B (batch B1, B2) in one process order. The relation between raw material and finished goods is that A1 product B1 and A2 product B2. But now I use BMBC to do batch traceability for batch B1, the batch A1 and A2 will be displayed. I only want to trace the batch A1. So how can I do this? By the way, I cann't split this process order to two process order , because i only know the total quantity of finished goods B.

    Maybe I haven't explain very clearly. I will list some example:
    First , I have the requirement 1000KG for material 30~40g Chicken wings(material B). I know I have 3 batch broiler(material A) will be slaughtered. Batch A1 is 10000EA which average weight is 1.5KG, Batch A2 is 8000 EA which average weight is 2.0 KG, Batch A3 is 7000EA which average weight is 1.9 KG.But I don't know the quantity will be product by every batch. So I will create only one production order of material B which order quantity is 1000KG.After production finished, we know batch A1 product 300KG material B which batch is B1 and batch A2 product 550KG material B which batch is B2 and batch A3 product 150KG material B which batch is B3. These confirmation will be entered in one process order. When batch traceability for batch B2, the batch  A1,A2,A3 will be displayed in together. But the result we want to is just to display the batch A2.

  • Issues during Component Batch Determination for Process Orders

    Hi,
    I am encountering a strange issue during component batch determination of process order.
    1. During creation of process order, when I execute batch determination, systems does determination based on strategies we have set and when I click on Copy it gives an error
    "Log cannot be saved: Object/subobject not specified"
    Message no. BL201
    *Diagnosis
    Log save cancelled because at least one log contains no object or subobject.
    Object and subobject are needed to classify application logs because there are several log types. Only a few logs are managed in main memory at runtime, so this classification is not needed.
    If the logs are to be saved in the database, object/subobject must be specified for later retrieval.
    Procedure for System Administration
    Object/sub object can be passed when a log is created (function module BAL_LOG_CREATE) and changed with BAL_LOG_CHANGE.
    The possible values for object and sub object must be configured in transaction SLG0.*
    If I save the order with CRTD status and come back again in change mode and do determination, It works fine.
    Again when the order is in REL status and do the determination, It gives the same error.
    This happens only for a specific plant, In other plants batch determination works in all scenarios.
    I checked for all plant related Config for batch determination and coudn't find any discrepancies.
    Please advise how to resolve this issue. Thanks in advance for your help
    Regards,
    Aheesh

    There Is no direct solution for your requirement just try this work around.
    While defining the batch determination search strategy for process order in COB1, there is one column Quantity proposal where you can attach the Routines (This is written in ABAB code )  make use of this, define New Routines with ABAB help to fulfill your requirement. Try this if found useful award full points.
    Regards,
    Ajay Nikte

  • Strategy Types in Batch Search Strategy (Process Order)

    Hi Expert,
    What are the difference between the strategy types - Order type/Plant/Mat, Order type/Plant, Prod Material?
    For Order type/Plant combination- If my criteria is to do automatic batch determination at process order release against the sort rule characteristics (LOBM_LWERT) GR received date. I maintained LOBM_LWERT in all material classes, now in selection criteria which class I will choose as different materials contain different class in the class type 023.
    I am confused.
    In case of Order type/Plant/mat- number of master data is huge.
    Pls suggest
    Krish

    Got answer.closed

  • In consistency during Batch Derivation in Process Order

    Hi,
    During Batch Derivation in process order, multiple old batches of sender material proposing even though actually only single Batch of sender material determined, and transferring the characteristic values from old batches to the Receiver material which is in-correct. (I am working with SAP ECC 6.0)
    Can any one advise if required to execute/run any program to correct the system in-consistency,
    regards,
    Purna

    Dear Pruna,
    please check if the correct level of WUL is defined in derivation rules 
    Mostly the problem is caused by default value 99 here. You can check and
    change the value in transaction DVR2.                                   
    BR Sabine

  • Correction of batch no.in Process order

    Dear Sirs, One Process Order has been created & all its transactions like co53, co60,co54, cork,mb31 & qa32 all has been furnished. Now it has been found that the batch no.is wrong .
    How to correct this batch no./Process Order ?
    Regards,
    G.C.Gupta

