Benefits of working in  BI upgrade project

Hi,
I will be embarking on BI upgrade project soon. and would like to know what are the benefits in terms of career working in such a project as a consultant.
e.g
what can I learn that will be useful in the future.
what knowledge will be gained etc.
and if possible give advice on what to look at for and materials.
thanks

[Hello ,|http://chandranonline.blogspot.com]
BI Upgrade Project will be a challenging one. Upgrade is a process and will never end with this version. Today its BI7.0 then later it can be some new version.
You will have to identify the new functionality and map to the  existing one. Some time the entire technical feature may change example, implementing Business Objects.
See these checklist docs for more
[Upgrading BW 3.X to SAP NetWeaver 2004s BI|https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/2e8e5288-0b01-0010-2ea8-bcd4df5084a7]
[SAP NetWeaver 7.0 Business Intelligence Upgrade Specifics|https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/10564d5c-cf00-2a10-7b87-c94e38267742]
[How to Checklist: Rapid SAP NetWeaver 7.0 BI Technical Upgrade with BI Accelerator Implementation (NW7.0)|https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/e0c9c8be-346f-2a10-2081-cd99177c1fb9]
[How to SAP BW 3.5 Upgrade Preparation and Post Upgrade CheckList (NW2004)|https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/472443f2-0c01-0010-20ab-fbd380d45881]
[Thanks|http://chandranonline.blogspot.com]
[Chandran|http://chandranonline.blogspot.com]

Similar Messages

  • How To Use SPDD and SPAU Transaction in An Upgrade Project

    Hi Friends,
    I will be working in an upgrade project very soon. this is my first experience for Upgrade project. Though I know these two transaction are used for Upgrade.
    Can anyone give me a step by step document for using these two transactions and other relevant information.
    Also, I have one query where do we use these transactions : On the old system e.g. R/3 4.7 or ECC 6.0
    Thanks,
    Pradeep
    <REMOVED BY MODERATOR - REQUEST OR OFFER POINTS ARE FORBIDDEN>
    Edited by: Alvaro Tejada Galindo on Dec 23, 2008 10:39 AM

    Hi Pradeep,
    For SPDD see this link
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/2e/6d66587d9011d396b60000e82de14a/frameset.htm
    For SPAU
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/c8/61ec66e33611d1954b0000e82de14a/frameset.htm
    Why you need this Adjustments
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/60/d6ba7bceda11d1953a0000e82de14a/frameset.htm
    You use the transactions in the new system.
    Regards

  • Learning Scope in Upgrade Project

    Hi SAP Gurus,
    I would like to know what is the learning scope for a fresher in an Upgrade Project(SAP Upgrade).
    Please help me in this regard.
    Thanks,
    Babu Kilari

    Hi Babu,
    You can learn lot of things if you are working in the Upgrade Project.
    For the upgrade you should have all knowledge about the source system as well as target system.
    I needs a lot of homework from your side coz a fresher we can expect that you will be knowing a little things.
    But I can only tell you that Upgrade is definetely a good learning experience.
    You can use Solution Browser tool to know the difference between various versions of SAP and from different point of views.
    [Solution Browser|http://solutionbrowser.erp.sap.fmpmedia.com/]
    Thanks,
    Nitesh Jain

  • Upgradation project

    Dear Professionals,
    One of my clients is implmented realestate 4.7 version with third party CAD.   Now they are expecting to fullfil their needs  with Flexible Real Estate .  Havnu2019t work on the upgradation project,  can any one plese guideme.  And what are the major areas between 4.7 and REFX.
    Thanks in advance,
    Best regards
    Jayakar

    Hello,
    You may please refer to the following notes: Note 517673, 828160.
    Regards,
    Suvarghya Dutta

  • Upgradation project to ECC 6

    Hi all
    Can anyone please provide some guidance, if possible also send some documentation, which I can follow to work on a upgradation project.
    Currently system is 4.7, and they want to upgrade to ECC 6.
    What are the steps involved, what would be my role as FICO consultant, in such upgradation, because i have never worked on a upgradation project.
    Any input will be highly appreciated.
    Krishna

    http://solutionbrowser.erp.sap.fmpmedia.com/
    http://service.sap.com/releasenotes
    http://service.sap.com/upgrade
    http://www.sap.com/solutions/business-suite/erp/pdf/BWP_ERP2006_Upgrade.pdf
    https://websmp104.sap-ag.de/instguides
    SAP Business Suite App->SAP ERP -> SAP ERP 6.0

  • After upgrading to Photos, how can I work on a Book Project from another apple device?

