Bdoc error status E02

Hi Experts,
In transaction BDoc monitor SMW01, the bdoc is showing in error state E02 (Partially send) and showing error "Personnel no. cannot be determined for Business partner xxxxxxxxxx". Please let me know how to resolve this error or tell me the step by step process to rectify this bdoc error.
Thanks,
Varun

Hello Varun,
You are getting this error  because the corresponding  persons do not exist in CRM with the corresponding personnel numbers
mentioned in the Bdocs errors. These personnel numbers do not correspond to customers from R/3, but to employees which are assigned to R/3 customers via employee specific  partner functions.
Now the HR specific employee master data should be synchronized between  R/3 and CRM first. In addition the HR integration must be active in your system so data for these employees is not rejected. You have information about it in the customizing documentation:
IMG: Customer Relationship Management   > Master Data   > Business Partner   >  Integration Business Partner-Employee   >
Set Up Integration With HR.
You have to synchronise the HR and CRM data, this note 550055 contains necessary information.
thanks
Willie

Similar Messages

  • Processing BDocs Errors in the background

    Hi,
    I was wondering whether the following is possible.
    We currently have BDocs errors in SMW01 on a regular basis.  This is because our users are opening the BP record in CRM and R/3.  There the BDoc error will have a message saying that the business partner is currently being processed by XXXX.  We can reprocess these BDocs and they are processed successfully.  What we would like to do is process these BUPA_MAIN BDoc errors in the background so we don't need to go into them manually.  I understand the program for transaction SMW01 is RSMW_SHOW_BDOC.  Has anyone ever taken a copy of this program and modified it so that it can process the above BDoc errors automatically in the background?  We are looking into this as our business process allows the user to launch a record in both CRM and R/3.  (Don't ask)
    Anyway if anyone has done anything similar - any tips would be much appreciated. 
    Thanks in advance.
    Regards
    JoJo

    Hi Jojo,
    I have not done anything similar but can point you in right direction.
    You can refer to class cl_smw_mflow which handles the middleware for messaging bdoc's.  You can write a bespoek program from scratch with some selection parameters and process the messaging bdocs by looking at the status of bdoc's. There is a function module 'SMW3_MFLOW_QPROCESSMBDOC' which allows to process the bdoc's by passing the header information.
    You can read the status of bdoc's & other header infromation from table SMW3_BDOC.
    Hope this helps.
    Surendar

  • Bdoc error : Plant IT01 is not assigned to any location

    Hi Experts,
    I have downloaded the Plants from r/3 to CRM [7.0] using object DNL_PLANT through /nr3as. I have checked the entries in /nCRM_LOCMAP, all plants are downloaded to CRM except IT01 & MS01.
    While downloading MATERIAL from r/3 to CRM, i am getting the following bdoc errors
    Plant IT01 is not assigned to any location
    Plant MS01 is not assigned to any location
    Since these do not exists in /nCRM_LOCMAP, i can see that i am getting this error. I have re downloaded DNL_PLANT & checked the status of completion as green. Still these two particular plants are missing.
    Also, when i checked the material [for which i am getting the bdoc error] in r/3, i can see that plants have maintained for that material.
    Is there anyway, to fix the issue?
    Appreciate if someone can suggest a solution on this.
    Thanks & Regards,

    Hi Chandrakant,
    There are no filters set for this object. Also, i took your suggestion, & created a BP with role plant & maintained the details in  /nCRM_LOCMAP. Reprocessed the bdoc's, & i am done, worked finally.
    Thanks a lot for your valueable solution. I have another issue in bdoc error which says " Check-digit in GTIN 00001216000000 (unit of measure KG) is invalid"
    This is the only one i am getting in /nsmw01 & almost in all the bdocs erros. I did search online, but have not got any suitable solution on this.
    Can you help me resolving this issue also?
    Thanks & Regards,

  • Bdoc error - Tax code 1 not valid

    Hello everyone,
    I am getting BDoc error "Tax code 1 not valid" . I downloaded the object "DNL_CUST_TAX" from R3 to CRM. After doing this, the BP's went through successfully from R3 to CRM.However while sending BP's from CRM to R3 , same error occured. Is there any other object which can be downloaded from CRM to R3. or any other way out??
    - Arpita Shah.

    Hi Arpitha,
    Download the object DNL_CUST_TAX to CRM system then reprocess the errpr bdoc.
    and let me know the status.
    If the bdoc is in the red state after reprocessing,i think u need to create tax group in CRM img.
    <b>Allot points if my post helps!!!!!!!!!!</b>
    Regards,
    Sathya Reddy.

