Bom explosion cs11

hi
i maintained bom for final assembly in 6000 plant.in final assembly bom sub assembly is a componenet in 6000 plant and i maintained subassembly bom in 6000 plant and 1000 plant. the problem is when i explode bom in cs11 multilevel. system takes sub assembly bom in 1000 plant.
note:
component of sub assembly in 1000 plant and 6000 plant are different.
how can i solve this.
i want to explode only 6000 plant material

Hi,
Before that Please let me Know  whether  u  have created the Group BOM and extented to plant 6000, 1000.
Inthat case if have change the Bom in any one plant, it will affect the all the plants.
Please check the BOM components for plant 1000, 6000 at CS03.
Pradeep
Edited by: Pradeep Kumar on May 24, 2008 3:03 PM

Similar Messages

  • CS11- BOM explosion with status inactive

    When a BOM is marked as inactive( at the header level), the BOM explosion using CS11 is not possible.  The systems says there is no effective BOM. However I can pull up the same using CS03 and drill down level by level.
    Is this standard SAP behaviour? Are there any settings in Customizing that will make the explosion for inactive BOM's  using CS11 possible?

    Alternative to select inactive BOM
    BOM status = inactive in BOM header
    In OS31
    Create a selection ID = 09, selection priority = 1, BOM usage = 1
    OS 30
    Create a BOm application copy from PP01 let us say ZP01
    In which enter the selection ID = 09, what you created before
    Remove all the ticks of check BOM
    Save
    That is all.
    In cs11, select the application as ZP01 and you will get the BOM explosion.

  • MRP RUN- KIT BOM explosion not working

    We setup one layer BOM’s for our maintenance KITs as parent material and components as child material.  For  example KIT is TS10000-K1 and components are TS10001, TS10002 etc setup as next layer with in the BOM. Both KITS and components are defined as material types ERSA (Spare parts). These one layers BOMs are setup as production BOMs and expected to create purchase requisitions for KITS and components by exploding BOMs during MRP runs. We use purchase requisitions and convert them into POs to procure both KITS and components. We DO NOT USE Panned orders and Production orders. 
    The safety stocks / reorder point are considered as demand for KITS and components as we do not have any external demand for KITS and components.  
    MRP run is creating purchase requisitions automatically for both KITS and components as per safety stocks and reorder point defined in MRP Views of Material Master. This is working as expected.  
    The issue is: KIT BOM’s are not exploding to generate purchase requisitions for the dependent components of KIT BOM. Please suggest the way to resolve this issue. 
    Split valuation: Also we plan to use split valued KITS with both new and refurbished. So we need BOM explosion for split valued KITS
    also (after the 1st issue is resolved).   
    I verified the following items to make sure the required configuration and data setup is defined correctly.
    1) Planning file activated Plant - OMDU 
    2) Executed MRP run with Total Planning - MDBT and MD02 (single item, multiple levels)
    3) BOM explosion for MRP activated- OS23 
    4) MRP type in MRP1 view- PD and VB (I tried both separately but BOM is not exploding).
    5) Procurement type “F” (MRP 2 view) and lot size “EX”  
    6) Planning strategy in MRP 3 view (tested w/o planning strategy and with strategies 10 and 40. But BOM is not exploded)
    7) BOM status and usage (status is active and usage is for production-CS02 and OS20)  
    8) BOM Validity date (Valid) 
    9) BOM structure in CS12 (BOM is exploding in CS11) 
    10) Availability check  
    11) Selection of BON ID to have BOM usage indicator assign (OS31).
    12) No alternate BOMs or production versions or work scheduling view are used.
    Please review the above 2 issues and suggest any workable solution. Thanks in advance!
    NOTE: I extensively used MRP with multi-level BOM explosion in my earlier projects without any issue. However the above issue is a  bit strange  why one layer BOM is not exploded in this case. 
    Regards
    Srini  

    Hi
    Thanks for your response. I reviewed all SAP notes and none of them are applicable to my scenario.
    1808396 - BOM changes not considered by MRP: I have not changed BOMs.
    1781324 - MD11: Valid BOM alternative is not found. We do not have alternative BOMs.
    1791009 - No BOM explosion after changing production version: We am not using production versions.
    Our Material KITS are PM spare assemblies set up as BOMs and consists of individual spare parts as components. We are creating purchase requisitions and not planned orders. We are not using PP functionality/Production orders.
    MRP is generating purchase requisitions for KITS and components as per ROP and safety stocks. In other words it is working as expected.  The issue is BOMs which are parent assemblies are not exploding to the next lower level components.
    Please note that I am not getting any error messages when MRP is executed.
    Regards
    Srini.

