BOM and Material

Hi,
is it possible to define a new BOM version for each new material version in 4.6c?
For example Matnr. 123456 Version 1 has BOM 1 and 123456 Version 2 has BOM 2?
If yes, how can I define it?
Kind regards,
Jens

Hi,
You can have multiple BOMs for the same material (using the alternative BOM number). But I am not aware of any method of attaching the alternative BOMs to a version number.
In 4.6c, the version function is VERY limited and does not have this kind of link.
Have you thought of using the version number field to hold the BOM alternative number (or vice versa). This would establish a visual link but the link would not actually do anything.
Steve B

Similar Messages

  • BOM and Material Configuration and Sales order..

    hi,
    in my requirement, i am supposed to create a project automatically based on sales order..
    additional requirement is that material components on the project are based on the the selections during the sales order creation
    (for example if customer chooses tiles instead of vinyl flooring then materials for tiles will be selected automaticall)
    i maintained reference points in my BOM and in the standard network activities.
    i also maintained the class and characteristics of the material..
    the missing part i believe lies in the dependency being set for the BOM. example:
             =if  floortype='vinyl' then get BOM_floortype..
    how to configure/set up that scenario? i cant seem to find the link between characteristic selection and output of selected BOM.
    Thanks in advance.

    Dear ramesh,
    If it  possible...can u explain...regarding
    (i also maintained the class and characteristics of the material..
    the missing part i believe lies in the dependency being set for the BOM. example:
    =if floortype='vinyl' then get BOM_floortype..
    how to configure/set up that scenario? i cant seem to find the link between characteristic selection and output of selected BOM.)
    Regards
    chandra

  • Bapi For Bom and material Bom in cs71

    Hi,
        In CS71 we have 2 pushbuttons on the top ie create/copy BOM and create/copy Material BOM.   for these 2 funtions i need Bapi or FM for the functionality of those 2 pushbuttons.
    Duplicate thread Continue with this one - Re: How to search for BAPI or FM for some requirement
    Edited by: kishan P on Aug 20, 2010 11:54 AM

    I tried to find BAPI for transaction CS71, but it seems that its no available.
    Try using BDC method for the same.
    Regards,
    Lalit Mohan Gupta.

  • SAP PM-BOM and Material/Spares planning

    Hi dear all
    can some one help me how to use equipment BOM for Material/Spare planning effectively in SAP PM
    Vinod
    Edited by: vnodpm on Sep 9, 2011 11:33 AM

    Hi,
         BOMs in PM define the structure of that Object :eqpt,material,F.loc
    Eqpt BOM is used specfic for that eqpt
    Material BOM can be used for multiple eqpts in IE02 -->Construction type u can assign material BOM
    Similarly F.Loc BOM
    You can use this BOMs for material planning in MO
    Ex :- If a particular eqpt MOTOR has a BOM -> Then this BOM would be helpful for material planning in Maintenance Order -- Components ..
    Spares mentioned in BOM can be directly used for selection into Component Tab .. this will serve u an easy material planning ..
    More than this there is nothing .. to my knowledge ..
    regards
    pushpa

  • SO BOM and Material BOM

    Hi all,
    I am facing a problem in following scenario.
    Sales Order has many line items (100-500). For procurement, Material/WBS BOM is huge.Now the case is that after the procurement, delivery happens from project and invoicing is itemwise. By Itemwise I mean that for a SO line item there will be an advance payment and the following partial invoices based on delivery.I can map this case with the help of milestones in project. But the no. of line items is huge and hence will be milestones (advance payment and progress payments)
    One more problems here is that when the SO is made it gives high level item. But there are cases when the SO line items itself is broken down into various subcomponents for invoicing purposes.
    Can someplease throw some light on this issue.
    Thanks

    Hi Anjali,
    Can you please provide the following details:
    1. In terms of material requirement, the requirement is generated from the project or from the sales order?
    2. What do the Sales order line items signify?
    Regards,
    Jibat

  • Discontinuation  data in BOM and MAterial master

    Dear all
    pl. tell how to maintain data for parallel discontinuation.
    thanks

    Hi Raj..,
    1. When you want to replace a group of materials by material you will use this.
    2. in the mrp4 view the materials which you want to replace put Discon ind "1" and the remaining materials in the group "3". and give the followup material name.
    3. In the Bom select the material to replace and select (F7). in the basic data tab click  "Discontin. Data". give the Dis cont grup and follo up grup.
    regards.

