Hi All,
I have already maintained the following PM-PP integration points:
1) Production work center is maintained in equipment master
2) System condition is entered in maintenance order as "Not in operation"
Please let me know how to block the production workcenter for production work when same workcenter (as equipment in PM)is planned for maintenance.
Sundar

Hi,
   Once you have done the settings, if you have Maintenance Order on particular eqpt belonging to PP Work Center ,
Then based on system condition the PP Work Capacity will be 0 i believe ..but system will still allow you to create a PP Order on that PP work center .. better thing is to perform Capacity Availablity Check while releasing the PP Order at that PP Work Center and if capacity is not avaialble then u can stop release of the PP Order..
In PP ->OPJK for combination of PP Work order type and plant u have for business function 02 , u have give Overall Profile
Release Capacities as 3
The Overall profile which ur using has control profile & this  should have presentation type as 04  for Capacity availability check to happen ..
regards
pushpa

Similar Messages

  • Block production work center during maintenance order

    Dear Experts,
    iam trying to do the integration between PM and PP, I want to block the production work center from any production order  when there is any maintenance order opened for a certain equipment which is inside this  work center ,
    till now i did the following:
    1) the production work center is now inside the equipment location tab
    2) when i open any maintenance order i put system condition as zero
    now what i only achieved ,
    - in transaction CM25 the capacity is black for the period of the maintenance order
    BUT the work center is not blocked and any production order can be created without any error
    please help and much thanks in advance
    Best Regards

    Hi,
    Till time you have performed right things to integrate PP-PM & system is also responding according to setting.
    Showing block capicity in CM25 against the Maintenance Order.
    If you want to block production order as well, you need to do one more setting.
    go to t- code OIOI, selection Production order types (those you want to block) & in capacity Availabilty choose Collect conversion as 3 : No creation if there is insufficiant caacity.
    i hope this will definately solve your problem.
    - Yatharth

  • Work Center Integration PM-PP

    I have 3 similar Production Machines. I will load any or all of them according to the requirement or acc. to which machine is free.
    so PP person says, he has to assign only one Work Center to all the three machines as he can not assign more than one Work center for a single Operation in Routing.
    But in PM, 3 machines will have 3 different Equipment numbers with common Production Work Center (Work Center at Location tab page)
    If I block any one of the machines for Maintenance, that work Center will get blocked. But physically remaining two machines are free. But PP person can not dispatch the Order as work center is blocked.
    Plz guide how to proceed

    hi,
    SAM,
    For 3 production machines PP Persone should create 3 pp workcenters......,
    as far as my knowledge is concern in standard SAP this is not possible.....
    although Capacity spiliting option is available in PP workcenter.
    but that dosn't solve our proble..
    if u set system condition - not in operation for a equipment
    .. this will capture whole PP work center..... rather than perticular equipment.
    Try to conyence them for 3 pp workcenter.
    regards,
    Amit kushwaha

  • Link between HR data and Work center

    Dear experts,
    We have assigned operators in work center through HRMS. For the purpose of making a report we require the table into which the linking of work center data and the employee is made.
    In the table CRHD a field HROID is found.  This is an object id which links the work center with a table either in HR or in PP which provides the link between organisational unit/ employee. Can anybody tell us the name of the table with details?
    Please help us.
    Thanks
    Jaikishan

    Dear Vittalji,
    Thanks for your prompt response.
    Our requirement is as follows:
    We need to create a report on details of operations done by each operators / workers for a specified period. For this purpose following assignments are done.
    (HR module is not implemented yet.  But we have made attempt to maintain the employee master by customising HR module little bit)
    1.  Employee master created in HR. 
    2.  Went to work center maintainence (CR02).
    3. Selected HRMS button.
    4. Selected Work Center option.
    5. Clicked on HR work center
    6. Given same work center as production work center.
    7. Selected 'person' from ALV list data
    8. Clicked on create relationship button.
    9. Assigned the appropreate persons.
    By doing assume this we made assignment of persons to this work center since the name of persons are getting displayed.
    We have a report to list out the workcenter wise operation confirmations for analying the daily production.
    Now we want to incorporate the operators (persons) name into our report by whom the operation/production was performed.
    For this purpose, while refering the table CRHD, found a field HROID (an object id).  To fetch the details of persons / operators those we assigned to the work center we need the tables for linking this field HROID.
    Our questions are
    1.  Whether the process of assigning   operators above mentioned are correct?
    2. What are the table-links for completing our report. i.e. only for work center to concerned operators (HR).
    3. What does the HR Work Center mean?
    4. What are the difference between HR work center and production work center?
    Your help is requested. Points will be rewarded promptly.
    Thanks and Regards
    Jaikishan

  • Qm task list- work center

    Hi, while creating the task list, thw ork center we mention, is it the production work center? let us say at prod work center X is used to manufacture at operation 10, we need only micrometer to check the dimensions of at that opeartion, do we need to mention micrometer as quality work center? pls brief.

