Block the Schedule line for Delivery

Hi,
I have a requirement in which I want to block the schedule line in my sales order for delivery.
Also I want that system should not perform the availability check and block the stock on the requested delivery date.
We want the order handler to take a desicion and remove the block, and then the item should be relevant for availability check.
To cover the 1st req of keeping the block, I will use a schedule line cateogry which has a delivery block setup in IMG.
Will setup the schedule line cateogry accordingly.
But I am not sure how to achieve the 2nd req to not to confirm the schedule line qty till the block is there.
Kindly advise.
Regards,
Harsh

Hi Harsh,
             2 ways to achieve this,
1- Create new reason for rejection & you can stop the requirements to flow to MD04. ( assumption is, item will be waiting for further activities by the Order handler )
2- Tx: OVB8 & OVB5
check whether you can include your own logic which is applicable only for newly created delivery blocks. This transactions works well for Delivery block "01"- credit block- for not to transfer requirement to MD04.
Hope it may work for you.
Regards,
ReazuddinMD

Similar Messages

  • No Schedule Lines for Delivery upto selected date

    Hi,
    I have a scenario for Repairs order. Following are the steps of my scenario:
    1. Create a Repair Order.
    2. Create return delivery to recieve the faulty item.
    3. Create Outbound Delivery to send a loaner item to customer (This item would be returned once the returned item is repaired and sent to customer)
    4. Send the item after repairing.
    5. Receive the loaner item.
    When I am trying to create outbound delivery for Loaner item, i am getting an error "No Schedule Lines for Delivery upto selected date".
    I have checked and verified the schedule line date.
    I have checked for Confirmed Quantity.
    Below are the screenshots. Please let me know how can this issue be resolved.

    Hi,
    With reference of your screens,I can see there is no qty in the field loner hence you are getting issue.
    1.May I know ,why you have checked indicator -Repair?
    because ,you are not going to repair the goods.You are just sending loner items to customer.In this case what is the use of to indicate repair ?.
    Thanks,
    Naren

  • Can I block the blank lines in delivery note?

    Hi Experts,
    I want to block the blank lines when creating or changing delivery note because  I don't want user to add new items manually.
    Can I realize such a requirement?
    Hope anyone can give me some solution.
    Thanks.
    Best regards,
    Chris Gu

    Go to OVLK,  select the delivery type and execute.  There maintain routine 201 against the field ItemRequirement.  Similarly, for new item category, go to zero184  and donu2019t maintain any item category under the tab MItC
    thanks
    G. Lakshmipathi

  • BAPI for VA02 to check availability & update the Schedule lines

    Hi Experts,
    Is there a BAPI which can 'check item availability' & update the Schedule lines for the same order?
    I have checked 'RV_AVAILABILITY_CHECK' 'BAPI_MATERIAL_AVAILABILITY' 'SD_BACKORDER_UPDATE'
    but it is not solving the purpose.
    Kindly give your suggestion for the same.
    Thanks.

    Hi,
    Please let me know if you were able to achieve this functionality. I have a similar requirement wherein I need to check for the material availability and update the schedule lines in the scheduling agreement. I checked the FM SD_BACKORDER_UPDATE, but it doesn't seem to be helpful.
    Regards,
    Dawood

  • How to put schedule lines for one year  in a schedule line agreement

    dear all
    thanks for the support till now from the forum
    now i need some seetings by which the scheduling agreement will autoumatically take the schedule line for one year automatically
    in my client we are getting open PO so
    we have to make one agreement acording to that PO and thats for one year
    and this one yr will have same quantity to be produced everyday
    means 12nos of material every day for 12 month and this will be for every day
    and as per that it should generate a sales order.i need to put schedule line automatically not mannually one by one for each date.so wat is the settingand how to reffer this scheduling agreement we can produce sales order.
    please help
    subrat
    Message was edited by:
            subrat panda

    Dear Subrat,
    you cannot create a yearly schedule line in the scheduling agreement. It is not possible due to format restrictions of the date field. But what you can do is the follows (it is the modification, but it should work with the help of user-exits):
    1. You can split the year schedule line to the monthly schedule lines. There are two ways to do it. If you apply the DELINS IDOC, then you can do it already during transfer of the data to the application (itr is the best way). Here you can use, for example, user-exit USEREXIT_ZUORDNEN_IDOCS (include LVED4FZZ) or customer function EXIT_SAPLVED4_002, called from the subroutine USEREXIT_DYNPRO (Include LVED4F0U). Alternatively, you can use the user-exit USEREXIT_MOVE_FIELD_TO_VBEP (Include MV45AFZZ) within the call transaction, then it will work also in the dialog case.
    2. After getting the monthly schedule lines, you can create a planning delivery schedule, where you can split mothly schedule lines automatically to daily schedule lines according to the customer factory calender.The settings for generation of planning delivery schedules can be found under:
    Customizing SPRO: Sales and Distribution => Sales => Sales Documents => Scheduling Agreements with Delivery schedules => Maintain Planning Delivery Sched. Instruct./Splitting Rules
    It is the only ways, how you can reach your aim. I hope, this information will help you further.
    Kind Regards,
    Akmal Vakhidov
    Development Support SD, SAP, Walldorf/Germany

