BOM explosion in Sales order with material variants

Dear all,
we would like to work with Variant Matching in the Sales Order. Additionaly we would like to explode the BOM....according to the SAP help this is not possible....
http://help.sap.com/erp2005_ehp_06/helpdata/en/bd/05a7d69d3211d190380000e8a49aad/frameset.htm
Does anybody of you has any ideas how and where to make this happen?
Thanks for your help and kind regards
Jan

Hi,
I have gonethrough the SAP link referred by you but never come across with any problem in type matching during Sales order even if the BOM explosion is set for Multilevel in Configuration Profile provided the other pre requisite set up was perfect.
Regards
Brahmaji D

Similar Messages

  • BOM explosion in sales order

    Hi Experts,
    I have met a problem in BOM explosion in sales order.
    I have maintained the BOM with usage 5 and the conversion between header material and component of the BOM. But in the sales order entry, no matter how many qty I entered for the header material, after the BOM explosion, the qty of component is 1.
    Can anyone help?
    Regards,
    Emily

    Hi,
    Go to CS02 and select ur bom and go to components give 1 that means 1;1
    hope u get it
    regards,
    sadanandam kasarla

  • Creditreport that displays Sales Orders with Material Availability Date as

    Hi
    I need input if the following requirement can be met in FSCM credit mgmnt.
    Currently In FDK43 there is a total sales figure that represents the Sales that are consuming the Credit Limit assigned to the customer, unfortunately there is no drill down on this number to see which sales orders are responsible for the consumption of credit
    Do we have any sales report that displays Sales Orders with Material Availability Date as an output in conjunction with Credit limit .

    Not in standard provided. Custom program is required.
    Regards
    Hein

  • Sales order with material & plan cost

    Hi,
    A sales order with material and assign WBS can display the plan revenue which equal sales revenue. How can I make the material cost also be display as plan cost? This material cost should equal standard price of material master.

    It is not possible to copy material cost from sales order to project. Please activate network cost planning, and assign the same material in the project structure, so system will take the material cost in plan cost.

  • BOM explosion in sales order  in variant configuration?

    Hi All,
    After searching all threads iam posting this .
    My requirement is
       In sales order the material(ZDESKTOP) which has been created in KMAT with item caragery gruop 0002(Configuration) has compenents like PROCESSESOR,DRIVE,KEYBOARD,STORAGE,MEMORY,etc where again each components have 3 varieties(values).while creating sales order the components and picking of values is running well.THE GREEN LIGHT IS ON IN VARIANT CONDITIONS.pricing is picking for variant conditins(values)
    These values are stockable items which i created as semifinished.
    item catagery TAC is determined.
    Now my problem is the values(sub-items) which are attracted pricing should reflect as sub items of ZDESKTOP.
    I have created a BOM also for ZDESKTOP.
    I HAVE GET ONLY THE PRICED VALUES AS SUB-ITEMS.
    HOW TO DO THIS SCENARIO?
    Need Help.
    Regards,
    Reddyy
    Edited by: REDDYY SD on Feb 4, 2009 12:51 PM

    Hi
    check your Item category group in material master , sales org view, if it is 0002 Configuration this material use for varient configuration, but your case it may be LUMF  (Structure/mat. below) it used for sub item price.
    It is , one of the reason.
    Regards
    Paulraj.S

  • No BOM explosion in Sales order item if another item exist

    Hi Experts,
    I have the following problem:
    If I have one item in sales order, it explodes multilevel and everything is OK.
    If I have 2 items in sales order,
    the first one(item 10) has to explode and
    the second item (item=20)has as higher-level item the first sales order item (UEPOS=10),
    there is no explosion.Item 20 is not in the BOM of item 10.
    I don't understand why item 10 doesn't explode  if there is another item in sales order with higher level to him. Any help please?
    Thank you.
    Kind regards,
    Danijela

    HI,
    Chck the Item Category Grp. of line item 2 & line item 1 BOM materials.
    I feel the item category of BOM Material is not NORM...
    Also with that pls. check the item category of 2nd item.
    try this i hope this will help you..
    revert me if not solved...
    Regards
    Deepak
    Edited by: Deepak Dhingra on Jun 18, 2009 10:43 AM
    Edited by: Deepak Dhingra on Jun 18, 2009 10:52 AM

  • BOM explosion in sales order for configurable materials and variants

    Hi,
    I have these materials:
    A: configurable material (header)
    B: variant material (header)
    C: configurable material 1 (position)
    D: configurable material 2 (position)
    E:variant material 1 (position)
    F:variant material 2 (position)
    I can in the sales order explode in this way the BOM (using SD01 application in the position type of the header material):
    1) A --> C+D
    2) B --> E+F
    while I can't make the explosion in this way: A --> EF and A --> CE
    is this possibile? I want to make an explosion of a BOM for a configurable material  and having variants material as sons, or having mix sons (one configurable and one variant)
    Thank you
    Sandra

