I am having a material which is having only one BOM and one routing. Now for this material in the material master in the selection method indicator i have put as 3 as selection only by production version. But i have not maintained any production versions in the work scheduling view for checking purpose. now when I am creating a production order for this material manually through CO01 system is allowing to create production order. when is the selection is only by production version how system is allowing to create production order when there is no version is maintained.

Hi Kumar,
Looking into scenario as u have maintained,if you have define the selection id and not maintained the production version then it should ask for the production version and show the following
Since the production version is missing, you cannot execute the desired processing step.
As well as pls look into OPL8 ,what Production Version is maintained.
Thanks,
Mohit
Edited by: Mohit Sharma on Feb 4, 2011 5:35 PM

Similar Messages

  • Alternative bom and routing selection in planned order

    hi
    how i can config the system so that while creating planned order
    system has to select the alteranative SEQUENCE and alternative routing ?
    at opl8 we do this for production orders what about the planned oreders
    in scheduling parameters of planned orders we can give only selection ID
    WHAT about alternative SEQUENCE .
    IN the same way how the system selects the alternative BOM with date in planned order
    iam not creating production versions
    plz suggest
    sasikanth

    Hi,
    If you r using Prod Version then system pick ups the BOM attached in first valid production version.
    So, normally put more frequently used BOM in your first Prod Version.
    You have more options to use:
    - lot size (defined in BOM header)
    - production version (several option you have: lot size, manually assign a PV to a planned order)
    - you can use explosion date (OPPP, Logistcs > Production > MRP > Master Data > BOM by date)
    MRP 4 (in material master) > 'BOM explosion/dependent requirement' tab > you can set selection method according to your wish.
    Details:
    http://help.sap.com/saphelp_46c/helpdata/en/f4/7d2b1144af11d182b40000e829fbfe/frameset.htm
    Regards,
    Sankaran

  • Wrong routing selection in production order creation via MILL_OC

    Hi,
    We are using the order combination functionality (MILL_OC)
    We have a product with alternative routings.
    Situation is as follows:
    - Create 2 plan orders for the same material
    - Execute MILL_OC
    When I execute the MILL_OC transaction I get the request to choose the routing. If I select routing with groupcounter 2 for both orders, the combined order is created with routing X /groupcounter 1.
    I also tried using production versions but the situation remains
    even by forcing to "use always production version" = setting in the material master, I still get routing 1.
    It seems the combined order takes always the first routing, Any selection is not possible
    Did I miss a setting/customizing or is it a bug?
    Any help would be appriciated
    Regards
    Johan

    Hi Ayoub,
    All the 4 routings are valid from Oct.2014 to 31.12.9999.
    The Order date is from Apr.2015.
    I've made another test with 2 routings created with ECN and the order chose one without asking me what to choose. I don't know the criteria used in this functionallity.
    Thanks,
    Caio.

  • How to ignore Assembly Scrap of MRP during Production order Creation

    Hi All,
    We want to ignore the Assembly Scrap maintained in MRP View during production order creation.
    We are maintaining assembly Scrap for planning so we do not want to remove that.
    Please let us know if any User exit is there during Production Order Creation.
    Thanks,
    Amit

    Dear Amit,
    Assume in CO01,once after entering the total order quantity the system proposes the scrap quantity field separately,now
    remove this quantity for scrap field and press enter and once again adjust the total quantity and check for what quantity the
    system is proposing the BOM components.
    check whether this works for your requirement.
    Regards
    Mangalraj.S

  • Batch no assigning during production order creation

    Sir,
    We are manitaining the batch management for inut raw materials. During production order creation it is mandatory to assign the batch no for raw materials then only production order releasing is possible.In our case due to batch assignement to production order while order creation,we are facing the lot of problems like batch no not assign for full req qty and also if unavailabilty of stock for particular batch no it will come to COGI.hereby i need experts help for,
    1.I want to determine the batch no during confirmation instead of order creation and also allow to release the production order even batch should be in blank.
    Kindly help
    Regards,
    PS

    Hi
    For Rawmaterials why cant'n you assign Batch nos buring GR of purchase order.
    Then you can do automatic batch determination during confirmation of order for mvrmt type ;261...
    This is  easy  to handle.
    Please check and come back
    Regards,
    srihari

  • Date of BOM Explosion/Routing in the production order

    Dear gurus,
    i would like have the Date of BOM Explosion/Routing in the production order same the "Basic start date" .
    I setting the value 1 = Basic start DATE  in the customizing transaction OPPQ and OPPR but the system calculate this date wrong.
    Are the the other setting for this necessity ?
    Thanks a lot
    Daniele
    PP TEAM

    Dear Toto,
    The standard procedure is that the system first checks whether a BOM explosion number exists for the BOM. If one does exist,
    the BOM is exploded using the fixed key date contained in the BOM explosion number. If a BOM explosion number does not exist,
    the BOM is exploded with the order start date.
    Check the setting in OPPQ for BOM explosion.
    Regards
    S Mangalraj