  • BOM EXPLOSION IN SUBCONTRACTING SCENERIO

    Hi,
    To all Experts,
    This is regarding the bom explosion in subcontracting P.O(scenerio).Scenerio prob. is explained as follows -
    1) I have an assembly which includes the semifinish & raw materials.
    2) By cs11 it explpodes whole BOm
    3) When i made P.O. for job work order(subcon.), in mateial data view it displys only the semifinish components(i.e. component or explode bom) ,but not the raw,which we want to send to vendor.
    so due to above,how we can determine, what the material we are sending to vendor?
    In short i want to explode the bom in po,in which it displys the semifinish as well as its raw.
    So please suggest a propper solution for above query.
    Hoping suggestion quickly
    Thanks in advance
    Manish

    Hello Manish,
    Could you please tell me how you have resolved this problem. I have the similar requirement.
    "want to explode the bom in subcontracting po,in which it displys the semifinish as well as its raw."
    we are exploring the PHANTOM ASSEMBLY but still no luck.
    When i set at BOM item level - Phantom Assembly off indictor and  Spec. Procurement 50
    system is still requesting for transfer of Phantom Assembly instead of components to the vendor.
    Thanks in advance

  • BOM explosion for Multiple  materials

    Dear All
    In Cs11 where we can get bom explosion  report for single material,but i need multiple material more than one material as desired.
    Any Std T code is there.

    Dear Sukendar,
    1.For this requirement you have to go for a Z report and you can give the Functional Spec's to prepare
    this report to your ABAP consultant.Prepare the input format,logic of the program and the output format.
    In the logic part you can make use of this Functional Modules's CSAP_MAT_BOM_READ or 
    CSEP_MAT_BOM_READ  or CS_BOM_EXPLOSION   or CS_BOM_EXPL_MAT_V2 .
    2.Using CEWB helps you to identify all the material that's having the BOM,but here the report does not
    shows you the level by level by BOM for a FERT.
    Check and revert back.
    Regards
    Mangalraj.S

  • Discontinued parts in BoM explosion reports

    I am having difficulty with the BoM explosion reports (CS11-13, and CSP1-3), in that they seem to take no notice of discontinuation.  In particular we have some assemblies which are discontinued, and replaced by alternative parts with a different sub-assembly BoM.  It does not seem possible to explode through the new BoM - the reports appear to continue to use the obsolete assembly.
    Am I doing something wrong?  It would seem clear that the reports should explode the BoM through the new assemblies, particularly if there is no stock of the obsolete part.
    Is there an alternative way to get a BoM explosion report which does take note of the discontinuation data?

    Hi,
    In my opinion discontinuation is considered only during MRP run (planning) and has nothing to do with BOM reports (CS03, CS11, CS12, CSMB, etc).
    SAP online help:
    If this indicator is set, the material is defined as 'to be discontinued'. The material is then discontinued in MRP. MRP transfers dependent requirements that are no longer covered by stock of this material to the follow-up material.
    So, I think you won't see the follow-up material in BOM reports. Even if you maintain the discountinuation in BOM I think you cannot see the actual sitruation in BOM reports (you will see both follow-up and discontinued material).
    I hope I'm mistaken and this is a solved issue in SAP.
    Regards,
    Csaba

  • What are the alternatives for BOM explosion?

    Hi.
    I am developing a report based on ck13n.I need the product costing of the Whole BOM upto the lowest level. right now i am js gettin the costing of the topmost heirarchy.Hw can i explode the BOM to the lowest level??? what are the alternatives?

