BDC for MRP Run

Hi,
     I am trying to Create Recording for the MD01 Transaction. In Recording itself is Not Updating in the Table Level(i.e., Creating the PR's).
     I Have Enhanced the MD01 for Running Based On User Key and Material Group, To Stop Planning for Blocked materials and To Save the Created the        PR's in the Custom Table.
     Everything is working fine when we run it by using TCode: MD01.
     But When Coming to recording the Same transaction MD01 it is Not Creating The PR's for the Material Group which i am Running
     I have Used CTU Parameters with Update Mode = 'S' and Commit = 'X', and passed to the Call transaction.
     I have Tried Session Method as well.
     I have Tried BAPI also it Doesn't Suit our Requirement as Suggested by Functional, because MRP area is mandatory. Since we will run at plant level a
     Dear Expert Please Suggest a Solution.
Regards
Kranthi Kiran CH

Hi,
     Check for the last field 'BDC_OKCODE' whether you are passing this field and Value to BDC call.

Similar Messages

  • Open Purchase Orders not considered as requirement for MRP Run

    Hi ,
    We are facing a issue of Open Purchase orders not appeared in Stock requirements list and also it is not considered as requirement for MRP Run against reservation.
    As aresult for a reservation demand of 10 units we are ending with Open POs 10 units and a additional planned order 10 units.
    Material Type : ERSA
    MRP Type : PD (or VB)
    Lot size : EX (  HB if MRP Type is VB)
    Could you please throw some light to correct our settings to MRP to consider Open POs?
    Saravanan

    Can you check to see if there is a re-order point set up for this materia? That could be causing the problem too.

  • Error while closing the open purchase order for MRP run

    HI expets,
                     We are facing issue while closing the old purchase order(18.12.2007) for MRP run, if we are clicking delivery completed for the particular line item ,system is showing the error NET PRICE MUST BE GREATER THAN ZEROthough we have made GR and IR aganist the line item an value is also showing in the purchase order history tab, but in the condition tab there is no value showing for the particular line item .Kindly suggest the way forward.
    regards
    Karthick sundaram

    one thing for sure, you cannot proceed without maintaining proper conditions in the PO.
    Why they are not there or not anymore there is probably caused by customizing or vendor master data changes.

  • What are all the major SPRO parameters available for MRP run in SAP.

    Dear Frndz,
    What are all the major SPRO parameters available for MRP run in SAP.
    Regards,
    Srini

    Hi,
    For MRP, the main Customization settings involved are:
    1. Activate MRP and Set Up Planning File - OMDU
    2. Define Parallel Processing in MRP - OMIQ
    3. Define Scope of Planning for Total Planning - OMIZ
    If you want to use MRP Areas and include this in Scope of Planning then.
    1. Activate MRP for MRP Areas
    2. Define MRP Areas - OMIZ
    With MDBT of Program : RMMRP000 you can schedule the Background MRP Run. (with a variant)
    If you need any any specific information please inform..
    Regards,
    Siva

  • Need clarification for MRP Run

    Dear SAP Guru,
    Need the clarification for MRP Run:
    1.At the time of MRP Run what is the status function for - shipping notification?
    2.First i have run the mrp planning mode is normal after that i have some changes in material master , so planning mode is - RE Explode planning & Bom ? AT THE TIME OF MRP RUN  it is correct
    3.In background MRP Run at MDBT - what is the PLANNING MODE ?
    4. How will work on automatic PO Create through MRP Run PR\S.?
    Kindly give me the feedback , i am waiting for your reply.
    Thanks,
    Uma

    Hello Uma
    1 - A shipping notification is a confirmation from the vendor that the material has been shipped.
    2 - When you change your BOM or material master MRP settings, system automatically set a flag on the planning file to re-explode the BOM. Therefore, MRP automatically re-explode the BOM, even with planning mode 1. Planning mode 2 is only necessary when you need to force a new BOM explosion and I don't recommend you to use it frequently, as it may lead to performance issues. See my document MRP: Why shouldn’t I use planning mode 3 on a productive system? for more details.
    3 - See notes 206666 MRP: Control parameters during planning and 135788 - Planning mode in material requirements planning.
    4 - MRP does not create or change purchase orders or production orders. MRP can only create planned orders, purchase requisitions or schedule lines.
    At last, I wrote the following document with links to the MRP FAQ notes, which may be helpful to you:
    MRP: Frequently Asked Questions
    BR
    Caetano

