Best Practice in Upgrade from ECC 5.0 to ECC 6.0

Dear All,
Can someone help in looking for Best practice in Upgrade from ECC 5.0 To ECC 6.0 Project from Functional FI and CO Side.
Thanks

Moved to a different forum.

Similar Messages

  • Best practice for upgrading from ADS 9.1 to ADS 11

    So we will need start upgrading installs from Advantage Database Server (ADS) version 9 to ADS version 11. Is there a set of best practices? Certain procedures? How do we gracefully fall back if it doesn't work? Does anyone have experience with the dual install setup of ADS 9 and ADS 11? Did anyone else run into any issues with this upgrade path?
    Thanks in advance!
    Rodney

    Rodney,
      My first recommendation is to read the "Effects of Upgrading" section of the help file. I put the links below.
    Effects of Upgrading to Version 10
    Effects of Upgrading to Version 11
    Effects of Upgrading to Version 11.1
      The server will always work with an older client so I would recommend upgrading the server and testing it with your current application. The next step would be to upgrade the client and re-compile your application. I wouldn't anticipate any issues other than those outlined in the effects of upgrading.
      You can install multiple instances of Advantage, beginning with version 10, on the same machine. Keep in mind that only one instance, the first one installed, will be discoverable. To connect to other instances you will need to use <IP Address>:<Port> in the connection string. Details on installing additional instances of Advantage are here
    Chris

  • What are the best practices in upgrading from mac OS 10.5.8 to Mountain Lion?

    I what to upgrade two iMac's from 10.5.8 to Mountain Lion. I have the harddrives backedup. I also have Snow Leopard family pac on disc.
    I want to know the best way to upgrade and get a clean install of the new OS.

    First check that the Macs will run Mountain Lion.
    Then install Snow Leopad
    Update to 10.6.8 for App Store needed for Mountain Lion
    Using App Store purchase, download and install Mountain Lion.
    Allan

  • What's the best practice to upgrade 3GS from 3.1.2 to 4.2.1

    I was reading the thread which was very helpful:
    http://discussions.apple.com/thread.jspa?threadID=2665989
    But there is a slight difference here with my situation:
    -- I'm planning to upgrade from 3.1.2 to 4.2.1, yet in that thread the guy was trying to upgrade from 4.1
    And recently a friend told me he had an error 1013 during upgrade. Google also mentioned another error code, 1015, related to upgrading to 4.2.1
    1. Does anyone know what exactly caused Error 1013 and 1015?
    2. what is the best practice to upgrade from 3.1.2? Upgrading to 4.1 first and then upgrade from 4.1 to 4.2.1? Will that eliminate the occurring of these itunes errors?
    *(Yes, I know apple has officially terminated supporting upgrading an iphone firmware to anything below 4.3. But can we just discuss my questions hypothetically?)*
    Thanks people.

    paulcb wrote:
    Errors 1013 and 1015...
    http://www.google.com/search?sourceid=chrome&ie=UTF-8&q=iphoneError+1013+and1015
    http://support.apple.com/kb/ts1275
    Thanks a lot, paulcb.

  • Best practice for upgrading task definition without deleting task instances

    best practice for upgrading task definition in production system without deleting or terminating task instances
    If I try and update a task definition with task instances running I get the following error:
    Task definition 'My Task - Add User' may not be modified while there are active task instances
    Is there a best practice to handle this. I tried to force an update through the console but that didn't work. I tried editing the task from the debug page and got the same error.

    1) Rename the original task definition.
    2) Upload the new task definition with the original name.
    3) Later, after all the running tasks have timed out, delete the old definition.
    E.g., if your task definition is "myWorkflow":
    1) Rename "myWorkflow" to "myWorkflow-old-2009-07-28"
    2) Upload the new task definition as "myWorkflow".
    Existing tasks will stay linked to the original (renamed) workflow definition.
    New tasks will use the new definition.
    As the previous poster notes, depending on the changes you are making, letting the old task definitions stay active could have bad side-effects and might be better avoided.