    These are the userexits available for the BOM transactions CS11, CS12, CS13.
    Exit Name Description
    PCSD0001 Applications development R/3 BOMS
    PCSD0002 BOMs: Customer fields in item
    PCSD0003 BOMs: Customer fields in header
    PCSD0004 BOM comparison
    PCSD0005 BOMs: component check for material items
    PCSD0006 Mass changes user exit
    PCSD0007 Check changes in STKO
    PCSD0008 WBS BOM: Customer-specific explosion for creating
    PCSD0009 Order/WBS BOM, determine URL page
    PCSD0010 Order/WBS BOM, determine explosion date
    PCSD0011 Knowledge-based order BOM, parallel update
    PCSD0012 Customer - Mat. number/mat. number during material exchange
    PCSD0013 Customer-specific processing of an explosion for BOM browser
    PCSD0014 Knowledge-Based Order BOM: Status
    regards
    Abhay.
    <b>rewards point</b>

  • Alternative unit of measure in BOM explosion report

    Dear gurus
    I want to get the alternative unit of measure along with the base unit of measure during the BOM explosion report in CS11.I tried with the layout but I cant find the same.
    How is this possible?
    regards
    kumar s

    Hi Kumar,
    You can develop  a Z report. In the standard CS11, the functionality of displaying the alternate UOM is not feasible.
    thanks and regards
    Muruegsan

  • BOM Explosion for MRP Area

    Dear Expert,
    I have doubt regarding BOM explosion for MRP Area. This doubt is triggered when performing MD01, as result I do not find the dependent requirement in MD04 for my FG. I have maintained the BOM through CS61 and MRP area for all component, I understand that only component level system is taking into account MRP area (storage location). FYI before maintaining all components to MRP area, the BOM explosion was successful exploded. Your advice is appreciated.
    Best regards,
    Mahnansa

    Dear,
    Please check the Explosion control in Customizing, Transaction OMIW.
    Try to explode the BOM in CS11 , CS12 or CS13 if it is working there in curret date then chack the planning file entry in MD21.
    You need to convert the planning file entery at MRP area in OM0F.
    Also note the dependent requirement is not generated in the corresponding MRP area to which the production storage location in the material master has been not assigned for the data of the MRP area.
    Regards,
    R.Brahmankar

  • Bom explosion collectively

    Dear all
    In cs11 we can see bom explosion for one material. Is it possible to see the explosion collectively in std sap ? if not  so  kindly share your other idea?
    Rgds

    We dont have std transaction to explode more than one BOM, but you can use function module 'CS_BOM_EXPL_MAT_V2' in SE37 and pass on all header materials to explode them all. Thank you.

  • BOM Explosion IN MRP RUN

    When I run MRP BOM Explosion doesnot take place for certain F parts.This is REM scenario.Planning strategy is 40.I have already checked Planning file entries.
    It is OK.Please guide.

    Hi,
    Pl. check in T.code oppq (plant parameters), if you have mentioned the BOM explosion ID. or in T.code oppq (mrp group).
    Also check in the material master, mrp 4 view,
    the bom selection id.
    whether it is based on lot size or based on production version.
    You can cross check using t.code<b> cs11 or cs12</b> (bom explosion).
    Rgds,
    SD

  • BOM Explosion for Multiple Process Orders

    Hi,
    I hope someone can assist me with the following: Is there a report I can run or transaction I can do to have BOM explosion for multiple Process Orders? I would like to input process orders for a week and see the BOM details per PO.
    Thanks

    Dear Sukendar,
    1.For this requirement you have to go for a Z report and you can give the Functional Spec's to prepare
    this report to your ABAP consultant.Prepare the input format,logic of the program and the output format.
    In the logic part you can make use of this Functional Modules's CSAP_MAT_BOM_READ or 
    CSEP_MAT_BOM_READ  or CS_BOM_EXPLOSION   or CS_BOM_EXPL_MAT_V2 .
    2.Using CEWB helps you to identify all the material that's having the BOM,but here the report does not
    shows you the level by level by BOM for a FERT.
    Check and revert back.
    Regards
    Mangalraj.S