    Hi
    As you know the work center is maintained at the operation level of the task list.
    First understand the significance of work center.
    Generally Work center are related to routing where multiple operations are there & multiple stations of work are there.
    In the work center we maintain the Capcity of Man or M/C.Scheduling parameter & costing etc.
    These are generally centers where production work takes place.for a perticular station while confirmation of Production order we can calculate the Number of m/c hr & man hs for a perticular job.
    But in Quality we do not have such stations in the task list.
    We can miantiain this only for information purpose like QREC  QFINAL QINPR etc.
    where as   micrometer etc are the PRTs and can not be work centers
    I hope this is clear to you.
    Regards
    Sujit

  • Work Center Block

    Hi Experts,
    We have one scenario
    W/C in PP(wc category m/c) = Equipment in Plant maintenance
    Is it possible to block the W/C automatically whenever there is creation of maintenance order for equipment(w/c for PP) so that it is blocked in routing and can not be used in production.
    Thanks in advance,
    Amit Kataria

    Dear,
    You can lock work center. if work center is lock, now production order will be created with locked work center.
    If you require that whenever maintenance order created against specific equipment in which locked work center used, system will not allow to create production or production order execution. In SAP Maintenance, there is integration with PP that whenever maintenance order created, system will not allow to execute production order. Kindly consult with you PM consultant in this regard.
    Thanks
    Muhammad Ashfaq

  • Block PP Work Center capacity  when breakdown maintenance order create on that work center

    Hi All,
    My Client want to Block PP Work Center  capacity when breakdown maintenance order create on that work center, how can i do it ..
    Please help me.
    Payal

    Dear Sir,
    I have Done Every think but still Production Order is create.
    CM50
    OIOI
    CO02
    Payal

  • Blocking the work center

    Dears
    Is it possible to block the work center from Quality department for creating any more production order because of quality issue
    Like what we are blocking the vendor by using quality info record
    Thanks in advance
    Faisal

    Yes Sujit
    I understand that
    But There is any method to evaluate Work center in QM prospective
    In usge decision we have quality score is updating when ever we select respective UD code
    Any tips on this pls
    Faisal

  • Error message when blocking a Work Center

    Hi,
    In order to block the use of a workcenter, it is recommended to go to cr02 and change u2018usageu2019 field to u2018000u2019 All task list types (see previous topic To block the use of a specific workcenter)
    When changing usage to 000, an error message appears : u201CThe work center is already being used, update task listsu201D. How could it be fixed? thanks
    sb

    If you don't want that operation , Then
    Go to CA80- work center where used list
    find out the routing, and delete the respective operation in routing.
    Or
    If you don't want the delete the operation, Then
    In workcenter , CR02 Go to Extras-->status set lock
    While creating a new production order, system won't copy the locked workcenter

  • Blocking Work Center

    Hello Everybody......
    Is there any way to block the work center through creation of notification instead of Maintenance Order.
    My Client wants that as & when the notification for breakdown is being created by production, immediately the work center should get blocked immediately for production scheduling.
    The production planning team being different from production team...may reschedule the order in the time frame which is between creation of Notification & Order. & As during this time maintenance order is not there, so how can the PP get intimated that machine is under breakdown though maintenance has not yet created any maintenance order.
    Regards.......

    Hi Vinay,
                   for your kind information there is an integration between PP and PM  in location tab of notification the workcenter is the pp workcenter and organization tab workcenter is PM workcenter. In the maintenance order header system condition is there it shows whethe the system is in operation or not. Through this integration whenever production people are going to raise an production order against the same equipment which is been under maintenance by maintenance people system will throw a message that the equipment is already maintained by maintenance.
    Regards
    Satish

  • All default routing value has to be changed, while changed the work center in production order

    Dear friends,
    our client they want to change the work center in production order.according to production version work center also they are changed.so while change the WC,all the default value has be changed as per routing what we maintained in routing.At present we have to enter the manually change the W.C as well as set up time and operation time enter manually.Any other option to do the automatically capture value from routing while change in Work center in production order.pl help me on this.
    Thanks&Regards
    Sabhapathy R

