How can i get bom quantity at the time of confirmation in CO11N?
Dear Hardik,
If the components are set for backflush,then as per the component assignment to routing operation,while confirming that
operation in CO11N,you can click on good's movement key and check the component's quantity getting reflected for the order
quantity as per the BOM relationship.
Regards
Mangalraj.S
Edited by: Mangalraj.S on Mar 17, 2011 4:34 PM
Similar Messages
-
What-if Analysis on Bom Component Quantity
Hi ,
Is it possible to do What-if analysis on Bom Component Quantity ? As Users wanted to do what if analysis for Gross Die per Wafer. We tried creating one measure for GDPW and use the if condition in BOM Custom Roll up for eg. if (isNull("GDPW"),Component_Qty,"GDPW") but it is not working for What-if Analysis. Do i need to change something in On-Change formulae in BOM Custom Roll up.
Thanks
LokeshHi ,
We are able to load the GDPW for Die level (only one stage )and we have a condition to validate if the measure is null it will take the component_Quantity or else it will take the 1/GDPW measure value. we are doing it for 3 purposes :
1. To get the Accurate value of GDPW which is equal to 1/Component_Quantity (GDPW will be accurate only if we get 30 decimal places value in calculation)
2. As part of information provided to Users as they wanted to see it.
3. To do What-if Analysis (if Possible).
We could have use 'todouble' for the accuracy but we were thinking of what if analysis, and user visibility also.So far calculation is coming nicely but it would be appreciated if you can give pointers for the risk involved in keeping GDPW as measure.
Thanks
Lokesh
Edited by: Lokesh Rathi on Sep 21, 2011 6:38 AM -
BOM Component quantity decimal places
Hi... All..
how & where to maintain settings for decimal places for component quantity in a BOM..??
eg., Base unit of measure is KG n base quantity is 1KG
component quantity is o.5KG... at present system is not accepting decimal places....
waiting for reply,
with rgrds
L NarayanaHi,
enter the no of decimal places in CUNI .
then , in CS02 - enter the qty as 0,05 and not as 0.05 (use comma instead of fullstop and it will not throw any error) pls check.
you can change this using this path also
in the SAP user menu System->User profile-> Own data in the Default value tab page you can find the decimal notation
The same topic was discussed earlier in this forum.
How to maintain BOM quantity in decimal (i.e.0.5 kg) instead of Round valu
Regards,
Sheik
Edited by: sheik abdulla on Apr 14, 2008 2:25 PM -
Change in BOM Component quantity
Hi SAP Experts
Currently I am working on an implementation project on Chemical manufacturing firm, where there is a requirement in Bill of materials.
In BOM, they are having components in which the quantity is getting varied. Example: For making a particular header material there may be quantity changes in the component because the raw material quantity received from the vendors varies.
So if we get a raw material with lower grade quantity, then to produce the header material - component quantity would be different. So quantity of the component quantity changes with the quality provided by vendor.
Please suggest me the best possible solutions in SAP.There is Std SAP functionality to deal with this called MQC given in Recipe. You need to discover this thoroughly & need to try in your sand box. I will suggest you to first understand how it works & then if you faces any issues ask for advice.
Go through the below thread.
[MQC|http://help.sap.com/saphelp_47x200/helpdata/EN/89/a42514461e11d182b50000e829fbfe/frameset.htm]
Regards
Abhijit Gautam -
How to increase Decimal Points for the BOM Component Quantity
Hi All,
While creating BOM:
Can anyone help me to know how i can increase the Decimal points for the BOM components quantity.
I can able to give only upto 3 decimal points, but the requirement is more than that.
I have increased the Decimal point value to 5 in transaction Code CUNI. but still it is allowing me to enter only upto three decimal places.
Thanks and Regards
KhadeerKhadeer,
You would be better off changing the base quantity of the parent part. Instead of "1 EA parent contains .00003MG of component" you could say "100 EA parents contain .003MG of component".
Alternately, you could use different units of measure for your parent or component parts, which would be more suitable for the 3 place decimal limitation.
I agree with Anil in that if you elect to change the decimals from standard, you could end up with huge changes that will propagate through every module in the ERP. In my view, there is no need of this kind of headache.
