BI PSA stays on status Yellow

Hi Experts
We are trying to integrate BW and XI. We can successfully send the data from Oracle to BW via XI.  A webservice type of data source is used in BW and the problem we are having now is that once the data is sent, the PSA (corresponding to the Info Package with webservice data source) does not close. (It stays yellow).  This results in a repeat of the send data process appending data to the same PSA, i..e if I have 10 records in Oracle, I end up with 20, 30 or even 7000 (which is our case) on the BW info Package because the PSA is still open, i.e. data is appended and not Delta Uploaded.
Put simple, how do you close a PSA belonging to an info Package of a data source of type Web service?  (I have specified 1 hour), but this is not working.
Thanks for the help.
Kind Regards
Ronny

Hi,
in the monitor is all the data processed successfully? I mean all datapackets have been updated in your IObj right?
if yes then you can set the QM status to green manually.
However the issue still remains; I could think of a warning coming from the source system datasource in conjunction with your settings of "evaluation of requests" :in the monitor / menu settings / evaluation of requests / if warning arise during processing....  you have to set the status to successful...
Can't you use 0ART_PLANT_* datasources instead of 0MAT_PLANT; indeed 0ART datasources have replaced 0MAT* sources some time ago and they're more reliable...
hope this helps...
Olivier.
Message was edited by:
        Olivier Cora

Similar Messages

  • PSA request is in yellow status

    Hi
    We got the problem when loading the 2LIS_03_BF data into cube. We have around 4 cubes and 2 ods.
    The data got loaded into all the cubes and ods except on Cube. There was a problem of table space and now it is solved.
    Now the request is in yellow status in PSA. It cube it shows no of records added and transferred but the status is in red color.
    How can i upload the delta data into the cube from PSA when PSA request is in yellow color.
    I feel strange that when the request is in yellow color how come the data is loaded into all other cubes.
    REgards
    Annie

    You should be able to load request from PSA to data target using the option available in PSA. When you manage on Datasource, you see all requests. You can select that PSA request and use Scheduler option in that screen to update that particular request.  It will run infopackage as usual. It will execute all the routines if there are any in update rules.
    When you say you have some programs running in process chain, they must be after this failed load right?
    If that is the case, all you need to do is push process chain further. Below are steps to push process chain further if you any step is stuck in yellow or if mually carry out any red step in process chain. In you case, load that failed step manually using scheduler form PSA manage tab and then push PC further using these steps. That will continue PC further and run any programs that run after load.
    Execute in SE38 -> RSPC_PROCESS_FINISH
    Fill the following parameters on screen and rest all can be left blank.
    1. LOGID - you will find this when you do monitor of your process chain. Every time you run process chain, unique LOGID is created.
    2. TYPE - If step is ODS activation then TYPE wud be ODSACTIVAT and if it is infopak loading TYPE wud be LOADING and if it is DTP Load TYPE wud be LOAD. In your case it will be LOADING.
    3. VARIANT - In the process chain monitor mode, right click on step which you executed manually -> Display Messages. Go to chain tab and there you will find VARIANT
    4. INSTANCE - In the process chain monitor mode, right click on step which you executed manually -> Display Messages. Go to chain tab and there you will find INSTANCE
    5. STATE - Value wud be G
    After entering above parameters, click execute. It will be done in fraction of second and wont give any popup. Now when you will check process chain monitor, you will see that step 4 is green and next step has started executing.
    Abhijit

  • Status YELLOW in the monitor

    Hello SDN,
    I made some changes to my datasource in R/3 and tried to extract the data from BW with out replicating the Datasource. The load is running from long time and it is till showing the status 'YELLOW'. Now, I want to stop the load both on BW side and R/3 side. I would appreciate if someone can give me the step by step process to stop the load both at BW and R/3 side.
    Best Regards,
    Nene.

