Blocking of Confirmed quantity while doing ATP

Hi,
While carrying out availability check in sales order( VA01) the quantifies are confirmed if availability check is set at schedule line and rest of the relevant setting of requirement planning.
The blocked quantities after carrying our availability check impacts good number of tables and field in SAP.
If  the stock is blocked at the time of creation of order or at the time of saving the sales order, how tough or easy is to change the tables and program to calculates the material availability data in the system.
If you can specify the program and when it is determined,pls provide input.
regards

it will check Un-Restricted stock of MATNR+WERKS, so check MARC with these details.
<b>That u have to DEBUG</b>
Message was edited by:
        Prabhu Peram

Similar Messages

  • Error in confirmed quantity while creating sales order

    Hi,
    When I am creating sales order, I am getting  confirmed quantity as 0. I have checked the following items,
    1. Partial Delivery is permitted for the customer
    2. Stock Ava liability is 1,100
    3. Confirmed Issue I am getting 1,100
    Please solve my problem why i am getting confirmed quantity as 0 and were i have to check for error
    Please help me
    regards,
    PR Bhaskar Rao

    Check what is there in the availability Check. Try to see the scope of check in the Scheduline tab of the sales order item. Also, check the date for which the item has been confirmed. You can also check what is the Requirement type that has come up.
    You can also check in MMBE (for the plant, material and storage loc combination) if the quantity available is reserved for some other sales order and at the same time in the availability check you have made it to consider the reserved quantity..
    All these will help you analyse why you are getting the confirmed quantity as 0.
    Hope this helps...
    Regards,
    Mukund S

  • Stock directly post to block instead of unrestricted  while doing MIGO with out quality inspection

    Dear Friends,
    we are facing this problem from last one month on wards regarding we don't have inspection set for F-30 part number for these F-30 part numbers while we are doing MIGO 101 Movement type in MIGO Screen it is showing as unrestricted when i click on post button system automatically post the stock  in to Block automatically in that MIGO Screen also it will automatically change from unrestricted to Block. why it is happens like this please guide me is there any configuration for this
    Regards,
    Venkat.

    Interesting.. you now mention Quality certificate which you didn't earlier.
    Do you have QM in procurement active?
    If you specified a certificate type in the "QM in procurement" set up in the material master, then yes.. this can cause the material to go to blocked stock.
    In config, for the certificate type, is a field called "Control without Certif."  Depending on what you selected here, the material could be posted to blocked stock.  You might have selected a value of A,B or E.  (those are the keys for the field).  Those three will post the material to blocked stock if no cert is received. You can change that setting W for warning.
    Craig

  • System proposing wrong quantity while doing Place in storage(305)

    hi gurus'
    Am having a issue.
    I have removed 100 units of material X from plant Y using movement type 303.(transfer posting).
    Then i did movement type 305(place in storage) in plant Y for 75 units refering the earlier document.
    After that when am trying to do the place in storage again for 100 units( when the system should allow only remaining 25 units), the document is getting posted without even an error message.
    Any solution for dis so that system proposes the correct quantity??
    Plz help me guruz. Its URGENT!!!!!!
    Thanks in advance.Points will be awarded if the solution is helpful.

    Hi
    It comes from Message Class M7 022 numbered message..
    I guess the message in your system is a warning message (W) most probably,
    so you should make it an error message (E), to that the above is not allowed.
    You can do the customization via following:
    SPRO>Materials Management>Inventory Management and Physical Inventory>Define Attributes of System Messages>Settings for System Messages
    Change mode
    and
    Version:00
    Area:M7
    Message:022
    Change The Message category from W warning to E Error
    Best Regards
    Hope this helps
    Please reward if found useful

  • Confirmed quantity on sch. line erased when credit block

    Hi Gurus,
    I hope you can help me. I am creating a sales order on VA01, but when trying to save, it appears the incompleteness log, saying the PR position is missing.
    What happen is that due to the credit block, the confirmed quantity on the schedule line has been erased.
    I want to keep the credit block and do not erase the confirmed quantity. How can I do it?
    Thanks in advance.