  • Fields update in "Schedule Lines for FRC sched." in a scheduling agreement

    May I know how the following fields in the "Schedule Lines for FRC sched." section in a scheduling agreement are being updated?
    We have already a new inbound delivery with goods receipt (last June 1, 2010) but the following fields still show the previous inbound delivery details:
    For example:
    Date of last del. 08.10.2009
    Last d. note no. 91011
    Last GR 21.10.2009
    Last GR qty. 54.500
    I wish I can show some screenshots here.
    Thanks a lot in advance for your answers.

    Hi Sravan,
    As per my view point, this is standard SAP behaviour. System will generate PR only in case of external operation.
    If you go to OPL8 (Order type dependent parameters) for your respective order type & plant combination you have option of maintaining setting related to PR only and there is no option of using scheduling agreement or generating schedule lines.
    I don't see any possibility to use scheduling agreement using to have schedule lines for external operation.
    Regards,
    Tejas

  • Changing schecule lines for delivery.......

    hi,
    sap gurus,
    good after noon to all,
    today i have to create delivery but its giving the information that "no schedule lines for delivery"
    stock is there,
    and no route determination is there,
    but the transport time, loading time, material availability date are different even stock is available.
    why its like that ?
    the system has to create delivery if the stock is available now.
    but its not happening
    its giving different schedule lines/delivery date.
    my query is when materials are available for delivery why the system is generating delivery date as todays date.
    plz confirm
    regards,
    balaji.t
    09990019711.

    Hi balaji., pls note the followings:
    1. schedule line cat. is CP
    2. dates' setting in MM (MRP2) can affect delivery date
    3. Due to system settings, selection date (delivery date) picks current date when creating delivery.

  • Donot want to fix the schedule lines at an Early date even P.O is the creat

    Hi ,
      If a material is sourced via a Scheduling Agreement, then MRP automatically creates schedule lines for this to meet MRP requirements.
    However, if a separate PO is raised for the same material (irrespective of the supplier) at a date after one or more of the scheduling agreement schedule lines, MRP creates a message to reschedule in the PO in front of the schedule lines even if this is known to not be possible. the result is that the schedule lines for standard supply are not put in early enough.
       And We don't  want to fix the schedule lines in a t an early date to over come this.Is there any settings for the same.

    Hello,
    If you want to control MRP messages for rescheduling you can make settings in tcode : OMDW either at plant level or MRP group level.
    You can introduce Tolerance value forward & Tolerance value for displacemt in No. of days here.
    If system finds requiremnts within the tolerance no of days it will not create MRP Exception messages. This way you can avoid unwanted messages.
    Thanks,
    Ram

  • HOW TO FIRM THE SCHEDULE LINES

    Dear All
    Scenario is "" Through MRP i am creating the schedule lines for raw materials"".
    Now I want that during my next planning run the already created schedule lines should remain firmed & according to requierement only new schedule lines should get created.
    Please tell me the steps how can i firm my schedule lines.
    Regards
    Rahul Bhardwaj

    Dera Rahul,
    There is option in Schedule Line itself that u can give firming period and in that period schedule lines r firmed. Go to ME32L
    enter ur SchedulingAgreement Then select ur material and click on Additional Data (Shift+F5). There under Scheduling Control 'Firm Zone' field is there, try with this option and see what i sresult.
    Regards
    Sunil Kumar

  • How to change  delivery  block for all item in the schedule lines via va32

    dear sap expert:
    i onle can  change delivery block for one  sales order item in the schedule line  every times via va32,it will take so many time because there are hundreds of item  in a sceduling agrrement. how to change all the item  one times.
    please give me a way to resovle the problem.
    best regards.

    dear:
      the fast change function cann't resovle the problem,i first double click the item of schedule agreement  ,then select the schedule lines option, finally in the delivery block input the reason of bolck.
    best regards.

  • Credit Release thru VKM3 remove the schedule line delivery block ...

