BOM Explosion IN MRP RUN

When I run MRP BOM Explosion doesnot take place for certain F parts.This is REM scenario.Planning strategy is 40.I have already checked Planning file entries.
It is OK.Please guide.

Hi,
Pl. check in T.code oppq (plant parameters), if you have mentioned the BOM explosion ID. or in T.code oppq (mrp group).
Also check in the material master, mrp 4 view,
the bom selection id.
whether it is based on lot size or based on production version.
You can cross check using t.code<b> cs11 or cs12</b> (bom explosion).
Rgds,
SD

Similar Messages

  • BOM explosion while MRP run

    hi all
    I have a FERT for which raw materials are assigned in the BOM. but while running MRP, the BOM is not being exploded and the list doesnt show the raw materials.
    I have checked in the Overall maintenance of the plant parameters in MRP in SPRO and the required paramenters are maintained.The scenario is MTS - strategy 10.but still the BOM is not exploded.
    Could anyone solve my query
    Thank you in advance
    chandra

    Hi Chandra,
    Could you please check if there was an exception message "50 or 52"? If so then it can be beacuse for the BOM explosion date system is not able to get a BOM.
    If there were no exception messages then check in MRP4 view of the FERT material for dependent requirement defination. This should be blank.
    Hope this helps..
    Regards,
    Prasobh
    Reward your points if this was helpful.

  • BOM Explosion in MRP runs for sub-contracting PO

    Hello Experts,
    We have sub- contracting Purchase order in business scenario.
    Subcontracting PO is required to be considered as demand for MRP. As I have checked PO is showing in MD04, after MRP run using transaction code
    MD02 subcontracting BOM not exploding.
    Sub contacting PO raised on “X” procurement type material, PR is required on BOM item “F” Procurement type 
    Please suggest what all special setting is required as master data & configuration data.
    Thanks in advance!!!

    Hi,
    In the header or parent material (the material that is being produced bu your subcontractor) you have to maintain the following data:
    Procurement type = F
    Special Proc Type = 30
    MRP Type = PD
    Lot Size, Minimum Lot Size, Rounding Value: Enter what is convinient for your business.
    Be sure you have a BOM (CS01)
    Create a Production version indicating the BOM (C223)
    Enter Selection Method 3 in the MRP4 view of the material master
    Create an Info Record (type Subcontracting).. (ME11)
    Create a Source List (ME01)
    Run the MRP and check MD04
    Kind Regards,
    Mariano

  • Alternative BOM problem in MRP run

    Hello Experts,
    We have two BOM for one material.Now I want to use BOM-1 for MRP run & BOM-2 for subcontracting.I have maintined following settings.
    1) Production version.
    2) BOM explosion selection method in MRP4 -2
    3) Assign PV in inforecord for subcontracting.
    4) Assign PV in MD61 in schedule line .
    But when I run MRP it still consider subcontracting BOM.Have I missed any setting?
    Kindly guide.Thanks you.

    Hi, Follow the below process,
    1.Enter the BOM selection method as 2 in the MRP4 view of the material master.
    2.In case if you have not assigned the production version in MD61 against the PIR's under schedule line
    tab key (in the top menu click on settings and prod version ,then you can assign the prod version which
    you need to pick during the MRP run),the system always picksup the first production version during
    MRP run even if all the prod versions contains the same validity dates and lot sizes.
    3.If you are not willing to assign the prod version in MD61 ,but the system should consider the second
    prod version for MRP run means,then set the locked status for the first prod.version.
    4.When run MRP via MD02 or MD50 in the simulation mode.(i.e w/o giving tick in simulation mode).
    Click on Save,You will get a pop screen,
    Now click on the continue icon, Then go to Plaining Results: Individual lines screen.where you will get Plan order on which when double click you will get pop screen below,where you have Planned order no,quantity,plant,storage location,and version.
    Now here you can select the required version,and it will become firmed. This BOM will be used in the order now. Try it.

  • BOM Explosion for MRP Area

    Dear Expert,
    I have doubt regarding BOM explosion for MRP Area. This doubt is triggered when performing MD01, as result I do not find the dependent requirement in MD04 for my FG. I have maintained the BOM through CS61 and MRP area for all component, I understand that only component level system is taking into account MRP area (storage location). FYI before maintaining all components to MRP area, the BOM explosion was successful exploded. Your advice is appreciated.
    Best regards,
    Mahnansa

    Dear,
    Please check the Explosion control in Customizing, Transaction OMIW.
    Try to explode the BOM in CS11 , CS12 or CS13 if it is working there in curret date then chack the planning file entry in MD21.
    You need to convert the planning file entery at MRP area in OM0F.
    Also note the dependent requirement is not generated in the corresponding MRP area to which the production storage location in the material master has been not assigned for the data of the MRP area.
    Regards,
    R.Brahmankar