    After upgrading to Photos, how can I work on a Book Project from another apple device?

    I'm not sure I understand what you are asking, but on the device/Settings, do you have iCloud and Photos sync turned on?

  • Importance of OCM in an Upgrade Project

    Many times when upgrade projects are commissioned, the need to involve the business community is often overlooked.  However, upgrade projects can be defined in different ways, all of which require more or less change management activity.  The idea is to get IT and the business to recognize the differences (i.e.upgrade entails switching out hardware behind the scenes with no new functionality for end user to learn v. upgrade that introduces a new user interface or new module).  Once the difference in definition of "technical upgrade" is acknowledged, IT and the business can start appropriate converstations as to how they will work together to make the upgrade a success.
    What was your experience in applying OCM to an upgrade project? 
    Also, for those interested in continuing this conversation in a live forum, I will be hosting such a discussion at TechEd.  See you at the BPX roundtable at 11:00 on October 3rd!
    Rebecca Potts

    More and more businesses are waking upto the fact that even an Upgrade project needs Change Management to make it a complete success. I have led CM in 2 upgrade projects (technical upgrade) and agree with you on the fact it is essential to understand the differences b/w the two systems.
    There are certain essentials which pertain to an upgrade:
    Identifying the objectives and the benefits envisaged from the Upgrade
    Communication to key stakeholders
    Business Impact Analysis (This is where a large portion of the business users get involved)
    Training on delta changes
    My personal experience has been that the sponsors of the Upgrade are always keen on having CM but they lack the drive and the support that is essential to any CM success. The inherent resistance also lies in the fact that it is ingrained in peoples mind that a technical upgrade hardly requires any CM.
    I refer to Upgrade as CM keeping in mind the scope, the criticality and the magnitude of change which is quite limited in this case. (CM being a subset of OCM)
    Roshik Shenoy

  • How can I work on a Logic Project in Logic9 with a user who is running LogicX without just trading stems?

    I am running logic9 and don't want to upgrade to X yet, but my writing partner is using LogicX and we haven't been able to figure out how to open Projects and share between us on DropBox.  All we can do is pass audio files back and forth. Any thoughts?

    Just another thought..... according to this
    http://support.apple.com/kb/HT5794
    "When you open an older project in Logic Pro X it does not change the original project in any way. Instead, a new copy in the Logic Pro X project format is created which leaves the original project in place. You can continue to work with the original project in the version of Logic it was last saved in if you want." 
    Does this mean the 9 project will open with the changes made in X, if it's just adding audio files to the arrange?

  • 4.6 C to ECC 6.0 Upgrade Project Timeline Sheet in MPP format

    Dear all,
    We are now proposing our customer for the 4.6c to ECC 6.0 Upgrade.
    Our customer is currently in 4.6c/oracle 9i/HPUX 11 i. He wants to move to ECC 6.0.
    If you have the project timeline for the above Technical Upgrade, can you pl send it to me.
    If you don't have in MPP format atleast send me the Work Breakdown structure with timelines.
    I shall modity the same to our customer and submit
    Thanks & Regards
    Senthil
    [email protected]

