BOM explosion for variant material

Hi Gurus!
I created a material variant, when type match is done, the configurable material is changed for the variant properly, in this case, BOM explosion is done in the sales order and components are shown properly (I did this thought customizing).
When I try to sale the variant material directly (without configurable material and type match), the system do not show the BOM explosion.
I need the BOM explosion in the sales order for invoicing proposes.
Can anyone help me?.
Thanks!!.
J. Carlos.

Hi,
To do a requirements explosion for a configured material, you must maintain the data in the
material master record and link a BOM to the configured material.
If the material of the material variant is the same as the configurable material, the link
is already there.
You can either create a BOM especially for the configured material (perhaps using the copy from
function) or allocate the configured material to the BOM for the configurable product. The second
option is the more common solution.
If you allocate the configured material to the BOM for the configurable product, the BOM for the
configurable product is interpreted and exploded according to the characteristic values assigned.
The interpretation includes the processing of selection conditions and the setting of field values in
BOM items according to the relevant actions.
Allocating a Configured Material to a BOM: From the bills of material menu, choose Bills of material   Material BOM   Alloc. config.
mat.   Create.
Chidambaram

Similar Messages

  • No Bom Explosion for Fert material

    I try to create a BOM where a A1 material(FERT) is link to 3 raw material, A, B and C. Enter the qty in MD61 independent requirement, after that i tried to run MRP and found out that there is no requirement/PR created for the 3 raw materials, only the A1 has the indep requirement. seems there is not BOM explosion.
    After that i try to create B1 material(SEMI) is link to 3 raw materials as well. But the 3 raws material able to show the requirement/PR after the MPR run.
    Am i miss out any step in the config for the material type? or may be other steps?

    Dear ,
    MRP will explode BOM  for FERT or HALB which has valid BOM , based on the following set up :
    1.In MRP4 view of FERT/HALB , keep BOM Selection method -Blank or 1 .If you have Production Version with valid Lot size , Valididt dates (To/From ) , then keep the BOM selection method as 2/3.
    In case of Blank , MRP will  selt the BOM as per the Qty or BOM lot size ( Valid Lot Size-TO/From -CS02-BOM Header )
    In case of 2/3 -System will  Check the Production Version Validdity or Lot size , select the PV and explode .
    2.In OPPQ-MRP Plant parametrs -Keep BOM Explosion indicator as Blank -BOM explosion method /order start date .
    3.Keep MRP Dep.Req filed in MRP4 vewi of FERT /HALB as Blank ( meand you want to plan the dependent ofr FERT/HALB-BOM Compoenet -a,b,c  etc )
    4.All the material (FERT/RAW/HALB) should have porper MRP1-MRP4 view parameters  like MRP Type -PD , Procurement Type E-In house /F-External procured item .
    5.All the material should be Block for Procurement in Basic Data1 -X plant status as 01
    6.All of them should have Planning File Entry in MDRE/MD20/MDAB
    7.Run MRP in MD02-2,1,3,3,2,NETCH
    Hope this is clear .Check Point 1 to Point 4 frist and try
    Regards
    JH

  • BOM Explosion for Multiple Process Orders

    Hi,
    I hope someone can assist me with the following: Is there a report I can run or transaction I can do to have BOM explosion for multiple Process Orders? I would like to input process orders for a week and see the BOM details per PO.
    Thanks

    Dear Sukendar,
    1.For this requirement you have to go for a Z report and you can give the Functional Spec's to prepare
    this report to your ABAP consultant.Prepare the input format,logic of the program and the output format.
    In the logic part you can make use of this Functional Modules's CSAP_MAT_BOM_READ or 
    CSEP_MAT_BOM_READ  or CS_BOM_EXPLOSION   or CS_BOM_EXPL_MAT_V2 .
    2.Using CEWB helps you to identify all the material that's having the BOM,but here the report does not
    shows you the level by level by BOM for a FERT.
    Check and revert back.
    Regards
    Mangalraj.S

  • BOM Explosion for MRP Area

    Dear Expert,
    I have doubt regarding BOM explosion for MRP Area. This doubt is triggered when performing MD01, as result I do not find the dependent requirement in MD04 for my FG. I have maintained the BOM through CS61 and MRP area for all component, I understand that only component level system is taking into account MRP area (storage location). FYI before maintaining all components to MRP area, the BOM explosion was successful exploded. Your advice is appreciated.
    Best regards,
    Mahnansa