    HI Gurus,
    I have created the sales order with the delivery block at the schedule line. i have save the order . The order goes to the credit block . So when i release credit block with the help of VKM3 then system also removes the schedule line level block.
    This is not std behaviour . Can any one come across such scenario ?
    Details: I have removed the routine 101 in the OVB8 so that if order goes to credit block still order will have the confirm qty.
    Also in the OVAK order type is mark D for automatic credit check.
    Thanks in advance

    Hi ,
    I have checked the sales order thru the program but we are not using any user exit for the same.
    Now i have found that if the qty is confirm on the first date i mean on the date given then system does not remove the block & if the ATP check suggest the diff date so there are two schedule line in this case block get removed ..
    May be this is like after credit removes system must be running the ATP check again ..
    Please help

  • Delivery block in the schedule lines.

    Hi,
    Mine is a MTO scenario. I am using planning strategy 50. So a planned order ---> production order will be created against MRP run  against each sales order.
    When i am placing a delivery block at the header the system is working fine. Its deleting the planned order(converted production order).
    when I am placing a delivery block at the schedulle line its not working fine. its not deleting the underlined planned order or production order.
    what configuration should I do to make this work.......

    Hi,
    Look at the help (press F1) on  the field confirmation block at SPRO-> Sales and Distribution ->Basic functions ->Availability check and Transfer of Requirements ->Tranfer of Requirements -> Block quantity confirmation in delivery blocks ->Reasons for and Scope of Delivery Blocks: Transfer of Req. blocks.
    It looks applying delivery block at schdule line level will not delete the passed requirements. This is standard SAP behavior. If you want to change this nature, then you may need to use an User-exit.
    Following is description given for the field confirmation block;
    Confirmation block
    Indicates whether the system, in addition to blocking delivery, also blocks the confirmation of order quantities after an availability check during sales order processing.
    Example
    You may want to block confirmation of sales orders where the creditworthiness of the customer is in question. In this case, you set the confirmation block for the delivery block that relates to credit problems. During sales order entry, when you enter a delivery block because of credit problems, the system, after you save the order, does not confirm any quantities for delivery. In this way, the goods remain available for other customers.
    Note
    If, before you save a sales order, you look at the schedule line overview, you can see what the system would confirm, if the block were not set. However, as soon as you save the sales order, the confirmed quantities are automatically reset to zero.
    Dependencies
    If you enter the delivery block at header level, the system transfers the desired delivery quantity for all schedule lines in the requirement. The confirmed quantity is deleted. This function is not available when you enter the delivery block at schedule line level.
    Regards

  • Delivery before the schedule line date in scheduling agreement.

    Hi All,
    I have a situation where in I am using JIT delivery schedule for processing the delivery requirement from customer. In this, lets say, I have a schedule as 08/05/2009 for material A to deliver 1000 qty and the material is made available to me after production as of 07/05/2009 and I want to despatch the material on 7th only and not on 8th. The system does not allow me to do this.It allows me to make a delivery only on 08/05/2009.
    Is there any alternative to this and is this SAP standard behaviour.

    I think you can change the schedule line date in scheduling agreement itself and do the delivery.
    regards,
    Sudhir

  • What is the link between schedule lines and delivery document item level

    Can any one please explain me what is the link between the schedule lines of the order/scheduling agreement and the item level of the delivery.
    Is there any link between VBEP and LIPS ?

    Hi
    Most of the item level data in delivery doc is copied from Schedlue lines in Sales order for eg delivery date
    So u may say that schedule line in sales order becomes the line item in Subsequent doc that is in Delivery doc .
    The table u are talking about i.e VBEP is related to sales doc and it contain data for Schedule line in sales order and the other table i.e LIPS give the delivry doc related data at item level.
    Hope this help

  • Delivery date determination in the schedule lines

    Hi,
           I have a question on the delivery date determination in the schedule lines of the sales order. If the goods issue date in the schedule line has been determined as 17th Aug 2009, and the transit time is 3 days. What should be the delivery date that will be proposed? Should it be 10 + 3 equal 20th Aug 2009, or it will be 21st Aug, which is the the following day of 10 + 3 ? I simulated in the sales order and it gave me 21st, my understanding was it should be just 17 + 3 = 20th Aug.
    hope anyone can shed some light on the above. TQ
    krt

    Hi ,
    This is what F1 help says
    Rounding-up period for delivery scheduling (in days)
        The amount of time that the system automatically adds as a safety margin
        to the estimated time required for processing a delivery.
    Use
        The system adds the rounding-up margin to the time estimates for a
        delivery, regardless of whether the system
        o   Calculates the times from data in the master records, or
        o   Simply uses the default times that apply to the relevant shipping
            point.
    This is F1 Help of rounding days and not my words..... you can also check in OVXD t-code.
    Thanks,
    Raja