Billing in other Plant

Dear all,
We are creating a export sale order from one plant and delivery done with the same plant. But we need to bill in the other plant under the same company code.
Is this possible?
Regards,
Manu

As mentioned in the other reply, plant cannot be changed in billing.
However, if your requirement is to bill under a different cost/profit centre or business area (of the other plant), then you can do this without changing the delivering plant.
Based on doc type and plant, you may derive the profit center / business area in some exit and update the sales order so that the same values flow in billing and relevant financial result can be obtained.
Cheers,
KC
SAP SD

Similar Messages

  • Inspection Lot Not Triggered for STO - One Plant to other Plant in same Company

    Dear SAP Gurus,
    We have a scenario of STO for one plant to other plant with in the same company code.
    The process is being followed as follows ;
    1. We create stock transfer by creating P.O thru ME21N
    2. Create Outbound delivery thru VL10B
    3. Doing PGI & Picking thru 'VL02N. Thru movement type '641'
    The QM settings are as follows to trigger an inspection lot
    1. Inspection lot origin '08' activated in MM.
    2. Quality plan is defined and task list is released.
    3. 'VL02N' is defined thru 'OMJJ' for movemrnt type '641'.
    But while doing PGI no inspection lot is created.
    Our requirement is to trigger a inspection lot and Invoicing / Billing only possible after inspection lot Approval.
    Please advice.
    Thanks

    Hi
    As per my understanding  inspection type 10 should be activated in QM view material master.
    Can you please check the below thread and also check some similar threads.
    QUALITY INSPECTION FOR OUTBOUND DELIVERY
    I hope your problem will be resolved or else revert with your observation.
    Regards
    D Mohanty

  • Withdrawal from other plant- sales

    Hi dudes,
    suppose if i am using 70  special proc. key for semifinished materials and are planned in other plant gets consumed for FERT materials order in the main plant.
    suppose if i maintain the sales views for these semifinshed materilas in the main plant and can i do the PGI for sales order from other plant to main plant where the sales procesing is happening.
    thanks in advance
    Robert

    Special procurment key 70 is reservation from FERT plant to the supplyiong plant.
    Against this reservation you need to issue the material? Is it your scenario?
    As I know the material will be withdrawn duting backflush from the supplying plant directly
    If you want to sell the raw material from supplying plant to production plant, then you need to set up STO, in OMGN.
    Since usually we use it for inter company tranfer and billing, I am not sure whether you can do it for the plants with in the same company code.

  • MM - Daily Report of the materials received from other plants

    Hello
    I want  the daily report of all the materials received from other plants i,e by stock transfer. Is there any way to get this information from the standard reports
    regards
    Ravi Pal

    Dear Prashant
    i checked with this transaction but the problem is that this gived the report for only the GR taken against STO with SD Delivery i,e with or with out billing. the system is not picking the STO with MM delivery whan we enter the supplyiny plant as u said
    pl check this
    thnaks
    regards
    ravi pal

  • Organizational data for inter-company billing missing in plant 2200

    Organizational data for inter-company billing missing in plant 2200

    Dear Siva,
           This may be related to incompleteness in the inter -company billing configuration settings so go through this IMG path then do the proper settings,
    SPRO>Sales and distribution>Billing>Inter company billing>Assign organisational units by plant, here you need to assign the Sales organisation,Distributional channel and Division (sales area) to the 2200 plant.
    Now you try
    I hope it will help you
    Regards,
    Murali.