  • Open order quantity for mrp run

    hi
    for x material i was made a subcontracting PO
    ORDER uantity was say 2000
    deliverd quantity was 1500
    rest of the 500 nos tobe deliverad on 30th agust
    ie, OPEN ORDER QATNTIY OF 500 NOS WHITH delivery date
    on 30th agust.
    for the same materail there was an dependent requirement of say 1500 in the month of MAY2008
    while MRP RUN for the dependent  reqirement of 1500
    i got a purchase requistion of 1000nos
    and for  the 500 nos saytem taken fron the purchase order
    which was made as subcontracting
    and throughs an expetion message which says  needs the rescheduling
    my requirement here is it should not consider the open order quantity which was there for sub contracting
    it sholud create purchase requirement of 2000nos
    plz suggest how to achive it
    regards
    sasikanth/vst

    I wanted to the same as you where getting in subcontract po but in a std po
    hi
    for x material i was made a subcontracting PO
    ORDER uantity was say 2000
    deliverd quantity was 1500
    rest of the 500 nos tobe deliverad on 30th agust
    ie, OPEN ORDER QATNTIY OF 500 NOS WHITH delivery date
    on 30th agust."
    guide me in terms of configuration
    i think i am missing some configurations

  • Planning File Entry Not Created For MRP Run

    We are running MRP in backgroung at MRP area level as per scheduled. One material is missing from MRP run. We are expecting that we should get the proposals because stock is zero ( below reorder level) on the date of sheduled MRP run. Earlier it is working.The material MRP relevant data is given below.
    MRP Type - VB
    Reorder Level - 6
    Lot Size - Fx
    Fixed Lot Size - 10
    Minimun Safety Level - 10
    Please help us to resolve this issue.
    Thanks in advance. For any clarofiaction, pls revert back.
    Regards,
    Chetan K

    Hi,
    Please check whether you have maintained the Availability check group 01 or 02 in MRP-3 View.
    Also check the Dependent requirement selection in MRP-4 view individual collective and Selection method in MRP-4 view for its assy material.
    Check the Plant specific material status whether it is blocked for any procurement or usage in Basic Data and Purchasing,MRP  views.
    thanks and regards
    muru

  • Sales order block for MRP run when the Customer payment terms is in Advance

    My client needs to block some sales order for MRP which customer payment term is advance. But it should be based on the customer payments terms (In case of Advance). After getting his advance amount, we would be release it and it also be consider for MRP.
    Option 1.Status profile  this concept is will controlled by sales document controls VOV8 not by customer's payment term Advance
    Option  2: In CMR sales area Billing Document tab  by using payment guarantee procedure and in VOV8 in billing tab Payment guaramtee procedure by using this setting , i am getting a pop up message" No Finanical document assigned" in sales order when u try to save. Now sales order is blocked for delivery but not MRP run.
    i am to ask the abaper to develop "here in the information box we will maintained required text say example u201C customeru2019s Payment term is in advance please check the reason for rejection number u201Csay ex: 13u201D: advance " after this is happen go to change mode of sales order put reason for rejecation" now MRP run will not generate the requirement for the sales order.
    for Undo these this flow :
    Va02 : remove the reason for rejection keep it in Blank
    VKM3 : release the sales order.
    Options 3: Development 
    Kindly suggest me the second options is only alternative for solving this issue but really i m not used specific feilds to solving this issue.