    Hi Nene,
    If you want to stop the job First Goto Header tab in Monitor and copy the request and paste this in SM37 of R/3 system.
    Then you can see the job which is in Acitive state.
    Double click on that job go Job Deatails in menu bar and click on that now you can see Job information screen, there note down the Executing server  and         
    WP number/PID  of that job.
    Then go the T.code sm51> click on the server which you note down> then select the PID --> In menu bar goto Process and click on Cancel without Core. Then your job will cancel in SM37 aswell as in Monitor in BW.
    Hope will helpful..........
    cheers,
    Jana

  • WS20000075: work item of 1st release step stays in status In process

    Hi All,
    I have activated and set up standard flow WS20000075 but the work item of 1st release (PO release strategy with 3 levels) step stays in status In process. The work item for the 2nd and 3rd release step are completed as expected.
    What could cause only the work item of the 1st release step to stay In process?
    Thanks a lot in advance

    Hi,
    I cannot see in what field the release code is filled in EKKO.
    See here SWEL after 1st release:
    And SWEL after 2nd release:
    EKKO after 1st release
    EKKO after 2nd release
    release strat
    Release strategy

  • WF: Object DECISION Method PROCESS - stays in status in process forever

    Dear Friend,
    Could you, please, give me any ideas why Workflow Task based on business objects/method DECISION->PROCESS stays in status in process?
    It happens after upgrade to ERP2005 from 4.6c. In old version it works perfectly.
    Thanks a lot for help.

    Hi,
    If a Workitem has Status "In Process" then it means it is under execution and it is not completed. however it might get completed and the status is still can be "In Process". The reason for this would be the Workitem might have gone in Deadline monitoring. Check the Workflow Task whether any deadline is assigned or not. I guess it got assigned in your case. And another important thing is there must be a background program that is scheduled which takes care of such deadline monitoring Tasks. Check whether this program is ticked or not in transaction SWU3. So altogether you have to check two things.
    hope this helps you.
    thanks,
    sksingh

  • STATUS YELLOW ( URGENT  )

    Hai all
    I am getting status yellow for request in bi after scheduling info package ( after migeration of data source)
    and in short dump of dataware house work bench I am getting following error : CONNE_IMPORT_WRONG_COMP_TYPE
    EXCEPTION :CX_SY_IMPORT_MISMATCH_ERROR
    AND TEXT OF ERROR AS ( ERROR WHEN ATTEMPTING TO IMPORT OBJECT " HIST2 " )
    THANKS
    CHAITHANYA

    Hi Chaitanya ,
    Just check with the text / value that you are trying to load  into ods ...
    Regards
    Nimesh

  • STATUS YELLOW FOR REQUEST

    Hai all
    I am getting status yellow for request in bi after scheduling info package ( after migeration of data source)
    and in short dump of dataware house work bench I am getting following error : CONNE_IMPORT_WRONG_COMP_TYPE
    EXCEPTION :CX_SY_IMPORT_MISMATCH_ERROR
    AND TEXT OF ERROR AS ( ERROR WHEN ATTEMPTING TO IMPORT OBJECT " HIST2 " )
    THANKS
    CHAITHANYA

    Hi,
    Check is there any Start/Individual routines(ABAP) are there? Usally i occurs when exception raise.Try to debug the update rule solve your problem.
    Regards,
    Saran

  • FEBA - bank statements not processed (status yellow)

    Hi,
    When using the FEBA transaction (Bank statements), some bank statements were not processed. They have the status yellow.
    What does this mean?
    How can I process it?
    Thank you.
    Kind regards,
    Linda

    Hi Linda,
    First of all check, the vendor address details. Is your SAP Version ECC6. If so, from FK02 Vendor master change - in the vendor address details maintain the postal code and city details and once again execute the proposal run. Delete the earlier proposal and enter a fresh proposal. This should work.
    Alternativelya lso check your FBZP settings.
    Hope this helps. Assign points if useful.
    regards,
    radhika

  • Data request in PSA is shown in yellow color

    HI Experts,
    I have created a generic data source in R/3 and replicated the same in BI.  But when the INFOPACKAGE is executed, the requested data in PSA is shown as Yellow Colour. 
    R/3 connection is fine.  I populated the data using RSA3.  Can you trace out why the data requested is shown in Yellow Colour and possible solution.
    Regards.
    Prasad

    1. Did you activated the transfer structure in BW or not?
    2. this might be also prob in the code which you might have writted in R/3 to extract the data. BY the way how is ur data source has been designed?
    3. Did you check the connection is proper or not?
    4. Is your load is picking any data or not? Is it lying with 0 from 0??
    5. Check also Partner profiles in WE20 if any load is not working fine in BW system.
    6. Also check whether the job is Active in r/3 or not?
    Check the above to track some details and come back to us with more details..
    Hope this helps.
    Murali

  • Infopackage - load to ODS - status yellow !