  • Which movement type use for return stock form one plant to other plant  in

    HI friends i am working on STO PROCESS
    i need to transfer return stock from one plant to other plant as a return stock i am using Mvt type 455
    but system shows  following error
    Update control of movement type is incorrect (entry 455 X X _ L)
    Message no. M7226
    Diagnosis
    The system could not find entry 455 X X _ L in any of the movement type control tables.
    Procedure
    Cancel current processing.
    Contact your system administrator.
    Action to be taken by the system administrator
    Check in Customizing for Inventory Management under Copy, Change Movement Types whether the entry is contained in the Update control view for the movement type.
    If the entry is missing, proceed as follows:
    For standard movement types, this means that the given process is not supported using the present data combination. Do not create any entries without prior arrangement with your SAP consultant. Otherwise, incorrect postings may result.
    For customer-defined movement types (beginning with 9, X, Y, or Z), this may mean that they have not been fully defined. Delete the movement type and re-create it by copying a standard movement type.
    thanks in advance

    Hello,
         I think there is a standard STO movement type you can use. But I can't remember. Why don't you try to find it and test if it fit your requirement?
         There are some information for your reference. Please check on website:
    http://www.sap-img.com/materials/difference-for-stock-transfer-and-transfer-posting.htm
    Using STO without delivery: 
      doc.type: UB
      GI:351, GR:101
      STO with delivery:
      GI:641, GR:101
      delivery type:NL
      STO with delivery and billing:
      GI:643, GR:101
      delivery type:NLCC , billing type:IV
         And if you want to use the way to return the goods replenishment, try to flag the return checkbox while you create purchase order item. Of course, corresponding configuration is required.

  • How to restrict a user for the other plant orders In CATS

    Hi
    We are using CATS for entering labour hours in PM orders. While entering the time in CAT2 first we will select the personal number of the employee and the order number in which he has worked .
    My question is while entering the order number if we worgly entered the other plant order number it should give error message saying that order number not belong to other plant.
    How can we restrict this .At present it is accepting the other palnt orders
    Thanks in advance
    Gangadhar

    Hi,
    You have to add some more fields in CAT2 this will serve your purpose.
    Text for Plant etc .
    Regards,
    Kapil Kaushal

  • Purchase and sales flow resulting from 'production in other plant'.

    Dear all,
    When using the procurement type 'P' (production in other plant), materials are consumed in plant A and goods receipts from production order happens in plant B.
    When plants A and B belong to different company codes, SAP generates a cross-company document. Within the receiving company, the offsetting account for the stock account is the cross-company clearing account.
    This posting is generally not sufficient as legal and tax requirements ask for a sales and purchasing flow between the 2 company codes. Therefore many companies need to 'develop a solution' to complete this posting 'after the facts'.
    Does anybody know whether this additional posting exists under the form of an 'add-on' or additional solution to the standard made available by one or another partner of SAP ? Note that the starting point for this question is important : our company wants to use the 'production in other plant' flow because the native purchase and sales flows are too much time consuming.
    Thanks for your help.
    José Beghein

    Hi all,
    I want to be a bit more accurate here :
    The produced material in plant B has a special procurement type code (MARC-SOBSL) which in its definition contains procurement type E (BESKZ) and special procurement P (ESOBS). It is special procurement P that triggers the 'production in other plant' behaviour. The production plant (WRK02) is also specified in the definition of the special procurement type code.
    Kind regards.
    José Beghein

  • Production in other plant for finish and semifinish

    Hi Friends,
    We have following scenario:
    i)    Finish Product FP1 and Semifinish Product SF1 exist in both Plant X and Y.
    ii)   BOM for FP1 consists of SF1.
    iii)  SF1 is produced in Plant X and FP1 in Plant Y.
    iv)  Planning plant for FP1 is X.
    v)   I have tried with special procurement key 'production in other plant'.
    vi)  SF1 is produced in Plant X and GR done directly to plant Y for consumpton to FP1.
    vii) FP1 is produced in plant Y and GR done directly to plant X.
    Here instead of doing GR  directlyto the consuming plant the client wants to do Stock Transport for both SF1 and FP1.Please suggest any method to achieve this.
    Thanks in advance
    Shiva
    Edited by: Shiva Sharanappa on Apr 24, 2009 3:37 PM

