BOM explosion from Production Order

Hi All,
  I understand from SAP Help files that we can explode BOM from Production Order using Read PP Master Data. But it also says, that we cannot do this if items have already been issued out. So would like to know is there anyway out to ensure that the production order is reading the latest version of BOM.
  The reason i want to know is because, at present the BOM keeps getting updated & so the work order has to reflect the new items. The BOM contains about 300 or more items, so manual changes is very tedious & error prone at the moment. Furthermore some components are outsourced. So i want to receive them back & post new materials for them. Hope my problem is clear & await inputs
Vivek

Hi All,
Thanks for the inputs. I think for the situation am facing, the Order change management method, should be of help, as the BOM changes does not take place on scheduled dates, for me to fix the BOM explosion dates & assign them. As of now the BOM gets changed, depending the customer requirements, which is unpredictable.
Clarification required:
1. The profile which is created using OPL7 & assigned in OPL9 is unique, i.e. for any change numbers of BOM will always follow the profile entered in 'Overall Profile' in Work Scheduling view & i do not need to create new profiles for each new change number of BOM
2. Once i run the COCM with the new change number, in the production order - components view will i be able to see any error message for those items which no longer feature in the new version of BOM? & will the materials added in the new BOM automatically feature in that list or do i have to manually add these to the order & if so, how will i know which materials need to be added?
  Hope the clarifications sought are clear, await inputs
Vivek

Similar Messages

  • FM for BOM Explosion at Production Order

    Hi all,
    I am using 'CS_BOM_EXPLOSION' to get the list of component of a material, for rework order we used to delete some component in that case this FM gives same list of component, so I need a FM which gives me list of component with respect to Production Order.
    Thanks
    Varun

    HI,
    You can always get the BOM Material Code by:
    Select Single * from AUFM where AUFNR = w_order_no.
    & then use FM CS_BOM_EXPL_MAT_V2  to fine out the Materials consumed by the BOM material.
    I hope this helps,
    Regrads
    Raju Chitale

  • Incorrect UoM Conversion on Transfer Requirement from Production Order

    I have a Question on a Production Order that created a Transfer Requirement.  Looking at the Components of the BOM within the Production Order, I have a Material where the Issue Unit of Measure is QT and the Base Unit of Measure is EA, with a Quantity of 1.   In the Material Master Alternate Unit of Mesaures, the Conversion is setup so that 1 QT = 1 EA.   The question of why the 1 for 1 conversion is not relevant, as this is just how the material was setup and I know it does not make any sense.   When the Transfer Requirement is created it is showing that 1 Qt = .25 EA.  I am unable to locate where this conversion is coming from.   We do not want to lose visibility of this part number, as creating a new part number with a Base Unit of Measure of QT would fix the problem.
    Is there anywhere in configuration where there could possibily be a Conversion?  I have looked at Control Cycles and the Reference Operation Set and do not see anything.

    Closing Thread as there has been no responses but I am still looking for a solution.  The only  possibility that exists at this time is the material was copied from another material and the UoM Conversion was 1 QT = 4 EA on the Copy From Material.  I can not see where any changes were made to the unit measure conversion for the new material.  The only other possibility is the Production Order was manually converted to the new material incorrectly.

  • Open Multiple PDF files from Production order/Routing

    Hi Everyone
    We are in ECC 6.0 environment. We have a scenario where multiple documents were attached to single operation and also at multiple operations. But when I was trying to open these PDF documents, only the last file was getting opened and closing the previous file. How can I open multiple PDF files at one time from Production order or Routing?
    Any help is appreciated.
    Regards
    Prasad

    Hi Prasad,
    from DMS standard I regret but such a functionality is not available. In the standard originals can be opened only one after another.
    I think for realising this functionality an individual modificatoin is necessary.
    Best regards,
    Christoph

  • BOM explosion in sales order

    Hi Experts,
    I have met a problem in BOM explosion in sales order.
    I have maintained the BOM with usage 5 and the conversion between header material and component of the BOM. But in the sales order entry, no matter how many qty I entered for the header material, after the BOM explosion, the qty of component is 1.
    Can anyone help?
    Regards,
    Emily

    Hi,
    Go to CS02 and select ur bom and go to components give 1 that means 1;1
    hope u get it
    regards,
    sadanandam kasarla

  • How to output serial number from production order in GLM ?

    how to pull serial number from production order in wwi template for GLM ?

    Hi,
    Please have a look to this thread:
    BAPI/RFC to get serial numbers for a production order
    Hope it helps,
    Kr,
    m.

