BI for SAP PS(Project System)

Hello,
I will be working on BI in SAP PS related area soon. As i am SAP PS keyuser here i am understanding functional things better. But for BI what are the pre-requisites for PS.
If anybody worked on BI in SAP PS related area please give some inputs.
I am referring BI contents for same but still want some information.
amit shetye

Thanks

Similar Messages

  • Cutover checklist for SAP BI project

    Hi All,
    Please share the cutover checklist for SAP BI project.
    Thanks
    Sandeep

    sandeep,
    please give us details of ...
    where you are on the upgrade
    landscape you are trying to upgrade
    nature of systems ....
    cutover depends on :
    1. criticality of systems and their availability
    2. Nature of upgrade - if you are upgrading your sandbox - then cutover is just a formality
    3. Ensuring that no data loss happens...
    Please be more specific - also search the forums on the same ..... this has been discussed a lot many times...
    since you have not given details - I expect that you will be adding more details to your post and am not locking your post....
    Arun

  • Requirements for SAP Document management system in ECC 5.0

    Hi All,
    Can any one provide me the requirements for SAP Document management system in ECC 5.0.
    SAP Component   ECC 5.0
    OS    Solaris 5.9
    DB    Oracle 9.2.0.7
    Thanks in advance.
    Regards,
    Surendra
    <removed_by_moderator>
    Edited by: Juan Reyes on Aug 6, 2009 12:49 PM

    That info is available either at http://service.sap.com/pam or http://service.sap.com/quicksizer
    Please do some research before posting
    Read the "Rules of Engagement"
    regards
    Juan

  • EWA: error message in CRM check for SAP Solution Manager system

    Hello!
    In EWA report for SAP Solution Manager system I have seen error message: Many CSA* inbound queues in error status were detected in your system. As a result of this BDocs have not been delivered. And then table
    Queue Name                                Status     Date of first entry             Entries
    CSABUPA0000000070           READY     03.12.2007                          45
    CSABUPA0000000934           READY     07.05.2008                          45
    CSAIBASE0000000000           READY     23.11.2007                          36
    CSA_ORDER_8000000000      READY     22.11.2007     5
    CSA_ORDER_8000000001      READY     22.11.2007     3
    and others.
    I looked transaction smq2. There are 11300 queues in it. Is it actual error or it is a normal situation? And that must I do, to remove an error?
    Edited by: Mariya Kurbatova on Jul 2, 2009 6:27 AM

    Hi,
    Usually problems with hanaging CSA* queues are caused because too many
    indiviaual queues are created for the qRFC resources to handle. You can
    limit the number of queues as described in note 763680.
    Note 763680 would be useful if all of your qRFC resourcesa are in use
    when you have a great number of queues. With a large number of dialog
    WPs on the system it would probably make sense to reduce the amount
    as described in the note.
    the casue when you have this problem would be to check SMQR -> GOTO ->
    qRFC resources. You can also see if most of your dailog WPs are in use
    in SM50.
    Also refer to note 758677.
    Please schedule report RSQIWKEX (Inbound) to run as described in the
    note.
    And since your title has mentioned that the EWA is on your CRM satellite system; this maybe a further good reference too
    When you replicate lots of data from CRM to R/3, there could be a qRFC
    resource problem. In this case, the numebr of queues created can be
    reduced by implementing the attached note 356228, particularly solution
    2.
    For CSA* queues is slightly different from the one decribed in note;
    this is because the CSA queues exchange data within the CRM system.
    The steps described should be followed, except that table SMOFQFIND
    must be used instead of CRMQNAMES. In this table, fields TR_SNAEMS and
    SEGM_FLD are equivalent to the CRMQNAMES fieds BAPISTRUCT and BAPIFLD
    respectively. It should be possible to follow the solution 2 in the
    note as long as you use SMOFQFIND instead of CRMQNAMES.
    Hope this helps
    Cheers,
    SH

