Bom Child Components disapper -maintaing delivery schedule in subcon PO

Dear all,
In subcontracting Purchase Order,
We are sending a material to a vendor for processing,BOM Child Components are showing ,
But while giving multiple delivery schedules for supply of material in required dates,
BOM components get vanished,
for single delivery schedule
BOM Componets are showing,
How to solve this issue ?
Expecting valubale contributions.
Thanks & Regards
Jeyakanthan
Edited by: Jeyakanthan A on Dec 19, 2009 1:13 PM

When you define several schedule lines in subcontracting purchase order the component list ("Object list") icon and the "Re-explode" icon will disappear from "Material" tab and you will see them on "Delivery Schedule" tab.
By selecting a schedule line and clicking on the suitable icon you can get the component list and you can also re-explode the BOM if necessary.
(If you have old version (4.7) and the BOM is really not exploded you can find suiatble OSS notes ot repair the problem.)
Regards,
Csaba
Edited by: Csaba Szommer on Dec 19, 2009 11:54 AM

Similar Messages

  • AT A TIME DELIVERY OF ALL BOM CHILD COMPONENTS

    IN MY SALES ORDER I AM HAVING A BOM ITEM ALONG WITH OTHER LINE ITEMS.
    I WANT TO DELIVER ALL THE COMPONENTS OF A BOM AT ONE TIME WITHOUT DELIVERY SPLIT.
    I WANT TO DO DELIVERY FOR THE OTHER ITEMS (NON BOM) IN ANOTHER DELIVERY.IS THERE ANY FUNCTION AVAILABLE IN STANDARD SAP TO CONTROL THAT ALL THE BOM ITEMS ARE DELIVERED AT A TIME WITH OUT DELIVERY SPLIT..
    THANK U & REGARDS
    RAJESH KUMAR RAJU

    Hi,
    In the item category for the header item say if it is TAQ In the controls
    For the field
    " Create Delivery Group " put value " X  " - ( X Form delivery group with one delivery date ).
    This will check the all bom items go in a single delivery.
    Hope it helps. Please reward if useful.
    Thanks & Regards
    Sadhu Kishore

  • Delivery schedule ME38

    hello Gurus,
    When we are maintaing delivery schedule with ME38 t code there is a button fixed which can be ticked or unticked please let me know the use of this.
    I have already seen F1 Help documentation
    helpful answers will be rewarded
    regards
    suresh

    Hi,
    Schedule lines for a Scheduling Agreement can be created in following 2 ways;
    1. Manual (In ME38)
    2. Automatic via MRP Run (MD01 / MD02)
    1. If you create Schedule lines manullay in ME38, these will get fixed by default since you know the requirment and entering by yourself.
    2. When Schedule lines are generated via MRP Run (MD01 / MD02), then system creates these as per the MRP Parameters which may not provide the correct results always and you might make some chnages in these schedule lines so these type of Schedule lines will not have "Fixed" indicator ON by default after creation.
    If you go to ME38 and make any chnages in date or quantity of schedule lines as per your requirement then "Fixed" indicator will get activated for this Schedule line and will not be affected by MRP Run for 2nd time onwards and will get changed only via ME38.
    To generate Schedule lines via MRP, maintain Sourcel Iist for material in ME01, here assign the Scheduling Agreement and also Put MRP Indicator as;
    1   Record relevant to MRP OR
    2   Record relevant to MRP. Sched. lines generated automatically

  • Procurement for kit item without listing its child components in PO

    Hi Experts,
                Could any one explain me how to get the solution for below scenario
    The purchase order will be placed for kit item and which has list of child components (For example 4 to 5 components). The child components may not be listed in PO. During goods receipt against the PO, how to track the child components into GR and child components may be recorded as staggered delivery. 
    Regards,
        Ramprakash

    Hi,
    The purchase order will be placed for kit item and which has list of child components (For example 4 to 5 components). The child components may not be listed in PO. During goods receipt against the PO, how to track the child components into GR and child components may be recorded as staggered delivery.
    every item there should be in PO line item for goods receipt
    we can not used BOM in PO
    Regards
    Kailas Ugale

  • Issue components for a subcontracting scheduling agreement

    Hello, 
    Please can anyone tell me how (steps)  to issue components on subcontracted item on a scheduling agreement .  Item is also set up with KANBAN indicator so GR is done thru changing KANBAN bin status.
    Thanks
    Mira

    You can view, Explode during creeation of delivery schedule for SA. Use ME38 transaction you will see the BOM in item details

  • Difference between Scheduling lines and Delivery schedule

    Hi SD Experts
    can u say me the clear difference between Scheduling lines and Delivery schedule.
    where we will maintain deliver schedule. whether delivery schedule is automatically created along scheduling agreements..
    with regards
    James