  • Purchase Order from Production order

    Hi,
    This purchase order is created directly from production order.( My problem is the material number is no where shown on PO. but when I print it (print preview) i can see the material number along with the Production order number. I am writing a new report and need material no.
    Interesting thing is, even when the Material no is missing. I can see the short txt for material as 'Galvanise'.
    Pls help me in finding the material number.(item wise)
    Thanks & Regards
    Hrishi

    Hello
    To optimize the workflows, you can change certain functions of the standard material master by using customer exits.
    You can tailor the display of the material number to your requirements by using the SAP enhancement MGA00003. If, for example, a material has the number 123, you can use this enhancement to determine that the material number is to be displayed with a prefix such as MAT-. (The number 123 is still saved in the database.)
    Control for the material number assignment
    MGA00002
    EXIT_SAPLMG02_001
    (Internal number assignment)
    EXIT_SAPLMG02_002
    (External number assignment)
    Control for the material number display
    -{}-MGA00003
    EXIT_SAPLOMCV_001
    (Number conversion from display format to database format (input: start))
    EXIT_SAPLOMCV_002
    (Number conversion from display format to database format (input: end))
    EXIT_SAPLOMCV_901
    (Number conversion from display format to database format (input: start))
    EXIT_SAPLOMCV_902
    (Number conversion from display format to database format (input: end))
    Regards

  • Purchase order from production order !!  (Missing material no)

    Hi,
    This purchase order is created directly from production order.( My problem is the material number is no where shown on PO. but when I print it (print preview) i can see the material number along with the Production order number. I am writing a new report and need material no.
    Interesting thing is, even when the Material no is missing. I can see the short txt for material as 'Galvanise'.
    Pls help me in finding the material number.(item wise)
    Thanks & Regards
    Hrishi

    Hi
    1. Check table EKPO, if material number is stored against said PO,
    2. Check ME23N, ME23N, ME22, ME23 screens are u able to see material no. in any of T-code.
    If one of T-code not showing material number, it is sort of bug in system
    Regards,
    NNK
    PS:Award points for useful ans

  • Material BOM explosion in Service Order components

    Hi experts,
    I created a Material BOM with transaction code CS01.
    Then I try to add this BOM in the component of a service order.
    What I expected is the BOM to be exploded in the service order. But this behaviour doesn't occur.
    Do you know what I can do to trigger a Material BOM explosion at service order level.
    By the way, the BOM is not exploded after the service order (in the reservation or in MIGO).
    Thank you for your help.

    Hi Özgen,
    Thank you for help.
    Special Procurement 50 didn't exist in my system.
    I created it in SPRO for the plant with the Procurement Type F (External Procurement) and the flag Phantom Item checked..
    Then I created
    - Material A (MM01)
    - Material BOM A (CS01) with:
    -- item 1 Material B (which has Spec Proc Type 50 in MM02-MRP2)
    -- item 2 Material C (which has Spec Proc Type 50 in MM02-MRP2)
    After that I created a Service Order (IW31)
    I put Material A in the Component tab with quantity 1.
    The BOM remains unexploded.
    Did I miss something?

  • Want to change BOM usage from production 1 to design 2

    Dear Experts ,
                               Is it possible to change BOM usage from production 1 to design 2 ? Any mass change T code ?
    Neal

    If I make BOM universal , I need to ,make alternative BOM as Engineering BOM will have several levels and production BOM has all the components and assy on single level .
    MRP might pick up wrong BOM .
    Is there any T.code by which we can make mass copy or change BOMs . AS in system there are many BOMs which needs to be copied as is with new usage .
    Neal

  • Deletion of Serial numbers/ Parallel sequences from production order

    HI ,
    I am trying to delete the Serial numbers from the production order programatically using the FM SERNR_DEL_FROM_PP. I dont get any error , but the serial number is not getting deleted from production order. If anyone have used this FM for deletion Please let me know what extra has to be done.
    Similarly i have a requirement or deletion of parallel sequence from the production order. Any FM to do the same?
    Code screenshot below
    CALL FUNCTION 'SERNR_DEL_FROM_PP'
           EXPORTING
                material              = i_matnr
                j_vorgang             = 'PMP2'
                ppaufnr               = i_paufnr
                ppposnr               = i_itemno
           IMPORTING
                anzsn                 = l_num_serno
                ZEILEN_ID             =
               SERIAL_COMMIT         =
           TABLES
                sernos                = gt_sernos
           EXCEPTIONS
                serialnumber_errors   = 1
                serialnumber_warnings = 2
                OTHERS                = 3.
      DATA ls_afpod_po TYPE afpod.
      MOVE-CORRESPONDING gs_afpod_po TO ls_afpod_po.
    *.....Update Number of serial numbers in parent order
      ls_afpod_po-anzsn = l_num_serno.
      update afpo
      set anzsn = l_num_serno
      where aufnr = i_paufnr and
            posnr = i_itemno.
      commit work AND WAIT.