  • BI 7.0: Source System upgrade from R/3 Enterprise to ECC 6.0

    Background:
    I am relatively new to BW team and will be going through my 1st source system upgrade.
    We currently have BI 7.0 SPS 17 connected to source system R/3 Enterprise EP1.
    We are upgrading to the source system to ECC 6.0.
    In Development and QA Environments:
    we will have access to both old (R/3 Enterpirse) and the new (ECC 6.0) source systems.
    We have a opportunity to compare the BW Objects, data flow and data loading from
    both source systems.
    In Production, however, we will just upgrade over 3 days downtime.
    One Question that comes to mind in this regard...
    What sort of things, we should be checking for before and after upgrade in Dev/QA and in Prod environments and what tools are available that can help the analysis and validation process ?
    Some of the suggestions that were given to me include following points.
    Before Upgrade:
    1 Check data, taking pre images of it for testing with post upgrade.
    2. Perform proper analysis of Source system related BW objects.
      - A complete listing of actively used Datasources,.. etc.
    3. Make delta queues empty,
    Make sure that all existing deltas are loaded into BW.The last request delta must not deliver any data and must be green in the monitor.
    4. Stop Process chains from BI (remove from schedule) and collection runs from R/3 side
    After Upgrade:
    1 After the OLTP upgrade, refer to note 458305 and other notes that are relevant to the actual upgrade
    (depending on the R/3 system release / R/3 plug-in to BI plug-in compatibility).
    2. Check logical system connections. Transactions SMQS, RSMO and SM59, If no access, then we can use Program RSRFCPIN_NEW for RFC Test.
    3. Check and/or Activate control parameters for data transfer. SBIW ---> General Settings --->
    Maintain Control Parameters for Data Transfer
    http://help.sap.com/saphelp_nw70/helpdata/EN/51/85d6cf842825469a51b9a666442339/frameset.htm
    4. Check for Changes to extract structures in LBWE Customizing Cockpit 
        - OSS Notes 328181, 396647, 380078 and 762951
    5. Check if all the required transfer structures are active. See OSS Note 324520 for mass activation.
    7. Check if all Source system related BW Objects are active - Transfer rules, Communication rules, update rules,DTPs,..etc. 
    Below is a link for some useful programs in this regard.
    https://www.sdn.sap.com/irj/scn/wiki?path=/pages/viewpage.action&pageid=35458
    6. Test all important datasources using RSA3 and check for OLTP Datasources changes .
    As soon as BW notices that the time stamp at the DataSource in the OLTP is newer than the one in the transfer structure, it requests replication of the DataSource and activation of the transfer structure. Transfer the relevant DataSources only if required, and transfer only the ones that have changed (RSA5 -> Delta).
    7. Create Data flow objects (trnasfer rules, infopackages, trnasformations, DTPs) for the Replicate
    new/changed datasources,if needed. 
    8. Check all CMOD enhancements.
    If we are using a customer exit with the extractor in the OLTP, see Note 393492.
    7. Check for unicode (all custom programs or Function Modules for DataSources)
    5.  Check all the queues in RSA7, start delta runs and test data consistency.
    For delta problems:In the BW system, start the 'RSSM_OLTP_INIT_DELTA_UPDATE' program for the DataSource and the source (OLTP) system for which the init selections are then transferred from BW into the ROOSPRMSC and ROOSPRMSF tables in the source system so that the delta can continue.
    9. Take back up of data posted during upgrade for contingency planing.
    10. Run the entire set of process chains once if possible and let it pick up no data or the usual master data.
    Since we have lot of experts in this forum, who have probably gone through such scenario many times, i wanted to request you to Please Please advise if i have stated anything incorrectly or if i am missing additional steps, OSS Notes, important details...

    Thanks Rav for your detailed post and very helpful contribution by posting all the information you had regarding the upgrade.
    We have similar scenario -
    We are upgrading our source system from 4.7 to ECC 6.0. We have our BI system with BI 7.0 at support pack 19 (SAPKW70019).
    Our strategy in ECC deployment  ->
    In development we copied our old DEV 4.7 system DXX to new ECC system DXY (new system ID).
    In production we are going to use same system PRXX upgraded from 4.7 to ECC.
    Now we are in testing phase of ECC with all interfaces like BI in Dev.
    My questions are below ->
    How can we change/transfer mapping of all our datasources in Dev BW system BID to new ECC dev system DXY (Eg. Logical system LOGDXY0040) from Old dev system DXX (Eg. Logical system LOGDXX0040). We donot want to create new datasources or change all transfer rules/Infosources for old BW3.x solutions on our BI.
    Also in new ECC sourcesystem copy  we see all datasources in Red in RSA7 transaction. Do we need to initialize again all the datasources from our BW BID system.
    Is there any easy way for above scenario ?
    Please let me know if you have any further helpful information during your ECC 6.0 upgrade connecting to BI 7.0 system.
    I have found some other links which have some pieces of information regarding the topic -
    Upgrade R/3 4.6C to ECC 6.0 already in BI 7.0
    http://sap.ittoolbox.com/groups/technical-functional/sap-bw/sap-r3-migration-and-sap-bw-version-1744205
    BI 7.0: Source System upgrade  from R/3 Enterprise to ECC 6.0
    Re: ECC 6.0 Upgrade
    Re: Impact of ECC 6.0 upgrade on BI/BW Environment.
    ECC 5.0 to ECC 6.0 upgrade
    Thanks
    Prasanth