    Hi James,
    Schedule Lines: Has basically information realted to delivery scheduling in Sales Order level.
    Delivery Scheduling: Is a process using which system will determine what are the different activities which need to be performed and time taken for each activitiy only after which the material can be delivered to the customer.
    Delievry scheduling will be started only from the material availability date i.e., system will first determine the material avail date and then do scheduling. By default Standard SAP system does Backward Scheduling in case material availability falls beyond the required delivery date system will do forward schedluing
    Delivery Scheduling consists of the following Basic activities:
    We give deatils while creating order:
    Order Creation Date
    Required Delivery Date
    Order date - Material availability date - Transportation Planning Date - Loading date - Goods Issue Date - Required Delivery Date
    Time Between GI Date and required Delivery Date is called Transit Time
    Time Between LoadingDate and GI Date is called Loading time
    Time Between Material Availability Date and Loading Date consists of 2 components - Pick / PackTime and Transportation Planning Time
    System has to calculate all this before it determines the confirmed delivery date.
    Give your mail Id I have some Presentation I will send you across.
    REWARD POINTS IF IT HELPS
    Regards
    Srini

  • Can serial number be entered for a BOM child material in production order

    Hi,
    Kindly let me know whether it is possible to enter serial numbers for a BOM child material in a production order. In case yes, then under what circumstances (parameters) and where do we display it in a production order? e.g. for a BOM parent material, we display it in transaction CO03 --> Header --> Serial Numbers.

    Dear Sourav,
    In myunderstanding I dont think we can maintain the serial numbers for the components in the production order,but however
    while performing GI using MB1A or during CO11N(,if backflushing is activated) we can enter the serial numbers for the
    components and then using documented goods movements we can trace for each production in CO03 or else in COOIS.
    But kindly check with T.Code COIB which seems to define the header-component serial no relationship.
    Check and revert with your findings.
    Regards
    Mangalraj.S

  • Schedule agrement: Delivery schedule

    Hi,
    For a sub contracting schedule agreement,when i try to maintain delivery schedule(me38) and try to explode BOM.the system is taking first alternative BOM but i wnt to explode second or third alternative BOM,
    How it can be done
    Regards,
    SAGAR

    Hi,
    This is generally controlled by the field 'Altern. selection' = 1 in the MRP view 2 of the material master.
    When this value is 1, alternatives are selected according to the BOM explosion date.
    Please check the Date of the alternative BOM's created and check for the desired BOM explosion.
    Regards,

  • Whats the Difference Between BOM and Components??

    Hi all,
    I tried to create a SubContracting PO,i found BOM and Components in Item <b>Tab</b>
    but if i click components and BOM same data details exists,then whats the difference between component and BOM??
    and also Pls give me method of Creating PO with BOM
    Thanks a lot in advance

    Dear Veeranna Chavadi,
    This is some infirmation about BOM in PO subcontract
    1) The purchasing department processing time defined for the plant
    2) The planned delivery time from the material master record or purchasing info record
    3) The delivery date
    4) The goods receipt processing time from the material master record
    For Ex:
    Processing time Planned del. GR processing
    Purchasing time time
    Release PO Delivery Date
    date date date required
    Date required: 10.09.2007
    GR processing time: 2 days (working days)
    Planned delivery time: 10 days (calendar days)
    Purchasing dept processing time: 2 days (working days)
    Requirement date less GR processing time, planned delivery time, and purchasing department processing time.
    Hope you understand, this is as per the SAP help.
    what happen to u r query, if BOM is exploding please close this thread as answered
    Hope this helps you
    Prem.

  • ME2L Delivery Schedule Showing Fully Delivered Lines

    Hey,
    We are experiencing this issue on a SAP 4.7c system that we support.
    Our business are trying to generate a report, every month, that is sent to vendors, of all the purchase orders that the business are expecting them to fill. To do this the business user uses ME2L report per vendor, only selecting the Schedule Agreements documents, hitting the calendar button (Delivery Schedule), exporting the resulting output to Excel, using a formula to identify the lines which have a GR value less than the Scheduled Qty value and sending these onto the vendor as a notification to the that these are the orders that the business have marked as outstanding.
    The issue arose when the business cancelled lines on Scheduling Agreement 5500000073 by going into MD04 and deleting the requirement for vendor 5033760 and reassigned those requirements to a new Agreement 5500000053 for vendor 5000259.
    However when you run the process above the deleted lines still show up on the report and you believe this should not be the case and never was the case.
    What process to accurately identify on SAP, schedule line items, that have not being fully Goods Receipted and/or cancelled so they can be sent to the vendor?
    Many thanks for any help,
    Colm

    Hi Jurgen,
    Apologies for the delay, I was away on leave.
    We use selection parameters WE101 and that correctly brings us back only open orders on the selection screen, however when we click the Delivery Schedule button it displays lines that have been fully Goods Receipted.
    For example, if I have a PO with 3 lines, Lines 1 and 3 have been fully received and line 2 has only been partly received.
    I run ME2L with the selection parameter WE101 and the report only displays line 2. Which is correct.
    However when I click the delivery schedule button I will be shown the entire history of that line, including scheduled quantites that were fully goods receipted.
    What I would like to see is only lines where the scheduled quantity is greater than the goods receipted quantity.
    I hope this makes sense, thanks for your help,
    Regards,
    Colm