Best Regards,
DB49 -
BOM Component quantity vs Backflush Component quantity
dear sirs,
shall the 2 kinds of quantities be the same? when running backflush, component list exploded differs from that of BOM.
what is in contact with them in between?
thanks a lot!
Mandydear Venugopal,
my question is, provided all master data maintained in place, when running some planned order to backflush, the quantity of component list doesnt match that by diploid in BOM.
Say, material 1 stands 1kg in BOM (on condition of base qty 100kg of Assembly), when backflushing a planned order - 200kg, excluded scrap factor in BOM, the qty of material 1 in component list of backflush table doesnt equals 2kg.
thanks so much for your prompt support!
Mandy -
BOM changes inputting the BOM component -reg
Hi Friends,
we would like to know the BOM quantity changes happened for a particular BOm component .
Using CS80 we have to input BOM header to know BOm changes , but our requirement is for a BOM component what changes are made and when they are made .
Our BOM component say a paint part number is used in many BOM headers
it is not possible to see CS80 by inputting one by one BOm header and check whether the BOM component quantity changes are there .
instead we would like to input BOM component and know when and what changes are made to its quantity (menge) in what BOM header by which use
please help
regards,
madhu KiranDear Madhu Kiran,
This is possible only if you are using ECM - Engineering Change number and you can obtain the details
from the tables STAS,STKO,MAST &STPO.
Without ECM I dont think its traceable.
Check & revert back.
Regards
Mangalraj.S -
Bom Component qty & WIP Quantity differ at Trget cost calculation
Dear gurus,
i am facing the problem with WIP at target cost calculation in REM.
My issue is
BOM Component qantity is 9.524 TO and price is 2000 then total cost is 9.521*2000=19048.
but in WIP Report kkas in WIP explation it takes input qty 9.52 T0 and price 2000 then total price is 19040.
Difference is 19048 - 19040 =8
and also when i am issuing actual qty i.e 9.524 in BOM then my price is 19048.00 ant at time of variance calculaton then quantaty variance as 9.52.0-9.524.0=-0.04 then 0.004*2000 =-8
Please suggest solution for this.
Any OSSS NOTE Required
any Quires please revert back
REGARDS
Avinash.pegarlawarHi
Rounding differences between target and actual values and quantities are not unlikely to occur and cannot always be avoided but can be minimized.
Small prices and price unit of 1 are likely to cause more of these rounding differences..
The actual credit is simply calculated as price * quantity. The target credit however is calculated during the variance calculation
and based on the sum of all items in the itemization/cost components of the cost estimate and therefore more accurate.
To avoid this I suggest to store the material price with a larger price unit, i.e. 1000
Std cost release stores price upto 2 decimals and target cost calculation goes upto 3 decimals...
Please check also the note 1265918 for more information to this topic.
Regards
Ajay M -
Error in component quantity while exploding BOM
Hi
We are facing error while exploding BOM
i.e. the component quantity is 11.111 YD in cs03
but while exploring in CS13 we are getting component qty as 12 YD
Note : there is no rounding value maintained in the material master
waiting for your valuable response
Regards
BarlaHi Barla
Check the field "Roundoff" in transaction OS29, and maintainted it "1"
Regards -
In subcontracting the component quantity consumed more than the BOM quantit
Dear Experts,
In subcontracting the component quantity ( 543) consumed more than the BOM quantity while doing GR, so please let me know what may be the possible reasons for the same.
Regards,
BaluBalu
may be the suncontractor needed more than the BOM quantiy.It is the case of overconsumption of components. -
How to get calculated component quantity for BOM like in CS12
Hi All,
Please let me know how to get the calculated component quantity of BOM similar to the field in CS12.
Regards
Maheshhi,
[http://www.sap-topjobs.com/SpecialPP/overviewdoc1.pdf] -
Product Costing - CK11N BOM component wrong quantity
Hi,
I have a question regarding Material Cost Estimates. I have a material (Product A) which has a BOM header Qty of 524. One of the Components (Product B) has a Qty of 560. When I run the Cost Estimate for Product A, the component costing list doubles the quantity of Product B, and therefore doubles the cost (this is when I change the report Qty to 524).