  • Regarding creation of bom and material in cfolder

    dear gurus,
    i want help from all of u.
    can any one tell me , what is the benefit of creating BOM / material in cfolder instead of R3.???????
    full reward points for useful answer
    thanks
    [email protected]

    Hi,
    cFolders is a collaboration tool (tool used for talking to 3rd parties outside your company.)
    Usually you will not give access to your ERP system to others. In that case you use cFolders as medium of sharing information with others.
    if the 3rd party colleague want to suggest some improvements or modify you design documents etc., he can do it in cFolders. This then can be verified by you in cFolders (once modification is done he can change the status in cFolders which will trigger a notification to you ) then import it to cFolders.
    regards
    Murugesh

  • Production Order for a material without BOM and Routing

    Is it possible to create a production order for a given material without routing and BOM, I know we can
    create a production order for a material without a BOM (with a default routing) just wanted to check with
    the above criteria
    Thanks in Advance!!

    Members:
    Thank you for your valuable replies and time
    Santosh:
    Tried what you have mentioned, but system still picks up a default routing
    Kaushik:
    Maintained Default values in OPJG for the given order type, but system still picks up
    default routing
    Mangalraj:
    have no issue in creating a production order without a BOM, but I am trying to see
    is there a way where I can create a production order without a BOM and routing (not
    even default operation )
    Any suggestions on how to create a production order for a material without a BOM
    and routing (not even default one )

  • Standard cost with material with alternate BOM and Routing

    I have a set up where the same material can be manufactured in 2 different production lines and each production line has two different BOMs and Routings. If I want to have a blended standard cost for the material what are our options?
    We do not want to do split valuation.
    thanks a lot

    Hi
    You can different PCC (Product cost collector) for both lines of the same product (Product cost by period).
    You can define a production process within a product cost collector for each line of production with a combination of BOM and Routing. TCode KKF6n. It would generate a order number for each production process.
    You can use each order within the PCC for each production line to capture the costs for seperate lines.
    Regards,
    Suraj

  • Material costing without BOM and routing

    I have recd an order on sample basis. I want to cost the materia. I don't have BOM and routing.  I want to cost that material manually.  Is there any provision in SAP to do costing in such type of scenarios.

    Dear BSR,
    I guess you are meaning about cost estimate without quantity structure.
    Check T Code KKPAN.
    Regards
    Mangalraj.S

  • Distribution Procedure for Material BOM and Modifications

    Hi Experts,
    I'm using ALE to distribute Materials, Material-BOMs and Modifications. The user select the BOM and start the distribution.
    What is the right procedure to distribute Materials, BOMs and Modifications (with the entire BOM-Modifications History).
    I'm using following Functions:
    - for Materials : MASTERIDOC_CREATE_REQ_MATMAS
    - for Modifications : Transaction CC92
    - for BOMs : MASTER_IDOC_CREATE_BOMMAT
    Thanks for support.
    Regards,
    David.

    up

  • Change BOM and Production Order

    Hello Expert,
    I have recuuring problem, hope you can lean help to me. Can you explain to me why this happen?
    we have change a component BOM in CS02, first we create change number in CC01. with effective date for 30.09.2008.
    In BOM 6083, there exist a component 10020379. we want this component to be deleted on 30.09.2008 and be replace with a new component material 10060530 effective on the date 30.09.2008. that was the new set up of the BOM of material 6083 (at this date august).
    Today (27.08.2008) we create a production order for material 6083, relesed it and when we will look at the PO Component Overview of our created PO both BOM component material 10020379 and 10060530 was present both backflushed was tick. but 10060530 component has zero req. qty compared to 10020379 it has a value on req. qty.
    why that even we create the PO in August replacement material 10060530 was exploded and included in PO since this material will be effective on 30.09.2008?
    and when we confirmed the PO via CO11N, we have a COGI error for the replacement material 10060530 "Enter Storage Location"?
    How all this happen Guru?.
    Thanks and more Power

    Hi,
    in this scenario, you can control the BOM explosion better with Revision Levels.
    say you have created the Revision Level with CC11, using the same change master which is effective from 30.08.2008.
    Every time, when you create an Order, system will pick the latest/relevant Revision level.
    If you create an Order on 01.01.2009, suppose there is a chanege again to your BOM, still at the time of confirmation/backflush system will explode the BOM as on 30.08.2008.
    Hope this helps..
    Regards,
    Siva

  • Sales BOM And Free Goods workaround

    we have 1 good with a sale BOM and we want to give the Same good away as a free good, so if the customer buys 10 he gets one free, however there is a problem with the BOM not exploding. Can anyone suggest a workaround this.