  • BOM explosion in MRP for non-stock material

    Dear friends,
    I have a non-stock(bom item category 'N')  service material setup as a component in my production BOM, which during MRP run, should create a Planned order or Purchase requisition for that non-stock component. But, when I run MRP for the top-level material, it doesn't create any requirement for that service material, while all other stock material(Bom item category L), it generated dependant requirements.
    Appreciate your help.
    Thanks
    Suri

    Dear Suri,,
    Please go through this.
    <b><u>Non-Stock Items</u></b>  Use this item category if you want to enter a
    material that is not kept in stock before use, and that is only procured for a
    specific planned order or production order.
    The material is only rarely required for a custom-made product and is used
    directly in the product as a purchased part.
    <u><b>Before you start</b></u>
    You can enter a non-stock item either with or without a material master. If you
    enter a non-stock item without a material master, you must enter a description.
    For non-stock items, you have to maintain purchasing data in the bill of material.
    You enter the following materials as non-stock items because the quantities are
    not updated in the material master record:
    o     Materials with a material type that supports configuration
    o     Pipeline materials, which can be taken from a pipeline at any time
    <u><b>
    Special functions</b></u>
    The following functions are supported for non-stock items
    •     You maintain purchasing data for non-stock items in the bill of material.
    •     In the planning run, the system generates purchase requisitions
    instead of dependent requirements for components that are procured directly.
    When you configure your R/3 System for MRP, you can define whether direct
    procurement is triggered by the planning run or by production order management.
    •     Product costing processes take valuation data from the BOM item.
    The system determines the release strategy on the basis of the price data you
    enter. The material group is required to produce a purchase requisition.
    Regards
    Mangal

  • BOM selection during MRP running

    Hi,
       I have a question about BOM selection during MRP running...
       I have three production version and all of them are valid at the same time..I get a problem "no BOM data seletion" during MRP
    running..I suspect it is due to that I have three production version and MRP didn't know take which one..Can anyone tell me
    where can i config it or what's wrong with it in my situation?
       btw,BOM usage and stats are correct .so is the router data..since MRP is running well if i only have one PV..thanks..

    Hi Monst,
    Looking at the screenshots you uploaded, it seems that the validity of each of the production version is from 7.12.2011 to 1.12.2012.
    Please check whether for Planned order no. 36659 alternative BOM no. 1 is getting selected (Since BOM selection ID is 2).
    For planned order nos. 36660, 36661 and 36662, the start date is perhaps before 7.12.2011 and end date as we can see lies in the validity period of production version. Hence, neither of the alternatives of the BOM is getting selected.
    For verifying the above logic, please make the BOM selection method as 3 (selection only by production version) and run the MRP. I think MRP will get terminated in this case since no BOM will be chosen for first planned order.
    Just in case u need to select the BOM for planned orders, you can manually enter the production version no. in the planned order change mode.
    Please tell if this helps and revert back.
    Regards,
    Chetan.

  • PP BOM explosion during MRP

    Hello all,
    During MRP, BOMs for dependent assemblies are supposed to be exploded.  I am running MRP in the background.  Until recently, MRP is exploding only the first level BOMs such that subsequent assemblies are not exploded.  Is there a setting I can check to ensure that BOM is doing a multi-level explosion.  MRP set to NETCH.  Thank you for your input.
    Joy T.

    Dear Joy,
    1.check whether the BOM status is 1 for the dependent assemblies in the BOM header.
    2.In case if you have used change numbers with release key for creating the BOM for those dependent assemblies,then check
    in CC02 whether the release key is set.
    3.Ensure that the MRP type is not ND.
    Also check this thread whether this can help you,
    MRP RUN NOT EXPLODING BOM
    Regards
    Mangalraj.S

  • Sample steps to setup BOM explosion in MRP

    Hi everyone,
    I am one of those unlucky folks that can't seem to get a simple BOM with FERT to explode HALB component within in MD02. I have spent two days reading every post about this common issue found over the Internet as far as 2007 and also read the SAP note 13023. I tried every suggestion to troubleshoot without success.
    In my environment, I am using a clean IDES with standard SAP configuration, meaning no changes were done on it. As faced by others before, the BOM component just won't explode. I have even blank the days in MRP2 not entirely sure if my way of troubleshooting make sense. For simplicity, I have input a safety stock value to trigger the FERT within MD02.
    Rather than I ask the same question again about where it might have gone wrong, may I know if anyone here can send or point me to a sample few steps guide or screenshots for the FERT and HALB MRP1 - 4 views and the BOM itself (1 material with 1 component)? I can then simulate the results using my IDES and move on from there.
    Asking in this forum is actually my last attempt. My apologies to forum administrator for posting a request instead of something helpful to the community.
    Thanks.
    D.B.