    The problem was solved changing the incompleteness log for that document class.

  • Reduction logic while doing PGI for Delevery

    Hello all,
    we have one requirement to make the consumption for MTO(Make to Orders) while MRP running through MD04. We have done some changes in enhancement spot to made the consumption forcifully for MTO's.
    But while accessing MD63 for VSF(Planning with Final Assembly) MTO's we are not able to display the reduction quantity while doing PGI for particular Delivery.But this functionality is working fine for VSE(Planning without Final Assembly) MTO's as SAP standard.
    Please help me out to achieve the same functionality for VSF(Planning with Final Assembly) MTO's .
    Thanks and Regards,
    Siva.

    Hello all,
    we have one requirement to make the consumption for MTO(Make to Orders) while MRP running through MD04. We have done some changes in enhancement spot to made the consumption forcifully for MTO's.
    But while accessing MD63 for VSF(Planning with Final Assembly) MTO's we are not able to display the reduction quantity while doing PGI for particular Delivery.But this functionality is working fine for VSE(Planning without Final Assembly) MTO's as SAP standard.
    Please help me out to achieve the same functionality for VSF(Planning with Final Assembly) MTO's .
    Thanks and Regards,
    Siva.

  • Sales Order Credit Status Block with Schedule Line ATP Confirmed Quantity

    I would like to keep the Credit Status Block on a Sales Order when it is created and over the credit limit and at the same time be able to Confirm the Order Quantity (if inventory is available) on the Schedule Line.  Has anyone done this?  I'm using ECC 5.0
    In the IMG --> Sales and Distribution --> Basis Functions --> Credit Management/Risk Management --> Credit Management --> Define Automatic Credit Control --> If I remove the Status/Block indicator the schedule line does confirm the sales order quantity but the sales order is not blocked and a delivery can be created.
    Thanks.
    Donna

    Hello Donna,
    I think I solved your problem.
    There are two ways to block the sales order - one is to not confirm the Schedule line i.e. block delivery... block further action that can be taken. The second is to not let the person save the sales order.
    Another option is to get Just a warning message, that the credit limit has been exceeded, but able to save the sales order with a confirmed schedule line.
    The setting will be in OVA8.
    For the Document Value you make the setting C or A. and make sure the block is not set.
    Don't worry about the Open order or open delivery unless you want the system to perform a credit check considering the orders that are already existent. Same with open delivery. It will take into account all the cost of the orders that are open for delivery.
    Now here some options:
    Either consider a 'warning' by the system good enough and still be able to confirm the schedule line.
    (ii) Put in a Delivery Block in the Sales Document Types, in the Shipping tab. That way, you will be able to save the sales doc. but not be able to deliver it.
    (iii) Put a Billing Block in the Sales Doc type, in the Billing tab. You will be able to deliver but not bill.
    (iv) Create a new routine (with the help of an ABAP guy) and place it in the auto credit check, 'Reaction' field where it will place a Delivery Block.
    Do let me know what your thoughts are and what you decided to do.
    Thanks
    Noel

  • Error while doing confirmation with cor6

    Dear PP gurus,
    I am getting following error while doing confirmation. please suggest.
    "Error while importing from memory QAPO SAPLQEEV
    0400000363"
    Thanks in advance
    Kailash T.