    Preparation Phase* 6 days
    Kick Off Meeting 1 day
    Upgrade Project Procedures Preparation 1 day
    Prepare Upgrade Project Plan 1 day
    Technical Requirements Assessment 3 days
    Assess Training needs of Key-users & End-users 1 day
    Prepare Detailed Basis Activity List for DEV, QA & PRD 1 day
    Business Blueprint Phase 6 days
    Develop System Landscape Upgrade Plan 1 day
    Functional Requirement Checklist 1 day
    ABAP Development check list 1 day
    Develop detailed Training Procedures & Documentation for Key Users & End Users 1 day
    Identify Testing Scope & Scenarios 1 day
    Identify Authorizations Conversion to Roles for SAP ECC 6.0 2 days
    Develop Documents as per Basis Activity List 1 day
    Develop Authorization Matrix for Activity Groups to Roles Conversion 2 days
    Prepare Upgrade Deliverables Checklist 1 day
    Realization Phase 28 days
    Installation of Solution Manager 3.2 System 1 day
    Creation of New Development System for Upgrade Project (Homogenous System Copy - PRD) 2 days
    Upgrade to AIX & Oracle 10g, SAP ECC 6.0 on New Development Server 3 days
    Upgrade Frontend Software 4 days
    Perform SPAU & SPDD Corrections 5 days
    Perform ABAP Development & Corrections 10 days Perform Authorizations Conversions and corrections after upgrade 8 days
    Perform Upgrade Testing for each Application Module 7 days
    Perform Unit & Integration Testing 6 days
    Perform Training to Key Users & End Users (Generic & Specific) 3 days
    Upgrade to AIX, Oracle 10g, SAP ECC 6.0 on Quality System 1 day
    Homogenous System Copy of PRD to New Quality & Upgrade to AIX, Oracle 10g & SAP ECC 6.0 2 days Perform Testing in Quality System 3 days
    Testing by end users on Quality System 1 day
    Production Realization & Go-Live Phase 6 days
    Upgrade to Production System Operating System to AIX (after close of business hours - 23:00) 1 day
    Oracle Upgrade to 10g (after close of business hours - 23:00) 1 day
    SAP Release Upgrade to ECC 6.0(Downtime Minimized - Downtime occurs in non-business hours) 2 days
    User Acceptance Testing 1 day
    Production System Go-Live 1 day
    Post Go-Live Support 14 days
    Post Go-Live Support 14 days Note: This is high level plan subject to change during Business Blue Print Phase 0 days
    This is taken from a post in Ittoolbox, May be this is generic. Hope you can tailor this to meet your requirements.

  • Text Determination Error in Upgrade Project

    Hi All,
    I am working on Upgrade Project from 4.6C to ECC 6
    I encountered the error like the Text Determination is missing in all the Documents like Sales Order, Delviery and Billing Documents in ECC6.
    But the same is appearing in 4.6 C.
    I am getting the error " Error in Text Formating ".
    Message No.VX201.
    Could you please give your valuable inputs on this.

    Hi,
    Check the settings again in 6.0. Follow the path IMG-sales and distBasic Func--Text Control. It may that while migrating the data certain tax type is found missing in the new system.
    Regards,
    Saurabh

  • Upgrade Project - 4.7 to ECC 6.0

    Hello Gurus,
    I am HR Functional consultant and assigned to work on upgrade project (4.7 to ECC 6.0) for the first time. I am new to this environment. Can any one help me with suitable documents to start with. My mail id: [email protected]
    Points assured..
    Thanks in advance
    Regards
    kasi

    Dear kasi raj,
    For Functionality Differences pls refer to the below site -
    http://solutionbrowser.erp.sap.fmpmedia.com/
    After opening the site, please select the Source Release Version which is 4.6 b Then Select the Target Release Version which is "mySAP ERP 2005" or ECC 6.0
    Select the Solution Area like Financials, Human Capital Management, Sales....
    Select module like MM, PP, SD, QM.....
    Click on Search
    Then it displays the Release Version and the Delta Functionality. which can be downloaded to a word document if required.
    and also check the release notes of ECC 6.0 in service.sap.com.
    Hope this helps you.
    Do award points if you found them useful.
    Regards,
    Rakesh
    P.S. you can send me a mail at my mail id [email protected] for any specific details

  • BW Upgradation Project from BW 3.5 t o BI 7.0

    Dear SDNS,
                             We got an requirement to do an upgradation project for BW 3.5 to BI 7.0... This is the first time am involving for Upgradation..Am An BW Technical Consultant.. Can anyone one sugggest at scratch level wat are the roles should play by BW Technical consultant.. And Wat are the activities whould done by BW technical consultant.. An can anyone tell me.. How many SAP Consultants should involve in this Project.. i.e like how many Basis Consultants and how many ABAP Consultants should involve.. Who plays the Vital Role for Upgradation...
    Can anyone send me the Documents Related for BIW Upgradation for BW 3.5 to BI 7.0.. If anyone send me screen shots related to BW Tehcnical Consultant work it would be helpful.....
    My E-Mail - [email protected]
    Answering Getz Appreciated,
    Thanks & Regards,
    Aluri