    Dear,
    Please check the Explosion control in Customizing, Transaction OMIW.
    Try to explode the BOM in CS11 , CS12 or CS13 if it is working there in curret date then chack the planning file entry in MD21.
    You need to convert the planning file entery at MRP area in OM0F.
    Also note the dependent requirement is not generated in the corresponding MRP area to which the production storage location in the material master has been not assigned for the data of the MRP area.
    Regards,
    R.Brahmankar

  • Alternative unit of Measure for variant material

    Dear All,
    Here is an interesting scenario,
    There is a naterial Billet with two variant characteristics length and size. and base unit of measure is TON. Now alternative unit of measure is PCS.  How can define the conversion factor on the basis of these two variant characteristics.
    In normal material (without variant char.)
    we can define conversion factor 1PCS= 2TON
    For variant material,
    For the material Billet with variant charc length and size how can i define conversion
    so that system calculates diff. PCS with diff. length and size but material is same. So how can i Do that.
    for example for same material Billet but variant char. Length is 6 M and size is 120*120 ,its wt will be 2 TON for 1 PCS.
    for the same material Billet with variant char. length 12 M and size 120*120, its wt will be 12TON for 1 PCS.
    How can i cater this for the same material.

    Hi Shoaib,
    We have faced the similar scenario for steel industry. Based on my experience, it is not possible to define variable values for Alternative UOM conversion with the variant characteristic/configuration, specially if you want SAP to maintain inventory with variable conversion rate.
    Use the Batch specific unit of measure for this situation.
    1) Create batch specific UOM i.e. Ton_per_pc (TOP) --- User proportional unit conversion
    2) Create batch characteristic ton_per_pc and assigned UOm.
    3) In material master additonal data select proportion unit and enter the standard conversion rate between ton & pcs.
    4) While doing GR - In batch creation you can enter whatever the conversion rate is and Inventory will be updated accordingly.
    Regards,
    Ravi.

  • BOM explosion  with Two Material Number

    Hi
    How can  i Explosion in  BOM with  two material number, if any Fm is there in sap or any othre options
    Please tell me
    Regards
    Mani

    Your question is not complete.
    There are two types of bom explosion. from child to parent and parent to child.
    You have to pass one material at a time. Please search in sdn for the fm's. This question ihas been widely discussed here.

  • BOM explosion for Multiple  materials

    Dear All
    In Cs11 where we can get bom explosion  report for single material,but i need multiple material more than one material as desired.
    Any Std T code is there.

    Dear Sukendar,
    1.For this requirement you have to go for a Z report and you can give the Functional Spec's to prepare
    this report to your ABAP consultant.Prepare the input format,logic of the program and the output format.
    In the logic part you can make use of this Functional Modules's CSAP_MAT_BOM_READ or 
    CSEP_MAT_BOM_READ  or CS_BOM_EXPLOSION   or CS_BOM_EXPL_MAT_V2 .
    2.Using CEWB helps you to identify all the material that's having the BOM,but here the report does not
    shows you the level by level by BOM for a FERT.
    Check and revert back.
    Regards
    Mangalraj.S

  • No BOM explosion for sub-contract purchased materials

    Hello,
    I have searched google and this forum and have not found any info on this.  Hopefully someone has run across this same situation and can help.
    We do not want to have a bom explosion happen for externally procured materials (using CU51).  We are using user exit CCUX0800 (EXIT_SAPLCUKO_008) to set no_expl_ext_procurement = 'X'.   This works good, except if the material is set up for external procurement (marc-beskz = "F") and also has a special procurement (marc-sobsl) of "30".  Include LCUKOFFB says to still explode the BOM if the special procurement is "30". 
    Does anyone know why it does this?  We don't want the bom to explode for externally procured parts even if they are set up as subcontracting ("30").  Any way we can do this with a different user exit?
    Thank you.