    Hi Rahul,
    Thanks for reply. I am maintained in diff value  maintained routing , Ex :First routing i have  work center 'X' value maintained as a setup time in 15 Min's and operation time 10 Min's
    second work center 'Y' I have maintained as set up time 10 Min's and operation time 30 Min's,
    Now I want to change the work center in production order as a 'Y' so whatever value maintained in routing , it has to be changed automatically (10 min's and 30 Min's), but system will not change only old value only picked (15Min's AND 10 Min's).
    Now I think you get to know what the client requirement, kindly do the need full.
    Regards,
    Sabhapathy R

  • Work center wise production order infomation report

    Hi all,
    i have a requirement that workcenter wise (with date) production order information with quantity details (plan and actual).
    Eg: My production order quantity - 40 nos. (it takes 4 days to finish).
          i have three operation in production order.
          my order scheduled start date - todays date.
    In standard, when enter my first operation work center, system showing production order and its quantity (40 nos) . but i need to split that order quantity in report.. means on todays date for particular production order - order quantity = 10 nos.
    Clent want like that (with quantity break) report..
    Any standard report ???
    If customization.... How it can be mapped in SAP.??
    Thanks in advance

    Hi,
    You can use the FM COIS_SELECT_ORDER_DATA_READ.
    CALL FUNCTION 'COIS_SELECT_ORDER_DATA_READ'
          EXPORTING
            iv_prod_order_sel       = lv_prod_order_sel
            iv_proc_order_sel       = lv_proc_order_sel
            iv_planned_order_sel    = lv_planned_order_sel
            iv_rem_objects_only_sel = lv_rem_objects_only_sel
            is_objects_to_read      = ls_objects_to_read
            it_parameter            = lt_parameter  "General Structure for PARAMETERS and SELECT-OPTIONS
            it_status_hdr           = lt_status_hdr
            it_status_opr           = lt_status_opr
            it_status_cmp           = lt_status_cmp
          TABLES
            ct_ioheader             = lt_ioheader
            ct_ioitem               = lt_ioitem
            ct_iodocl               = lt_iodocl
            ct_ioopdocl             = lt_ioopdocl
            ct_iomamo               = lt_iomamo
            ct_ioconf               = lt_ioconf
            ct_ioopconf             = lt_ioopconf
            ct_iosoconf             = lt_iosoconf
            ct_iogomo               = lt_iogomo
            ct_ioopgomo             = lt_ioopgomo
            ct_iosogomo             = lt_iosogomo
            ct_iogmer               = lt_iogmer
            ct_ioopgmer             = lt_ioopgmer
            ct_iosogmer             = lt_iosogmer
            ct_iosequen             = lt_iosequen
            ct_iooper               = lt_iooper
            ct_iosoper              = lt_iosoper
            ct_ioopcomp             = lt_ioopcomp
            ct_iooppreq             = lt_iooppreq
            ct_iosopreq             = lt_iosopreq
            ct_iooppord             = lt_iooppord
            ct_iosopord             = lt_iosopord
            ct_ioopmst              = lt_ioopmst
            ct_ioopprt              = lt_ioopprt
            ct_ioopcap              = lt_ioopcap
            ct_ioopscap             = lt_ioopscap
            ct_iosocap              = lt_iosocap
            ct_iososcap             = lt_iososcap
            ct_ioopsccf             = lt_ioopsccf
            ct_iososccf             = lt_iososccf
            ct_ioprodlist           = lt_ioprodlist
            ct_iomatver             = lt_iomatver.
    This FM get data from the report used by transaction COOIS. If you needed the header data then you can use lt_ioheader table and seperate the data with the date. If you need at operation basis the you can use lt_iosoper table. You can use this FM to create custom report even with the checks like material availability, PRT availability, capacity requirement etc.
    Thanks and regards,
    Pradip
    Edited by: Pradip Ray on Aug 26, 2009 8:26 AM
    Edited by: Pradip Ray on Aug 26, 2009 8:26 AM
    Edited by: Pradip Ray on Aug 26, 2009 8:26 AM
    Edited by: Pradip Ray on Aug 26, 2009 8:27 AM

  • How to get a list of production orders for a work center?