    Hi
    I think this is a standard sap issue.
    When we give a free good the item category becomes TANN. Now BOM material will have different item category. TAB.
    Now for BOM category material, i think there is no free good item category. Probably u can try creating a new category which wil be a free goods category and which will carry all the characteristics of BOM mateerial.
    Furthermore i think this will be issue only with exclusive free goods. But if u have inclusive free goods then there will be no BOM issue as there will be no other line item added for free goods.
    Kind regards
    Sandeep

  • Mass creation of BOM and Master Recipe for Plants

    My client wants to do Mass BOM creation and Mass Master Recipe Creation from a Generic BOM and Generic Master Recipe for all 10 Plants by just a click of button.
    He does not want to use copy function using CSO1 or C201, and do for plants 'one by one'. He finds it very time-consuming. He wants to copy for all ten plants all at once. Please advice how this can be accomplished in the best possible manner, and if by standard SAP.
    Thanks,
    Sac

    Dear Sir ,
    What is LSMW ?
    I want to Copy some bill of material from another plant .I had used T code CS01 for it but only the header bill of material is copied .
    The copy field in CS01 is only for first level boms the subsequent Boms are not copied .
    so is there any other way to do it ? if possible please give the detail procedure .
    Regards
    Pankaj .
    Edited by: pankaj.001 on Mar 9, 2011 10:55 AM

  • Looking for BOM and Routing objects created with a BAPI

    (I ran this one up the flagpole in the data forum and didn't get any responses.  Maybe someone here has see this phenomon?)
    I'm invoking BAPI_MATERIAL_BOM_GROUP_CREATE from an external Java program. I believe my code matches the example I find here and in the SAP documentation (transaction BAPI). When it finishes, I get a successful return (type=I, number=000), and a message of "BOMGroup 00000070/TAM1/1 has been created. External reference:" But I can't find anything back on the SAPGUI - the material number still says it has no BOM (on CS02); I don't see any new BOM Groups (on CS06). By the way, the "00000070" number seems to be assigned by SAP: I t increments each time I run my test, so I must be doing something; the TAM1 in that message is the plant, and the "1" is the BOM Usage I assign in my BAPI (both in the BOMGroup structure and the MATERIALRELATIONS structure). I do a commit transaction at the end too, although the BAPI to create the material created it without me doing a commit, so I don't think that was necessary.
    (Update since I posted this on the other forum:  I tried to create a routing and have the same result - 000 message number, and a message including an SAP-assigned number, making me think I've created an object, but I don't see it anywhere.  Any idea which tables I can look at to find them, and maybe see what's missing (e.g., with SE12 or some such)?)
    Any thoughts on what I AM creating? Or some little thing I'm missing here?
    Thanks for any insight!
    Thomas.

    check the post:
    BOM and Routing with Dependencies
    -Murugesh AS

Maybe you are looking for

  • How do you uninstall safari 5.1 and go back to 5.05

    How do you uninstall safari 5.1 and g back to safari 5.05

  • Help required with Gnome 3 Input Sources

    I used CapsLock before gnome 3.6 upgrade all working fine, however new Input Sources broke my system a little bit I fixed my CapsLock by dconf-editor org\gnome\desktop\input-sources\xkb-options ['grp:caps_toggle', 'grp_switch', 'grp_led:caps'], but I

  • Need xp performance tool to monitor client-server apps

    My Xp/Oracle 61 forms are causing the application to "stall" when many images are displayed. I need a tool that tells me what threshold is hit- to at least point me in the right direction. Is it memory, cpu, graphics cards, what? The XP supplied perf

  • How to Hide a Tab in FPM

    Hi Colleagues, We have a requirement in which we have to dynamicaaly hide a tab on a screen that uses FPM. We were able to disable the tab but we did not find any option to hide/remove tab provided by FPM. regards ashish

  • 2 frames in same VM cause problem when one frame sleeps

    Hi, I need to have 2 frames within the same application. At one stage one thread needs to sleep for app. 5 seconds. During this period the other frame fail to repaint itself. I have tried lots of different things like starting the frames in different