We have a strange and interesting scenario here with STOs. Let me explain step by step
1) We don't do ATP check for STOs and hence a Z-check mode has been designed and it will be considered for STO documents
2) Now, let us consider a situation where I have a stock of 100 CS for Material M1 at Plant P1.
3) Let's say, a STO document gets created at 09:00AM in the morning with requested quantity 50 and as it doesn't do ATP check this will be fully confirmed
   and consumes 50CS of the stock.
4) So, the net cumulative quantity that is available is 50CS.
5) At 11:00AM,let us say; there is a sales order that was created for a quantity of 100 CS. As the sales document does the ATP check it consumes the only available 50 CS and gets saved with partial confirmaiton situation.
Now, at 12:00 PM - We are running the BOP. When we run the BOP ; what standard SAP does is STO document (as per our business scenario, STOs has higheest priority and they fall on top of the list) gets skipped due to non-ATP check mode and full stock is allocated to the sales order which makes no sense to us which leads to over confirmation situation.
We thought of exluding the STOs from BOP ; however - we end up in not re-scheduling the STO documents which would result in requiring a separate BOP to be run for the STO documents.
FYI - We have contacted SAP and they have confirmed that the above mentioned behavior of the BOP is as designed and it cannot be changed.
Is there any alternative solution for this ? Appreciate your valuable ideas.
Thanks
Babu Kilari

You might have already considered this. pardon if this sounds dumb.
see if you can pass STO's as a receipt in the scope of check for STO's. I presume it is requirement element in your case for ATP checking rule for STO's. Don't include these STO's in sales order checking rules.
This may result in inconsistent ATP logic though. Alternately try creating a Z category for STO and call it a receipt. include this also in the scope of check for STO's. 
Try running BOP and see what happens. BOP on its own is not a gurantee that a requirement is always confirmed over another, whatever be the sorting criteria. If there isnt enough stuff, the system has its own internal logic of sorting too which probably treats priority by time of creation of the requirement.
Publish if you meet any success. These ideas are just based on my fancies
Guru

Similar Messages

  • How to block the Form Settings for Main Menu to use ONLY "My Menu"?

    Hi everyone:
    Our customer wants to define an User Menu (My Menu) for each B1 user within the company and restrict the Modules at main menuu2026
    How can I block the Form Settings for the Main Menu?... It is possible to give an user Only access to My Menu and denied Authorization to the Modules?. 
    I appreciate your help!!. Thanks very much
    Claudia Gutiérrez

    Hi,
    'My Menu' refers to the third tab on the Main Menu, and the
    authorization of 'Organize My Menu' works as below:
    - Full Authorization: Allows the user to access the Organize User Menu
      window (Tools -> User Menu -> Organize) and customize the menu.
    - No Authorization: The user cannot open this window.
    Check the Note  [1062635|https://websmp130.sap-ag.de/sap(bD1odSZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=1062635] if you are looking for it.
    Regards,
    Jitin
    SAP Business One Forum Team

  • Define the Characteristics of the validity table for non-cumulatives

    Hi Friends,
      Here I am designing MultiProvider ( ZCA_M01), based on the Two Business content info cubes (0IC_C03 & 0SD_C03 ) & one customized info cube (ZPUR_C01).
    I done Identification for char & keyfigures also.
    When i trying to activating the Multiprovider, here i am getting the error , error message is : Define the Characteristics of the validity table for non-cumulatives.
    Even here I am attaching the error message help also.
    Message no. R7846
    Diagnosis
    The InfoCube contains non-cumulative values. A validity table is created for these non-cumulative values, in which the time interval is stored, for which the non-cumulative values are valid.
    The validity table automatically contains the "most detailed" of the selected time characteristics (if such a one does not exist, it must be defined by the user, meaning transfered into the InfoCube).
    Besides the most detailed time characteristic, additional characteristics for the InfoCube can be included in the validity table:
    Examples of such characteristics are:
    •     A "plan/actual" indicator, if differing time references exist for plan and actual values (actual values for the current fiscal year, plan values already for the next fiscal year),
    •     the characteristic "plant", if the non-cumulative values are reported per plant, and it can occur that a plant already exists for plant A for a particular time period, but not yet for plant B.
    Procedure
    Define all additional characteristics that should be contained in the validity table by selecting the characteristics.
    In the example above, the characteristics "plan/actual" and  "plant" must be selected.
    The system automatically generates the validity table according to the definition made. This table is automatically updated when data is loaded.
    Please take as a high priority.
    Thanks & Regards,
    Vanarasi Venkat.

    Hi Venkat,
    If you want to include 0IC_C03 cube in your multi provider the you must make sure that the time characterestics ( 0CALDAY, 0CALMONTH ....) are present in all of the other info providers which you are including in the MP. The Time char to choose depends upon the Inventory cube in which you have mentioned during the definition. As you are using the standard cube 0IC_C03 it has the time char as 0CALDAY. Try to include this in all the other info providers and dont include more tha one Non-cumulative in the MP.
    Try this and see if it helps....