    Hello SDN Community, 
    I have an requirement to display in a pop-up window a list of production orders for a work center.
    Does anyone know which screens/transactions would show this relationship?
    Or better yet, does anyone know how to demonstrate this from the tables themselves?
    Thank you,
    Dean Atteberry.

    Hello Mangalraj.S
    >>Goto COOIS-->For the field List select PPIOO000 - operations and layout -->standard layout
    >>and execute,by this you will be able to see the operations for each order and to which
    >>work center they are assigned.
    The system I am working on is ECC 6.0.
    For this system the values in the dropdown for the "List" field are "Capacities, Items, Order Headers, Sequences, Trigger Points, etc".  But nothing that says PPIOO000 - operations and layout.
    >>Or else in the in input screen of COOIS,enter the work center for which you want to see which
    >>are the production order's assigned and execute.
    For system I am working in, I do get a grid display when entering a work center.  It has columns like "Order, Material, Icon, Order Type, MRP cntrlr, etc."   But no column with Work Center.
    Any further insight into how to use this transaction to display a list of production orders for a work center would be greatly appreciated.
    Thank you,
    Dean Atteberry.

  • Dyanmic work center selection in production order based on material

    Hi ALL,
    We’ve a business requirement to support the following functionality.
    There are four similar type of milling machines say MILL1 MILL2, MILL3, MILL4, we create a single work center called MILLMC by specifying total capacity of four milling machines in the capacity header screen of work center with 4 individual capacities. And we mention work center MILLMC in the operation of routings for respective materials.
    However, during production order creation, there needs to be provision for detailed planning of work centers as per the following requirements
    In production order, some operations can be performed on any one of the machines MILL1 MILL2, MILL3, MILL4, so provision needs to be there to enter exact machine on which it is performed in the production order operation after the details are copied from respective routing during production order creation.
    In production order, some operations can be performed on only MILL3, so system should select only MILL3 in the respective operation of the production order
    In production order, some operations can be performed on either MILL1 or MILL2 or MILL4 and not on MILL3, so system should not select MILL3 in the respective operation of the production order.
    Please provide your valuable feedback to support the above requirements.
    Regards,
    Satya.

    Hi Satyanarayan,
      Please do refer to the below document. I think the same concept can be used for work centers as it is used for resources in PI industry.
    Resource Classification in Master Recipe for Planning
    Regards
    Kalyan

  • Change Work Center during production order confirmation

    Dear All,
    I must to modeling this situation:
    I created an production order. In routing I used an work center A.
    After I confirmed a half of quantity, the work center A was damaged and I must to change it, with the work center B.
    The system allow this change, but when I checked the costing, the situation isn't real. The system counted the costs just for the work center A, and no for work center B.
    My question is: it's possible to change the work center, during production order confirmation and the costs updated with new cost?
    Thank you for your answer!
    Regards,
    Marian

    once a Order is released, the Process order detaisl for that order is frozen.
    however if you want to do it, change the order status to CRTD after reversing the Movements done.
    Do READ MAster data , this will copy the new Work center , redo the previously done Moevements.
    if the change is long term.
    or
    Just manually add the new work center and do the processing. if the change is temporary.

Maybe you are looking for

  • PP - No data in Field J_3ARESM (reserved qty) of 2lis_02_pabdsi(AFS based)

    Hi, I have loaded data for the AFS based datasource 2LIS_AF_PABDSI of PP. But there is no data in the field - J_3ARESM(reserved quantity) - only showing 0,000. Used RSA3 transaction to extract data. I checked it after filling up the setup tables. Dat

  • Total Settlement Value field  not getting populated in IW38  Transaction

    Dear all PMCS group Members, I have a list of  Maintenance Orders on which  Actual Costs are posted and also periodic settlements done before TECO.  When i list these Maintenance Orders in IW38 transaction the system is bringing in the values in  Tot

  • On Demand Freezing/Sticking

    Everytime I try to access the on demand portion of FiOS, I will be scrolling though the titles and it will freeze/stick on a title, and I will have to wait for a few seconds, and then it will catch up and scroll through real fast.  Its really annoyin

  • I can't log onto icloud today 7/2/12

    Just get a blank (black) screen using Firefox, but I can with Safari. Ha ha. Neat trick, Apple. Next move Firefox!?

  • Sync Gmail contacts with Facebook

    All of my contacts are on my Gmail account and are synced to my iPhone and I've also synced Facebook to contacts. If I open any contact now they have a 'Facebook line' so it's clear that the sync has worked, but only a few contacts have also synced t