    Hi everybody,
    I am on BI 7.0 and i use Architecture 3.5.
    When i transfer data (36000 records about) from a data table to ODS, i obtain for the 2 last days
    a problem of loading -
    > Status is always yellow.
    As concerns TRFC, In transaction sm58, i obtain the following error:
    RFC:     RSAR_TRFC_DATA_RECEIVED
    Status:  Conversion Error
    I have different behaviours following configuration of my InfoPackage when Incorrect Data Records Occur:
       - Valid Records update, reporting possible -
    > Status Yellow
       - Valid records update, no reporting       -
    > Status Red (few records are wrong)
    Have you any ideas ?
    Thanks a lot,
    Rodolphe.

    Hi,
    If your data packets are getting into BW, then check your transfer and update rules, for any routines where the data is getting stuck.
    If there are warnings, in the infopackage there is an option for treatment of warnings. Select the radio button as green and then reload the data.
    Also suggest you keep an eye on SM50/51/66 to check what's happening with the data load.
    Check the size of the data packets. If possible reduce the data size of the packets and see if that helps.
    Cheers,
    Kedar

  • PSA load remains in yellow status.

    Hi Gurus,
    I have created a generic datasource based  on function module.
    I have replicated the datasource in  SAP BI dev instance.
    I have even checked the extractor checker in R/3 and it shows 381 records.
    On BI side I am loading data upto PSA.When I execute the infopackage for full load in the monitor screen I could see
    "381 out of 0 records".The request remains in yellow status.
    The idoc status in source system side is 03 and on BI side is 53.
    I dont get any error message.Even I am not seeing idocs with red status in SM58 tcode.No logs are seen in sm21.
    I even asked the basis team to check for RFC connection SM59 and partner profile.Every thing looks fine .
    This loading issue is only happening with this specific datasource(ie datasource created on function module).
    For other datasources load are carried out fine.
    Has anybody faced a similar issue?.Please help in this regard.

    seems the load is hung bcoz of thehung IDOCs.
    Process the idocs manually. after
    check the below things
    --> Check weather the source system job finished or not?
    If the job is finished check the TRFCs are processed or not?
    In the monitor screen - menu bar --environment -->job overview (to check the job) -->TRFcs - to check the TRFCs.
    Check for short dumps using transaction ST22.
    -->Check for the Idocs in BD87 and if there are any IDOCs got stuck process them manually.
    To process Idocs first change the status of request to red and try to process them in the background.

  • JMS status Yellow in J2SE Adapter Engine Screen

    Hi All,
    I have tried to configure the JMS Adapter in J2SE Adpater Engine but the status is Yellow.and after that when we went to trace we found the error which is as follows:
    com.sap.aii.messaging.adapter.ModuleHandlerImpl [Thread[Thread-11,5,main]] Error: Error creating module:java.lang.NoClassDefFoundError: javax/jms/MessageListener
         at java.lang.ClassLoader.defineClass0(Native Method)
         at java.lang.ClassLoader.defineClass(Unknown Source)
         at java.security.SecureClassLoader.defineClass(Unknown Source)
         at java.net.URLClassLoader.defineClass(Unknown Source)
         at java.net.URLClassLoader.access$100(Unknown Source)
         at java.net.URLClassLoader$1.run(Unknown Source)
         at java.security.AccessController.doPrivileged(Native Method)
         at java.net.URLClassLoader.findClass(Unknown Source)
         at java.lang.ClassLoader.loadClass(Unknown Source)
         at sun.misc.Launcher$AppClassLoader.loadClass(Unknown Source)
         at java.lang.ClassLoader.loadClass(Unknown Source)
         at java.lang.ClassLoader.findSystemClass(Unknown Source)
         at com.sap.aii.messaging.adapter.AdapterClassLoader.loadClass(AdapterClassLoader.java:67)
         at java.lang.ClassLoader.loadClass(Unknown Source)
         at com.sap.aii.messaging.adapter.ModuleHandlerImpl.createModuleSynced(ModuleHandlerImpl.java:406)
         at com.sap.aii.messaging.adapter.ModuleHandlerImpl.run(ModuleHandlerImpl.java:612)
         at java.lang.Thread.run(Unknown Source)
    Can anyone help us?
    Regards
    Sathya