    Hi,
    For Halb: DepReq in receiving plant and no receipt elements in prouducing plant.
    I am expecting also for Halb: Purchase Requisition in recieving plant(Y) and a planned order in producing plant(X) just like Fert.
    You stated you have DepReq for SFG in PlantY (receiving plant), nut MRP did not generate prourement proposal (PurReq) for it.
    In this case you should check the planning situation (e.g. whether you have sufficient stock to cover the requirement). If the procurement proposal is missing and this do not originate from the planning situation (e.g. stock level, stock like elements(STO, existing PurReq, etc.)), you should check your master data settings (e.g. MRP type) - if your master data settings are proper, MRP should generate procurement proposal (please be aware that in case of "VB" MRP type system watches the so called reorder point!).
    So, second MRP run should generate the mentioned PurReq for SFG (in PlantY) and at this moment you should get requierement in PlantX (that produces SFG). Third MRP run would generate procurement proposal (PldOrd) in PlantX.
    Please check master data (BOM, material master) settings of SFG.
    Regards,
    Csaba
    Edited by: Csaba Szommer on Apr 26, 2009 8:50 AM
    Edited by: Csaba Szommer on Apr 26, 2009 8:50 AM

  • Transfer of cenvat credit to other plant

    Hi,
    I have a plant AAAA.I have recieved raw materials and availed cenvat credit.
    Now I'm transferring the material to other plant BBBB.
    Is it possible to transfer the cenvat credit availed in plant AAAA to plant BBBB.
    Regards,
    Venkatesh

    Hi Lakshmi,
    During intra company STO process,when materials are transferred does the cenvat availed at one plant is transferred to other plant?
    FI consultant is not clear on this so i posted.
    So kindly request you to transfer this post to FI forum if it is not relevant to MM,as i don't know how to do it.
    Edited by: Venkatesh DY on Jan 18, 2012 11:54 AM

  • Requirement from other plant.

    Hi Gurus,
    There are plants A and B. Plant B is in need of service parts. Plant A is also not having stock for same parts then creates Purchase order for some vendor and corresponding requirement is triggered in plant B with reference as Procurement should be carried out in plant B. Plant B then purchase required parts for plant B. How this scenario can be mapped in SAP. Is there any way to map this? Please guide with detail steps.
    Regards,
    Pradeep

    Hi
    You can do that with the help of special procurement key in SAP. You need to define your own special procurement key for your plant in t.code OPPQ. Give your plant. Then click in special procurement. Create new entries.Give procurement type F and tick with draw from alternate plant or other options as per your requirement. Then Then assign it in masterial master for the required masterials. So that requirements in one plant is reflected in other plant.
    Regards
    Antony

  • Production at other plant

    I have created sales order for material X. In Material BOm of X there is material y with special procurement 80 ( production from other plant ) in line item of Bom.
    When I do MRP MD01 in first plant  then system does not create planned order for material y in other plant.
    But when i do MD50 then system creates planned order in other plant.
    Also when production is completed in other plant for material Y then it does not built stock in First plant but it creates sales order stock in other plant.

    Mayuresh,
    Sorry for the very late reply. I do not think you need to built stock of Y in the first plant. You can just do good issue of Y (in stock in 2nd plant) to the production order of X (the first plant). 
    If you need to have stock of Y in first plant then you will need to manually do a plant to plant transfer posting goods movement.
    Hope this helps. If you have additional questions please come back.
    Thanks,
    Ram

  • Sale wrt STO of raw material from a manufacturing plant to other plant

    Hi Gurus,
    My scenario is that, I have procured a raw material for PLANT A. At the time of procurement it  hits RG23A PART1 AND RG23A PART2 registers. Now I want to sell this raw material without any value addition to other PLANT B of the same company code.
    Here the excise requirement is that at the time of delivery it should hit RG23A PAR1 AND PART2 and should not hit RG1 register.
    i request you to pls guide me how to execute this process in SAP so that it satisfies excise requirements.
    Thanks and Regards
    ujwal

    Seems you need new mov type- ( in place of 641)
    is this requirement is only for Raw material STO??
    Generally , even when you do STO for Raw Material,as per excise it should hit RG1- Not sure,why you want it to be posted in RG23A reg.