  • BDoc error in Delta Update for CRM_SRV_IBASE_ATTR

    Hi Gurus,
    I'm having troubles with the delta queues in CRM 6.0 (2007) , I really appreciate if you can help me out.
    I'm using the extractor CRM_SRV_IBASE_ATTR to get the installed bases. I have no problems with the INIT but at the moment of updating deltas there are always 0 records in the DELTA UPDATE, (even after creating new IBASE's).
    I was cheking the transaction SMW01 and noticed that the BDocs are being created with status in RED (Incomplete), I guess that's the reason which I don't see any record (LUW) in RSA7 for this extractor and therefore the reason which I get always 0 records in the DELTA UPDATE.
    The BDoc error message reads:
    14.10.2008 14:36:18  Outbound call for BDoc type CRM_IBASE_MESS to adapter module CRM_UPLOAD_TO_OLTP failed.
    Area: SMW3.  Nº: 5                             
    14.10.2008 14:36:18  Service that caused the error: SMW3_OUTBOUNDADP_CALLADAPTERS
    Area: SMO8.   Nº:  47  
    I've been reading SAP documentation but have no clue so far about this issue.
    Have you got any idea about what could be happening? I really appreciate your Help...!!
    I'll give you points.!!
    Regards,
    Carlos

    hi,
    The problem may be due to adapter object is set to inactive, while in administration console, the all business transaction mesg is subscribed. So try  settimg  the adapter object to active and re-process the bdoc.
    after  reprocessed the error bdocs, then automatically queue to BW started to piling up .
    hope this helps you ..
    Reagrds,
    Shikha

  • Error 8 when starting the extracting the program-data load error:status 51

    Dear all,
    <b>I am facing a data exracton problem while extracting data from SAP source system (Development Client 220). </b>The scenario and related setting are as the flowings:
    A. Setting:
    We have created 2 source system one for the development and another for the quality in BW development client
    1. BW server: SAP NetWeaver 2004s BI 7
    PI_BASIS: 2005_1_700 Level: 12
    SAP_BW: 700 Level:13
    Source system (Development Client 220)
    2. SAP ERP: SAP ERP Central Component 6.0
    PI_BASIS: 2005_1_700 Level: 12
    OS: SunOS
    Source system (Quality Client 300)
    2. SAP ERP: SAP ERP Central Component 6.0
    PI_BASIS: 2005_1_700 Level: 12
    OS: HP-UX
    B. The scenario:
    I was abele to load the Info provider from the Source system (Development Client 220), late we create another Source system (Quality Client 300) and abele to load the Info provider from that,
    After creating the another Source system (Quality Client 300), initially I abele to load the info provider from both the Source system – , but now I am unable to load the Info provider from the (Development Client 220),
    Source system Creation:
    For both 220 and 300, back ground user in source system is same with system type with same authorization (sap_all, sap_new, S_BI-WX_RFC) And user for source system to bw connection is dialog type (S_BI-WX_RFC, S_BI-WHM_RFC, SAP_ALL, SAP_NEW)
    1: Now while at the Info Package : Start data load immediately and then get the
    e-mail sent by user RFCUSER, and the content:
    Error message from the source system
    Diagnosis
    An error occurred in the source system.
    System Response
    Caller 09 contains an error message.
    Further analysis:
    The error occurred in Service API .
    2:Error in the detail tab of the call monitor as under,
    <b>bi data upload error:status 51 - error: Error 8 when starting the extracting the program </b>
    Extraction (messages): Errors occurred
      Error occurred in the data selection
    Transfer (IDocs and TRFC): Errors occurred
    Request IDoc : Application document not posted (red)
      bw side: status 03: "IDoc: 0000000000007088 Status: Data passed to port OK,
                                    IDoc sent to SAP system or external program"
      r<b>/3 side: status 51:  IDoc: 0000000000012140 Status: Application document not posted
                                   Error 8 when starting the extraction program</b>
    Info IDoc 1 : Application document posted (green)
       r/3 side: "IDoc: 0000000000012141 Status: Data passed to port OK
                     IDoc sent to SAP system or external program"
       bw side: "IDoc: 0000000000007089 Status: Application document posted,
                     IDoc was successfully transferred to the monitor updating"
    Have attached screen shots showing error at BW side.
    •     check connection is ok, tried to restore the setting for bw-r3 connection – though same problem
    •     Have checked partner profile.
    <b>what's wrong with the process? </b>
    Best regards,
    dushyant.