    Hi,
      Thanks a lot.i have already appended the jar files to the class path.i guess the entries of JMS Adapter defined in the Configuration screen is not proper. Bcoz i am getting the following error.
      ...i.messaging.adapter.ModuleHandlerImpl [Thread[Thread-11,5,main]] Info: action=1 not possible - no module found
    ...i.messaging.adapter.HTTPRequest.run() [Thread[Thread-243,5,main]] Error: java.util.NoSuchElementException
         at java.util.StringTokenizer.nextToken(Unknown Source)
         at com.sap.aii.messaging.adapter.HTTPRequest.run(ModuleGUIBrowserEngine.java:366)
    ..aii.messaging.adapter.XMBParameters [Thread[Thread-244,5,main]] Info: Getting parameters: default value '20' set for parameter 'version'
    Apr 21, 2006 3:14:05 PM  ...p.aii.messaging.adapter.XMBParameters [Thread[Thread-244,5,main]] Info: Getting parameters: default value '' set for parameter 'XMB.ReceiverBusinessSystem'
    Apr 21, 2006 3:24:11 PM  ...sap.aii.messaging.adapter.AdapterImpl [Thread[Thread-269,5,main]] Info: Destroy and remove adapter instance 'jms_receiver'
    Apr 21, 2006 3:24:11 PM  ...essaging.adapter.ModuleAdapterMonitor [Thread[Thread-269,5,main]] Info: Adapter(s) 'jms_receiver' suspended successfully
    Apr 21, 2006 3:24:28 PM  ...i.messaging.adapter.ModuleHandlerImpl [Thread[Thread-11,5,main]] Error: Error creating module:java.lang.NoClassDefFoundError: javax/jms/MessageListener
         at java.lang.ClassLoader.defineClass0(Native Method)
         at java.lang.ClassLoader.defineClass(Unknown Source)
         at java.security.SecureClassLoader.defineClass(Unknown Source)
         at java.net.URLClassLoader.defineClass(Unknown Source)
         at java.net.URLClassLoader.access$100(Unknown Source)
         at java.net.URLClassLoader$1.run(Unknown Source)
         at java.security.AccessController.doPrivileged(Native Method)
         at java.net.URLClassLoader.findClass(Unknown Source)
         at java.lang.ClassLoader.loadClass(Unknown Source)
         at sun.misc.Launcher$AppClassLoader.loadClass(Unknown Source)
         at java.lang.ClassLoader.loadClass(Unknown Source)
         at java.lang.ClassLoader.findSystemClass(Unknown Source)
         at com.sap.aii.messaging.adapter.AdapterClassLoader.loadClass(AdapterClassLoader.java:67)
         at java.lang.ClassLoader.loadClass(Unknown Source)
         at com.sap.aii.messaging.adapter.ModuleHandlerImpl.createModuleSynced(ModuleHandlerImpl.java:406)
         at com.sap.aii.messaging.adapter.ModuleHandlerImpl.run(ModuleHandlerImpl.java:612)
         at java.lang.Thread.run(Unknown Source)
    What do we need to do?
    Regards
    Sathya