  • Best Practice for upgrading to 11.1.1.3

    Hi,
    Can anyone tell me what is the best practice to upgrade FMW to 11.1.1.3...
    I followed the following steps to set up FMW 11.1.1.3.
    1. Oracle Enterprise edition Database 10.2.0.1 and applied 10.2.0.4 patch
    2. Installed RCU 11.1.1.3
    3. Installed Weblogic server 10.3.3 (11gR1)
    4. Installed Soa Suite 11.1.1.2 and applied patch for 11.1.1.3
    Is this the right way of installation or do i have to install 11.1.1.2 first f and then install 11.1.1.3..
    Regards,
    Sundar

    Yes, that seems to be fine.
    regards

  • Best practice for exporting from iMovie '08 to iDVD

    I am looking to find out what is the best practice for exporting from iMovie '08 to iDVD. I have read the other postings that give the basic howto (export to Media Browser then select the video in iDVD). However, my question is a little more technical. I have 1080i HD projects. I am interested in burning them to DVD in the best possible quality. What setting should I be using when I publish to Media Browser?
    I am wondering about quality loss due to more than one conversion/compression. I suspect that when I export to the Media Browser then this is occurring. If I am not mistaken iMovie is using something like H.264 for this. Then, when I run iDVD I suspect it will it do another conversion/compression, I think to get to MPEG2. Not only could this result in a loss of quality but also it will take extra time. I am interested to know what others think about this.
    Finally, I am looking to create DVDs for a lot of video. I am wondering if there are any USB or firewire hardware devices out there that could speed up the compression. I use the Elgato Turbo.264 when I want to encode to H.264 but I wonder if there is something similar for DVD creation.
    Thanks in advance.

    the standards for videoDVD are 720x480, and usually mpeg2 encoded..
    so, your HiDef project HAS to be 'downsampled' somehow..
    I would Export with Qucktime/apple intermediate => which is the 'format' your project is allready, and you avoid any useless 'inbetween encoding'..
    iDVD will 'swallow' this huge export file - don't mind: iDVD cares for length, not size.
    iDVD will then convert into DVD-standards..
    you can 'raise' quality, by using projects <60min - this sets iDVD automatically to highest technical possible bitrate
    hint: judge pic quality on a DVDplayer + TV.. not on your computer (DVDs are meant for TVdelivery)

  • Issues during technical upgrade from  version 4.6C to ECC 6.0

    Dear All,
    We have done a technical upgrade from version 4.6C to ECC 6.0 and encountered following issues -
    In the t-code ABZE (acquisition with in house production) there is a check-box for reversal posting on screen with version 4.6C. However, this field is missing in ECC 6.0. Why so?
    In the report s_alr_87012327, there is a field "only with creation block" in version 4.6C. However, this field is missing in ECC 6.0. Why so?
    Request to kindly suggest the alternative to carry out the same in ECC 6.0.
    Thanks in advance.
    Regards,
    Dhawal

    Hi Akshya,
    Please find answers below.
    1) 4.6c is NON-UNICODE system, Can I upgrade it into ECC 6.0 UNICODE system?
    Yes you can.
    If you are on a single code page system then you can give a gap between your uprade and unicode conversion. There is no problem with the singlecode upgrade and conversion.
    But if your system is MDMP then you will have to do the CUUC method that is both upgrade and unicode conversion together. Though you can give a gap and sign an disclaimer with SAP it is still not recomended way.
    2) 4.6c does not have any ITS system installed. If we upgrade it to ECC6.0 ABAP only, then Can I activate WAS internal ITS?
    Yes you can activate it.
    3) 4.6c does not have any JAVA stack. When I upgrade it to ECC 6.0, can I upgrade it to dual stack (ABAP+JAVA)? If yes, then how?
    After the upgrade and unicode conversion you can install the java stack.
    Regards,
    Ravi.

  • Best practice video conversion from download

    I am looking for best practice for video conversions.
    I am downloading adobe recordings via this method:
    http://server.adobeconnect.com/xyz/output/filename.zip?download=zip
    From here, I have been converting the FLVs using either freemake video converter or FLV converter. I have tried converting into AVI (XVID), MOV, WMV, etc. (I need the file to be under 600 MB for an hour of recording, therefore it is going to need some type of compression).
    My goal is to import the video into Sony Vegas Pro 10 for further editting. I have found that whatever method I use, the video and audio does not sync properly about 50% of the time. The video time is longer than the audio time usually. Or that there are other various errors, such as the video just freezing halfway through the video.
    I have been using connect for a few years now, but with each update I find (connect 8, 9, etc), that the problems are getting worse. At this point I am just wasting time trying to convert into various formats using various codecs just trying to luck upon one where the video is at least without error.
    What methods are others using to convert the FLV to a workable editable format?