  • Function Point Analysis for SAP BW Projects

    Hello All,
    Have been assigned a task to come up with Function Point
    analysis for SAP BW projects.
    Any help will be appreciated.
    Thanks,
    Mainak

    Hi Mainak,
      Function Point Analysis is independent of technology, methodology or platform, so there is no function point analysis specific for sap bw, rather you should familiarize with the fundamentals of FPA.
      And as you might know, FAP is used to determine whether a given a tool, an environment or a language is more productive when compared to others.
      I can send you good links if you can give me your email-id.
    Hope this helps...
    Thanks,
    Raj

  • How to archive data for SAP ISU&Billing Systems

    Hi All,
    Can any one tell me the procedure that how do the archiving data for SAP ISU-Billing Systems
    Regards

    Please check this thread you will get some idea about this.
    [Billing for Archiving|http://help.sap.com/saphelp_utilities472/helpdata/en/97/276c359513cf41e10000009b38f839/frameset.htm]
    Regards,
    Siva

  • QA job for sap bw project

    Hello Gurus,
            will you please tell how to do QA job for sap bw project?
    Many thanks,
    Frank Zhang

    hi chakri,
    i sent some docs to your mail i.d
    also refer to these links
    http://help.sap.com/bp_biv235/bi_en/html/BWspecific_Info.htm
    http://help.sap.com/bp_biv235/bi_en/documentation/Multi-dimensional_modeling_EN.doc
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/2b50ac90-0201-0010-d597-8d833833f9e0
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/828d9590-0201-0010-95a7-ea8cf8814b94
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/1b439590-0201-0010-ea8e-cba686f21f06
    Also for Bw case studies u can refer to these links
    http://help.sap.com/bp_biv135/index.htm
    http://service.sap.com/bi .
    regards
    ravi
    <b> Assigning pts is the way of saying thanks in sdn</b>

  • Milestone payment for vendor in project system

    Dear sapient
    As per our client requirement vendor payment is based on the basis of milestone i.e activity based. As per the contract agreement payment is made on the basis of certain percentage as mention below.
    1st payment 5% of total order value (with out tax)
    2nd payment 10% of total order value  (with out tax)
    3rd payment 65% of total order value (Including tax 100 % )
    4th payment 20% of total order value (with out tax)
    Is there any standard or workaround functionality available in sap for vendor payment in project system ?
    Regards
    Soraj

    Thnx for reply
    As per our requirement payment is based on completion of work. can i use payment term on the basis of completion of work/activity not on due date basis?

  • Going live check for SAP upgrade projects

    Hello,
    I am interested in "going live check" service and procedures for my upgrade projects. May I find any documentation? Do I have to pay for it?..
    Thanking you in advance and a happy new years!
    Kind regards
    Nilüfer Çal&#305;&#351;kan

