BOM Change Issue

I have material number, component number in my file. I need to change the issuing storage location for each component. I am unable to figure out the way to write a bdc. Shall i use cs02 or cs05. Also if go inside the bom change how do select a component in my BDC??
with regards
MurugeshRajeev

ok,
following previous instruction do the recording in LSMW.
in 4 th step of LSMW i.e. in  filed mapping add a validation for Material type where you write a query on MARA to check if material type is 'Whatever you wnat'.Only do transfer_record for transaction which satisfy youir condition , for rest of them do SKIP_TRANSACTION.
let me know if any questions.

Similar Messages

  • Customized report for BOM changes

    Hi PP Gurus,
    My client is not having ECM. he want to create one Z report for BOM changes. I checked tables MAST, STKO, STPO, CDPOS and CDHDR. In CDPOS I can see replaced component and replced quantity. But if I deleted any component or inserted any new component I can not see this in any table. Please suggest me how can I track such changes without ECM.
    Jayesh Narvankar
    SAP PP

    Dear ,
    You can try to develope a report with the help of you ABAPer with following FM /BAPI :
    CSAP_MAT_BOM_MAINTAIN
    CSAP_MAT_BOM_OPEN
    CSAP_BOM_ITEM_MAINTAIN
    CSAP_MAT_BOM_CLOSE
    Refer this experts theards on this issues : Deletion of BOM item using BAPI/FM
    If you need to go ahead with ECM , you refer  our earlier posting in the same issue :
    Changes in Production Orders
    Regards
    JH

  • Read Order BOM Changes

    Hi All,
    How to read/track the order bom changes (CU51)?
    I want to track all changes made using CU51 for perticular sales order, like component deletion, change in quantity etc. I checked the tables CDHDR and CDPOS but did not get any information.
    Please help

    Sachin,
    How did you solve this issue ? I have same req in my prj.....any help in this would help us...
    Please let us know how did you solve this ? Is it by CDHDR or User exit tracking changes and passing it to Ztable ? any other method ?
    pls let us know ...thanks in advance....
    Gayathri

  • I think I solved my time changing issues- hope this helps

    Hey everyone, I think I've had some success with my time changing issues. I originally posted this to another user as a follow up to her question, but I'm reposting it here. Hope it helps:
    "msteinny,
    So i went to the apple store to meet with an apple genius to ask him why my phone's time kept moving up 1 hour everytime I synced my phone. Well he said that he's never seen this problem before, and after a trying a reset and restore he let me exchange my phone. The problem is that when I went to sync my new phone the problem still persisted. They told me it was probably something to do with my computer and its time zone settings.
    So I get home and click on my computers clock in the bottom right hand corner to bring up the date and time properties and sure enought my time is correct, the date is correct and the time zone is correct (Eastern Daylight Time). So I look through the different tabs (Date & Time, Time Zone, Internet Time). The first thing I tried to do was to change where my computer syncs its internet time. It was originaly set on NIST time. I then switched it to Windows time, but this didn't do anything. My clock would still change when I synced to itunes. The next thing I tried was fideling around in the Time Zone tabs. I noticed that the box that says "Automatically adjust clock for daylight savings" was unchecked, so I checked it and my computer's time jumped an hour ahead. So I left the box checked but moved my clock one hour back (to the correct time), clicked on apply and left it at that. I synced my iPhone and voila! The time didn't change! It stayed on the correct time! To to make a long story short, make sure that you computer's clock is set on "automatically adjust clock for daylight savings changes, make sure your time zone is correct, and that the time is right when that box is checked. I hope this helps you. I'm glad I got a new phone out of the deal;)
    Chris P. "

    As I mentioned in my post, whenever I checked that box the time would be incorrect. It would move up an hour. I've messed with this along time ago, way before I got my iphone. I think this had something to do with the daylight savings change that was implemented this year or last year. I dont remember if I never tried correcting it before, or if I couldn't, but this time I didn't have any problems correcting it. Anyway, since I couldn't correct it back then, I just left the box uncheck and decided that I would change the time manually when the next time change occurs. But it seems to work fine now so all is well.

  • Bom Change Authorization (CS02,CS62)

    Hi all
    I am tring to block users from changing Material Bom usage 1 without ECM
    but allowed them to change Order Bom any usage without ECM
    I used c_stue_ber and c_stue_noh for tring block them
    also i couldn't find any user exit that i can used for this validation.
    Please Help

    Hello Kobi,
    In exceptional cases you can allow a BOM change without a change number
    using the authorization object C_STUE_NOH for BOMs with history
    requirements.
    Hope it works...
    Cheers, Dudle.
    PS: Plz Do not forget to give rewards

  • BOM CHANGE MANAGEMENT

    HI,
       we r changing bom with change number.
    we changed one bom with one change number(validty next month date).now that change number has not been used for any other bom changes.i want to restrict that change number for further use..
    can i activate deletion indicator in change master????
    whether it affects my changed bom.