The Costing Lot Size on the product A is 1. When I change this Costing Lot Size on the material master to 100 and rerun the CK11N, the Component Qty and Cost are correct.
Is there some rule that I should be following when it comes to Costing Lot Sizes?
Thanks for any help.
Daniel.TO MY KNOWLEDGE,
COSTING LOT SIZE IN MATERIAL MASTER, FOR WHICH YOU ARE DOING STD COST ESTIMATE,
COSTING LOT SIZE IN MATERIAL MASTERS, OF BOM COMPONENTS,
BASE QUANTITY IN BOM,
BASE QUANTITY IN ROUTING ,
ALL THE ABOVE SHOULD BE IDENTICAL. -
EXPLODE BOM COMPONENT QTY -REG
Hi abapers,
I am creating a report inwhich showing all BOM components for sale order
wise.
I have used FM 'CS_BOM_EXPL_MAT_V2' to show all the BOM
components.
Now I want to display the component quantity also based on required
quantity as we do in CS11.
Is there any tables or function modules to get those fields.
Thanks in advance.
Regards
RajaramHi,
please check out the following link it might help you
Re: Function Module for Displaying BOM
*****please reward points if the information is helpful to you*********** -
More than 3 decimal in Bill of Material component quantity
I want to know whether we can use more than 3 decimals in quantities in Bill of Material. I heard that it was an issue in SAP but is that issue still exist in ECC 6.0.
RegardsDear,
During maintaing the unit of measure in T-code CUNI we can define No. of decimal places to which rounding should be performed which specifies the number of decimal places to which this measurement unit should be rounded.
System will not allow more than 3 decimal places in satandard SAP.
You can use a larger base quantity of 100 or 1000 in the BOM header (instead of 1).
That would eliviate your issue with the 3 decimal places in the component quantity.
SAP always takes the base quantity into account during requirements calculation.
Hope clear to you.
Please refer this link,
[Decimal in Bill of Material|Re: Decimal Points in BOM]
Regards,
R.Brahmankar -
Report for Issued component Quantity vs Subcontracting PO component qntity
Dear Expert,
My client wants to know a report on issued Component quantity (what is issued against a Sub- contraction PO) with PO component quantity (what is maintained in a subcontracting PO component).
Is there any standard report available for the same?
Please suggest if any query report can be built or not.
Thanks in Advance
Regards
Rajib DebnathDo you change child qty consumption in p.o BOM ?
Check it in mb51 541 mvmt for material for issued component quantity.
Also check reports MBLB,ME2O.
Can you explain term
Report for Issued component Quantity vs Subcontracting PO component qntity
Maybe you are looking for
-
I have a ipod 5 gen and I lost it somewhere around the house. I've used the Find My Iphone app, but it indicates that its offline. So I'm guessing it ran out of battey or its turned off. That's why I am asking if theres anyway that I could turn my ip
-
How to display current navigation on "Body only" page layout
I create a new page and applied "Body only" page layout which is basically PageFromDocLayout.aspx But it doesn't show current navigation. How do I show current navigation on left side of the page? I have the code which will display current navigation
-
Unassign users from a Org unit and reassign to another org unit
Hello Friends, There are users in my org who are already assinged to a org unit through USERS_GEN transaction (from SU01 users) and are creating shopping carts for the past four months without any issue. Now there is a requirement to assign few of th
-
Hi all, I need department wise running total in forms Like this EmpNo EName DeptNo Sal RunTotal 1234 Test1 10 500 500 1235 Test2 10 600 1100 1236 Test3 10 1000 2100 1237 Test4 20 800 800 1238 Test5 20 600 1400 But i need it on form not on report or S
-
Hi, I recently formatted a Pavilion 15-n213sl and I re-installed Windows 8.1 (64-bit). In the Device Manager there are the following devices with missing drivers: ACPI\HPQ6001\3&11583659&0 ACPI\HPQ6007\3&11583659&0 \VEN_10EC&DEV_5227&SUBSYS_2166103C&