  • I received a notice that there is an update for my Lightroom 5. I have the non-creative cloud version. Is the update available for non-cloud users? It says to download click the link and it takes me to Cloud free trial screen.

    I received a notice that there is an update for my Lightroom 5. I have the non-creative cloud version. Is the update available for non-cloud users? It says to download click the link and it takes me to Cloud free trial screen.

    It is the same installer. You can run it as 30-days trial (CC version) and decide later for CC or stand-alone. To license as stand-alone, follow this guide.
    If you already have the LR6 license key, you can enter it during setup and do not need to follow the guide.

  • Is it worthwhile to buy the airport extreme for non intel

    I currently am using an airport express for my home network and want to use it on my home stereo(upstairs) so we can play music from itunes. So I need to buy another airport for downstairs. Will I get any benefit from the extreme or should I just get another express?

    idadof3, Welcome to the discussion area!
    I think iFelix provided a very good answer in your other thread "Is it worthwhile to buy the airport extreme for non intel".

  • How can we block the asset class for company code

    Hi Experts,
    At what level we can define asset class and how can we block the asset class for particular company code in group company
    Regards,
    Harish

    Dear Harish,
    You can block the asset through OAOA at asset class level blocking at Asset Class level, and same you can block for creation at a chart of depreciation level from AM05.
    And for additional acquisition you can block from AS05. I hope this will solve your issue. If you have doubts feel free to share.
    Regards,
    Pankaj A Bhalerao.

  • According to postal code should block the purticular material for customer

    In sales order According to postal code should block the purticular material for the customer.for this Can I go for User exit?can anyone explain how to do this?I m new to user exit.

    You can use the material listing/exclusion in SD cutomizing, instead of writing a userexit. SPRO: sales-> basic functions -> listing/exclusion
    Here you can define the criteria and make tables and accesses that manage this kind of problem without writing code.
    pls. reward points if helpful
    regards
    Roberto

  • Mozilla shows NOT RESPONDING until it loads the pages completely, for FACEBOOK and checking EMAILS on yahoo and google

    Mozilla shows NOT RESPONDING until it loads the pages completely, for FACEBOOK and checking EMAILS on yahoo and google.
    You can't do anything, you should just wait.

    I'm getting a similar error over here. Sporadically some sites won't load specifically in Safari; they open just fine in Opera, Firefox and Camino though. This is really annoying.
    It's pretty clear it's nothing network related…

  • Creating/setting up vendors for NON- PO type item

    What is the best way to handle Vendor set up for Non- PO type items e.g. utility bills or taxes or something similer?
    How can this be handled? I am sure this applies to all - any help would be greatly apprecited. thanks
    Raj

    Hello Rajendra,
    You can think about two options.
    1. Blanket Order
    -You create a blanket PO for the desired validity period.
    -The PO need not contain any specifications.
    -You set a value limit.
    -It is not necessary to record and accept services performed against the order. During the validity period of the purchase order, incoming invoices are posted directly with reference to the PO, provided that the value limit is not exceeded.
    <a href="http://help.sap.com/saphelp_46c/helpdata/en/c3/72cbf155cd11d189660000e8323c4f/frameset.htm">Blanket order</a>
    2. Invoicing plan
    An invoicing plan comprises a list of scheduled dates on which invoices relating to PO items covering materials or services are to be entered in the system and subsequently paid.
    The invoicing plan facilitates the largely automated creation and payment of invoices for both recurrent procurement transactions (e.g. rental or leasing) and transactions that are to be invoiced in stages (e.g. following the completion of individual phases of a construction project).
    <a href="http://help.sap.com/saphelp_46c/helpdata/en/c3/72cbe455cd11d189660000e8323c4f/frameset.htm">Invoicing plan</a>
    Hope this helps.
    Regards
    Arif Mansuri

  • Retrieving the milestone dates for an opportunity line item

    Good afternoon experts,
    I am looking for a way to retrieve the milestone dates for an opportunity line item.  I have the line item GUID and need to find out the milestone dates for the item.
    Is there a table or FM that will allow me to do this?
    Thanks,
    Eric

    Hi Eric,
                     I think you can use the FM 'CRM_ORDER_READ'. Pass the guid of the transaction as input to the FM , milestones details you will get from the parameter 'ET_APPOINTMENT'.
    Hope this helps.
    Regards,
    Ruby.

  • Block the Schedule line for Delivery

    Hi,
    I have a requirement in which I want to block the schedule line in my sales order for delivery.
    Also I want that system should not perform the availability check and block the stock on the requested delivery date.
    We want the order handler to take a desicion and remove the block, and then the item should be relevant for availability check.
    To cover the 1st req of keeping the block, I will use a schedule line cateogry which has a delivery block setup in IMG.
    Will setup the schedule line cateogry accordingly.
    But I am not sure how to achieve the 2nd req to not to confirm the schedule line qty till the block is there.
    Kindly advise.
    Regards,
    Harsh