    Cleint is not using the field  in CMR Payment granatee , i gone for user-exit and closed this issue

  • Help required -for MRP Run at storage location level

    Hi ,
    we need to have separate MRP fro two storage locations with direct procurement from Storage locations. Right now we have MRP run at Plant level for all the storage locations. we donot want the materials in these two storage locations to be planned at Plant level only with Separate storage locations. Plant level MRP will run for the other storage locations .
    I have created separate MRP areas for the storage locations & activated MRP for MRP Areas client level. material masters for the two storage locations have been asigned the MRP areas & maintained the MRP area data in material master .
    When we run the MD01, the Planned orders are getting created at both MRP areas plus at the Plant level.we donot want the planned orders creation at Plant MRP area level-only at the storage location level for those two storage locations MRP areas.
    Can anybody guide me -how to achieve that ? Did we miss any configuration?
      I tried to maintain scope of planning & getting error for parallel processing .
    Do i need to maintain parallel procesing with servers ?
      Pls need your input on this. Any help will be highly appreciated .
       Thank you in advance.
        Regards,
        Krish.

    Hi,
         Go to IMG settings 'Materials Management + Consumption-Based Planning + Planning + Define Storage Location MRP per Plant' Enter your Plant, It will show list of storage location in that Plant, then select 2 in 'MRP Indicator' field for storage location for which u want to plan seperately.
    Hope It will clear Your Problem
    Regards
    Sunil Kumar

  • User exit for MRP run - MD01

    Hi All,
    Can i know the use of "User exit parameter" field in MD01. as i know it means if we only want to plan the materials of a certain MRP controller, for example, we can enter the key of the appropriate MRP controller as the parameter.
    in my scenario, we have already incorporated a user exit for MD01 - MRP Run.
    i have 3 MRP controllers, but want to plan for only 2 MRP controllers, then how to enter in that field?
    Regards,
    Ram

    HI,
    User exit are available for Md01 transaction. You can plan material by MRP Type, MRP Controller,MRP Type, Procurement type & so on....
    Once you activate user exit, you can select the same by drill down option in user exit Key field.
    Regards,
    Milind.

  • Plannning Material and Plant for MRP Run

    Hi,
    If I have a material (01) extended on 2 plants, on one plant (A) we have production and planning/MRP + stock and on the other one (B), just stocking and transfer. B's requirements are to be entered and planned at A. I also want stock at B to be considered with stock at A when MRP runs at A. In the material master, I have some settings. I want to know if these would be any good:
    Material 01 on Plant A:
    MRP PD
    Strategy 40
    Lot size EX
    Coverage profile applied
    Material 01 on Plant B:
    MRP ND/PD tried both
    Strategy 40
    Lot size EX
    Coverage profile applied (same)
    Planning material: Material 01 itself
    Planning plant: Plant A
    I particularly want to know about points 5 and 6. Will they make any difference if I run MRP on scope of planning(all plants) or just plant A? Will stock at B be considered? What difference does that setting make in my case? Please help!
    Thanks!

    No sales on Plant A. Only transfers and STO's. Stock is STO'd to Plant B (and other Plants, as well)
    Plant B sells the stock.
    Yes, I want to load the forecast in Plant A (COPA to SOP to DM to MRP). What do I do in this case?
    I tried another case, as well. In that I put a special procurement on the material in Plant B view and marked it as external procurement. (the planning material and plant were there, didn't remove)
    Then I entered the forecast in both plants separately (PIRs for both Plants) The requirements from Plant B made STPO Planned orders in Plant B and STCK Planned orders in Plant A. I am using coverage profiles (period is month, standard length 25 days, target 10 days for 1st period for 2 months, target 10 days for 2nd period  for 1 month, target 10 days for the rest of the horizon) Not using any consumption modes.
    The results I am getting don't make sense to me. I have attached screen shots for both plants MD04 and the MRP + work scheduling views

  • Regarding bdc for automatic run

    hi experts,
                    i have developed a bdc for hr in which the data is uploading from the excel sheet,what my user wants that this report will run automatically at 11 pm every day so for this send me the steps for this i know i have to exceute it in the background but how plz help me ...
    ***plz dnt send me the url come up with your own answer....
    thnx in advance.....