    Hi,
    The structure QAPO relates to Inspection operation records & the program - SAPLQEEV relates to Spec. tables for results recording. Hence would suggest to discuss this with your QM personnel.
    Also was able to find a link which had a same issue, but no solution posted, have a look if it helps in anyway
    http://www.sapfans.com/forums/viewtopic.php?f=27&t=173200
    Also refer to OSS note - 334400. If all the above does not resolve the issue, raise an OSS message with SAP.
    Regards,
    Vivek

  • Error while doing Rapid delivery confirmation

    Hi,
    i am encountering the following error while doing rapid delivery confirmation, "set checkbox for rapid confirmation", pls guide me where to set this check box and wat are all the necessary settings need to be done.?
    Thanks in Advance,
    V.S.Sabitha

    Hello ,
    There is a field called 'Rapid Confirm' in transaction O4H1. You need the select this first.
    Check the link for the prerequisites :
    http://help.sap.com/saphelp_oil472/helpdata/en/bf/a007362b89e30ae10000009b38f839/frameset.htm
    Regards ,
    Jerin Ipe John .

  • Error while doing GR : Deficit of PU GR quantity 5 EA

    I am getting the below error while doing the reversal of GR:
    Deficit of PU GR quantity 5 EA : <material><plant><pur grp>
    Please let me know the solution to rectify it.
    Thanks in advance.

    Hi,
    Check the latest goods issue docs for this quantity and cancel that GI doc. This will bring the required stock to enable you cancel the GR. After creating new GR, cancel the "cancelled GI doc" to complete the loop.
    or
    Increase the stock by doing GR against 501. After new GR, cancel this 501 doc.
    or
    Post issue return (202) for this quantity. After new GR, cancel this 202 doc.
    or
    thro' physical inventory, you can add the stock. After new GR, make another PI doc. to set right the stock.
    While the first option is a best one, based on your urgency/superior approval, you may opt for other options also.
    Regards,
    Siva

  • Error while doing the confirmation by COR6N

    Hello Friends,
    While doing the confirmation by  T.C COR6N,in that screen i gave the process order no. and the phase no. and the posting date only and pressed enter, after that system thrown the error message "  Incorrect Resource entered " , Message no. S1333.
    Diagnosis
    This message is dynamically created, no more information possible.
    Actually by default from the process order system takes the resource.Here in COR6N screen i haven't given the resource than also system is giving the error message.
    Thanking you guys in advance.

    PLease check in the master data, Whether you have mentioned the resource..
    Foe Example, In discrete manufacturing, In the routing , we will give the workcenter which will be copied to the production order...
    Similarly please check and revert..
    karthick

  • Confirmation Quantity issue while creating Sales order using BAPI

    Hi SDN,
    Can anyone of you help mein the below issue:
    I have a program to create a sales order using upload file. for this i use "BAPI_SALESORDER_CREATEFROMDAT2" & for changing existing "BAPI_SALESORDER_CHANGE".
    Now If the upload file contains the Same Material, Based on other conditions, it needs to create Multiple sales order.
    When the first Salesorder is created, the Quantity is getting confirmed (Confirmed quantity VBEP-BMENG). But during actual run, since the confirmation is getting done for the same material in the above Sales order, the confirmation is not being done in the subsequent Sales order".
    This poses a problem for business, user need to manual refresh the u201Cconfirmed quantity for each line item in the particular SO where it failed during program upload.
    Also while uploading using the BAPI, if we wait forsometime after creating the first sales order in Debug, then the above material is unlocked & the confirmation quantity is done for the subsequent sales order also.
    But in the actual run, this is creating a problem. Some Refresh or Unlocking problem.
    Can you please suggest a suitable solution for this issue.
    Thanks & regrads,
    Chaitanya LBK

    Have you tried backorder processing?
    V_V1
    V_V2
    V_RA
    V_R1
    V_R2

  • How do I get rid of pop up ads at bottom of page while doing surveys that block my continuing doing the survey?

    I have been doing surveys for a long time online. I just got Windows 8 a couple of weeks ago. This week while on Pinecone Research and Valued Opinions I had pop ups that appeared at the bottom of the page and covered up the next button so you could not continue the survey. I had to go back to the email and and click it to restart the survey and then go question by question to get where I was at. I cannot click these pop up off the screen, there is no x anywhere. They come on with each question I do of the survey. It is taking forever to finish a survey having to start over with each question. It is a real pain. How do I stop these pop ups from coming on while doing surveys? this is a new computer and I have never had a problem like this before. Is this something to do with Windows 8?