    Hi
    I have some checklist ,do not exactly remember from where i got it but its really usefull
    There is no standard SAP checklist as it used to exist in 3.x for nw2004s upgrade and trust the master data guide available on market place is not upto the mark and expectations
    So Heads up..
    /message/2979584#2979584 [original link is broken]
    /message/2765713#2765713 [original link is broken]
    /message/2979576#2979576 [original link is broken]
    /message/3214476#3214476 [original link is broken]
    /message/3024448#3024448 [original link is broken]
    You may wish to have a look at draft portrayed below,rest you learn when you drive
    Lessons Learnt - Upgrade
    1)Convert Data Classes of InfoCubes. Set up a new data class as described in SAP OSS Note 46272.
    2)Pay attention to the naming convention. Execute the RSDG_DATCLS_ASSIGN report.
    3)Run the report RSUPGRCHECK to activate objects.
    4)Upgrading ABAP and JAVA in parallel may cause issues. If there is no custom development on J2EE instance, it is recommended to drop the J2EE instance and re-install the latest J2EE instance after the upgrade.
    5)Apply SAP OSS Note 917999 if you include the Support Patch 6 with the upgrade or you will get the error at PARCONV_UPG phase. When you upgrade to a product containing Basis 700, the phase PARCONV_UPG terminates. You included Basis Support Packages up to package level 6 (SAPKB70006) in the upgrade. The job RDDGENBB_n terminates with the error RAISE_EXCEPTION. In addition to this, the syslog contains the short dump TSV_TNEW_PAGE_ALLOC_FAILED. The program SDB2FORA terminates in the statement "LOOP AT stmt_tab". An endless loop occurs when the system creates the database table QCM8TATOPGA.
    6)Apply the OSS note 917999 if you get the following error during PARCONV_UPG phase: PARCONV_UPG terminates with TSV_TNEW_PAGE_ALLOG_FAILED
    Critical OSS Notes:
    819655 – Add. Info: Upgrade to SAP NW 2004s ABAP Oracle
    820062 - Oracle Database 10g: Patchsets/Patches for 10.1.0
    839574 – Oracle database 10g: Stopping the CSS services ocssd.bin
    830576 – Parameter recommendations for Oracle 10g
    868681 – Oracle Database 10g: Database Release Check
    836517 – Oracle Database 10g: Environment for SAP Upgrade
    853507 – Usage Type BI for SAP Netwaevers 2004s
    847019 - BI_CONT 7.02: Installation and Upgrade Information
    818322 – Add. Info: Upgrade to SAP NW 2004s ABAP
    813658 - Repairs for upgrades to products based on SAP NW 2004s AS
    855382 – Upgrade to SAP SEM 6.0
    852008 – Release restrictions for SAP Netweaver 2004s
    884678 - System info shows older release than the deployed one
    558197 – Upgrade hangs in PARCONV_UPG
    632429 – The upgrade strategy for the add-on BI_CONT
    632429 - The upgrade strategy for the add-on FINBASIS
    570810 - The upgrade strategy for the add-on PI_BASIS
    632429 - The upgrade strategy for the add-on SEM-BW
    069455 - The upgrade strategy for the add-on ST-A/PI
    606041 - The upgrade strategy for the add-on ST-PI
    632429 - The upgrade strategy for the add-on WP-PI
    Post upgrade Steps :-
    1. Read the Post Installation Steps documented in BW Component Upgrade Guide
    2. Apply the following SAP OSS Notes
    47019 - BI_CONT 7.02: Installation and Upgrade
    558197 - upgrade hangs in PARCONV_UPG, XPRAS_UPG, SHADOW_IMPORT_UPG2
    836517 – Oracle Database 10g: Environment for SAP Upgrade
    3. Install the J2EE instance as Add-in to ABAP for BI 7.0 and apply the Support Patch that equivalent to ABAP Support Patch.
    4. Run SGEN to recompile programs.
    5. Install the Kernel Patch.
    6. Missing Variants - (also part of test script)
    look at the RSRVARIANT table in SE16. If it is empty, then you will definitely need to run RSR_VARIANT_XPRA
    program - RSR_VARINT_XPRA
    OSS -953346 and 960206 1003481
    7. Trouble Shootauthorizations
    820183 - New authorization concept in BI
    I think the above material is sufficient but in case you face any issues feel free to revert back
    Reward suiatble points

  • SCM 5.1 Implementation Project, Upgrade Project

    Hello,
    Is any one working on SCM 5.1 Implementation or upgrade Projects..
    If you are doing SCM 4.0 to SCM 5.1 upgrade what are the Delta changes you have observed for DP, SNP , PPDS, GATP modules?