    Can't the FLV files be changed into many different formats through Apple's
    Compressor or Adobe Media Encoder? These formats can then be opened in
    standard video editing software for editing.
    Best practice video conversion from download
    mach5kel
    to:
    jsb152
    05/21/12 01:03 PM
    Please respond to jive-509399086-9dnu-2-2mvb7
    Re: Best practice video conversion from download
    created by mach5kel in Connect General Discussion - View the full
    discussion
    Yes, I use this as a last resort, as the quality of capture this was is
    signifcatnly lower. As well as it is a much more time consuming process. I
    sometimes have over 50 parts of 1 hour video. To use camtasia, you need
    first to record it, then it must be saved in a camtasia format, and then
    lastly rendered into avi or wmv. Therefore, it is does take awhile.
    Really, I feel there shouldnt be so many errors in the conversion process,
    but I am finding the FLV recordings themselves have problems. This last
    file I am looking at, even the recording playback on adobe connect, has
    serious issues with audio and video sync. A problem that is all too common
    Replies to this message go to everyone subscribed to this thread, not
    directly to the person who posted the message. To post a reply, either
    reply to this email or visit the message page: [
    http://forums.adobe.com/message/4426243#4426243]
    To unsubscribe from this thread, please visit the message page at [
    http://forums.adobe.com/message/4426243#4426243]. In the Actions box on
    the right, click the Stop Email Notifications link.
    Start a new discussion in Connect General Discussion by email or at Adobe
    Forums
    For more information about maintaining your forum email notifications
    please go to http://forums.adobe.com/message/2936746#2936746.

  • Upgrade from 4.6 B to ECC 6.0

    Hi Gurus,
    Well and I would like to inform to our gurus that currently we are in the Phase of upgrading form 4.6 B to ECC 6.0
    I this regarding, can any one of our Guru's guide me regarding the following doubts.
    1. How to do Upgrade from 4.6 B to ECC 6.0?
    2. If you have any documents in this regard?
    3. Do you have any documentation for ECC 6.0?
    I request you to kindly forward the information to mail id: [email protected]
    Thanks with regards,
    Bala

    Hi,
    Please visit the following links:
    http://service.sap.com/erp
    http://solutionbrowser.erp.sap.fmpmedia.com/ (Functional prespective)
    http://service.sap.com/instguides --> mySAP Business Suite Applications --> mySAP ERP --> mySAP ERP 2005 --> Upgrade
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOVC/LOVC.pdf
    For Functionality Differences pls refer to the below site -
    http://solutionbrowser.erp.sap.fmpmedia.com/
    After opening the site, please select the Source Release Version which is 4.6 b Then Select the Target Release Version which is "mySAP ERP 2005" or ECC 6.0
    Select the Solution Area like Financials, Human Capital Management, Sales....
    Select module like MM, PP, SD, QM.....
    Click on Search
    Then it displays the Release Version and the Delta Functionality. which can be downloaded to a word document if required.
    and also check the release notes of ECC 6.0 in service.sap.com.
    Hope this helps you.
    Please assign points if it useful.
    Regards
    Ravinah Boni

  • Best Practices for Upgrade UCS firmware from 2.0 to 2.2?

    Hi
    I have Cisco UCS system ( 2 FI, 4 Chassis with 32 Server ) running 2.0 firmware. Now I want upgrade to 2.2. When I check document "Upgrading Cisco UCS from Release 2.0 to Release 2.2", I see have 2 solution:
    - 1. Upgrading from Release 2.0 with Auto Install -> Step simple but all server reboot at same time.
    - 2. Manually Upgrading from Release 2.0. -> Step more complex but can upgrade server one by one.
    My question:
    - Can I "Upgrade the infrastructure firmware with Auto Intall but upgrade Server with Manual"?
    - What is best for my case?
    Thanks

    Hi Phamcongtuan,
    In UCS you can create host firmware policy that can be used to upgrade the firmware of your blades.  Once you upgrade the infrastructure firmware, you can apply the host firmware policy to the service profiles of your blades.  If you are using service profiles templates you will need to unbind the service profiles and apply the policy to the individual servers.
    Host Firmware Package
    http://www.cisco.com/c/en/us/td/docs/unified_computing/ucs/sw/firmware-mgmt/cli/2-2/b_CLI_Firmware_Management_22/b_CLI_Firmware_Management_22_chapter_01000.html#concept_6982A188474A452CBFDBBDD7DD4921F3