  • BOM Explosion needed on PO and/or Delivery for Stock Transfer PO Process

    Good afternoon,
      I have been researching the SDN and web for a solution to my problem to no avail so far. 
    The business problem I need to solve is the requirement for our STPO process to explode certain BOM's that are transfered from one company/plant to another company/plant in order to record batch/serial # component information by the delivering plant on the delivery and verification of the batch/serial # in the receiving plant during MIGO processing of the delivery.  This is needed by our Service Mgmt department in order to track servicable items within the Finished Good (medical devices industry).
    It appears on the SDN that a BOM can not be exploded on a non-Subcontracting PO (which would be ideal for us), but barring this problem, we are trying to have the BOM explode in the Delivery created from the STPO via the VL10B transaction.
    The STPO generates a Delivery doc with type NLCC and item category NLC.  I have maintained the material master for the BOM material to have an Item Category Group of ERLA, and I have modified Item Category Determination in configuration in Logistics Execution for deliveries to include ERLA, usage V, and NLC as default item category.  But, the deliveries generated from the STPO still do not explode, like what normally happens if the delilvery of the BOM was created from a standard Order.
    The components for the BOM need to be displayed on the Delivery (if not the STPO), so the cleark can record the Batch/Serial #'s for each component.  Then when the receiving plant posts the Goods Receipt for the delivery a user exit we have (based on movement type and material document code) builds a Service Mgmt table that is then processed to De-install the BOM and components from the former plant and install the BOM and components at the receiving plant (and then subsequently at the ultimate customer's location when a normal sale is made), generating a new Functional Location.
    Has anyone here had to do anything like this before?  Would any of you have any ideas on how this BOM explosion might work on the PO or Delivery?
    Thanks in advance.
    Scott.

    No responses to this question.
    Subject dropped.

  • BOM Explosion needed on Delivery for Intercompany Stock Transfer Order

    Good afternoon,
    I have been researching the SDN and web for a solution to my problem to no avail so far.
    The business problem I need to solve is the requirement for our STPO process to explode certain BOM's that are transfered from one company/plant to another company/plant in order to record batch/serial # component information by the delivering plant on the delivery and verification of the batch/serial # in the receiving plant during MIGO processing of the delivery. This is needed by our Service Mgmt department in order to track servicable items within the Finished Good (medical devices industry).
    It appears on the SDN that a BOM can not be exploded on a non-Subcontracting PO (which would be ideal for us), but barring this problem, we are trying to have the BOM explode in the Delivery created from the STPO via the VL10B transaction.
    The STPO generates a Delivery doc with type NLCC and item category NLC. I have maintained the material master for the BOM material to have an Item Category Group of ERLA, and I have modified Item Category Determination in configuration in Logistics Execution for deliveries to include ERLA, usage V, and NLC as default item category. But, the deliveries generated from the STPO still do not explode, like what normally happens if the delilvery of the BOM was created from a standard Order.
    The components for the BOM need to be displayed on the Delivery (if not the STPO), so the cleark can record the Batch/Serial #'s for each component. Then when the receiving plant posts the Goods Receipt for the delivery a user exit we have (based on movement type and material document code) builds a Service Mgmt table that is then processed to De-install the BOM and components from the former plant and install the BOM and components at the receiving plant (and then subsequently at the ultimate customer's location when a normal sale is made), generating a new Functional Location.
    Has anyone here had to do anything like this before? Would any of you have any ideas on how this BOM explosion might work on the PO or Delivery?
    Thanks in advance.
    Scott.

    No responses to this question.
    Subject dropped.

  • BOM explosion in subcontracting PR

    Hi...
    I have one issue of BOM explosion in subcontracting PR.
    I have created BOM, routing & PV. Production version maintained in info record.
    While creating manaul subcontracting PR , BOM is not exploded giving error message as "Not possible to determine any components".
    I have checked validity of BOM, PV found ok.
    Also Proc. type X & Spl. proc type 30 maintained.
    Any suggestion to the problem appreciated
    Regards
    Tushar

    Dear Tushar,
    Check this link
    [Sub contracting PO - BOM components are not seen;
    Regards
    Madhu