    Hi,
       Refer note 140147.
    Regards,
    Meiy

  • Error Status Message

    Hi Vadim,
    Thanks for your help in my previous issue.
    My client wants to setup the error message when the user enter >1 value in input schedule against to each month(Jan,Feb and March etc) it is basically HC planning where as they have average headcount value is 1 (So that the user has to enter the value between 0 to 1). The requirement is when the user enters more than 1 then the system needs to thrown an error message and it has to restricted the user.
    I have found the normal excel function to setup this error status message through data validation in excel. Can you please tell me is there any EPM function available for this kind of setups in SAP BPC 10.0 EPM. So that we can use that option instead of normal excel function.
    Please see my current setup message in the above screen shot.
    Regards,
    Satish

    Hi Satish,
    No EPM functions available, you have to use Excel data validation.
    BPC can validate data only afte data was sent to database.
    Vadim

  • Message has error status at outbound side File To Idoc Scenario

    hi ,
    In my File to Idoc scenario , when i go to sxmb_moni , i found that its showing red flag at Outbound Status Tab and showing message "Message has error status at outbound side".
    When i go to IDX5 and and select my idoc and click on Transaction Id it shows "Password logon no longer possible - too many faile" .
    Please suggest what may be the problem ?
    Regards,
    Rohit

    1. First check the RFC destination name used in receiver Idoc adapter communication channel.
    2. As i said earlier, in sm59 transaction in XI gui, u can check same rfc destination under type 3. There check the logon credentials and the username.
    3. Now goto the R3 system GUI and check in su01 that same user is locked or not. If locked unlock it.
    4. And if u change the password of that user, then do the similar change in XI -> sm59 -> rfc destination logon credential
    Regards,
    Prateek

  • Error message without error status matching

    Hi Gurus,
             I have a error message from process chain as follows:
    Failure Group EREC01 Special FULL - Job 1                                                                                Process Group EREC01 Special FULL - Job 1 Of Type Local Process Chain Has Status Ended with errors (Process Chain Encapsulate EREC01 GRP)                                                                                It is now 21:19:54 on 05/05/2010 (time zone PST)                                                                                Current Process Chain Run: D80JW1WN91Q0OEZ3K0ZGF3MS5 in System BIP (Host biprd03)                                                                               
    but when I get into rspc to check the status for this running, it shows green for status in the log view. why does this error message come up without any error status matching?
    Many thanks

    Hi,
    Please check if your are looking the correct process chain and in correct transaction. you may look at the logs of this process chain in RSPCM and not in RSPC.
    If you can not find this error status message in RSPCM, them check SM37 and SM12 by providing the proper timeinterval for the message you got.
    Regards,
    Pratap Sone

  • Initial Load of IS-U business partners to CRM - bdoc error

    Hi Gurus,
    i try to do an initial download from R/3 IS-U to CRM. Several objects from customizing have already been downloaded successfully. When downloading the business partners i get a bdoc error message for every single BP saying that
    'business partner role MKK is not available' Number R1206
    I figured out that the business partners in IS-U do have that role 'Contract partner' (which is technical 'MKK') and that data is maintained there. I also checked CRM and figured out that a business partner role 'contract partner' is not available there.
    Should i create it manually?? It is nowhere mentioned that a CRM role 'contract partner' should be created manually. Shouldn't the middleware do that? I found a document on service marketplace called 'IS-U specifics on the setup and load guide for the business partners' where i can read:
    'Sold-to-parties in CRM are replicated as contract partners in the OLTP system and vice versa'
    Does that mean that this mapping of roles is hardcoded? Is it customizeable? Does somenone know where to customize the mapping of business partner roles?
    Thank you
    Edited by: sapgipsy on Mar 19, 2010 4:21 PM
    Edited by: sapgipsy on Mar 19, 2010 4:22 PM

    Looks like as if you haven't activated the IS-U specific FM "COM_BUPA_MWX_BPS_FILL_ISU" in the BP middleware framework where the conversion between the IS-U role "MKK" and the CRM role "CRM000" takes place:
    Check via SM30 table com_bupa_call_fu in the IS-U system if the above FM is activated.
    Regards,
    Alexander