    Hi Sandara,
    Just check the BOM in cs03 u have maintained !!! If u have maintain the variant material there in the config mat BOM with object dependencies than u can explode !!!!
    Please let me knwo if u any query and also if u elabore more than will help u out

  • Sales Contract with Material Variant at Sales Order

    We are producing fabric and using make to order in SAP. Our customer give us a commitment with qty and a fixed price for certain fabric in advance, then later they release order to us with specific qty per color. We want to use Sales Contract for the customer commitment and sales order when the customer release the order with color qty to us.  We are putting color in the sales order in the material variant. However we are facing the following problem:
    1. Let say we have a contract 1 with 100,000 yds of material A. 
    2. then we have a sales order 2 of 20,000 yds of material A with color Blue refering to contract1.
    3. Somehow our factory over produced Material A color blue total 25,000 yds.
    4. Then we have another sales order 3 of 5,000 yds of material A with color RED referring to contract 1.
    5. MRP does not create plan order for RED material A because it is showing customer stock 25,000 with contract 1 and 20,000 consume by sales order 2 and 5,000 extra.  however these 5,000 extra is blue is not red and cannot fulfill sales order 3.
    Any idea how to solve this problem?
    Tks,
    Calvin Ngan

    Hi Calvin,
    I think if you define your material as configurable, it can solve your problem.
    A car, for example, has a large number of options that need to be described wheras the order is created only at a model and variant level. Then you define values for characteristics, to allow you to select specific options, such as 'black' for paint.
    So in your case you need to define characteristics of colour(or texture or thickness) or whatever differentiates each output and add optins for each of them.
    These are asked for and stored both in your reciepts(stocks, Prod. orders, POs etc) and in your requirements(SO etc). Also MRP will differentiate between each characteristics while planning.
    Hope this helps.
    Thanks & Regards
    Santanu Dawn

  • Bom explosion in sales order mrp(MD50)

    Hi Experts,
    In sales order MRP i.e. MD50 Getting the planned orders for header material(Finished goods) generated but for raw materials (BOM items) Purchase requisitions are not getting generated.
    Details:
    Header material A and raw materials B and C.
    In material B in MRP 4 coll/ind indicator is 2 And same indicator for C is blank.
    Now when we are running the MRP sales order based it will generate the purchase requisition for C only but not for B.
    In OPPQ we have done the setting for sales order BOM explosion.
    Can anyone please throw some light what is the setting missing in customization or in front end?
    Thanks in advance.
    Regards
    Vilas

    Dear,
    If you select individual requirement then system will not consider available stock and generate Proposals for every single requirments. Check in MRP4 view Individual / Collective .
    Also you will find PR and Plan order with account assignment of Sales order (in case of MD50).
    - If you select collective requirement then system will not generate planing proposals through MD50.In that case you have to go for individual MRP (MD02 / MD03)
    Please try and come back.
    Regards,
    R.Brahmankar

  • Sales set in Retail and BOM explosion in sales order

    Greetings.
    I configured a sales set that contains variants of generic articles and also unique articles as follows:
    Sales set: distinct code, LUMF - item category group, gets TAQ item categ in SO; it contains:
    - Var 1 of article X, distinct code, NORM, gets TAE in SO and mat. nr. and HL item is greyed out in SO
    - Var 1 of article Y, distinct code, NORM, gets TAE in SO and mat. nr. and HL item is greyed out in SO
    - unique article Z, distinct code, NORM, gets TAE in SO and mat. nr. and HL item are NOT greyed out in SO
    as a result changing Z with whatever different article is possible.
    Also the individual quantities for the components are editable: I was expecting to be able to modify ONLY the set's quantity and see the components multiply accordingly but iti is not the case.
    You can download a picture from [HERE|http://fbx.ro/5j87odrxexs3s7it]
    My question is: what settings are needed to have inactive/grayed out quantity, material number and HL item for the components of the sales set and why do I get a different behavior between a unique material compared with a variant ?
    Thank you in advance.
    Best regards.
    Edited by: Enache Catalin on Jan 21, 2009 4:25 PM - add picture

    Thank you for your patience.
    The link would have revealed that there is no visible difference between SO's made with ERLA and LUMF header material , in both the user can modify quantities, item category, plant for ALL subitems and measurment unit plus Higher Level Item ONLY for unique items(why? that was my secondary question).
    Nevertheless I tried to follow your steps and forth is what I found:
    - working in Retail I didn't use CS01 for creating the BOM; instead I defined the structure(mat. codes and quantities) directly in header material (sales set - 10 material category - in my case). I could however open with CS02 the right BOM for my sales set but only if I don't mention the plant.
    - further I used CS01 and added the delivering plant this time-> no result, the subitems can still be modified as described above...
    I must add that I tried to use for sales set both KMAT and TRGO articles...and it happens the same.
    Best regards.
    Catalin.