  • Material Issued from other Plants

    Hi All,
    I have 2 question here.
    I have created a STPO with delivery date say 12.09.2009 from my plant ABC to the Plant XYZ and 140 qty, For this XYZ plant has issued material on 15.09.2009 around 100 qty.,
    Now I am looking for the report ME2W to find out what are all the materials has supplied by other plant till 14.09.2009.
    but as per the report ME2W it is having I/P option as delivery date, so if i put delivery date between 01.09.2009 to 14.09.2009, it is showing  all the material which is issued on after 14.09.2009 also as i have put the delivery date and also it is checking as per delivery date.
    Question:
    1. How to get these reports ie., materials issued as per issued date or posting date not as per delivery date or not as per material code---- any transaction available for this.
    2. one more i come across here in STPO is that, if i create 100 qty of PO but it is allowing to issue more than the PO qty, say if i create Po with 100 Qty but other plant can issue more than 100 ie.,>100.
    Is thr any settings available to make such the system should not allow to issue more than the PO qty.
    Please help me out on this.
    Regards,
    Nagaraj S
    Edited by: Nagaraj  S on Oct 1, 2009 2:52 PM

    Dear Vidya Dewangan ,
    I have checked MB5B, it is not for the requirment what i want.
    See this report or MB51 would works with only 2 plants where within which these ST can occur.What in my scenario we have more than 2 plants, See i will clearly expalin the situatin -
    Thr are 3 plants-  Plant A,Plant B, Plant C.
    ST happens b/w A and B, A & C, B& C and Visa versa.
    Now I want to know what are all the ST happens between Plant A and Plant B, where Plant A has supplied some material  to plant B on some day(ie., 351 on posting day),say i dont know material i know only the dates.I cant use MB51, is thr any other report i can get.
    Pls help me out.
    Regards,
    Nagaraj S

  • Return to Warehouse from other plant - Related to STO return

    Hi Gurus,
    We have a scenario at our client:
    We had a stock transfer order from plant 1 to plant 2. In plant 2 we did the created the delivery - created transfer order - performed good issue - confirmed transfer order and the material is issue to stock in transit i.e. mvt 641. Then we do a GR in the other plant 1 (who issued the STO). Then we do a return MIGO with 122 Mvt. in plant 1. Now what should be the process for receiving back the returned material in the warehouse again? How to relate the return with deliveriy created for STO?
    thanks for any input.
    regards,
    KHAN

    Hi,
    Go with below transactions:
    VL09-PGR Reversal
    VL02N-Delete the Out.Delivery Document
    MIGO-For cancellation of GR Document ( With selection of "Cancellation-Material Document -Enter your GR document number>>click on enter button>>you will get GR Document scenario screeen >>Tick on "Item OK box">>check and post).
    Your GR document shall be reverse and update your material stock also.
    Hopfully your problem is solved.
    Thanx-Rajesh

Maybe you are looking for

  • Customer Master Idoc DEBMAS

    Hi I kindly ask you how can I send customer master IDOC in full. I am using change pointer and change pointer allows only to be send ,changed fields other fields are filling with '/' character. Is there any way to send this '/' what is in original

  • Is  it Possible to add 1 PDF to 300 separate PDFs????

    Hello, I have 300 customized PDF files that I created using the Data Merge system from Indesign, but each of the customized PDF's need to have a second page. The second page will be the same PDF for all of them. I was wondering is it possible at all

  • My mac pro screen has vertical lines... How much does it cost to get it fixed?

    My mac pro screen has vertical lines... How much does it cost to get it fixed?

  • Excess Report

    Which report or module can I use to get all the exCess material and dead stock ? Thanks Polo Ramirez [email protected]

  • Usage of 'BAPI_ACTIVITYCRM_CHANGEMULTI'????

    Hi All, Can anyone help me with the following BAPI. I have used it as follows:- CALL FUNCTION 'BAPI_ACTIVITYCRM_CHANGEMULTI' TABLES header = it_header headerx = it_headerx PARTNER = PARTNERX = ORGANISATION = ORGANISATIONX = DATE = DATEX = TEXT = TEXT