    Hi,
    Dont think about changing Batch No. in Process Order.It is not advisable at all.
    Do as our other expert has suggested.And that stock transfer from using Movement type 309 and t.code MB1B.Use same Material code in both fields (sender and receiver) but assign required B.No in Receiver Batch No. field.
    Regards,
    Dhaval

  • Batch determ. in Process Order doesn't consider Stock Provided to Vendor

    Dear Forum,
    We have a problem with the following scenario:
    We use Process Orders to manage our Subcontracting process. This is standard SAP, where the Operation is defined as 'external', and this works fine.
    The scenario which we can not seem to be able to work is the following:
    When executing batch determination for the component(s) which are batch relevant, the system does not show the batch stocks which are already at the subcontractor, i.e. Special Stock 'O' stock provided to vendor.
    This is strange, because:
    - In the availability check the flag 'W/o subcontracting' is not set.
    - The batches in the subcontracting location fulfil the selection criteria which have been defined in the batch determination Selection Class.
    Does somebody have experience with this? Any hints are welcome.
    Thanks, Mark Voet

    Hi Mark,
    As I understand you determine the batches in the process order.
    From SAP point of view it means that you determine the stock which is to be provided to the vendor. Components with batches are copied into the PO when it is created from the PurReq and system will use this stock (batches) automatically when you execute MB1B541PO reference.
    Later, when you do the GR against this PO, the same batch(es) will appear automatically for components-to-be-consumed (by mvt 543).
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/8b/55a026995011d195a2080009c17b92/frameset.htm
    So, SAP's concept is that the batches which are determined in the order are those batches which are to be sent to the vendor - these batches will be posted from your storage location to the subcontractor. Stock in special stock segement "O" ar at the sc-vendor.
    As per my best knowledge there's no solution in standard system for that if you want to determine such batches in the order which are located at the subcontractor...
    Regards,
    Csaba
    Edited by: Csaba Szommer on Sep 1, 2010 11:43 AM

  • Batch Determination in process orders

    Hi All,
    This is regarding batch determination in Process Orders. We have components which are batch managed. When we do a batch determination system shows up old batches  qty in available qty field in batch determination which were already consumed for different process orders.When checked in stock overview (MMBE) there was no stock available for this material.
    Can you please explain me how the batch detmination in done in the system. Why is the system looking for old batches for which there is no stock available.
    Kindly reply to the mail.

    Hi
    Pl follow the below path and transection and check the settings..if missing pl make necessary settings
    Batch management> Batch serach procedure allocation and check activation
    T.Code to be looked specifically  <b>OMCG , CORC</b>
    Pl reward if this is helpful or come back if you need another help
    BR
    Sumit

  • Exclude quality inspection batche from Batch Determination in process order

    Dear Gurus,
    When doing batch determination in process order, the system taking quality inspection batches for selection.
    I have checked in OPJJ , quality inspection stock is select but if i remove , it will effect MRP process
    How to exclude quality inspection batches from Batch Determination?
    Thanks in anticipation.
    Regards,
    Sandy

    Hello,
    I also have the same requirement. Can some one provide solution.
    Regards,
    Naren

  • Automatic batch determination in process orders

    Hi,
    How batch determination can be done automatically for components in process orders?
    regards,
    Mohit Goyal

    Dear,
    Define the batch determination search strategy for process order in COB1 with sort rule in CU70.
    On the initial screen of your application choose Logistics>centrel function>batch management>Batch determination>For process order -->Batch search strategy --> Create.
    On the initial screen of your application choose Batch search strategy -->Create.
    Choose the strategy type, say choose co02
    Choose the key combination-
    Enter the required dat-->say plant ,production order type, product,valid from and component for which you want to have this
    Choose Selection criteria push button. Choose a sort sequence.
    If no values have been entered, enter the selection class and the characteristic values.
    Go back to the screen on which you create a batch search strategy.
    Choose Sort if required(it should be defined earlier(in CU70- here you are giving the charateristic name on which you want to sort)
    For component you need to use MBC1 with search stratgey as ME01 for your plant movement type and material and assign the sort rule and search procedure here.
    Check also in COR4, for the combination of plant and order type...you have selected search procedure-CO0001
    Batch management> Batch serach procedure allocation and check activation
    T.Code to be looked specifically OMCG , CORC
    Hope it will help you.
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Nov 11, 2008 11:31 AM