    Hi Nilufer,
    The following Input as follows :
    Source : http://www.thespot4sap.com/upgrade_guide_v2.pdf
    This service is included as part of your annual maintenance fee.
    The underlying concept of the SAP GoingLive Functional Upgrade Check is
    to ensure smooth operation of your mySAP.com solution by taking action
    proactively, before severe technical problems occur.
    The GoingLive Functional Upgrade Check is made up of three sessions
    (Planning, Analysis and Verification)—two sessions (Planning and Analysis)
    before the upgrade and the other (Verification) after the upgrade.
    Planning Session: This session should be performed as much in advance as
    possible when the upgrade is first being considered.
    Analyses compatibility for the target release with regards to connected
    systems in the Solution Landscape, OS version, DB version, installed Add-
    Ons, Plug-ins, Country Versions, and so on.
    Analysis Session: It is generally performed two months before the
    production upgrade (consider lead time for hardware procurement).
      The focus is on resource planning and system configuration.
      There is a high-level hardware plausibility check (this is not a hardware
    sizing exercise).
      Potential resource bottlenecks are identified.
      Necessary changes will be recommended to prepare the system for the
    productive use of the new release.
    38 SAP Upgrade Guide | Simplifying Your Upgrade
    Verification Session: Generally performed four to six weeks after the
    production upgrade, and the recommendation from the analysis session
    implemented.
      Comparison of performance with results prior to upgrade
      Recommendations on configuration and optimization
    More information and ordering . For more information, see the GoingLive
    Functional Upgrade Check web page at:
    <b>http://service.sap.com/goinglive-fu</b>
    To order a GoingLive Functional Upgrade Check, contact SAP Customer Care
    Center at least eight weeks prior to the planned upgrade of your production
    system.
    For customers of value-added resellers (VARs) such as CBS customers in the
    US, special conditions apply. Contact your VAR.
    Remote Upgrade Service
    Remote Upgrade Service is a technical upgrade that is performed by SAP
    remote consultants. Pricing is based on the complexity of the customer’s
    environment.
    SAP performs the technical upgrade of your system, allowing you to focus on
    the functional and training side of the upgrade. You are still responsible for
    resolving object conflicts.
    See SAP Notes 106447 and 84044.
    The Remote Upgrade Service is an attractive option for CBS sized customers
    with small or non-existent mySAP Technology group.
    For more information see the Remote Upgrade Service web page at:
    http://service.sap.com/remoteupgrade
    Resources
    The following list shows some of the resources you can use as you prepare for
    your upgrade of SAP. These resources include:
      Your installation partner
      Customers and others you have networked with at customer functions and
    conferences such as:
    • ASUG
    Hope this Info helps you.
    <i>Advanced New Year wishes.</i>
    Br,
    Sri
    Award points for helpful answers

  • Sender IDOC adapter for SAP 3.1H system & XI 7.0

    We are on XI 7.0 and XI would receive a IDOC message from SAP 3.1H system.
    I need to import IDOC's in imported objects in integration repository but I cannot see any IDOC under the IDOC node. I am able to see the RFC's. Do we need to do extra steps with SAP 3.1H version for IDOC adapter?
    Thanks in advance for help!
    Mrudula

    Ahmad,
    This thread is for sender RFC adapter. I am able to see the all the RFC's but not IDOC's from Integration repository for imported objects from SAP 3.1H version.
    Thanks!
    Mrudula

  • For 0PS_C02  cube  Project System - Dates update rules not activated!!

    Hi All,
    When we are trying to install update rules from the BI content for PS module  for the cube "0PS_C02  Project System - Dates",  the
    update rules are not activating. under the cube when BI content activation. What is the issue in activating the update rules from BI content. From BI content the available version objects only will be activated i think. Please rectify and resolve the same at the earliest friends.
    thanks,
    Sakali

    Hi,
    Try to activate through program RSAU_UPDR_REACTIVATE_ALL.

  • CHARM for SAP Bank Analyzer system

    Does anyone have experience with setting up CHARM for SAP BA system ?
    Does work ?
    Generally I would think it should as BA is technically just an ABAP-type system.
    But I have never seen it before connected to CHARM, so any information is much appreciated: PROs, CONs, issues etc.
    Thank you
    Elena

    Thom
    I have configured CHARM on BW 3OB & BI 7 landscapes, and i dont think whatever you heard is correct.
    If you follow pre-requisites you will able to configure it without any errors.
    Thank you
    Sharmishtha

  • Searching for SAP certified project manager for project

    Please post a response if you know someone who has a BS or BA degree and has:
    General SAP Functional Knowledge and Experience
    8 - 10 years of previous experience as
    an SAP Project Manager with SAP, an SAP Partner, or large companies doing SAP
    implementation projects.
    A minimum of 5 full lifecycle
    implementations of SAP in a Project Manager role.
    Would prefer a candidate that is an SAP
    Certified Associate Project Manager, or have some other type of Project
    Management certification combined with significant SAP project and implementation
    experience on a number of different SAP implementation projects at different
    customers and in different industries. 
    Candidate should be certified in the
    use of SAP Solution Manager.
    Candidate should be certified in the
    use of ASAP Methodology.
    Candidate should be willing to provide
    two professional references.
    Required SAP Functional Knowledge and
    Experience Specifically for this Project:
    SAP Solution Manager
    Solution Manager Implementation
    (SMI210)
    Implementation Projects with SAP
    Solution Manager (SMI310)
    ASAP 8.0 Methodology for Implementation
    (ASA380)