  • Routing cannot be determined during production order creation

    Hi,
    I am puzzled as to why the system cannot determine the routing data when i create the order against a material. I have confirmed the following that :-
    1) Order type refers to the correct routing selection id and routing type, rate routing in this case in OPL8.
    2) The rate routing is already created for the validity date with the correct usage and release status.
    Please check the screen shots attached :- http://wikisend.com/download/509556/routing.zip
    Can someone please help on this peculiar problem

    Hi,
    Are you using any production version. Check your production versions date range, lot size, also check if your production version is locked.
    Also check whether you have assigned the selection ID in OPU3 for the order type.
    Also check OPEB setting.
    Hope it will help you.
    Regards,
    Alok Tiwari

  • Routing selection in Production Order when using ECN in Routing

    Hi experts,
    I'm having some trouble with routing selection when using ECN in routing creation.
    I tested a case where I have 3 routings without ECN, and the Order asked me which one of the 3 I want to use.
    Then I created a routing with ECN. The order asked only one routing without ECN and the new routing with ECN.
    Do you know if there is any relation about using the ECN in Routings and using at the same time Routings without ECN, when selecting the routing in production order?
    Anybody can help?
    Thank you,
    Caio.

    Hi Ayoub,
    All the 4 routings are valid from Oct.2014 to 31.12.9999.
    The Order date is from Apr.2015.
    I've made another test with 2 routings created with ECN and the order chose one without asking me what to choose. I don't know the criteria used in this functionallity.
    Thanks,
    Caio.

  • Error during Production Order creation

    Hi All,
    Our's is MTO scenario. We have maintiain Account Assigment Category as 'M' in Requirement Type. During creation on production order with ref to sales order system gives error "Account assignment cannot be carried out because of different origin no."
    If I create the production order with ref to quotation system does not gives any error. But my requirement is to create the prod order with ref to sales order.
    Please guide
    Regardsd

    Hi Bala,
    In SPRO goto>Sales and Distribution> Basic Functions-->
    Availability Check and Transfer of Requirements
    -->
             Transfer of Requirements
    -->
                 Define Requirements Classes
                 Define Requirements Types
      -->      Determination Of Requirement Types Using Transaction
    Determination Of Requirement Types Using Transaction
    In the standard system, requirements types are determined according to a specific search strategy beginning with the material strategy group.
    Strategy for Determining the Requirements Type
    1. First, an attempt is made to find a requirements type using the strategy group in the material master.
    2. If the strategy group has not been maintained, the system will determine it using the MRP group.
    3. If the MRP group has not been defined, the system uses the material type instead of the MRP group when accessing the corresponding control tables.
    4. If no requirements type is found here, the system assumes a special rule and attempts to find a requirements type with the aid of the item category and the MRP type.
    5. If this is not possible, a last attempt is made to find a requirements type with the item category only.
    6. If the last attempt fails, the system declares the transaction as not relevant for the availability check or transfer of requirements.
    Note
    You can select an alternative search strategy in the 'Source' field, for example a transaction-related procedure for determining requirements type (source = 1 or 2). 
    Example
    There are business transactions, such as consignment stock processing, in which the material with its planning characteristics is not important, rather the transaction itself. An issue from the customer's consignment stock should not trigger an availability check against planning at the plant as layed down by the planning strategy but rather against special stock.
    Actions
    1. Assign the item categories and MRP type to the requirements types.
    2. Select an alternative search strategy in the 'Source' field if necessary.
    By assigning the 1 or 2 to the Source you can have the requirements in MD04 refered to order instead of the initial source document which is usually quotation. If we don't assign this then the system by default refers to the initail document created i.e. Inquiry or Quotation whichever is the first document.
    Regards,
    Karthik.

  • Component Availabity Check during production order creation

    Hi All,
    During production creation, I donu2019t want to include/ check the reserved stock of component (stock which has been assigned for other prod order)
    Where I required to make the changes in config.
    Regards,
    Shailendra

    Hi,
    Deactivate Include Reservation in T.Code OPJJ. But make it sure you are doing it for correct Checking Rule which you have maintain in your checking Control OPJK for Order Type and Plant Combination.
    Regards,
    Dhaval