    Melissa,
    Since you are using Special proc 30 ( subcontracting) system assumes BOM components will be supplied by purchaser.
    When a Subcontract purchase order for subcontracted material is cut on vendor, the components of the subcontrated product is typically supplied by buyer to the vendor. Hence MRP(system ) typically explodes BOM to plan for those compoments in buyer's plant.
    If however you do not want BOM to be exploded &/or components planned in buyer's plant you can set that in BOM of subcontract material at the component level. In the BOM component item detail screen (under tab status/long text) there is a field called Material provision indicator. Set that to L(material provided by vendor).
    This should prevent planning of components (or explosion of BOM) for the subcontract material ( with settings F, 30).
    Hope this clarifies & solves your issue. else please come back with further questions.
    Thanks,
    Ram

  • BOM  explosion using variant configuration

    Hi
    I have a material (LAPTOP) and it has two BOM(RAM and HARD DISK).
    LAPTOP is my main material.
    Through VA01, when I try creating a Sales Order, I give the Material as LAPTOP and when I click "Configuration" menu, I will be showing the Variant Configuration Characteristic values for this material (LAPTOP) namely RAM and HARD DISK.
    When I select them and come back to VA01 scree, I could see both the sub materials (RAM and HARD DISK).
    But my question, I want to see only the one which I select. If I select RAM, then only RAM shoudl be displayed in my sales order not HARD DISK.
    I have created the Characteristics as "Multiple Value" assignmetn
    Please help.
    Thanks in Advance,
    Priya

    Hi Priya,
    Use Dependency concept ,to achieve your requirement.
    Regards,
    Subash.

  • How to get bom application for a material

    hi abapers
              how can we get the bom application for a particular material.
              suggest me a suitable tables.
              thanks in advance.
    Regards
    Rajaram

    Hi,
    for BOM related tables are MAST+STPO.
    and for 1 st case
    Use the report CS15 - Where Used List: Material in BOM
    Give the material number for which you want to find where it is used.
    In the Type of Where Used List Check the Direct checkbox,
    and in Used in Check the Material BOM,
    Then Click on the Next Screen button available on the Top left cornerof the screen.
    Then in the next screen give the plant number and execute.
    This gives you the report of where ever this material is used.
    Regards
    Message was edited by:
            skk

  • Sales order for variant material using BAPI "BAPI_SALESORDER_CREATEFROMDAT2

    Hi,
    I am using BAPI "BAPI_SALESORDER_CREATEFROMDAT2" for creating salesorder for variant configuration material. I am able to create a salesorder when have only one variant material, However when i have more than one variant material getting errors. Can some one tell me how to fill the material data in the config tables provided in the BAPI.
    Thanks.

    Hai Vinit
    Check the following Code & also Check the following Standard Programs
    L2032U12
    LCRMAU01
    LCRMAU11
    LZOC1U01
    MWWMJF32
    RBUS2032
    Structures for order header
    DATA: l_order_header_in    LIKE bapisdhd1,
          l_order_header_inx   LIKE bapisdhd1x,
    Tables for order items
          li_order_items_in    TYPE STANDARD TABLE OF bapisditm,
          li_order_items_inx   TYPE STANDARD TABLE OF bapisditmx,
    Order partners
          li_order_partners    TYPE STANDARD TABLE OF bapiparnr,
    *Schedule lines
          li_ORDER_SCHEDULES_IN  TYPE STANDARD TABLE OF BAPISCHDL,
          li_ORDER_SCHEDULES_INX  TYPE STANDARD TABLE OF BAPISCHDLX,
    *-condition type
          li_ORDER_CONDITIONS_IN   TYPE  STANDARD TABLE OF BAPICOND,
          li_ORDER_CONDITIONS_INX   TYPE  STANDARD TABLE OF BAPICONDX,
    Return table from bapi call
          li_return TYPE STANDARD TABLE OF bapiret2,
    Sales document number
          l_vbeln LIKE bapivbeln-vbeln,
    CALL FUNCTION 'BAPI_SALESORDER_CREATEFROMDAT2'
    EXPORTING
    order_header_in  = l_order_header_in
    order_header_inx = l_order_header_inx
               testrun          = 'X'
    IMPORTING
    salesdocument    = l_vbeln
    TABLES
    return           = li_return
    order_items_in   = li_order_items_in
    order_items_inx  = li_order_items_inx
    order_partners   = li_order_partners
    ORDER_SCHEDULES_IN = li_ORDER_SCHEDULES_IN
    ORDER_SCHEDULES_INX = li_ORDER_SCHEDULES_INX
    ORDER_CONDITIONS_IN = li_ORDER_CONDITIONS_IN
    ORDER_CONDITIONS_INX = li_ORDER_CONDITIONS_INX.
    Thanks & Regards
    Sreenivasulu P