    Hello,
    the function module SERNR_DEL_FROM_PP calls the function module SERNR_DEL_FROM_DOCUMENT within. There, the changes are only written into the memory.
    See also the code below:
    CALL FUNCTION 'STATUS_BUFFER_EXPORT_TO_MEMORY'             "P99K058111
            EXPORTING                                             "P99K058111
                 I_MEMORY_ID = MEMID_STATUS.                      "P99K058111
    The variable memid_status has the value 'SN_STATS'.
    So if you want to update the data, you have to call the following function module:
    CALL FUNCTION 'SERIAL_LISTE_POST_PP'
      EXPORTING
        MEMORY_ID_STATUS       = 'SN_STATS'
    Regards Simon

  • How to get unloading point value from Production order?

    Hi
    Can u tell me how can i get the Unloading Point  value from Production order where the
    Warehouse no,
    Movement Type AND
    Requirement Type F is given
    Kindly send me full select query (Table name-field name).
    Moderator message: please search for available information and try solving things yourself before asking.
    locked by: Thomas Zloch on Sep 24, 2010 9:15 AM

    Try these options.
    Table: AFPO
    Field: ABLAD.
    Table: AUFM
    Field: ABLAD.

  • BOM updation in production order

    Dear All
    I have created production order against one specific BOm
    Then i changed the BOM line items & again i have created one more production order but new BOm items are not updaetd in the new production order
    pl help
    regards
    Kiran

    Kiran,
    I would suggest you to check the Valid from Date of specific component you are taking about, probably you would have added with effectivity date 10.01.2008. Now when order is exploded it is looking for valid components as on 03.01.2008, this may be the problem.
    A simple suggestion here is that you execute Read PP Master data for this order in the change mode(CO02), from the menu bar Functions--->Read PP Master Data. You would get a Pop-up screen Read PP Master data.. here in the screen "Cont." button. One more screen pops up, here in the BOM explosion date you give it as 10.01.2008. Hope you will get the new component also in your production order now.
    Regards,
    Prasobh

  • No BOM explosion in assembly order

    Dear Experts,
    I am running a assembly order, type PP04 which is directly created from a sales order.  During the creation, the BOM is exploded.
    My question is that how can I disable the BOM explosion as I want to enter all the components according to our customer rule instead of a predefined BOM.
    If there is no BOM of that material, there will be a error message when saving the production order.
    Thanks.
    Claude

    Hi,
           following settings to be made in Customization for the Assembly Order If you don'twant to explode the BOM
    1) Create the selection ID with priority & BOM usage in OPJI
    2) Create the BOM Application & Assign the selection ID created in above step & Also mantain the following cheks in OPJM
    uncheck the Sales Order explosion indicator--OPJM
    3)Assign the above Application to the Order type & Plant in OPL8
    Thanks,
    Rajanikanth

  • BOM explosion in subcontracting order according to revision level

    Hello experts
    I have different revision levels available for a subcontracted material, e.g. the BOM of this material has different versions depending on the validity date.
    When a BOM explosion is carried out in the subcontracting order (either in the purchase request or in the purchase order) the selected version of the BOM is done accordingly to the delivery date. It does NOT take into account the revision level even when I change it manually.
    Do you have any idea if it is possible to force SAP to consider the revision level instead of the delivery date for the BOM explosion ? (custo, user exit, BAdI, ...)
    Many thanks
    Amaury

    Hi
    BOM explosion in Subcon PO will be carried out automatically when you select the item category L.
    If you want to control the BOM selection based on the Alternative then you can go with Production version option and get the help from PP consultant to create the production version.
    Assign the production version in Subcontracting Inforecord.
    Click the BOM explosion button the switch to alternative BOM during the PO creation.
    Hope it helps
    Thanks/Karthik

Maybe you are looking for

  • Problems with using Deskjet 3745 on 2-PC home network

    I have an old PC running Windows XP SP3 and a new one running Windows 7, but only one printer. The network connecting the PCs is on an ADSL router with to its own external Iomega network drive with a USB port. To make the printer usable on both PCs,

  • In base component when user change the serial number we need to set date time in Extra attribute filed

    HI Team, In ibase component when user change the serial number we need to set date time in Extra attribute filed..if we click edit ,User change serial number after save we need to set date time in  Extra Attribute 4 field . Component - PRDGENSET In t

  • Re-creating techniques in photoshop

    Hi, I'm relatively new to photoshop and am wondering if anybody could share some knowledge of how to re-create a similar effect, to the below image. I want to make my images have a yellow tone to them and look slightly old and faded. Can anyone help?

  • JTable disturbs gridbaglayout with jtextfields

    Hello, my problem is a JTable, that shrinks my two JTextFields to zero length. I tried to create the gui without the JTable and it works as expected. There should be two JTextFields with fixed length in a row below the JTable in a JTabbedPane. Code:

  • Dynamic partitioning in 10g -

    Hi, I am on 10g and need to implement dynamic partitioning. In a table based on a column I need to implement dynamic partitioning . id name value 1 name1 val1 2 name1 val2 3 name2 val3 4 name2 val4 5 name2 val5 From the above table for each name uniq