  • Availability check during production order creation - Missing parts details

    Hai Gurus,
    I have one problem during Availability check when converting Planned order to production order.
    1) A- is the finished material, which has A1 to A7 components.
    2) A2 is the procured item with safety stock and it has safety stock also.
    3) When sale order is created , the material A2 is reserved against the planned order for finished material - A.
    4) so when availability is checked during planned order stage , system says no missing parts, when planned order
         is converted to production order system says missing parts for component A2, which is stock and reserved against
         planned order
    5) Checking rule for Production order is maintained as follows,
         a) Include safety stock.
         b) Include reservation.
         c) Include sales requirement
         d) Include deliveries.
         e) Include dependent reservations.(x)
         f) Include production orders.(X)
         g) Check release for stock transport orders only.( A)
    So now i don't know where I went wrong , so that the system could consider the safety stock of Component A2 which is in stock and already reserved against planned order and it does not show missing parts when planned order is checked.
    Waiting for your positive feed back.
    Regards,
    Sekar chand

    Dear,
    What checking rule you have maintained for planned order.???
    As what i can understand by your question that you have maintained to check reservation only in production order not in planned order. Or one important thing mostly people configure to reserve material only after release or creation of production order. Are you reserving material at planned order stage.?
    Check these things. you will automatically find the answer. Hope it will help you. Revert back for more clarification.
    Regards,
    Alok Tiwari

  • Route determination during sales order creation!

    Hello all,
    I am having a problem with route determination in sales order. The issue is when I remove delivery block (LIFSK) on the sales order and select 'under minimun' in orther reason (AUGRU)field, the route is not getting determined when the partner at the header level is changed.
    When if there is a delivery block and other reason is empy, the route is correctly determined when the partner (intermediate consignee) is changed.
    Why is it behaving this way? Any siggestions?
    Thanks,
    Message was edited by:
            Naren Somen

    Hello all,
    Looks like if there is credit block for a customer, the sales order is not getting updated. Is there anyway to get around this?
    Thanks,

  • Withholding Tax Selection during Sales order creation

    Hi,
    Do we have an option to select or deselect Withholding Tax Codes at the time of Creating Sales order / Billing for the Customer?
    As, We get the popup during the time of invoice creation to the vendor.
    Your inputs are appreciated.
    Thanks & Best Regards
    Shashikanth.M

    Hi,
    Refer the below OSS note:-
    [https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=178824]
    Regards,
    Gaurav

  • How BOM and routing is selected for Planned order and Production order?

    Hi,
    Can any1 plz tell me how BOM and routing is selected for a planned order and production order. ?

    Hello Mathisuthan,
    BOM and Routing selection for the planned order and production order through production version, If u have more than one BOM and more than one Routing then u can maintain this information as Production Version in the system.
    Production version you maintained
    MM01/MM02 -- MRP4--- Production version
    Or you can create Production Versions in Mass also with Transaction Code "C223"
    In the case no production version maintained/created  for the material, then system by default  will pick the first BOM and routing.
    I hope this information helpful to you.
    Regards
    Umesh Mali

  • Production order creating without BOM and Routing

    create the production orders without bom and routing
    they confirm the order
    they want to stop confirmation if production without bom and routing
    is it possible to set error or warning message
    my first doubt is how can we confirm the order without bom and routing
    i think it can be solved by production order type
    please reply

    Hi,
    You can make it mandatory by following ways :
    Go to OPPQ -> Select your plant-> Go to BOM / Routing Selection in that you need to maintain BOM Sel ID & Routing Sel ID which is having selection ID with usage 1 Production which will make it mandatory to create BOM & ROuting with usage 1 & need to be selected while creation & saving Production ORder.
    Also, you can maintain another config. for making routing mandatory at Order type level :
    Go to OPL8 -> Select Plant & Order type-> Routing Selection
    Maintain 5     Routing/ref. op. set mandatory (manual selection)
    or          6     Routing mandatory (automatic selection)
    This setting will ensure without routing your order will not be saved.
    Hope this helps.
    Regards,
    Tejas

Maybe you are looking for

  • Keynote will not open in Powerpoint for Mac 2011

    I followed all the instructions for saving the Keynote presentation for Powerpoint. But, when Powerpoint for Mac 2011 tries to open it, it will not open and gives me an error message indicating it needs repair; I click repair, it says there is someth

  • User Exit or Badi when opening a Work Order

    I am looking for a user exit or badi that triggers when a work order is opened or better yet when the components tab/button is clicked.

  • Error loading updater workflow elements 9

    Can anyone help, i have elements 9, and have tried to install the camera raw update, however when i try the install i get a message box saying.... error loading updater workflow..... this is now driving me insane..... i have dowladed the latest downl

  • Lightroom 3 - Web module - Unable to load Flash Player

    Running to most uptodate version of Lightroom 3 - on OS X 10.6.4 also fully up to date.  Have downloaded and installed the latest Flash Player from the site.  This problem seems only to be on my 2.8ghz iMac with 2 gig of RAM.  Lightroom 3 and flash g

  • [WRV200] Two SSID and remote control?

    Hi, I have a WRV200 and need to setup a wifi access for a place that is shared. So two questions: 1. How can I have two SSIDs, one for me, one for visitors with my router? Is it by setting up a VLAN ? If yes, would those persons be able to access the