  • Scheduling Agreement with Delivery Schedule using Idoc messages

    Hi all,
    Can anybody please explain the importance of the field name "LABKY" in Idoc execution for Forecaste/JIT Delivery Schedule.
    My requirement is that when i send a new Idoc i do not want the old schedule line which are not yet released , to be deleted .
    As per the SAP help the use of the field LABKY is related to this , but when i tried its value as "1" , the previous schedule lines are still getting deleted.
    Can you pls explain how to go about it . ( DELFOR/DELJIT Idocs)
    Thank you
    Regards
    Subha

    Hi ,
    The Field
    LABKY : Delivery schedule key
    internal data type : CHAR
    Internal length : 000001 characters
    Position in segment : 026, Offset : 0393. external length : 000001
    Regards
    Seegal

  • Order of delivery schedule line counter at schedule agreements from MRP run

    Currently we are using schedule agreements for our long term external suppliers, but we are facing a problem with the order of new delivery schedule lines created during MRP run.
    Because of master data settings like, lot size, rounding value, plan delivery time and planning time fence to set as firm new requirements, multiple schedule lines are created with no order for schedule line counter.
    Does anyone is aware of a BADI, user exit or customizing control to have this schedule line counter in order?
    Thank you
    Daniel Guillen
    IT
    Skyworks Inc.

    Hi,
    Pls put this query in SD fourms  and get immly help because this is technical fourms.
    Anil

  • Schedule Line(Delivery Schedule) generation stopped

    Dear Experts,
    We are using Scheduling Agreeements to procure materials from Vendor.We are using MRP(type PD) to generate our requirements.We have noticed that ,for a Schedule Agreement- MRP generates Delivery Schedules accordingly,but if user will try to interven the process by entering a manual schedule line with some quantity,and Fix Indicator is getting fixed,after that MRP is not able to generate Schedule Lines,henceforth.
    We had done the same things earlier,but MRP was able to generate Schedule Lines even after manual intervention by user.We have not maintained Fix indicator in Source List also and the particular material and the Agreement both have been marked as MRP relevant against that Vendor in Source List.
    If we will remove the open delivery schedules having Fix indicator fixed ,after that we run MRP,then the Schedule Lines are getting generated,but for those Schedule Lines(Manual or thorough MRP) having Fixed Indicator fixed and have GRN transaction completed,we would not be able to delete those and also MRP will not be able to generate Delivery Schedules.Please advice what is the reason behind this and share the full concept of Fixed Indicator against the same?
    Regards,
    Soumick

    It looks we encountered very similar problem,one item line in our Scheduling Agreeements can't be driven by MRP MD02/MD41,but if we add another same line item under this SA, this new line can be driven by MD02,and generated delivery schedule line.
    I don't know why. Please give me some light! Thanks!

  • Deletion of Scheduling Agreement and Delivery Schedule using BAPI

    Hi SAP MM Gurus,
    Please assist in inquiry below:
    My scenario is that I am trying to delete delivery schedules and scheduling lines using BAPIs. I have no issues when there is no GR made yet for the delivery schedules. The error arises when there are already existing Goods Receipts and Invoices for the schedule line that I wish to delete
    When using the BAPIs (either BAPI_SAG_CHANGE or BAPI_SCHEDULE_MAINTAIN), I set the deletion indicator to "L" and set to X all change relevant fields (i.e. DELETION_INDX). However, whenever I execute it, I get the error message 06088. The funny thing is both the Quantities and the delivered quantities that are normally populated are left blank.
    For example:
    Normal error for 06088:
    Quantity 100.0 smaller than quantity delivered 179.0
    Error using BAPI with deletion indicator:
    Quantity  smaller than quantity delivered
    Is this a bug of the BAPI? or am I just missing some settings?
    Your immediate response is appreciated
    Regards,
    DeLo

    Hi,
    Please find the below link check the setting are correct or not
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/a02cb00a-bfb4-2c10-98aa-e33e7f64ba28?quicklink=index&overridelayout=true
    Reagrds,
    Pramod

  • Open Delivery Schedule list

    My current client wants to display a list of Open Delivery Schedules via ME3M or ME3N in ALV mode. using selection criteria WE101 or WE103. The problem is that these reports also display schedule lines that were already received.  I tried changing the selection criteria, creating a new one and still the report shows schedule lines already received.  Do you know a way to remove these delivery schedule lines.
    Frank

    Hi,
    there is e.g. ME3N.
    in the report on the very right there is a button like a schedule. Press it and you'll jump to the schedule lines.
    regards, Paul.
    Edited by: Paul Herzog on Feb 23, 2010 1:10 PM