  • BOM explosion for component in ECC which are relevant for planning in APO

    Hi ,
    as we assign materials the MRP type X0 with the MRP procedure X (without MRP, with BOM explosion) which are relevant to APO, so if i have BOM under this item then how this below level Items will be plan in ECC....?
    as we are excluding the component from planning so how the below level will be plan .....?
    Regards

    Dear SCM APO 22 ,
    Answer lies in your question only.
    as the assembly is relevant to be planned in APO but it will be exploded in MRP and the lower level component will be planned in R/3 only if required.
    Only teh assembly which have MRP type X0 will be planned in APO.
    Revert back if you need further clarification.
    Hope it helps you.
    Regards
    Ritesh

  • BOM Explosions for Materials and Plant

    I am looking for the same functionality as in CS15 where I can check if a component within a BOM is part of another BOM.
    How can I achieve this?
    I have tried the FM: CS_BOM_EXPLOSION or CS_BOM_EXPL_MAT_V2, but I can not get these to work as I wish.
    I have material number and plant as a selection criteria as well as BOM usage.
    Does anyone have a good solution to this?
    Please help out as soon as possible, since I am stuck.
    Rgds,
    /Fredrik.

    Hi Fredrik,
    in the past i used FM CSEP_MAT_BOM_SELECT_WHERE_USED  (and afterwards CSAP_MAT_BOM_READ to get details).
    Also you could have a look at FM CS_WHERE_USED_MAT - it should be like CS15.
    Hope it helps,
    BR,
    Sebastian

  • Problem in BOM explosion for a operation Sub Contract.

    Hi All,
    Please advise how to explode a BOM or Assign component in a Purchase order with Item category (L) for a Operation SubContract External Processing  oriented material for which no material code is created from a Series Operation production order .
    Actually in my scenario, no raw material component will send to the Sub -Contract Vendor. Only Assembled operation material lets say operation 20 from a routing ( which is not having material code ) from an In - house production from a shopfloor has to be sent to the vendor to create a operation 30 material , which is also not having a material code." How to explode a BOM or component allocation for the Non- codified Item in a PO".
    regards,
    YK

    Hi
    Change the control key of the operation to PP02. System will prompt u to PR data screen where u have to tick on Subcontracting checkbox. Enter other mandatory field like material grp, cost element, purchasing grp etc. On saving system will create PR with line items. System will trigger the components reqmt based on the assignment to operation. Example if for operation 20, materials M1 & M2 are assigned, then in the PR u will find M1, M2 in the component screen which u have to send to the vendor.
    Hope it is clear to u.

  • Function module to get the BOM details for a material-plant combination

    hi
    Is there any function module to get the BOM details such as
            BOM Usage       -STLAN
            Alternative BOM -STLAL
            Items                -POSNR
            Required Quantity-EMENG
            Resulting Quantity-MENGE
            Unit of measure    -BMEIN
            Base unit of measure-MEINS
    for a given material-plant combination
    if so please suggest me some FMs.................
    Awaiting for ur reply..............

    try the below fm it may be useful for you
    DATA : BEGIN OF I_BOM OCCURS 0.
            INCLUDE STRUCTURE STPOX.
    DATA : END OF I_BOM.
    CALL FUNCTION 'CS_BOM_EXPL_MAT_V2'
        EXPORTING
          CAPID                 = 'PP01'
          DATUV                 = SY-DATUM
          MEHRS                 = 'X'
          MTNRV                 = P_MATNR
          WERKS                 = P_WERKS
        TABLES
          STB                   = I_BOM
        EXCEPTIONS
          ALT_NOT_FOUND         = 1
          CALL_INVALID          = 2
          MATERIAL_NOT_FOUND    = 3
          MISSING_AUTHORIZATION = 4
          NO_BOM_FOUND          = 5
          NO_PLANT_DATA         = 6
          NO_SUITABLE_BOM_FOUND = 7
          CONVERSION_ERROR      = 8
          OTHERS                = 9.
      IF SY-SUBRC <> 0.
        MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
                WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
      ENDIF.
    just befor use it check your application area.for my case it is PP01. you can find it in CS12 when you are exploding the bom the value you are giving in BOM application that is the value for CAPID.
    Just go to se37 and checkout the fm it has lot of options here I am using the minimum things.
    regards
    shiba dutta

Maybe you are looking for