Hi
We would like to use any version component in BOM. We marked it with * and it shows ALL as version. Now the problem is that assembly seems to accept only current version of the BOM element.
Is it designed so, meaning is * reserved current version? And if so is there a marking for any version?
Br,
Jennsen

Hi Hannes,
Taking into account [the online help|http://help.sap.com/saphelp_me52/helpdata/EN/00/92e9f87f844d64933f9de1fffbd038/content.htm], I would expect asterisk to be taken as any revision, and emtpy value - as a current revision.
As I remember, System Rule "Specific BOM Component Version Required" could affect this behavior.
Regards,
Sergiy

Similar Messages

  • BOM Explosion with Versions

    Hi,
    I am trying to build BOM Explosion Hierarchy with levels, but one of the requirements is to also generate the hierarchy with versions.
    So for instance I have Parent BOM with version C and component with version D. I need to also generate the hierarchy for all the versions of the Parent  (o,A,B) and to what components and versions do they tie to.
    I am not sure how is this possible. All I have been able to do is get the latest version via BOM, and BOM Component tables.
    Thanks

    hi,
    The defination in OPPQ is only working for the MRP, when the planned order is created.
    Then the explosion date will be copied from planned order to production/process order when you convert the planned order.
    However, when the production or process order is created manually, or when you do a re-read master data process, then a different BOM explosion date process will be carried out as described in the SAP note 506345, it has explained the behavior clearly base on the different value of paramter:
    V_T399D_S-BESAL = initial, 1, 3 or 4
    V_T399D_S-BESAL = 2 (Explosion with order finish date)
    So there is no problem to have different behavior of planned order and production/process order.
    Regards,
    Rachel

  • PO  with BOM component issue?

    Dear Gurus,
    Po updation and creation will go to third party system.
    In PO, the material X carries Y BOM component with different grid sizes like 26 26, 26, 28 etc...
    But, in PO, I am not finding any of these grid sizes coz these r not subcontracting...
    The idoc carries PO informations also BOm component.
    But, how third party system gets these grid sizes value which are maintained in BOm componet i.e.; Y.
    Please help..

    Hi,
    Check on it:-
    Purchase Order With BOM (Components)
    Table for BOM components of Purchase Order
    pherasath

  • Linked Documents to BOM: Current version/All versions

    Hi,
    I am talking about the screen that is obtained in ECC6 after executing CS03 , Go to Header Level and select the tab Doc.assignment.This shows Linked Documents ( Current version and All versions)
    I have linked three released versions of a Document Info Record ( AA,AB and AC) with change number to the BOM by navigating to the screen listed above and saved the BOM.But I dont see any Linked documents, if I click on "Current version" in the same screen.However "All versions" shows all the three versions of this DIR.The DIR also shows the linked BOM in Cv03n for all three versions.
    I have tried linking these three versions to the material, and the "current version" in the additional data tab ( basic data view) - document data tab rightly shows the latest version AC and All versions shows all three AA,AB and AC.
    1.Is there any activation to be done for current version in BOM as mentioned in above screen?
    2.The version is released with change number and is valid on todays date , what might be other possible reasons current version doesnt show up any DIRS for the BOM?
    Regards,
    Prasad

    Hi Christoph.
    The SAP system we are using already has corrections of note 974270 as it is on higher version.
    I have checked the documentation in the links you have sent and made sure that the settings for screens are fine.
    I tried to execute couple of scenarios to check the logic for "Current version".
    Scenario:1 : Two DIRS with out change number and not released
    I see that there are no versions displayed in "Current version" tab( in CS03 tcode)  for a simple test case where i created two DIRS with out change numbers, both of them not released.As per documentation in link, it should display the latest version in such scenario,
    Scenario 2: Three released versions with valid change number.
    For another test case , though three versions are released( AA, AB And AC) and change numbers are still valid, the current version still shows older version of "AA".( in CS03 tcode)
    Please help if there is something else that I can check to proceed further.
    Regards
    Prasad

  • When I make a Book in Aperture and print a PDF proof version, all the modified photos (marked with Badges) are totally distorted.  What is causing this? All other - non-modified photos - appear to be fine.

    When I make a Book using Aperture 3 and print a PDF proof version, all images that have been modified within Aperture are distorted in PDF form.  All other images appear ok.