  • BOM explosion in Sales Order acting weird

    I am trying to make a simple BOM explode but it just wouldn't although as far as I can see it should. The details:
    1. I created a sales BOM (T-FUA01) with usage 5 (S&D), entered the components (automatically got L - stock item), entered the plant no. and saved it.
    2. I went to the Material Master of the sales BOM and changed the item category (not the general Item category) to ERLA.
    3. I checked that OR - ERLA -blank - blank combination leads to a TAQ from Customization.
    4. I checked that structure scope of single level BOM (option A) has been selected for TAQ.
    When I make the Standard Order (OR) though with Material T-FUA01, the sales BOM simply gets the Item Category of TAN and upon manually changing it to TAQ explodes when it should be doing this automatically. This made me think that apparently the system is using:
    OR-NORM-blank-blank
    that allows 4 different options to be manually entered (hence I can). But why is it taking up NORM instead of ERLA or even LUMF is simply beyond me. In frustration I even changed the General Item Category which has nothing to do with this but as expected did not help.

    Hi
    just re-check the following:
    1) in your material master, the item category group is ERLA in sales org 2 view field: 'Item category group'.
    2) You re-created the order after you changed the material master.
    3) You're using standard item categories?
    Regards,
    Raghu.

  • Sales order with material having environmentally rlavant flag checked

    Hi All,
    I have a requirement where i have to develop a ALV for sales order details with material having environmentally rlavant flag checked during material creation.
    Problem: The details of sales orders are picked, whic dont have material.
    So I have used the following logic:
    1) data retrieval:
    select vbeln
           erdat
           auart
           kunnr
      from vbak
      into table it_vbak
      where erdat in s_erdat
        and auart in s_auart.
      if it_vbak is not initial.
        select vbeln
               matnr
          from vbap
          into table it_vbap
          FOR ALL ENTRIES IN it_vbak
          where vbeln = it_vbak-vbeln.
          if it_vbap is not initial.
            select matnr
                   kzumw
              from mara
              into table it_mara
              FOR ALL ENTRIES IN it_vbap
              WHERE matnr = it_vbap-matnr
                and kzumw = 'X'.
            endif.
        select vbeln
               bstkd
          from vbkd
          into table it_vbkd
          FOR ALL ENTRIES IN it_vbak
          where vbeln = it_vbak-vbeln.
         select vbeln
                parvw
                kunnr
           from vbpa
           into table it_vbpa
           FOR ALL ENTRIES IN it_vbak
           where parvw = 'WE'
             and vbeln = it_vbak-vbeln.
      endif.
            if it_vbpa is not initial.
            SELECT kunnr
                   adrnr
              from kna1
              into table it_kna1
              FOR ALL ENTRIES IN it_vbpa
              where kunnr = it_vbpa-kunnr.
              if sy-subrc eq 0.
                select addrnumber
                       name1
                       name2
                       street
                       city1
                       region
                       post_code1
                  from adrc
                  into TABLE it_adrc
                  FOR ALL ENTRIES IN it_kna1
                  where addrnumber = it_kna1-adrnr.
                   if it_adrc is NOT INITIAL.
                     select addrnumber
                            smtp_addr
                       from adr6
                       into TABLE it_adr6
                       FOR ALL ENTRIES IN it_kna1
                       where addrnumber = it_kna1-adrnr.
                  endif.
                    endif.
              endif.
    2) Reading the data:
    loop at it_vbak into wa_vbak.
    clear wa_final.
      read table it_vbap into wa_vbap with key vbeln = wa_vbak-vbeln.
      read table it_mara into wa_mara with key matnr = wa_vbap-matnr.
      read table it_vbkd into wa_vbkd with key vbeln = wa_vbak-vbeln.
      read table it_vbpa into wa_vbpa with key vbeln = wa_vbak-vbeln.
      read table it_kna1 into wa_kna1 with key kunnr = wa_vbpa-kunnr.
      read table it_adrc into wa_adrc with key addrnumber = wa_kna1-adrnr.
      read table it_adr6 into wa_adr6 with key addrnumber = wa_kna1-adrnr.
        wa_final-matnr = wa_mara-matnr.
        wa_final-bstkd = wa_vbkd-bstkd.
        wa_final-erdat = wa_vbak-erdat.
        wa_final-kunnr = wa_vbpa-kunnr.
        wa_final-name1 = wa_adrc-name1.
        wa_final-name2 = wa_adrc-name2.
        wa_final-street = wa_adrc-street.
        wa_final-city1 = wa_adrc-city1.
        wa_final-region = wa_adrc-region.
        wa_final-post_code1 = wa_adrc-post_code1.
        wa_final-smtp_addr = wa_adr6-smtp_addr.
        append wa_final to it_final.
        clear wa_final.
    endloop.
    Problem: The details of sales orders are picked, whic dont have material.
    So please suggest me the solution for this problem.
    With Regards,
    S.Asha.