  • Batch split in production order confirmation

    Hello
    any body please suggest me how to map collective batch split during production order confirmatio.
    i am using t.code CO11n.
    in goods movement i am having qty as 2000 kg.
    In this 200kg i want split in to 100 batches as 20 kg each. my client wants to put no batches it should automatically divided 2000kg and need to split 100 batches in to each 20 kg. how can i map this. is there any function module in our SAP.
    Please suggest any body on this.
    Thanks & Regrds
    Bhakta

    Hi Onat,
    Thanks for ur reply.
    I want to split GR101. actually. i have shown individually to my client means select line item and split one by one. but theey are saying that 200 times to do this is not possible.  please suggest ow resolve this.
    Thanks & Regards
    Bhakta

  • Batch determination in Process Order

    Hi Guys
    I am doing the automatic batch determination on the process order release. It gets rejected and the error is CO 691: You must enter the batch for material 1025301
    Now when I do the manual batch determination in the process order. On clicking the batch determination button I get the message: No Check exist for planning (item: 0010, mat: 1025301) message number C2119.
    Can you guys please advice how to resolve this error please!
    The SAP version in 4.7
    -Rahul

    Hi Ram,
    You are right. I am not getting batches with zero stock.
    By inadequate stock, I mean, say, for a raw material, I find from MMBE 1.448 kgs are there in the unrestricted and 1.448 kgs in reserved for the batch. When I check in the material list of the process order, total 9200 kgs are booked by the batch. How is this possible?
    Does the system cannot do the batch splitting automatically. Because everytime it is not possible to calculate the remaining stock and enter it manually in the order.
    Thanks and Regards,
    Jyoti

  • Batch determination for process orders

    Hi All,
    My requirement is complete batch batch is proposed in process order  batch determination even though the requirement is of less qty.
    For example the required qty. for component XYZ is 20 units but the available batch is of 40 units. Now requirement is that no batch splitting should happen & complete batch of 40 units is determined.
    This is required to do Material quantity calculation.
    regards,
    Mohit Goyal

    There Is no direct solution for your requirement just try this work around.
    While defining the batch determination search strategy for process order in COB1, there is one column Quantity proposal where you can attach the Routines (This is written in ABAB code )  make use of this, define New Routines with ABAB help to fulfill your requirement. Try this if found useful award full points.
    Regards,
    Ajay Nikte

  • Full batch quantities selected in batch determination in process orders

    In batch determination of a process order, how can you require that only full batch quantities be selected?  I do have selected multiple batch splits.  But would rather it pick full batch sizes up to the requirement quantity.

    Dear,
    full batch sizes up to the requirement quantity
    What it mean?Up to my understanding you want to restrict multiple Batch Determination..Correct me if I Wrong.
    If  yes then
    In Batch Determination Strategy (COB1) set No. Batch Split allowed up to 1 only..
    Regards,
    Dhaval

  • Distribution Function - To split Planned/Process orders into 10

    Have you used, or tried to use Distribution Function?
    It is assigned to the Production version and we assumed that it would divide the Planned order/Process order by the %  we have in customizing.
    We have created a distribution function DV10 and assigned to our plant. This uses the standard function S30 which has 10, 20, 30, 40, 50, 60, 70, 90, 100 in % dur and % cap fields. So you would think the planned/process order would be divided into 10 parts
    Reason u2013 if an order goes over multiple days we want the order to be broken down by day.
    Why? So that Deployment, when looking at an ATP report in R3 for multiple materials in 1 location, by day or period of days,  can see how much will be available each day
    Problem with GLEI (equal distribution) is that if an order starts today at 22:00 then we have equal distribution, we then have 25,000 PAL available today and 25,000 tomorrow, which is not a fair proportion according to the time available. Therefore, we thought that dividing by 10, for example, we would have a more accurate proportion each day
    Many thanks for any input, even if "tried and failed :("
    Cheers, Paul

    Hi Mario,
    Thanks for your input. Today we use GLEI which equally splits the same planned or process order into equally daily quantities for ATP purposes. We also have created STRT which drops the Planned/process order quantity onto the first day of the order.
    Regarding daily lot sizes this could be an option but I suppose you would then get individual orders, which the business may prefer not to do.
    Cheers, Paul