    Hi RAVI,
    if u've created the BDC in call transaction method, then create a variant for the selection screen with the relevant data. and create a scheduled job from SM36.
    in case of session: u need to schedule the two programs in SM36.
    1st the bdc program to create the session and next the program RSBDCSUB with variants. in case of scheduling RSBDCSUB session name & other details should be saved in the variants.
    Reward if useful
    Regards
    ANUPAM

  • MRP - firming Purchase Order dates for MRP run

    We are using demand management and MRP to create purchase requisitions for external procurement. It works fine and creates purchase requisitions based on the monthly demand entered in MD61. However, if I have a purchase order with a delivery date of a few months in the future, MRP always asks me to reschedule the order to meet current demand. i.e. it reduces the quantity on a requisition because it expects the rescheduled PO to meet the demand. In addition, it creates a requisition for the full demand a few months out, even though I have a PO delivery on that date (as it expects me to move the PO to the current date) See example below
    Does anyone how to get MRP to treat a PO delivery date as fixed or firmed and create requisitions based on this?
    We are using MRP type PD,  a planning strategy that looks only at LSF in demand management and KSL in SD requirements.
    Thanks
    Donal
    Scenario:
    Current Stock:               500 KG
    Safety Stock Level:        1000 KG
    Demand:
    Aug: 1500
    Sep: 2000
    Oct: 3000
    PO del date 01.10.08 : 750 KG
    When I run MRP it proposes the following
    01.08.08 Requisition: 1250 KG. Aug demand (1500) + deficit below safety stock (500) = 2000 less PO that it is saying I should move to July (750). (I want this qty to be 2000)
    01.09.08 Requisition: 2000 KG. Sep demand (2000) - OK
    01.10.08 Requisition: 3000 KG. Oct demand (3000). Doesnu2019t look at PO dated 01.10 at all. (I want this qty to be 2,250)

    OMDW
    rescheduling horizon days fixes this.

  • User Exit For MRP RUN

    Hi all ,
    I am using the user exit for the Plant A - MRP by MRp Type.
    and i would like to use the same enhancement in the Different project in Plant B MRP by Material Group , But the sys is not allowing to use the same enhancement saying the enhancement is already used in the Project .
    Whether i have to code in the Same project or i can create TWo project with the same enhancement ?
    Regards

    Please understand, if you are changing the project for a different plant then you need to create same enhancement. If you are working on same project, you need not to create another code, you can get results by simply changing the plant name.
    I hope, I have cleared.
    cheers!!!

  • Exception groups & Traffic Lights for MRP run shortage quantities

    Hi Guys:
    How to define Traffic Lights and Exception groups in MD04/Mdo5 transaction?
    Or any literature available ?
    Thanks
    kodali

    Kodali,
    You can customize the exception message and grouping in configuration.
    Please follow below mentioned path and do necessary config.
    SPRO -> Production --> Materials Requirement Planning --> Evaluation --> Exception Messages.
    Regards,
    Himanshu

Maybe you are looking for

  • Apex 4.2 Report region sql query with "apex_item.text" renders wrongly

    In APEX 4.2 page i have created region "Report data". Type="SQl Query". "User Interface"-->"Template"="Reports Region". "Region Source"="select apex_item.text(1, '111') as c1 from dual". Actually the select query is little bit more complex, but gener

  • New HD, can't install OS x

    Installed a new 640 GB hard drive in my mid 2010 core 2 duo, 2.4ghz , macbook pro 13", Macbook Pro 7,1 Boots fine with install disk, 10.6.7 (not original that came with computer) After selecting the language to install, it says "can't install Mac OS

  • Dual Screens with Imac

    Is is possible to operate an iMac 10.5.4 using two monitors? I have been doing some work in iMovie and Final cut and would like to have the ability to move things from one screen to the other.

  • Firefox add-ons not installing

    Just installed Firefox (Konqueror till now) and am trying to install some add-ons. Problem is that once I press the 'Install' button on the add-on page, nothing happens - the tab header changes to "Loading' with a running circle of dots - and that's

  • BB Curve 8320 Software needed! pls help

    Im a BB 8320 Curve user. Software version 4.2.2.180 (Platform 2.5.0.36) T-mobile user. I need to download this version bcoz i've upgraded to OS 4.5 but im didnt liked dat much. So i want to switch to 4.2.2.180 (Platform 2.5.0.36) but didnt get this v