  • Tehnical upgrade from 4.6C MDMP to ECC 6.0 using CU &UC approach

    Hi SAP Experts,
    We are embarking on a project for Technical upgrade from SAP R/3 4.6C MDMP system to ECC 6.0 using the CU & UC approach for our Asian operations (comprising of India, Japan, Taiwan & Singapore).
    Please share with me the Best Practices you followed in your projects, checklists, DOs, DONTs, typical problems you encountered and the possible safeguards, any other useful information, etc.
    Since very little information is available from Organizations who have used this upgrade successfully, I am raising this in SDN to share your experiences during the Technical upgrade.
    All useful information will be surely awarded with suitable points.
    Looking for your invaluable inputs which will be a BIG help for our project.
    Best regards,
    R.Rajaraman

    Pls go thru the below mentioned notes and its related notes
    Note 928729 - Combined Upgrade & Unicode Conversion (CU&UC) FAQ
    Note 73606 - Supported Languages and Code Pages
    Note 79991 - Multi-Language and Unicode support of SAP applications
    Note 959698 - Twin Upgrade & Unicode Conversion FAQ

  • Best practice for upgrading task definition in production system

    If I try and update a task definition with task instances running I get the following error:
    Task definition 'My Task - Add User' may not be modified while there are active task instances
    Is there a best practice to handle this. I tried to force an update through the console but that didn't work. I tried editing the task from the debug page and got the same error.

    The best way for upgrade purposes is to use the rename function of the TaskDefinition from the lh command line utility.
    Basically renames all current task instances with the TaskDefinition name. You can then alter the existing TaskDefinition and upload into identity manager.

  • Best practice: read information from server

    Hi All,
    currently I am wondering about the best-practice approach to read/write data from an iPhone app to a webserver.
    What is the easiest way to achieve such a scenario? Is it just to build an easy SQL server online an connect via xcode? Using which frameworks/protocols would be best-practice in xcode? What would be the best setup for communication between an iPhone app and any server-instance in the web?
    My goal is more or less to read data from a server when the application is started and write some data to this server when the user has input some text details.
    Regards,
    Patrick

    Please post your questions in the appropriate forums.
    This forum is for the specific product Virtual Server 2005.
    For Hyper-V related questions, use the Hyper-V forum:
    http://social.technet.microsoft.com/Forums/windowsserver/en-US/home?forum=winserverhyperv
    For server questions please use the server forums:
    http://social.technet.microsoft.com/Forums/windowsserver/en-us/home?category=windowsserver
    Microsoft has a lot of documentation, have you read it yet? Googled?
    Clustering:
    http://social.technet.microsoft.com/Forums/windowsserver/en-US/7173caf4-a5aa-4426-a16b-592a6e6714ec/windows-server-2012-hyperv-cluster-step-by-step?forum=winserverhyperv
    http://www.bing.com/search?q=hyper-v+cluster+2012+r2+step+by+step&src=IE-SearchBox&FORM=IE11SR
    Domain upgrades:
    http://technet.microsoft.com/en-us/library/hh994618.aspx

Maybe you are looking for

  • F110 error

    I am trying to run a payment program for clearing vendor invoices. In F110 : “There is an error that the bank is different from the bank in the Master Record.”  For my project, I have 1 house bank with 3 sub accounts.  Any suggestions why this error’

  • How do i talk to a supervisor in customer service?

    Have a sony tv less than 6 months old. called for warranty service was told would get a call in 24-48 hours. No call received. called in today and was told my warranty ticket was not done right and would have to done all over again, this time was tol

  • Roles in NWBC 4.0

    Hi all I am new in NWBC 4 and I am having this problem about authorizations: I created a page with page builder successfully. I tried to use this page and on simple lookup object (customer for example): I get a message "XD03" is not present in user a

  • A bug is stuck, and dead, in the screen of my MacBook Pro.

    A bug crawled up under the screen of my MacBook Pro and has died there. Is there any way I can get it out? Or should I just keep looking around it?A

  • 9.2.0 Upgrade (CPSID_50026) "Files in Use" - "Some files that need to be updated are currently in use" "Program Manager"

    I have no other applications open, when I try to update with 9.2.0, but I receive subject error message.  Task Manager shows NO Image Name called "Program Manager".  There is nothing else running, that is obvious to shut down.  Any suggestions, Pleas