    You are not filtering your VBAK records, after getting data from MARA table, Moreover I can see your consolidation logic is also wrong ..you can refer following pseudo code .
    LOOP at IT_VBAP.
    READ TABLE IT_MARA ..... based on material no in line item
    if sy-subrc = 0 .
    ...get the data from other internal table and pass it to WA_FINAL..
    APPEND WA_FINAL TO IT_FINAL..
    else .
       CONTINUE..
    endif .
    ENDLOOP .

  • Order BOM explosion in sales order

    Hi,
    Is it possible to explode order BOMS in sales order. If so how.
    Intially we are creating sales order. Then we are creating order BOMS. When i open the sales order after creation of order BOMs, order BOM should be exloded enable us to dispatch in staggared lots.
    regards,
    N. Laxman

    Hi,
    1) For the BOM to be exploded in the sales document the following customizing setting is required.
    A) If the item category group is ERLA the item category of the BOM is TAQ, in the definition of which we have to specify the value A (Explode single level BOM) in the structure scope.
    B) If the item category group is LUMF the item category of the BOM item is TAP in the definition of which we have to specify the value A in the field structure scope.
    Regards,
    Sheik

  • Sales order with Material Delivered through pipeline

    Hello  Community,
    I'm looking for a SAP scenario/solution that can manage Sales order delivered through pipeline.
    I found a lot of information about Pipeline but from MM side not SD one.
    I also check Oil and Chemmical solution but did not found proper solution
    Here is my business case.
    1° Sales order is created with 1 month delivery period through Pipeline.
    2° System has not to book the entire quantity the fisrt day of delivery but has to book it day by day (can be done through APO)
    3° About GI actual delivered quantity is measured and one GI is done at the end of the period.
    4° Creation of one Billing for the period.
    I proposed a sollution with a POD but Customer want to make GI at the end of the delivery.
    If anybody faces this kind of Scenarion help would be apprciated.
    Thank you for support
    and best regards.
    Benoî

    Hello,
    We finally decided to create automatically daily delivery schedule in STO and ask to logistic people to create daily OBD and GI.
    Quiet basic and it works.
    Thank you and regards.
    Benoî

  • Avoid substitute material.., while creating sales order with BAPI?

    Hi experts.
    I use BAPI_SALESDOCU_CREATEFROMDATA1 function module to create a sales order.
    Material A has a substitute material B with substitute reason 0005.
    So if I use material A when creating sales order with above BAPI function, the order is created with material B.
    I don't want to substitute the material automatically. I want to create the sales order with material A.
    What should I do? Help me please.
    Thanks in Advance.

    Hi bvrn Reddy,
    I know, your message is almost two years old, but, did you find a solution? I'm facing the same problem. The material A has B as substitute, but in va01 a popup appears (its customizing inside the substitution reason, strategy = A). Of course, we have no popup inside the bapi, but there must be a way to decide which material the bapi should use. At the moment I only get the substitute, never the old mat (even there is something in stock).
    Maybe you've got a helpful hint for me, thanks!
    Ben

Maybe you are looking for

  • How can I prevent rogue software from installing itself via Firefox on my system?

    I don't know if this malware is exploiting a hole in Win7 or Firefox or both. So bear with me in my description. I am trying to ascertain if there are Win 7 security settings or configuration changes I can make to eliminate this. Or are there Firefox

  • Is it possible to not use PPR for a selectionListener on an af:table

    (Using Jdev PS3) Maybe a strange question but let me put it into context. I'm more specialized in WebCenter than in ADF so i am mostly using ADF to write portlets or taskflows for WebCenter portals. when you want portlets to talk to each other you ca

  • Problem in JSeparator

    Here is the Code u can see Make a main Method here Ok i havent make it because in my application this call call by some auther class So dear's the mail problem is JSeparator hh = new JSeparator(SwingConstants.VERTICAL); panel3.add(hh); This line is n

  • Help please! Unable to receive some attachments.

    I am suddently having problems with some attachments I have been sent a .pdf file several times, but it does not arrive in my e-mail, and there is no notification that there was a problem. Can anyone help me solve this - it has never happened before

  • Two of each template in the chooser how to remove extras?

    Hello all, since installing leopard I have two of each template in the chooser. Only for the template that I purchased from Keynote user site or from another site. How can I remove the extra one? Thank you for your help Mireille