    Hello DB
    The most common cause for a missing BOM explosion is the validity.
    On transaction OPPQ, on tab BOM explosion, you can determine which date will be used for the BOM explosion. You should make sure that your BOM is valid on this date. You can try to create your BOM with a validity in the past, in order to guarantee that it will be exploded.
    Another common reason is the setting selection method on MRP4. If it is set to 3, the BOM will be only exploded if there is a production version.
    BR
    Caetano

  • Issue with BOM Status in MRP Run

    Dear All,
    I have a BOM structure and BOM status as attached below.
    In this case, system is generating the PR's for all three components correctly while i run MRP (MD51). But when i convert planned order to production order for "Assembly" & "BOM", it is coping the components for Assembly correctly but not for "BOM".
    If i maintain the BOM status as "4" for "BOM", then the components are copied into Production Order but i am getting double PR's as the BOM is exploding two times.
    As per my requirement BOM should be exploded only one time ie. for "Assembly" and component should be come in Planned order for "BOM".
    Please tell me where is the problem..
    Regards,
    Rao

    Dear Rao,
    assembly and Bom have the same type of production order?
    In the production order type which application is contained? PP01?
    You should check the explosion setting in the profile order and the setting of application of the Bom.
    if you can send me screen shot of the planned order of the Bom (components details).
    Thanks
    Daniele 

  • Bom explosion after MRP (variant configuration)

    Hi Experts,
    I'm facing a problem here, for unknow undentified reason until now, after I run the MD50 with a configuration material, I cannot get a explosion of the itens. This is happening in 4 cases here and I cannot get any good result, I check dependencies rules and everything and no success
    Does anyone know waht can I do?
    regards
    Oliver

    HI,
      If a BOM is not exploded possible reasons could be
    1.  Validity period of BOM
    2.  BOM Status should be active for MRP.
    3.  BOM Components should be relevant to production.
    4.  Check whether you have defined the selection ID for the 
         priority of BOM Usage in SPRO define order of priority of
         BOM Usage.
    Regards,
    nandha

  • Bom explosion in MRP

    Hi
    I have following scenario -
    I have Regular Sales order bom For one material X in Plant A and as long as engineering is not completed, this Sales order bom is having status inactive. Once engineering is completed then it will become active.
    For Same material X in Plant A material BOM also exist  ( It is used for stock transport order) and I dont want MRP should select material BOM if it doesnot find Active Sales order BOM.
    How to achieve this.

    Hi
    Try these steps
    1) Create BOM Selection ID  in SPRO
              Sel ID(say for ex 09)    Sel pr (1)      Usage (5)
    2) Assign the ID in OPPQ under BOM/Routing selection Tab
    During MRP system will chk for the Usage Priority and if it found any active sales BOM then only it explodes or other wise it don't consider any other BOM
    Regards
    Brahmaji

  • MRP RUN- KIT BOM explosion not working

    We setup one layer BOM’s for our maintenance KITs as parent material and components as child material.  For  example KIT is TS10000-K1 and components are TS10001, TS10002 etc setup as next layer with in the BOM. Both KITS and components are defined as material types ERSA (Spare parts). These one layers BOMs are setup as production BOMs and expected to create purchase requisitions for KITS and components by exploding BOMs during MRP runs. We use purchase requisitions and convert them into POs to procure both KITS and components. We DO NOT USE Panned orders and Production orders. 
    The safety stocks / reorder point are considered as demand for KITS and components as we do not have any external demand for KITS and components.  
    MRP run is creating purchase requisitions automatically for both KITS and components as per safety stocks and reorder point defined in MRP Views of Material Master. This is working as expected.  
    The issue is: KIT BOM’s are not exploding to generate purchase requisitions for the dependent components of KIT BOM. Please suggest the way to resolve this issue. 
    Split valuation: Also we plan to use split valued KITS with both new and refurbished. So we need BOM explosion for split valued KITS
    also (after the 1st issue is resolved).   
    I verified the following items to make sure the required configuration and data setup is defined correctly.
    1) Planning file activated Plant - OMDU 
    2) Executed MRP run with Total Planning - MDBT and MD02 (single item, multiple levels)
    3) BOM explosion for MRP activated- OS23 
    4) MRP type in MRP1 view- PD and VB (I tried both separately but BOM is not exploding).
    5) Procurement type “F” (MRP 2 view) and lot size “EX”  
    6) Planning strategy in MRP 3 view (tested w/o planning strategy and with strategies 10 and 40. But BOM is not exploded)
    7) BOM status and usage (status is active and usage is for production-CS02 and OS20)  
    8) BOM Validity date (Valid) 
    9) BOM structure in CS12 (BOM is exploding in CS11) 
    10) Availability check  
    11) Selection of BON ID to have BOM usage indicator assign (OS31).
    12) No alternate BOMs or production versions or work scheduling view are used.
    Please review the above 2 issues and suggest any workable solution. Thanks in advance!
    NOTE: I extensively used MRP with multi-level BOM explosion in my earlier projects without any issue. However the above issue is a  bit strange  why one layer BOM is not exploded in this case. 
    Regards
    Srini  