  • Process Chain Status Red, DTP status yellow, DTP is green from inside

    Hello All,
    I have a problem where the  Process Chain  status is red, but the process(DTP) status is yellow.
    When I right click on the yellow process there is no error message and the DTP is green in Process Monitor.
    But the chain did not complete and the rest of the process steps are grey.
    After 20 minutes the Process Chain ran again(automatically after new data arrived) and this time without errors and it went green.
    My question is, how to proceed with the red Process chain and complete the further process and make it green.
    Regards
    Alex

    hi,
    There are scenarios where you need to change status of a process chain or a particular step in process chain.
    You might need to change the status in the cases where we need mark these steps successful so that dependent steps get processed. There are other scenarios where one needs to change the status of a single step in the process chain or status of whole process chain.
    Step by step instructions on change process chain status
    1. Right click on the failed step in the process chain monitor and go to displaying messages
    2. Go to u2018Chainu2019 tab and note down variant, instance and start date
    3. Go to SE16 and the table RSPCPROCESSLOG and enter variant, instance and start dates from step 2 and note down log_id, type, variant, instance.
    4. Go to SE37 transaction and execute the function module RSPC_PROCESS_FINISH and enter the values from step 3 and enter the new status u2018Gu2019 in status field and execute the FM
    5. This sets the status of the process chain (PC)
    After you set the status using the FM, go to the monitor screen of the process chain, you will notice the changed status. Now dependent steps in the process chain will start running
    Thanks

  • Vault status yellow when launching Aperture?

    I have noticed that when I launch Aperture, the Vault status is always yellow. This is even after I have updated the Vault before I quit Aperture. I think it started after I created a MobileMe Gallery. Is there a correlation?
    -Scrags

    Sounds like the vault might be corrupted. As vaults are just snapshots of the current state of the library I would try making a new one and see if that updates. If it does just abandoned the old vault and use the new.
    If the new vault fails also post back.

  • Background task stays with status "in process" without creating any error

    Hi all,
    we created a two step approval workflow for parked documents based on the SAP WF templates WF WS10000051 (WF frame) and WS10000053 (two step approval sub WF). The problem now is, that after the two approvals have been given and the release flag is set the system should post the document. This is done in a background task. This task is started automatically but the status stays at "in process" and the document remains "parked" and not posted.
    What we did so far to solve the problem:
    1.) Check if shortdump has been created via ST22 --> not the case
    2.) Refreshed buffer via SWU_OBUF
    3.) Reacticvated/executed task with workitem id from log in SWIA
    --> nothing solved the problem so far. Please help!
    Thanks in advance. Johannes

    Hello Johannes !
                  You have asked "What do you mean with populate the value?"
                            Populating means conceiving the variable or container with valid value.In your scenario , with reference to your URL http://img851.imageshack.us/i/wflog2.jpg/ , POSTED_FLAG should be populated with value X.It should not be "Not Set".
                            With reference to your URL http://img717.imageshack.us/i/wfprotocol.jpg/, Set Release Flag step does not sets release flag.
                            It's evident from the URL http://img263.imageshack.us/i/flagreleasesetsw01.jpg/
                The solution for your problem is straight forward : Pass all the export or result parameters of RELEASE step to SET RELEASE FLAG step. Similarly , pass all the export or result parameters of SET RELEASE FLAG step to POST PARKED DOCUMENT STEP.
    Answer for question 1 : After  successful workflow transportation, it's version changes.Never mind the versions unless either of the versions are inactive or the version you require is inactive.
    Answer for question 2 : The user WF-BATCH should have SAP_ALL and SAP_NEW profiles.
    Regards,
    S.Suresh

Maybe you are looking for

  • Best Safari version for 10.6.6

    I'm running Safari 5.0.2 on a 15" Macbook Pro running Snow Leopard 10.6.6. I'm having issues with some sites so wish to try another version of Safari to see if that will help. I downloaded versions 5.0.2 (just for safety if I had to return to it), 5.

  • How do I send photos by email?

    Until recently I used Adobe Elements 3 and sent Photomail and E mail attachments with no problems. Recently I installed Adobe Elements 8 and since then have had continual problems sending images via email. I've read all the material, watched the tuto

  • Password Protected pdf's

    I am trying to view a password protected PDF on an iPad but not having any success yet. I think I am transferring the PDF fine but can't get it to open.

  • I deleted a movie out of the cloud on accident and want to back it up

    I still have the movie on my iPad but now it's no longer in the cloud.

  • VS 2013 deletes ProjectTypeGuid for MVC4 from .csproj file

    I am on a team working on a long-term MVC 4 project. The solution was created in a previous version of VS. In VS 2013, when you right click the controllers folder and choose "add controller..." the only options are for WebAPI 2.  We discovered with o