  • ITune - Windows 8.1 Upgrade error : Installation success or error status: 1603

    Hello,
    When I try a upgrade itunes automaticaly ( IE, open iTunes and iTunes tells me there and update ), it fails to update.
    When I manually download the latest copy of itunes and double click to install it, it failes with :-
    iTunes installer completed
    The installer encountered errors before iTunes could be configured
    Errors occured during installations. your system has not been modified
    Please run the installer again. finish to exit
    When I look at the event loggs I can see :-
    Windows Installer installed the product. Product Name: Apple Mobile Device Support. Product Version: 7.1.1.3. Product Language: 1033. Manufacturer: Apple Inc.. Installation success or error status: 1603.
    Windows Installer reconfigured the product. Product Name: Bonjour. Product Version: 3.0.0.10. Product Language: 1033. Manufacturer: Apple Inc.. Reconfiguration success or error status: 0.
    Windows Installer reconfigured the product. Product Name: Apple Application Support. Product Version: 3.0.1. Product Language: 1033. Manufacturer: Apple Inc.. Reconfiguration success or error status: 0.
    Please can someone help me fix this ? and tell me what I need to do to stop it happening inthe furture ?
    Many Thanks

    Hello there, G-Oker.
    The following Knowledge Base article offers up some great recommendations for the very error message you are receiving:
    Resolve specific iTunes update and restore errors
    http://support.apple.com/kb/ts3694
    Particularly:
    Check USB connections
    Related errors: 13, 14, 1600, 1601, 1602, 1603, 1604, 1611, 1643-1650, 2000, 2001, 2002, 2005, 2006, 2009, 4000, 4005, 4013, 4014, 4016, “invalid response,” and being prompted to restore again after a restore completes.
    If there’s an issue with the USB port, cable, dock, or hub, or if the device becomes disconnected during restore, try troubleshooting the USB connection, then troubleshooting your security software.
    To narrow down the issue, you can also change up your hardware:
    Use another USB cable.
    Plug your cable into a different USB port on your computer.
    Try a different dock connector (or no dock).
    Add (or remove) a USB hub between your device and computer.
    Connect your computer directly to your Internet source, with no routers, hubs, or switches.
    If you checked your connections and are still seeing the error message, check for hardware issues.
    Thanks for reaching out to Apple Support Communities.
    Cheers,
    Pedro.

  • SAP PI Message Cancellation Alert - Message does not have restartable error status

    Hello SCNers
    Version: 7.1
    Scenario: File --> PI -->SOAP
    We have a situation where a PI message  in Integration Engine shows error status.We want to cancel the message in IE but are unable to do so.
    On clicking Cancel for this message in SXMB_MONI, we are receiving an alert "Message does not have restartable error status".
    In SXMSPMAST table, value for ITFACTION is DEL.
    We do not want to run report RSXMB_DEL_TO_ARCH, that would change status of all messages with DEL status to ARCH.
    Is there a way to Cancel or Change the Status of this single message?
    Regards
    Sudheer

    Hi Hareesh,
    Tried that too, but to no avail.
    Strangely, the log shows NO_ERROR_STATE for the cancelation of this message thru RSXMB_CANCEL_MESSAGES.
    But in SXMSPMAST table the status of this message is 14 (System Error - Manual Restart Possible).
    Regards
    Sudheer

  • BPM Error: Message has error status on outbd. side

    Hi,
    BPM overview:
    Receive Step -> Transformation Step (1) -> Send Step ASYNC (1) -> Send Step SYNC (1) -> Transformation Step (2) -> Container Operarion Step (1) -> ...
    Error Message in SXMB_MONI: Message has error status on outbd. side
    - <Trace level="1" type="B" name="CL_XMS_PLSRV_CALL_BPE-ENTER_PLSRV">
    <Trace level="1" type="T">--start sender interface action determination</Trace>
    <Trace level="1" type="T">select interface MI_BPM_TRAN_EMP_DETAILS_FILE_OUT_ASYNC*</Trace>
    <Trace level="1" type="T">select interface namespace urn:tranbpm</Trace>
    <Trace level="1" type="T">no interface found</Trace>
    <Trace level="1" type="T">--start receiver interface action determination</Trace>
    <Trace level="1" type="T">Loop 0000000001</Trace>
    <Trace level="1" type="T">select interface AI_BPM_TRAN_EMP_DETAILS_FILE_ASYNC*</Trace>
    <Trace level="1" type="T">select interface namespace urn:tranbpm</Trace>
    <Trace level="1" type="T">no interface found</Trace>
    <Trace level="1" type="T">--no sender or receiver interface definition found</Trace>
    <Trace level="1" type="T">Hence set action to DEL</Trace>
    </Trace>
    I am don't any Interface name MI_BPM_TRAN_EMP_DETAILS_FILE_OUT_ASYNC* in my scenario, the actual interface name is MI_BPM_TRAN_EMP_DETAILS_FILE_OUT_ASYNC does BPM adds a '*' at the end of the interface name.
    In the workflow log it shows that "Transformation Step (2)" has error. I am using multimapping in the transformation step.
    Any help would be greatly appreciated as I ran out ideas to fix this issue.
    Thanks in advance.
    Sarvesh