    i suppose its called SCM2007
    you can find the help file for this in help.sap.com
    you can also find the release restrictions and release notes for SCM 2007
    not sure of active customers
    the release date is 31/08/07 as per the PAM
    i think it wouldve been beta tested for the last 6 months at least
    one might fond some customer specific SCM 2007 notes and that might give an idea of the customers who are using it - nestle/ HP??.... am guessing

  • Role of ABAP Consultant in an Upgrade Project

    Hi Friends,
    I'm an ABAP consultant, I've worked on Implementation Projects till now. Last one was on ECC 6.0.
    I have been assigned to an upgrade project (from 4.6 to ECC 6.0).
    So can anybody let me know what is the role and what are the responsibilites of an ABAP consultant in an Upgrade Project?

    Hi,
    Role of technical consultant:
    1) Code fixes and bugs for upgrade objects
    2) SPAU / SPDD corrections
    3) removal of obselete statements by checking through the code inspector or EPC
    4) replacing the BDC on enjoy transactions with BAPI
    5) replacing the call transaction on obselet transactions with the corresponding new transactions.
    Few of them are listed above..
    Reward if useful
    Regards
    Shiva

  • Upgrade projects and Compare and ajust func.???

    Hi All.
    I am trying setting up a demo of the benefits using SolMan for upgrade projects with Compare and Adjust functionality.
    I am following a guide with the following steps:
    1. Create an Implementation project with some processes from BPR (Using SAP R/3 Enterprise 4.7 as logical component).
    2. Model (change) the processes to simulate that a not fully SAP std. process is used at this compagny.
    3. Copy the implementation project to an Upgrade Project (with option "Adjust target project to original of the source project".
    4. Adding logical component SAP R/3 ECC 6.0 to the system landscape.
    5. Executing transaction SA_PROJECT_UPGRADE for the Upgrade project.
    Now, when I go to the project, I see no marking of changes anywhere...
    Could this be because I am using the wrong processes in my Implementation project from BPR?
    Does anyone have a good example of processes that can be good to demo this?
    Thanks in advance!
    /Per

    Hi All.
    I am trying setting up a demo of the benefits using SolMan for upgrade projects with Compare and Adjust functionality.
    I am following a guide with the following steps:
    1. Create an Implementation project with some processes from BPR (Using SAP R/3 Enterprise 4.7 as logical component).
    2. Model (change) the processes to simulate that a not fully SAP std. process is used at this compagny.
    3. Copy the implementation project to an Upgrade Project (with option "Adjust target project to original of the source project".
    4. Adding logical component SAP R/3 ECC 6.0 to the system landscape.
    5. Executing transaction SA_PROJECT_UPGRADE for the Upgrade project.
    Now, when I go to the project, I see no marking of changes anywhere...
    Could this be because I am using the wrong processes in my Implementation project from BPR?
    Does anyone have a good example of processes that can be good to demo this?
    Thanks in advance!
    /Per

Maybe you are looking for

  • 10.5.2 Update questions

    Hello! I was just wondering if anyone has had any issues with CS2 and/ or FCP Studio after upgrading to 10.5.2. I've been running Leopard since its release and haven't come across any issues that I haven't been able to fix myself. I'm a little nervou

  • HH:MM:SS Time format to show in Graphs - OBIEE 11g (11.1.1.5)

    Hi, I have got a requirement to show time format in graphs. I am converting seconds to HH:MM:SS format using the formula that I found in one of the blogs. http://123obi.com/2012/06/obiee-converting-seconds-to-minuteshoursdays/ Is there better way to

  • Exchange Distribution Groups not updating in Active Directory

    Hi all, I'm not sure if this is intended behaviour or not, but any distribution group we create in Exchange ECP does not update in Active Directory Users and Computers. Any particular reason why? For example, we have a user group called "Managers" an

  • Change material Item Category

    Hi, maybe this topic already discuss in this Forums. Can help me. I have some question. When i create Order IW31 ( Module PM ) i put material in component which this material Item Category L ( Stock Item ). when i click button PURCHASING can not crea

  • Projectors Again

    Hi. First post and sorry if this is an old chestnut. Running Flash Pro 8 on Macintosh OS10.4.9. I'm trying to create a standalone projector following the procedure outlined in the online tutorial - creating a Flash Video Player Component and linking