    Yes, make it  inactive status so that it cannot be user in other product BOm change.
    Otherway use authorization group. Give the authorization to useres who should use it and donot give the authorization to musers whoc not suppose to use that change number.

  • BOM Change Restriction

    Dear All,
    My client has Requirement that the BOM should not be allowed to Change ( for specific Product ) for specific Period ( Say for 3 months ) i.e the BOM of the Finish Product & the semifinish below it will not be changed for next 3 months from Today
    We are using ECM for Bom change. They dont want to control by using Authorization as they have different types of products
    Kindly let me know if any user exit or Badi I can use
    Thanks
    Ishwar

    Dear Ishwar,
    In my understanding I dont think it is possible in standard SAP.And also through enhancements also I dont think it is possible to
    achieve this.I will suggest you to think a lot before going for any enhancement.
    Regards
    Mangalraj.S

  • BOM change after Purchase order creation

    Dear all
    My client requirement is an error message should appear when the end users are trying to change the BOM after the purchase order creation for the BOM items and the system should allow the BOM change only after the PO cancellation.
    Please throw some light
    regards
    Kumar

    Dear Kumar,
    Do you mean to say user's should not be allowed to change hte BOM items in a purchase order?or should not be allowed to change a
    BOM,if there are some purchase orders for the same material?
    If your requirement is to restrict the BOM change of a material using T code CS02,after purchase order creation,I dont think its
    possible.
    Please explain your problem little more in detail.
    Regards
    Mangalraj.S

  • BOM change history

    Dear all
    We are using change number to chang BOM. We want to develop a report for all BOM change history. Is there any function module can use? From table CDPOS is difficult to know what have been changed.
    Thanks
    Hailiang

    Hi,
    As others have questioned Why CS80 is not suitable ??
    Other possibility would be:
    Make a work instruction or mandatory to maintain the description and details of the change in the "BOM Long text".
    U can see the long text indicator in BOM,if checked than u will come to know the details.
    Caution: Works fine only if everyone follows maintaining the long text for any changes.
    Regards,
    Prakash

  • BOM change track report.

    Hello All,
    I have a requirement where I need to develop a report that represent following fields of BOM change history.
    1. Material (Along with description if possible)
    2. Changed By
    3. Change On
    4. Change Details (Entry, Delete, and replacement data for the item)
    5. Header level change (Change in Base quantity, from to lot size, Bom activation/deactivation)
    6. Plant (Most Important)
    I have checked to get it through CS80  Change Documents for Material BOMm but it'svery lengthy task and can't do it one by one.
    I have gone through these tables
    STKO --- BOM - header 
    STPO --- BOM - item 
    STAS --- BOMs - Item Selection 
    STPN --- BOMs - follow-up control 
    STPU --- BOM - sub-item 
    STZU --- Permanent BOM data
    But not getting any clue.
    NOTE:- I have not implemented the Change document mgmt system (CC01,CC02) and if I do such so then what about the existing changes already done in the system. So, I know it can be achieved by implementing Change mgmt but practically it's not possible for me.
    kindly help!!!!!!!!!
    -- Jimmy

    Dear Jimmy,
    I dont think it's possible to prepare a report using the tables or CS80 for the same,without having Engineering Change
    Management.
    Check and revert back.
    Regards
    Mangalraj.S

  • Production Order BOM change

    Dear Expers,
    How can i restrict the Production order BOM Change. Please tell me with the steps.
    Other than screen variant.
    Regards
    Raghu

    Hi,
    To do this you can use below mentioned processed.
    1. create a user status and give approval to the order at creation and the user will not be able to change any thing in the process order.
    2. You can use user exits to restrict changes changes at "materials" screen.
    Hope this will help.
    regards,
    kaushik

  • BOM ALE issue

    Hello all,
       I am trying to ALE BOM changes from client 300 to 100. SO I changed the qauntity of a component and saved without using ECM . I did the ALE, but in target system it did not update the item quantity. Instead it added a new line item with a valid from date.
                           I want to update the quantity and not add a new line item. This functionality works right with ECM, but I want to see if it can do it without ECM. Thanks
    Atul

    Atul Katti wrote:
    lets say the original component  with qty 2 was valid from 5 June and today I did the ALE, the original line is left as is and a new line with the SAME item number is created with a valid from date of today with the changed qty.
    this sounds like it works in create mode instead of change mode.
    And this makes me think that it may have something to to with the situation explained in the ALEKZ note.
    Had you checked whether your BOM in the target system has the ALEKZ active?
    the note explains that you can only update records with this ALEKZ set.
    How do you transfer the BOM? with transaction manually or automatically using change pointers?