    Hey Sweeneyword, there is an addon available for firefox called adblock plus:
    https://addons.mozilla.org/en-us/firefox/addon/adblock-plus/
    This should block the ads that are keeping you from continuing. You should also clear your history, cookies, etc and make sure you have malware protection installed.

  • Help While doing Confirmation"OPK4"

    Hii sir
    slight confused need help
    I have configured process order
    while doing confirmation
    i want that system should give error message if any shortage of material is there
    but this is not happening
    System is allowing confirmation with the message ,Goodmovements-0, failed 1
    Need hel\
    Thx Got the solutiion
    Edited by: Bhupendrasingh on Feb 7, 2012 11:52 AM

    Hello,
    In OPK4- second tab Individual entry general tick check box goods movement and termination for incorrect goods movement. Remember you have to do this setting for the particular order type for which you do not want to gave goods movement failed.
    Regards,
    Alok Tiwari

  • OM vision India Hyderabad---exception while doing the ship confirm

    order management vision India Hyderabad ----we are getting the exception while doing the ship confirm the exceptions are shown below:
    Order: 20041 customer: C2il_customer Item: XXBikeEngine Error: NO DATA FOUND
    Order: 20041 customer: C2il_customer Item: XXBikeEngine Error: NO DATA FOUND Transactions window: Pick and ship
    Errors
    Warning: Item on delivery detail 3962489 does not have pre-specified weight and volume.
    Warning: Delivery 3773383 has null Weight
    Error: Bill of Lading Number could not be generated because the ship method code was not selected for the trip 3129358.
    Warning: Bill of Lading information could not be automatically created for delivery 3773383.
    Submitted 4 out of 4 documents for this document set. (REQ_IDS=5807692, 5807693, 5807694, 5807695)
    Warning: Failed to submit document set for delivery 3773383
    Warning: 1 deliveries will be marked as Confirmed.
    Warning: Some deliveries selected for Ship Confirm have errors or warnings.
    i am grateful if any one can provide suggestion on the issue.....

    Can you please share the documents and suggestions for R12Have you reviewed all the docs referenced above?
    actually all are working fine in normal vision operations,and we are facing the exceptions while we are doing in OM vision India Hyderabad.
    is there any setups do we configured for the OM vision India Hyderabad.if you can share any information on that it will be helpful...If the docs referenced above and Oracle Documentation http://download.oracle.com/docs/cd/B53825_08/current/html/docset.html do not help, then I would suggest you log a SR.
    Thanks,
    Hussein

Maybe you are looking for

  • How to upload data from excel to SAP and options to be used

    How to upload data from excel to SAP and options to be used thank you, Regards, Jagrut Bharatkumar shukla

  • Searching For Dashboard Widgets

    Hi, How do you search for Dashboard Widgets on Apple's website? Since they changed the site this year, I've found it very hard to find widgets which I know for a fact are listed on the site. For example, if I type into the Search bar in the top-right

  • Wireless keyboard battery broken inside: how to remove?

    The AA battery of my wireless aluminium keyboard (iMac) have broke inside, it may have melt of something, it is glued, it does not move out. Any tip, any product or tool to force-remove it? Or is my keyboard dead?

  • CS6 Img Properties panel no longer supports hspace

    I just upgraded from CS5.5 to CS6 and have lost the ability to quickly insert the img hspace attribute. I very often take advantage of the img hspace attribute. While I know it is deprecated, is still fully supported, and codewise, more efficient tha

  • Spry Widget Horizontal Menu IE Issue

    Hi, I am new to spry widgets. I am building this site in dreamweaver and am using the spry widgetfor my nav bar. The issue is, in Firefox the menu looks the way it is supposed to, but in IE it has a black box. I have tried a few things, but no luck.