    Hi
    Thanks for your response. I reviewed all SAP notes and none of them are applicable to my scenario.
    1808396 - BOM changes not considered by MRP: I have not changed BOMs.
    1781324 - MD11: Valid BOM alternative is not found. We do not have alternative BOMs.
    1791009 - No BOM explosion after changing production version: We am not using production versions.
    Our Material KITS are PM spare assemblies set up as BOMs and consists of individual spare parts as components. We are creating purchase requisitions and not planned orders. We are not using PP functionality/Production orders.
    MRP is generating purchase requisitions for KITS and components as per ROP and safety stocks. In other words it is working as expected.  The issue is BOMs which are parent assemblies are not exploding to the next lower level components.
    Please note that I am not getting any error messages when MRP is executed.
    Regards
    Srini.

  • Alternae BOM during MRP RUN

    Dear PP Gurus,
    I have a finished product for which there are 2 bom,  When I  run MRP for this finished product , which BOM system will consider? Is  there anyway by which  i can deicde which BOM it  should consider?
    Please help.
    Thanks

    Dear,
    If a product contains more than one alternative BOM,try to mention this by creating different prod.versions.
    You can assigne the production version in MD61 against the PIR's under schedule line tab key (in the top menu click on settings and prod version ,then you can assign the prod version which you need to pick during the MRP run),
    Also selection method is maintained in Material master MRP4 view.whether the BOM needs to be selected through BOM Qty. Explosion date or Production version....
    Or use  BAdI MD_MODIFY_PRODVERS.
    Also refer this thread,
    alternative BOM selection in MRP run
    Regards,
    R.Brahmankar

  • BOM Explosion Dates between Quotes and CIR's

    Hi All
    I have inconsistencies occurring in the BOM between the Quotation and the CIR when changes occur to the BOM. The quote uses the "pricing date" to explode the BOM while the CIR uses the "delivery date". As a result they are both exploding different versions of the BOM and the CIR, which is used to drive procurement, ultimately creates purchase requ2019s for incorrect components. Has anyone experienced a similar problem and how was the explosion of components made consistent?
    Example
    Quote for Material X
    Date = 01.01.2011
    Material X BOM = Component A
                                Component B
                  Material X BOM is changed on 01.02.2011
                  Material X BOM = Component A
                                               Component C
    CIR copied from Quote
    CIR Delivery Date = 01.03.2011
    Material X BOM on CIR = Component A
                                            Component C
                 Based on the quote the CIR BOM should be
                 Material X BOM = Component A
                                             Component B

    system will take the  new BOM only, since on 3 rd the new BOM is valid, After MRP run system will create a PR for new BOM only
    System won't copy the BOM while creation of CIR
    while running MRP, system will explode the BOM based on MRP run date, system will explode the valid BOM only
    Edited by: Sundaresan . E. V on May 3, 2011 9:52 PM

Maybe you are looking for

  • Cannot Restore Unknown error 2001

    iTunes says it cannot restore my iTunes and has an Unknown Error 2001. It all started after it failed the new update. Any ideas?

  • Open webpage in a new $ie window

    When running the following, $ie1 will open web page1 and then will go to page2 after $a.click(). However, Page2 will take the same window as Page1. Is there a way to keep Page1 in $ie1 and open a new window page2 in $ie2 after $a.click() ? Thanks. $i

  • Cannot input in Labview

    until yesterday the program was fine, but nothing changed and I can not interact with Labview (version 8). Ctrl-E would not switch to diagram, string ctrl or number ctrl would not take anything. I move my mouse onto the ctrl and click, the screen jus

  • Put the debug point in coldfusion file for line by line debugging

    I need to debug the existing coldfusion project line by line. so i configured coldfusion9 and coldfusionbuilder2. I installed coldfusion9 in inbuilt server mode. I have window7 as os. I set the line debugging property via launch Adminstrator. Now i a

  • Partner Determination Error

    Hi, Currently working on SAP IS-AFS. While creating the SO i could see that an unwnated partners are getting determined. The customization is correct even when looking in Customer Master the partner determined in SO is not linked. Request your input.