    As if only the corrected layer would have remained on the photos.
    So the geometry of the pictures is correct - they are not skewed or something? Only the colors and intensities are wrong?
    . Only in printing when it is converted to PDF file some photos are unrecognizable.
    Is it the printed pdf or the pdf viewed on the screen? If it is the printed copy you need to fix your print settings.
    Does Aperture give a warning, that the high resolution images are not available?
    We had some cases of books not being able to be printed, and that was due to a broken reference to the original files. Only the book could not access the originals, all other parts of Aperture could. To check for this, try to add one more adjustment to one of the images in question. Is it possible? Are the edits reflected correctly in the pdf of the book?
    We were shooting with 3 cameras, Lumix5 shooting RAW, Cannon 100 shooting JPEG and SONY alfa850 shooting RAW.
    Have you tried to reprocess the raw of the edited images? (Photos > Reprocess Raw)
    Also try, to remove one of the images from the book and to add it again. That usually helps, if Aperture has lost the connection to the originals used in the book.
    If you no have done so already, repair (and if necessary rebuild) the Aperture library.
    See: Repairing and Rebuilding Your Aperture Library: Aperture 3 User Manual
    Regards
    Léonie

  • I just created a new iPhoto library with holding the option key down and then opening iPhoto with version 7.1.5.  I changed the name of the first library to iPhoto library 1 and now I all my photos are gone.  My operating system is Mavericks.

    I just created a new iPhoto library with holding the option key down and then opening iPhoto with version 7.1.5.  I changed the name of the first library to iPhoto library 1 and now I all my photos are gone.  My operating system is Mavericks.

    launch iPhoto wile holding down the option key and select the original library - when you create a new library of course it is empty
    And you seriously need to backup your iPhoto library and purchase and install iPhoto '11 version 9.5.x from the App store and download and run the iPhoto library upgraded \then run the new iPhoto - 7.1.5 is not fully compatible with Mavericks
    LN
    PS you also need to update your profile - it states that you have OS X 10.6.8

  • Some component with an unsupported version is trying to use NI Spy

    This problem is intermittent. In GPIB Configuration, Network settings, when I select the IP address of GPIB ENET/100, I get this NI Spy message: Some component with an unsupported version is trying to use NI Spy. Please contact National Instruments for an update. Do I need to update the firmware of GPIB/ENET100? The current version is B.9.

    Hello,
    Try uninstalling 488.2 driver, then uninstall MAX and then reinstall the 2.1 version for 488.2 from CurrentGPIB driver versions. Also make sure you are the administrator while you uninstall and reinstall.
    I have not seen this problem happen before so I hope uninstalling and reinstalling helps solve this problem.
    Please feel free to email me back incase you have further questions.
    Good luck and have a great day!
    Koninika
    National Instruments

  • Which version of MaxDB will be there with SAP All in One program

    Hi All,
    Does any one know what version of MaxDB will be bundled with SAP All in One program.
    Regards
    Raja

    Hello Raja,
    as far as I know, the SAP Business All-in-One Faststart program is bundled with SAP MaxDB version 7.6.03. Of course an update to the latest 7.6 version can be done.
    Best regards,
    Melanie

  • All infoproviders with version "In Process" after upgrade

    Dear experts,
    After the upgrade from 3.5 to 7.0, we have noticed that all our infoproviders appear with version "In process" even those that were not active in production.
    Is this normal? what is the meaning of "in process"? Is this something that can be fixed so they all show their original version: either active or inactive?
    Thanks in advance.
    Inma

    Hi,
    You can see these kind of changes after the Upgrade.
    So try to active the targets using the standard program RSDG_CUBE_ACTIVATE program and use * for the all cubes and use B for Basic type.
    Hope this helps.
    Murali

  • How do i check the compatability of all my version 3 add-ons with version 4 before updating to vesin 4

    How do i check the compatability of all my version 3 add-ons with version 4 before updating to vesin 4

    Here's the link. It's a long list and unfortunately, it's not in alphabetical order. So it'll take some time to go through them:
    https://addons.mozilla.org/en-US/firefox/compatibility/report?from=%2Fzh-CN%2Ffirefox%2Fcompatibility%2Freport

  • I'm running a 13" MAC pro with version 10.8.2  But none of that will matter once you hear my news.  Some days ago, I copied then pasted a long page item into my calendar.  Now, all the claendar does is beep at me.  I can't delete or cut the entry.  In sho

    I'm running a 13" MAC pro with version Lion v.10.8.2  But none of that will matter once you hear my news.  Some days ago, I copied then pasted a long piece of type into into my calendar.  Now, the things jammed up and all it  does is beep at me.  I can't delete or cut the entry.  There much be someone out their smarter than I.  Help!