    The issue was with the step "Transformation Step (2)" and I fixed it in the mapping. 
    When using two send steps "Send step (1)" & "Send step(2)", BPM is executing the second send "Send step(2)" before it completes the first send step "Send step(1)".  The first "Send step(1)" inserts the data into the database table and the second "Send step(2)" retrieves the data inserted in the first send step. 
    If I insert a "Wait step" between the 2 send steps it working.  Can anyone explain how the send step in BPM works. 
    I did post the same question in "Exchange" forum also so that it can be view by more people.
    Thanks,
    Sarvesh

  • BPM Scenario: Message has error status on outbound side

    Hi All,
            I am doing one BPM scenario. In my scenario i am collecting 12 different type of idocs in BPM and bundling these idocs and sending these to the 12 different files.
            If i send 12 idocs from the R/3 then my scenario is working perfectly fine. If i send less than the 12 idocs that time i am getting the error message as "Message has error status on outbound side" with red flag.
               Can you please explain what minght be the problem. I have already checked in SM58,SMQ1 and SMQ2.
    Thanks & Regards,
    Purushotham

    Hi Nutan,
            I hv configured my scenario as follows
    1. Start
    2. Block ( Deadline and Control step for cancell the process)
       3. Fork(Necessary branches 12)
          4. Loop(12 loops)
              Under loop
              a. Receive Step
              b. Container Operation( For count)
              c. Container Operation(For append)
    5. Fork( Necessary branches 12)
        6. Transformation
        7. Send
    8 Stop
    This is my scenario. In the first Fork step i am checking end condition as total  number of idocs is reached then i am sending all the data to the target system. If the idocs are not reaching with in 1 hour then i am cancelling the process.
            Now can you please tell me what is the problem.
    Thanks & Regards,
    Purushotham

  • Message has Error status on outbound side - in ABAP inbound proxy !!

    Hi All,
    One interesting question for you guys. I have got one of the scenarios like File to ABAP inbound proxy. Message are going properly, no errors in receiving system. But on PI moni I can able in "outbound status" column in red colored flag. No all the messages couple of them with u201CMessage has Error status on outbound side ". Why please?
    Regards
    San

    Hi ,
    Please check whether the  correct data  is coming from sender side .  and check the j2ee engine runtime parameters.
    Cheers,
    Meera
    Edited by: MeeravaliDudekula on Oct 18, 2010 2:36 PM

Maybe you are looking for

  • Writing a Vector to a Output File Line by Line.

    Can anyone tell me how to write each element of the Vector on a New Line to the Output file? Right now the Output is in a String across 1 line. Now - � t Bowser 5 years 105 lbs.t Bowser 5 years 106 lbs.t Daisy 1 year 30 lbs.t Dog 1 yr 66 lbs.t King 6

  • Unable to transfer keywords, titles etc from iPhoto 4.0.3 to iPhoto 6.0.5.

    I have tried transferring my Photo Library in my old Mac to my new Mac without success. I can transfer the photos themselves but the keywords and titles are not accepted. from CES2

  • Configure log file transfer to downstream capture daabase!

    Dear all, I am setting up bidirectional replication among 2 database server that are Linux based and oracle 11gR1 is the database. I am following the document Oracle Streams Administrator Guide, Have completed all the pre-configuration tasks but I ha

  • ERecruit 604 slowness

    Hi, We have upgraded our eRecruit from 600 to 604 and since after the upgrade, the users are experiencing extreme slowness in certain areas of the system especially "job posting". When a recruiter tries to post a job or search for a candidate, the sy

  • Plugin help please

    im getting p/o'ed with this i want to "plugin" invigorator(its a plugin to us 3d models,in my case from cinema 4d) and i cant see to get it working...so i was just wondering where do u put those kinds of plugins because ive tried alot of them and non