    Hi,
    this might help you
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/40fde890-0201-0010-fa86-ee9a507bc62e
    Regards
    Agasthuri Doss

  • Best Practice for SAP BW project implemetation/management

    BACKGROUND: I have worked with Microsoft NAV ERP system, but in my new job I am working with SAP BW including BPS.
    In Microsoft world we had a framework covering all aspects of a project form pre-sales, analyzis, design, implementation called Sure Step. (http://www.microsoft.com/dynamics/support/implementation/success.aspx)
    The framework consist of templates like risk register, business case, requierement collection, questionaries and check-lists. In addition to cover the whole project management part of a project (texts about what should bee done in diffrent phases).
    I found a template searching for some BPS stuff http://www.google.com/url?sa=t&rct=j&q=SAPBPScreate+questionaree&source=web&cd=4&ved=0CDkQFjAD&url=http%3A%2F%2Fwww.sdn.sap.com%2Firj%2Fscn%2Findex%3Frid%3D%2Flibrary%2Fuuid%2F90465610-181c-2a10-eba4-eb6d550682f5%26overridelayout%3Dtrue&ei=7EzfTof3DqiQ4gTc0_C9Bg&usg=AFQjCNFJTtkQ8d3c3ZA_NbW0Gpot_m0SwQ
    QUESTION:
    Does SAP have a similar project framework (for BW) with templates to use in different part of a project, like analysis, design and so on? Is it free for everybody to download and use?

    Hello Ramesh,
    you should have a look at the SAP Instguide, and if it tells you to do as your colleagues say, open a ticket to SAP and ask, whether doing it the otherw ay could have spoiled your system. Anything but an official "yes, it's ok" won't help you.
    For the other guys: have a loook at http://service.sap.com/instguides, there you can find all the guides you need.
    kind regards,
    Carl

  • Configuring SAP R/3 system as data source for SAP BW3.5 system

    HI All,
    Please help me in getting some document for integrating SAP R/3 4.7 with SAP BW3.5 as data source system.
    Thanks in advance.
    Regards,
    Nalla.

    Hi,
    I have got the link which has solution for my question from old questions in this Forum.
    http://help.sap.com/saphelp_nw04/helpdata/en/00/dc54384ac9a81be10000009b38f8cf/frameset.htm
    So stopping this thread.
    Regards,
    Nalla.

Maybe you are looking for

  • I quit, Im tired of signing in so much

    Im headed back to cs4. Im so very exahausted from signing in to cloud services so excessivly. I love adobe cloud, but I will not tolerate this behavior towards paying customers. I am one handed and it takes a while for me to sign in. I use Last Pass,

  • I cannot print pdf files with Adobe flash player installed

    Hello, I have just encountered an issue with printing PDF files on my computer. I am running windows 7 64 bit. I just upgraded to the latest Flash player with firefox addon. After I completed the upgrade, I soon realized that I could no longer print

  • MicroSoft SQL Server 2005

    Hi Experts, Please let me know if we can use ODI with Mircosoft SQL Server 2005. The Drive list is showing only MS SQL Sever 2000. Thanks and Regards, Andy

  • Connect two BW systems to one source system

    Hi Experts! I would like to know if I can set up two BW systems connect to one source system.  We copied and built new BW system (BW2) from existing BW system (BW1).  We need to have both system connect to one source system.  When I execut Restore fr

  • How to replace iphone 5s contacts with imac (10.6.8) contacts

    need to totally replace contacts in the iPhone 5s with the contacts in Apple Mail Address Book on an iMac running OS 10.6.8 (Snow Leopard) with latest version of iTunes.  I know there must be a way to do this, but have been unable to figure it out so