  • Tracking Production BOM changes in Documents

    Hi,
    I am a BW consultant and am working on a report that concerns tracking changes to the BOM code in documents. The situation is
    The PP BOM is created and basis that procurement and GR is done. However changes to the PP BOM are frequent and cause problems while MIGO. For example on a certain day a material, lets say A, requires 2 qty of material A2 and on another it requires 1 qty of A2. This causes discrepencies in the inventory. So a report that can give a comparison of the actual qty ( as given by the GR doc) and the ideal qty ( as given by the BOM) can help check this.
    To the best of my understanding tracking BOM changes on doc level solve the purpose so that one can spot the state of the BOM on the doc level. Is this possible in std R3 system ? If yes, then what are the entities involved ?
    Am aware of a functionality called ECM, Engineering Change Management, but am not sure if that will help here.
    Thanks in advance.
    Saurabh Diwakar

    Dear,
    The best way to meet your requirements is to activate Engg. change management.
    Then you will get track of all changes .
    Check in cs03.enter your material, plant and usage. execute it
    then click Environment -> change doc -> Full
    Also try with transaction CS80,CS81.
    ECM and do the necessary seetings in T code OS27 - Set Modifications parameters for BOM's ,OS54 - Engineering Change Management Control Data.
    Or,
    The best way to do is using Change douments .. Since SAP provided the Change doc mainly for this..
    Tables: CDHDR and CDPOS.
    Tcode: SCDO. Vendor Master : KRED is the Change doc object.
    Regards,
    R.Brahmankar

  • Table for BOM changes

    Is there a report that I can run to find all BOM changes for a specific date? Is there a table that I can query that would hold this information?
    I would also like to perform the same search for recipies and material master changes.

    Hi
    YOu can use CS80.
    I think you must be aware about the BOM history maintenance which you select at the time of customization.
    After you select the indicator please go to the table MKAL and find out the BOM.
    It will show you all the changes made in a particular BOM
    also you can find the change records in tables CDHDR (Header records), CDPOS (Item records), CDATA (Details)
    Material master changes - MM04
    Recipe change report - check C260 and C261
    regards
    Srinivas

  • BOM changes inputting the BOM component -reg

    Hi Friends,
    we would like to know the BOM quantity changes happened for a particular BOm component .
    Using CS80 we have to input BOM header to know BOm changes , but our requirement is for a BOM component what changes are made and when they are made .
    Our BOM component say a paint part number is used in many BOM headers
    it is not possible to see CS80 by inputting one by one  BOm header and check whether the BOM component quantity changes are there .
    instead we would like to input BOM component and know when and what changes are made to its quantity (menge) in what BOM header by which use
    please help
    regards,
    madhu Kiran

    Dear Madhu Kiran,
    This is possible only if you are using ECM - Engineering Change number and you can obtain the details
    from the tables STAS,STKO,MAST &STPO.
    Without ECM I dont think its traceable.
    Check & revert back.
    Regards
    Mangalraj.S

Maybe you are looking for

  • Upgrade to Yosemite and can no longer place jpg files in Illustrator

    I have recently upgraded to Yosemite, wish to hell I hadn't, but now all my Illustrator work that has placed images that are not eps images is destroyed. When I open a file I am asked to repair or replace the images but any that are not in eps format

  • Installing photoshop elements 11 on laptop

    I just purchased a laptop w/o a cd drive.  I need to install my copy of photoshop elements 11 from my disc.  Aside from buying an external disc drive is there any other way to do it?

  • When someone calls their number doesnt displays on...

    using 2 online numbers for uk and usa  when someone calls me on usa number it shows me their number but when someone calls me on uk number skype doesn't show me their number  how can i see their number someone please help

  • Mail Not Sending; Recreate Account?

    Comcast sent me an e-mail saying they had blocked the sending of email on port 25 (I was actually using 995), and that I should change my settings to send email on port 587. True, I could not send, but I could receive. When I switched to 587 (with pa

  • Clearcut image. distortion when importing into Aperture3

    I clear cut an image in PS then pasted it into a new transparent file. Reduced the image to 600 pixels high. Saved with "web and devices" with png-24 and transparency ticked. The preview looks perfect (see example). Hit save. Go to A3 and use the imp