    Try restoring from your backup of a day or so prior to when you made the error.

  • Reg. Fetching of Documents/Drawings attached to BOM Component in CS03

    Dear Experts,
    My requirement is that i need to use FM for BOM Explosion (CS12) to display all BOM Components associated to BOM Material along with the Documents / Drawings attached to each BOM component, in an ALV report. I found the FM to be used, but i could not get the Documents / Drawings data attached to each BOM Component (Tcode CS02 / CS03) and sub assemblies in that FM. Is there any other FM / BAPI available to achieve this. Kindly help me in this regard.
    Thanks & Regards,
    Ramesh Manoharan

    Hi ,
      1.  use bapi -  BAPI_DOCUMENT_GETOBJECTDOCS to get document number, version,part,type by passing object catagory and
    object key .
    2. once u get this above detail use FM CVAPI_DOC_GETDETAIL to get documents and drawings for the bom component.
    Thanks

  • Bom Component qty & WIP Quantity differ at Trget cost calculation

    Dear gurus,
    i am facing the problem with WIP at target cost calculation in REM.
    My issue is
    BOM Component qantity is 9.524 TO  and price is 2000 then total cost is  9.521*2000=19048.
    but in WIP Report kkas in WIP explation it takes input qty 9.52 T0 and price 2000 then total price is 19040.
    Difference is 19048 - 19040 =8
    and also when i am issuing actual qty i.e 9.524 in BOM then my price is 19048.00 ant at time of variance calculaton then quantaty variance as   9.52.0-9.524.0=-0.04  then 0.004*2000 =-8 
    Please suggest solution for this.
    Any OSSS NOTE Required
    any Quires please revert back
    REGARDS
    Avinash.pegarlawar

    Hi
    Rounding differences between target and actual values and quantities are not unlikely to occur and cannot always be avoided but can be minimized.
    Small prices and price unit of 1 are likely to cause more of these rounding differences..
    The actual credit is simply calculated as price * quantity. The target credit however is calculated during the variance calculation
    and based on the sum of all items in the itemization/cost components of the cost estimate and therefore more accurate.
    To avoid this I suggest to store the material price with a larger price unit, i.e. 1000
    Std cost release stores price upto 2 decimals and target cost calculation goes upto 3 decimals...
    Please check also the note 1265918 for more information to this topic.
    Regards
    Ajay M

  • By-Product as a BOM component

    Hello gurus,
    During the manufacture of my main product there is a by-product being produced at a certain stage. I have to mention this particular item as a BOM component and signify it with a negative sign. When i do this, then during the Goods receipt stage of my main product I also have certain qty of by-product coming to stores. This is all well and fine, But I do not want the cost of this by product to be subtracted from the main product when i do the cost estimate in CK11N, What are the settings that have to be done to achieve this.
    I want the by-product qty to be credited to stores but do not want the cost of this by-product to be subtacted from the main product.
    Thanking you in anticipation
    regards
    Sri.

    Hi ,
    There are two options to avoid this.
    1. Remove costing relevancy tick mark  from BOM
    2. In material master costing view maintain 100 % costing structure for header component.
    This will solve your problem
    Regards,
    Amit

  • SG:50, Cannot convert planned orders to prod orders at BOM component level

    Test scenario for Strategy Group 50 (Planning without final Assembly)
    Product Structure
    Material-->  SG50.00 > FERT> (Strategy Group: 50)
    Material---> SG50.02 --> HALB --->(Strategy Group: 40)
    Material---> SG50.04 ---> ROH --->(Strategy Group: Blank)
    Maintained PIRs and Ran MRP at the header level, Planned orders are created
    with order type VP at levels of BOM structure. Thus cannot covert planned orders
    to production orders without having sales order.
    But my understanding of Strategy Group 50, is BOM components can be produced before hand (i.e.
    before sales orders are recieved ). Now planned orders with order type VP not able to convert
    planned orders to prod orders at BOM component level

    Stuti/Prasobh:
    Thanks for your inputs, it answers my question
    Intially maintained Individual/Collective indicator to "2" at header level (FERT), which is why all the planned orders are created with order type VP
    Changed the Individual/Collective indicator to "blank " at header level (FERT), and maintained Individual/Collective indicator  to "2" at component level
    Reran the MRP (MDO2), with the following settings --> Delete and Recreate planning data and Check mark on  Also plan on unchanged components
    Able to see planned orders at component level with order type LA
    Due points have been assigned