    Hi Harsh,
                 2 ways to achieve this,
    1- Create new reason for rejection & you can stop the requirements to flow to MD04. ( assumption is, item will be waiting for further activities by the Order handler )
    2- Tx: OVB8 & OVB5
    check whether you can include your own logic which is applicable only for newly created delivery blocks. This transactions works well for Delivery block "01"- credit block- for not to transfer requirement to MD04.
    Hope it may work for you.
    Regards,
    ReazuddinMD

  • Is possible Block the batch stock  in the run MRP

    Dear gurus,
    i have a stock in the batch A , is possible block the stock for run MRP ( don't see the stock in the esecution MRP ) and create a planned order?
    Thanks a lot
    Daniele Pistilli
    PP TEAM

    Dear
    MRP can't be run on Batch and the stock of the batch should be transferd to special stock like QI , Block stock  so that MRP do not consider during Net Requirement Calcualtion  even it is avaliable in the same storage loaction which is relevent for MRP run .
    Basically , In order to exclude few Batches stock from MRP, SAP has come up with different categories of stock like blocked stock, restricted-use stock... etc.
    you can transfer these stock into blocked/restricted use stock and enable the respective check box in T-code: OPPQ in "Available Stocks'Option (Maintain Plant Paramters screen) -Here Mark Block Stock so that MRP will not cosider the same .
    After transfer of stock & Check Box enabled in OPPQ, execute MRP, system will not consider this stock.
    Hope it helps
    Regars
    JH
    Edited by: Jiaul Haque on Dec 21, 2010 1:09 PM
    Edited by: Jiaul Haque on Dec 21, 2010 1:11 PM

  • How to block the status mail for an inbound Idoc to a specific user

    Hi,
    I have to stop sending the error status mail to a specific user depenidng on Partner Type. This will trigger when an inbound Idoc contains status error(message type INVOIC &ORDRSP).This user needs other mails which are getting triggered with the same Idoc for the same partner. Basically, the requirement is to block only the status mail for that user. The statndard task for this is TS70008125 and it uses the agent determination rule 30000001 (Idoc Administrator).in WE46, this task is assigned to process code EDIR. I have copied the task to a custom task and changed the agent determination rule. I would like to know how will I configure this task so that this custom task will trigger for the status error, without altering other workflows for the same message type & the partner type. Or is there any other way to block the mail?
    Thanks,
    Santosh

    Hi,
    I have done the required coding to exclude the specific agent from the rule,copied the task and its ready. My question is how do I map this custom task to a particular partner type, for the message type INVOIC in WE20? (The message type used for the inbound Idoc is INVOIC). I checked the Partner profile in WE20. Most of the process code is using function module as the processing type.
    Thanks,
    Santosh

  • 'Error Occured in the Source System' for Non SAP system

    Hi Gurus,
    We have an Info Package which is getting the data from the Source System 'DOCP' and it has failed due to 'Error Occured in the Source System'.Since the source system is Non SAP system there is no option 'Replicate Data Sources'.So,First I activated the transfer rules by the program and ran the package again .But again the same error occured.
    Please suggest me how to proceed for this error for Non SAP Systems?

    Hi,
    Check the RFC connection in SM59 and reactivate the source system again.
    Hope this helps..
    Thank you,
    S R.

  • Where can i find the Datewise stock for a particular material

    Hello friends,
    In which table i can find the stock of a particular material on particular date?.MARD, MCHB these all tables gives the current stock of material.But i want to find the stock of material on particular date.In Report MB5B and MC.9 we can find the stock on particular date but is there any table from where these reports fetch the data?
    Thanking you guys in advance.

    Dear Jitendra,
    Check once again in this thread whether are you able to find out some help.
    But I'm sure MB5B is not getting the info from a single table,it's getting the information from info
    structures and few tables.
    table to see stock on particular date
    Regards
    Mangalraj.S

Maybe you are looking for

  • Videos not playing in iTunes 7, where can I get previous version of iTunes

    Since "upgrading" to iTunes 7, I can't get any of my videos to play in iTunes--they show up but nothing happens when I try to play them. This includes videos I bought via iTunes and DVDs I imported using Handbrake. I didn't upgrade to Quicktime 7 bec

  • JTextArea selection color

    Hi I want to be abel to set diffrent colors in a textarea by selecting a interval of text och and then selecting a color. How is this done? I dont mean the selection color, the actual text. The purpose is to have an textarea with lots of news text, a

  • TS1550 Mac OS X v10.8.2 Mountain Lion

    I get this error when I am trying to backup to "my passport for mac": Unable to complete backup. An error occurred while creating the backup folder.  I am using the latest OS 10.8.2 Mountain Lion.  Has anyone encountered this problem and has any idea

  • Consolidations Planning using BCS PCtr 'Entire Hierarchy time dependant'

    Hi All, We are doing CONS planning using BCS Profit Center and this infoobject has the 'Entire Hierarchy time dependant' property and we have two hierarchies one for 2010 and one for 2011. If  '0PLANDAT' variable used for the 'Key Date' in the Input

  • PeopleSoft Application Performance Testing

    Hi, We are using load runner testing tool for performance testing the peoplesoft application. We want to know whether people soft protocol is the best suited or http/html protocol. Any hints/suggestions will be of great help. Thanks and regards, Sriv